CN112037648A - Construction progress display device and display method thereof - Google Patents

Construction progress display device and display method thereof Download PDF

Info

Publication number
CN112037648A
CN112037648A CN202010692909.3A CN202010692909A CN112037648A CN 112037648 A CN112037648 A CN 112037648A CN 202010692909 A CN202010692909 A CN 202010692909A CN 112037648 A CN112037648 A CN 112037648A
Authority
CN
China
Prior art keywords
display screen
construction progress
display
board
display device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010692909.3A
Other languages
Chinese (zh)
Inventor
沈忠平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Youjian Construction Technology Co ltd
Original Assignee
Shanghai Youjian Construction Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Youjian Construction Technology Co ltd filed Critical Shanghai Youjian Construction Technology Co ltd
Priority to CN202010692909.3A priority Critical patent/CN112037648A/en
Publication of CN112037648A publication Critical patent/CN112037648A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09FDISPLAYING; ADVERTISING; SIGNS; LABELS OR NAME-PLATES; SEALS
    • G09F9/00Indicating arrangements for variable information in which the information is built-up on a support by selection or combination of individual elements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B1/00Cleaning by methods involving the use of tools
    • B08B1/10Cleaning by methods involving the use of tools characterised by the type of cleaning tool
    • B08B1/12Brushes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B1/00Cleaning by methods involving the use of tools
    • B08B1/30Cleaning by methods involving the use of tools by movement of cleaning members over a surface
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B13/00Accessories or details of general applicability for machines or apparatus for cleaning
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16MFRAMES, CASINGS OR BEDS OF ENGINES, MACHINES OR APPARATUS, NOT SPECIFIC TO ENGINES, MACHINES OR APPARATUS PROVIDED FOR ELSEWHERE; STANDS; SUPPORTS
    • F16M11/00Stands or trestles as supports for apparatus or articles placed thereon ; Stands for scientific apparatus such as gravitational force meters
    • F16M11/02Heads
    • F16M11/04Means for attachment of apparatus; Means allowing adjustment of the apparatus relatively to the stand
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16MFRAMES, CASINGS OR BEDS OF ENGINES, MACHINES OR APPARATUS, NOT SPECIFIC TO ENGINES, MACHINES OR APPARATUS PROVIDED FOR ELSEWHERE; STANDS; SUPPORTS
    • F16M11/00Stands or trestles as supports for apparatus or articles placed thereon ; Stands for scientific apparatus such as gravitational force meters
    • F16M11/02Heads
    • F16M11/04Means for attachment of apparatus; Means allowing adjustment of the apparatus relatively to the stand
    • F16M11/06Means for attachment of apparatus; Means allowing adjustment of the apparatus relatively to the stand allowing pivoting
    • F16M11/12Means for attachment of apparatus; Means allowing adjustment of the apparatus relatively to the stand allowing pivoting in more than one direction
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16MFRAMES, CASINGS OR BEDS OF ENGINES, MACHINES OR APPARATUS, NOT SPECIFIC TO ENGINES, MACHINES OR APPARATUS PROVIDED FOR ELSEWHERE; STANDS; SUPPORTS
    • F16M11/00Stands or trestles as supports for apparatus or articles placed thereon ; Stands for scientific apparatus such as gravitational force meters
    • F16M11/02Heads
    • F16M11/18Heads with mechanism for moving the apparatus relatively to the stand

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Devices For Indicating Variable Information By Combining Individual Elements (AREA)

Abstract

The invention discloses a construction progress display device and a display method thereof, belongs to the technical field of construction progress monitoring, and comprises a base and a construction progress analysis system, and further comprises a pitching angle adjusting mechanism, a dust cleaning mechanism, a display board, a rotary seat and a rotary column, wherein the display board is of a rectangular structure, the top of the rotary seat is provided with an installation seat, the top end of the installation seat is provided with an installation square pipe connected with the installation square pipe through a hinged shaft, the side wall of the display board is provided with a main display screen, a left display screen and a right display screen, and the dust cleaning mechanism is arranged on the display board; the pitching angle adjusting mechanism is arranged on the side wall of the mounting seat. According to the invention, the dust adhered to the main display screen, the left display screen and the right display screen can be cleaned through the dust cleaning mechanism, so that the dust is prevented from adhering to the main display screen, the left display screen and the right display screen to influence real-time checking of workers, and the display method can be used for rapidly judging whether non-human factors or human factors influence project progress.

Description

Construction progress display device and display method thereof
Technical Field
The invention relates to the technical field of construction progress monitoring, in particular to a construction progress display device and a display method thereof.
Background
At present, the management of the construction progress mainly depends on manual recording, and the time and the labor are wasted. A way of monitoring construction site equipment has also been proposed to monitor the progress of the construction. Such as monitoring the number of bolts currently installed by the jumbolter, the grouting pressure, etc. Construction progress control is an important link in building construction management, and construction progress information acquisition accuracy and instantaneity are directly controlled by image management personnel. In the prior art, the situation of site construction is reflected only through data or character records, the actual construction progress or the situation of the construction site is not reflected visually, and managers cannot timely and accurately obtain the actual situation of the construction site. A large amount of dust exists in a construction site, the dust is easily attached to a display screen of the construction progress display device, troubles are brought to the observation of managers, and when the expected completion date is delayed, whether the influence of human factors or the influence of non-human factors cannot be quickly determined, and troubles are brought to the troubleshooting of the managers.
Disclosure of Invention
The invention aims to provide a construction progress display device and a display method thereof, which aim to solve the technical problems solved by the background technology.
The technical scheme of the invention is as follows: the construction progress analysis system comprises a base, a construction progress analysis system, a pitching angle adjusting mechanism, a dust cleaning mechanism, a display plate, a rotating seat and a rotating column vertically arranged at the top of the base, wherein the display plate is of a rectangular structure, the rotating column is connected with the base through a bearing, the top of the rotating seat is provided with an installation seat, the top end of the installation seat is provided with an installation square pipe connected with the installation seat through a hinged shaft, and the display plate is installed at the end part of the installation square pipe;
a main display screen, a left display screen and a right display screen are arranged on the side wall of the display board, the left display screen and the right display screen are respectively arranged on two sides of the display board, and the dust cleaning mechanism is arranged on the display board;
the top of the base is provided with a rotating assembly for driving the rotating column to rotate along the axis of the rotating column;
the pitching angle adