CN112039958A - Integral solution for environmental remediation - Google Patents

Integral solution for environmental remediation Download PDF

Info

Publication number
CN112039958A
CN112039958A CN202010818242.7A CN202010818242A CN112039958A CN 112039958 A CN112039958 A CN 112039958A CN 202010818242 A CN202010818242 A CN 202010818242A CN 112039958 A CN112039958 A CN 112039958A
Authority
CN
China
Prior art keywords
module
water
environmental
monitoring
measures
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202010818242.7A
Other languages
Chinese (zh)
Inventor
徐檬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jieyou Information Technology Co ltd
Original Assignee
Shanghai Jieyou Information Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jieyou Information Technology Co ltd filed Critical Shanghai Jieyou Information Technology Co ltd
Priority to CN202010818242.7A priority Critical patent/CN112039958A/en
Publication of CN112039958A publication Critical patent/CN112039958A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/01Protocols
    • H04L67/12Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D21/00Measuring or testing not otherwise provided for
    • G01D21/02Measuring two or more variables by means not covered by a single other subclass
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01SRADIO DIRECTION-FINDING; RADIO NAVIGATION; DETERMINING DISTANCE OR VELOCITY BY USE OF RADIO WAVES; LOCATING OR PRESENCE-DETECTING BY USE OF THE REFLECTION OR RERADIATION OF RADIO WAVES; ANALOGOUS ARRANGEMENTS USING OTHER WAVES
    • G01S19/00Satellite radio beacon positioning systems; Determining position, velocity or attitude using signals transmitted by such systems
    • G01S19/01Satellite radio beacon positioning systems transmitting time-stamped messages, e.g. GPS [Global Positioning System], GLONASS [Global Orbiting Navigation Satellite System] or GALILEO
    • G01S19/03Cooperating elements; Interaction or communication between different cooperating elements or between cooperating elements and receivers
    • G01S19/10Cooperating elements; Interaction or communication between different cooperating elements or between cooperating elements and receivers providing dedicated supplementary positioning signals
    • G01S19/12Cooperating elements; Interaction or communication between different cooperating elements or between cooperating elements and receivers providing dedicated supplementary positioning signals wherein the cooperating elements are telecommunication base stations
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01SRADIO DIRECTION-FINDING; RADIO NAVIGATION; DETERMINING DISTANCE OR VELOCITY BY USE OF RADIO WAVES; LOCATING OR PRESENCE-DETECTING BY USE OF THE REFLECTION OR RERADIATION OF RADIO WAVES; ANALOGOUS ARRANGEMENTS USING OTHER WAVES
    • G01S19/00Satellite radio beacon positioning systems; Determining position, velocity or attitude using signals transmitted by such systems
    • G01S19/38Determining a navigation solution using signals transmitted by a satellite radio beacon positioning system
    • G01S19/39Determining a navigation solution using signals transmitted by a satellite radio beacon positioning system the satellite radio beacon positioning system transmitting time-stamped messages, e.g. GPS [Global Positioning System], GLONASS [Global Orbiting Navigation Satellite System] or GALILEO
    • G01S19/42Determining position
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B25/00Alarm systems in which the location of the alarm condition is signalled to a central station, e.g. fire or police telegraphic systems
    • G08B25/01Alarm systems in which the location of the alarm condition is signalled to a central station, e.g. fire or police telegraphic systems characterised by the transmission medium
    • G08B25/10Alarm systems in which the location of the alarm condition is signalled to a central station, e.g. fire or police telegraphic systems characterised by the transmission medium using wireless transmission systems

Abstract

The invention discloses an overall solution method for environmental improvement, which aims at solving the problems that the existing measures for environmental improvement and supervision are not thorough in implementation, pollution sources and pollution manufacturers cannot be quickly and accurately found for some existing behaviors of polluted environments, and pollutants are emitted by some bad enterprises and individuals in a stealing mode, so that environmental pollution is seriously caused.

Description

Integral solution for environmental remediation
Technical Field
The invention relates to the technical field of environmental improvement, in particular to an integral solution method for environmental improvement.
Background
The existing measures for environment improvement and supervision are not thorough, and some existing behaviors of polluting the environment cannot quickly and accurately find a pollution source and a pollution manufacturer, so that some bad enterprises and individuals steal and discharge pollutants, and environmental pollution is seriously caused; moreover, a unilateral remediation method is mostly adopted, and the overall remediation of the environment is not realized.
Therefore, we have introduced an overall solution to environmental remediation.
Disclosure of Invention
The invention aims to provide an overall solution for environmental remediation, which solves the problems in the background by establishing a monitoring-commanding integrated platform, matching with various environmental data in all-weather monitoring areas of a positioning satellite and an aerial photography satellite, constructing a heaven-earth-person three-in-one monitoring and management system by utilizing a satellite, an skynet monitoring device and a supervisor, and serving the supervision implementation of the overall environmental remediation measures.
In order to achieve the purpose, the invention provides the following technical scheme: an overall solution to environmental remediation, comprising the steps of:
s400: the method has the advantages that the method is in place, places with serious environmental pollution are searched, places with the most prominent environmental pollution are searched, various potential hazards of environmental pollution are searched, and the environment can be better treated with clues;
s500: the measures fall to the ground, the improvement measures are more, and the measures can be really effective only after falling to the ground, so all the measures must be carried out to the actual place for doing the environmental improvement work, and the measures can take roots and germinate and generate the actual effect;
s600: supervision and management, namely establishing a monitoring-commanding integrated platform to cooperate with various environmental data in all-weather monitoring areas of a positioning satellite and an aerial photography satellite, commanding processing departments at all levels to quickly arrive at the site, preventing further deterioration of the situation in time, and thoroughly solving the event;
s700: and (3) supervising and examining, establishing a supervising and examining mechanism, fulfilling responsibility, implementing a regular examining system, finding problems which need to be pursued, and striving to make all work fall to the real places if the problems exist and require regular correction and modification.
Further, the step S500 of landing the measure further includes the following steps:
s510: water source protection is carried out, so that pollutants generated by human activities are prevented from entering a water body, the water quality is reduced, and the utilization value is reduced or lost;
s520: the method comprises the following steps of (1) recycling waste, namely performing harmless burying or recycling on industrial waste residues after comprehensive treatment of a waste residue field, conveying domestic garbage to a waste residue field for classification treatment, recycling with a utilization value, and performing incineration or covering soil and burying after harmless treatment with the non-utilization value;
s530: the air pollution control, the enhancement of maintenance and repair when the mechanical vehicle is used, the use of high-quality fuel to reduce the emission of poisonous and harmful gas; before the engineering vehicle enters a public road, protection work needs to be done, and dust is prevented from being raised; the construction site and the public road surface are regularly sprayed and dedusted, so that the dust content in the atmosphere is reduced, and the occurrence probability of haze is reduced;
s540: noise control, namely enhancing the control and management of traffic noise, implementing traffic noise control on each road section of a street and completely eradicating the generation of noises such as automobile whistling; low-noise equipment is selected during construction, so that the maintenance of the equipment is enhanced, and the construction noise is reduced;
s550: the crowd health protection complies with and executes relevant regulations, regulations and requirements set by the state or local medical department, adopts reasonable and effective preventive measures to prevent infectious diseases, and regularly performs the work of killing rats, mosquitoes and flies;
s560: green vegetation protection, strengthening the urban greening work, removing temporary facilities in time after the construction site engineering is finished, recovering vegetation or original use, and completing site greening; planning exploitation of the forest is realized, and felling is planned on the premise of ensuring the forest coverage rate;
s570: resource protection, namely enhancing propaganda and education of resource protection, reducing the damage to the existing ecological slow environment as much as possible, creating a virtuous cycle ecological environment, and avoiding excessive exploitation of resources and application waste;
s580: water and soil conservation measures are taken, so that the phenomenon that the water channels of river channels and ditches are blocked by randomly dumping waste residues is avoided, the flood running capability of the water channels is ensured, measures of a drainage system are perfected, and a large amount of water and soil loss caused by flood scouring is avoided; after construction, vegetation is recovered as soon as possible, and the anti-scouring capability of the earth surface is improved.
Further, the water source protection of step S510 further includes the following steps:
s511: building a domestic water facility, and purifying a domestic water supply system according to a sanitary standard;
s512: garbage waste is not required to be stacked near the pool, a water seepage pit and a water seepage toilet are not required to be built, a sewage pipeline is not required to be laid, and residents are not required to be occupied;
s513: the industrial wastewater is treated and purified strictly according to the discharge standard, and is discharged under the supervision of local environmental protection departments after the quality reaches the standard;
s514: after being fermented and sterilized in septic tank, the domestic sewage is treated concentratedly or conveyed to harmless water area via special pipeline.
Furthermore, the effective volume of the septic tank meets the requirement that the domestic sewage stays for more than one day, and the domestic sewage is cleaned regularly to ensure the treatment effect.
Furthermore, the monitoring system is arranged in the monitoring-commanding integrated platform and comprises a CPU module, a data processing module, a wireless transceiver module, a water quality monitoring module, an atmosphere monitoring module, a noise monitoring module and a skynet monitor, wherein the CPU module is electrically connected with the data processing module in a two-way mode, the data processing module is electrically connected with the wireless transceiver module in a two-way mode, and the wireless transceiver module is electrically connected with the water quality monitoring module, the atmosphere monitoring module, the noise monitoring module and the skynet monitor in a two-way mode respectively.
Furthermore, the CPU module is respectively connected with the positioning satellite and the aerial photography satellite in a wireless ultra-long distance mode through the wireless transceiving module.
Furthermore, the CPU module is respectively and electrically connected with the display module and the alarm module in a one-way mode, and the alarm module is wirelessly and remotely bound with a mobile terminal of a staff of a processing department.
Further, the water quality monitoring module comprises a PH sensor, a heavy metal ion sensor and a liquid level sensor, and the PH sensor, the heavy metal ion sensor and the liquid level sensor are respectively in wireless transceiving module bidirectional electric connection.
Compared with the prior art, the invention has the following beneficial effects:
1. the invention provides an overall solution for environmental remediation, which is characterized in that a monitoring-commanding integrated platform is established to cooperate with various environmental data in an all-weather monitoring area of a positioning satellite and an aerial photography satellite, a skynet monitoring device, a monitoring device and a supervisor are utilized to establish a heaven-earth-person three-in-one monitoring management system, the supervision implementation of the overall environmental remediation measures is served, the accurate and rapid capture of pollution sources and pollution manufacturers is realized, the measures are taken in time, and the further pollution harm to the environment is prevented.
2. The monitoring-commanding integrated platform is internally provided with a monitoring system, a CPU module of the monitoring system is respectively and electrically connected with the display module and the alarm module in a one-way mode, the alarm module is also wirelessly and remotely bound with a mobile terminal of a staff of a processing department, when the phenomenon of damaging the environment is detected, the monitoring-commanding integrated platform commands the staff of the processing department nearest to an accident occurrence place to arrive at the site for processing, and the accident processing efficiency is improved.
Drawings
FIG. 1 is an overall flow diagram of the overall solution to create environmental remediation of the present invention;
FIG. 2 is a process flow diagram of the steps of the present invention to create an overall solution to environmental remediation;
FIG. 3 is a water source conservation flow diagram of the overall solution to create environmental remediation of the present invention;
FIG. 4 is a working block diagram of a monitoring system of the integrated monitoring and command platform of the present invention;
FIG. 5 is a working block diagram of a water quality monitoring module of the present invention;
fig. 6 is a topological diagram of the connection between the integrated monitoring-commanding platform and the satellite according to the present invention.
In the figure: 1. a monitoring system; 11. a CPU module; 12. a data processing module; 13. a wireless transceiver module; 14. a water quality monitoring module; 141. a pH sensor; 142. a heavy metal ion sensor; 143. a liquid level sensor; 15. an atmosphere monitoring module; 16. a noise monitoring module; 17. monitoring the skynet; 18. positioning a satellite; 19. an aerial photography satellite; 110. a display module; 111. and an alarm module.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example one
Referring to fig. 1, an overall solution for environmental remediation includes the following steps:
s400: the method has the advantages that the method is in place, places with serious environmental pollution are searched, places with the most prominent environmental pollution are searched, various potential hazards of environmental pollution are searched, and the environment can be better treated with clues;
s500: the measures fall to the ground, the improvement measures are more, and the measures can be really effective only after falling to the ground, so all the measures must be carried out to the actual place for doing the environmental improvement work, and the measures can take roots and germinate and generate the actual effect;
s600: supervision and management, namely establishing a monitoring-commanding integrated platform to cooperate with various environmental data in all-weather monitoring areas of the positioning satellite 18 and the aerial photography satellite 19, commanding processing departments at all levels to quickly arrive at the site, preventing further deterioration of the situation in time, and thoroughly solving the event;
s700: and (3) supervising and examining, establishing a supervising and examining mechanism, fulfilling responsibility, implementing a regular examining system, finding problems which need to be pursued, and striving to make all work fall to the real places if the problems exist and require regular correction and modification.
Example two
Referring to fig. 2, an overall solution for environmental remediation, the step S500 of grounding the measure further includes the following steps:
s510: water source protection is carried out, so that pollutants generated by human activities are prevented from entering a water body, the water quality is reduced, and the utilization value is reduced or lost;
s520: the method comprises the following steps of (1) recycling waste, namely performing harmless burying or recycling on industrial waste residues after comprehensive treatment of a waste residue field, conveying domestic garbage to a waste residue field for classification treatment, recycling with a utilization value, and performing incineration or covering soil and burying after harmless treatment with the non-utilization value;
s530: the air pollution control, the enhancement of maintenance and repair when the mechanical vehicle is used, the use of high-quality fuel to reduce the emission of poisonous and harmful gas; before the engineering vehicle enters a public road, protection work needs to be done, and dust is prevented from being raised; the construction site and the public road surface are regularly sprayed and dedusted, so that the dust content in the atmosphere is reduced, and the occurrence probability of haze is reduced;
s540: noise control, namely enhancing the control and management of traffic noise, implementing traffic noise control on each road section of a street and completely eradicating the generation of noises such as automobile whistling; low-noise equipment is selected during construction, so that the maintenance of the equipment is enhanced, and the construction noise is reduced;
s550: the crowd health protection complies with and executes relevant regulations, regulations and requirements set by the state or local medical department, adopts reasonable and effective preventive measures to prevent infectious diseases, and regularly performs the work of killing rats, mosquitoes and flies;
s560: green vegetation protection, strengthening the urban greening work, removing temporary facilities in time after the construction site engineering is finished, recovering vegetation or original use, and completing site greening; planning exploitation of the forest is realized, and felling is planned on the premise of ensuring the forest coverage rate;
s570: resource protection, namely enhancing propaganda and education of resource protection, reducing the damage to the existing ecological slow environment as much as possible, creating a virtuous cycle ecological environment, and avoiding excessive exploitation of resources and application waste;
s580: water and soil conservation measures are taken, so that the phenomenon that the water channels of river channels and ditches are blocked by randomly dumping waste residues is avoided, the flood running capability of the water channels is ensured, measures of a drainage system are perfected, and a large amount of water and soil loss caused by flood scouring is avoided; after construction, vegetation is recovered as soon as possible, and the anti-scouring capability of the earth surface is improved.
EXAMPLE III
Referring to fig. 3, an overall solution of environmental remediation, the water source protection of step S510 further includes the following steps:
s511: building a domestic water facility, and purifying a domestic water supply system according to a sanitary standard;
s512: garbage waste is not required to be stacked near the pool, a water seepage pit and a water seepage toilet are not required to be built, a sewage pipeline is not required to be laid, and residents are not required to be occupied;
s513: the industrial wastewater is treated and purified strictly according to the discharge standard, and is discharged under the supervision of local environmental protection departments after the quality reaches the standard;
s514: after the domestic sewage is fermented and sterilized by the septic tank, the domestic sewage is treated in a centralized way according to the regulations or is conveyed to a harmless water area by a special pipeline, the effective volume of the septic tank meets the requirement that the domestic sewage stays for more than one day, and the domestic sewage is cleaned regularly to ensure the treatment effect.
Example four
Referring to fig. 4-6, an overall solution for environmental remediation is disclosed, in which a monitoring system 1 is built in a monitoring-commanding integrated platform, the monitoring system 1 includes a CPU module 11, a data processing module 12, a wireless transceiver module 13, a water quality monitoring module 14, an atmosphere monitoring module 15, a noise monitoring module 16 and a skynet monitoring module 17, the CPU module 11 is electrically connected with the data processing module 12 in a bidirectional manner, the data processing module 12 is electrically connected with the wireless transceiver module 13 in a bidirectional manner, the wireless transceiver module 13 is respectively electrically connected with the water quality monitoring module 14, the atmosphere monitoring module 15, the noise monitoring module 16 and the skynet monitoring module 17 in a bidirectional manner, the atmosphere monitoring module 15 uses a dust sensor to monitor air quality, and the noise monitoring module 16 uses a noise sensor to monitor air quality.
The CPU module 11 is respectively connected with a positioning satellite 18 and an aerial photography satellite 19 in a wireless ultra-remote way through a wireless transceiving module 13; the CPU module 11 is further electrically connected with the display module 110 and the alarm module 111 in a one-way mode, and the alarm module 111 is further wirelessly and remotely bound with a mobile terminal of a processing department worker.
The water quality monitoring module 14 comprises a PH sensor 141, a heavy metal ion sensor 142 and a liquid level sensor 143, and the PH sensor 141, the heavy metal ion sensor 142 and the liquid level sensor 143 are respectively electrically connected with the wireless transceiver module 13 in a two-way manner.
In summary, the following steps: the invention provides an overall solution for environmental remediation, which is characterized in that a monitoring-commanding integrated platform is established to cooperate with various environmental data in an all-weather monitoring area of a positioning satellite 18 and an aerial photography satellite 19, a satellite, an skynet monitoring device 17, a monitoring device and a supervisor are utilized to construct a heaven-earth-person three-in-one monitoring management system, the supervision implementation of the overall environmental remediation measures is served, the accurate and rapid capture of pollution sources and pollution manufacturers is realized, the measures are taken in time, and the further pollution harm to the environment is prevented; the monitoring system 1 is arranged in the monitoring-commanding integrated platform, a CPU module 11 of the monitoring system 1 is respectively and unidirectionally electrically connected with the display module 110 and the alarm module 111, the alarm module 111 is also wirelessly and remotely bound with a mobile terminal of a processing department worker, when the phenomenon of damaging the environment is detected, the nearest processing department worker of the monitoring-commanding integrated platform commands an accident place to arrive at the site for processing, and the accident processing efficiency is improved.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. An overall solution to environmental remediation, comprising the steps of:
s400: the method has the advantages that the method is in place, places with serious environmental pollution are searched, places with the most prominent environmental pollution are searched, various potential hazards of environmental pollution are searched, and the environment can be better treated with clues;
s500: the measures fall to the ground, the improvement measures are more, and the measures can be really effective only after falling to the ground, so all the measures must be carried out to the actual place for doing the environmental improvement work, and the measures can take roots and germinate and generate the actual effect;
s600: supervision and management, namely establishing a monitoring-commanding integrated platform to cooperate with various environmental data in all-weather monitoring areas of a positioning satellite (18) and an aerial photography satellite (19), commanding processing departments at all levels to quickly arrive at the site, preventing further deterioration of the situation in time, and thoroughly solving the event;
s700: and (3) supervising and examining, establishing a supervising and examining mechanism, fulfilling responsibility, implementing a regular examining system, finding problems which need to be pursued, and striving to make all work fall to the real places if the problems exist and require regular correction and modification.
2. The overall solution to environmental remediation of claim 1, further comprising: the step S500 of landing the measure further comprises the following steps:
s510: water source protection is carried out, so that pollutants generated by human activities are prevented from entering a water body, the water quality is reduced, and the utilization value is reduced or lost;
s520: the method comprises the following steps of (1) recycling waste, namely performing harmless burying or recycling on industrial waste residues after comprehensive treatment of a waste residue field, conveying domestic garbage to a waste residue field for classification treatment, recycling with a utilization value, and performing incineration or covering soil and burying after harmless treatment with the non-utilization value;
s530: the air pollution control, the enhancement of maintenance and repair when the mechanical vehicle is used, the use of high-quality fuel to reduce the emission of poisonous and harmful gas; before the engineering vehicle enters a public road, protection work needs to be done, and dust is prevented from being raised; the construction site and the public road surface are regularly sprayed and dedusted, so that the dust content in the atmosphere is reduced, and the occurrence probability of haze is reduced;
s540: noise control, namely enhancing the control and management of traffic noise, implementing traffic noise control on each road section of a street and completely eradicating the generation of noises such as automobile whistling; low-noise equipment is selected during construction, so that the maintenance of the equipment is enhanced, and the construction noise is reduced; s550: the crowd health protection complies with and executes relevant regulations, regulations and requirements set by the state or local medical department, adopts reasonable and effective preventive measures to prevent infectious diseases, and regularly performs the work of killing rats, mosquitoes and flies;
s560: green vegetation protection, strengthening the urban greening work, removing temporary facilities in time after the construction site engineering is finished, recovering vegetation or original use, and completing site greening; planning exploitation of the forest is realized, and felling is planned on the premise of ensuring the forest coverage rate;
s570: resource protection, namely enhancing propaganda and education of resource protection, reducing the damage to the existing ecological slow environment as much as possible, creating a virtuous cycle ecological environment, and avoiding excessive exploitation of resources and application waste;
s580: water and soil conservation measures are taken, so that the phenomenon that the water channels of river channels and ditches are blocked by randomly dumping waste residues is avoided, the flood running capability of the water channels is ensured, measures of a drainage system are perfected, and a large amount of water and soil loss caused by flood scouring is avoided; after construction, vegetation is recovered as soon as possible, and the anti-scouring capability of the earth surface is improved.
3. The overall solution to environmental remediation as recited in claim 2, further comprising: the water source protection of step S510 further includes the steps of:
s511: building a domestic water facility, and purifying a domestic water supply system according to a sanitary standard;
s512: garbage waste is not required to be stacked near the pool, a water seepage pit and a water seepage toilet are not required to be built, a sewage pipeline is not required to be laid, and residents are not required to be occupied;
s513: the industrial wastewater is treated and purified strictly according to the discharge standard, and is discharged under the supervision of local environmental protection departments after the quality reaches the standard;
s514: after being fermented and sterilized in septic tank, the domestic sewage is treated concentratedly or conveyed to harmless water area via special pipeline.
4. The overall solution to environmental remediation of claim 3, wherein: the effective volume of the septic tank meets the requirement that domestic sewage stays for more than one day, and the septic tank is cleaned regularly to ensure the treatment effect.
5. The overall solution to environmental remediation of claim 1, further comprising: monitoring system (1) is built-in to monitoring-commander integration platform, monitoring system (1) includes CPU module (11), data processing module (12), wireless transceiver module (13), water quality monitoring module (14), atmosphere monitoring module (15), noise monitoring module (16) and day net control (17), CPU module (11) and data processing module (12) two-way electric connection, data processing module (12) and wireless transceiver module (13) two-way electric connection, wireless transceiver module (13) respectively with water quality monitoring module (14), atmosphere monitoring module (15), noise monitoring module (16) and day net control (17) two-way electric connection.
6. The overall solution to environmental remediation of claim 5, wherein: the CPU module (11) is respectively in wireless ultra-remote connection with a positioning satellite (18) and an aerial photography satellite (19) through a wireless transceiving module (13).
7. The overall solution to environmental remediation of claim 5, wherein: the CPU module (11) is further electrically connected with the display module (110) and the alarm module (111) in a one-way mode, and the alarm module (111) is further wirelessly and remotely bound with a mobile terminal of a processing department worker.
8. The overall solution to environmental remediation of claim 5, wherein: the water quality monitoring module (14) comprises a PH sensor (141), a heavy metal ion sensor (142) and a liquid level sensor (143), and the PH sensor (141), the heavy metal ion sensor (142) and the liquid level sensor (143) are respectively in wireless electrical connection with the transceiver module (13).
CN202010818242.7A 2020-08-14 2020-08-14 Integral solution for environmental remediation Withdrawn CN112039958A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010818242.7A CN112039958A (en) 2020-08-14 2020-08-14 Integral solution for environmental remediation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010818242.7A CN112039958A (en) 2020-08-14 2020-08-14 Integral solution for environmental remediation

Publications (1)

Publication Number Publication Date
CN112039958A true CN112039958A (en) 2020-12-04

Family

ID=73578585

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010818242.7A Withdrawn CN112039958A (en) 2020-08-14 2020-08-14 Integral solution for environmental remediation

Country Status (1)

Country Link
CN (1) CN112039958A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116257540A (en) * 2023-05-10 2023-06-13 南京麦堤微林信息科技有限公司 Management method and management system for geographic environment data

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116257540A (en) * 2023-05-10 2023-06-13 南京麦堤微林信息科技有限公司 Management method and management system for geographic environment data
CN116257540B (en) * 2023-05-10 2023-09-19 南京麦堤微林信息科技有限公司 Management method and management system for geographic environment data

Similar Documents

Publication Publication Date Title
CN106780154A (en) The electricity transmitting and converting construction process environmental practice monitoring system and method for multithreading information fusion
CN112039958A (en) Integral solution for environmental remediation
CN111667166A (en) Construction unit environment credit evaluation system and method
Baby Approach in developing environmental management plan (EMP)
Board FORM A
Ciolea et al. Research on Fog Guns for Dust Reduction at Coal Field–Roșiuța Quarry
RU2294245C1 (en) Method of the environmental protection against pollution by the domestic and industrial wastes
CN215946936U (en) In-situ monitoring and repairing device for heavy metal pollutants in underground water
KR102337289B1 (en) Urban heat island reduction system through eco-friendly rainwater management
CN220790724U (en) Main power house structure for garbage incineration power generation with garbage transportation road
Musthafa Environmental impact assessment: proposed 14 storey building construction in G. Hudhukoka, Male'
Sandhu et al. Assessing the Site Selection, Operation and Management of Waste Disposal Site in Islamabad
Musthafa Environmental impact assessment: proposed 10 storey building construction in M. Yookafi, Male’
Arghiuş et al. The assessement of the risk induced by climatic changes on wastewater systems from Cluj county and the associated adaptation measures
Musthafa Proposed 5000 social housing units development project in Hulhumale’phase II: environment impact assessment
Musthafa Environmental impact assessment: proposed development of 15 storey mixed residential building at M. Chanbeylee Vilaa, Male’
Musthafa Environmental impact assessment: proposed mixed residential apartment complex in plot no. C1-1 Hulhumale’–FW construction
Musthafa Environmental impact assessment: proposed mixed residential apartment complex in plot No. D7-1, Hulhumale’
Council Spring Lane and Ellis Yard Redevelopment
Musthafa Environmental impact assessment: proposed luxury apartment complex at Hulhumale’–K park residence
Moçambique ENVIRONMENTAL IMPACT ASSESSMENT FOR THE 66 KV POWER EVACUATION LINE FROM NAMAACHA WIND POWER PROJECT TO BOANE SUBSTATION
Musthafa et al. Proposed 2500 Housing Units Development Project in Hulhumale’Phase II
Musthafa Environmental impact assessment: proposed 8 storey building development with basement in Ma. Gongali, Male'
ENVBRONMENTAL ISLAMIC REPUBLIC OF PAKISTAN
Musthafa Environmental impact assessment proposed mixed residential apartment building development ‘The Gardens’ in Hulhumale’, Maldives–Jausa Investments

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20201204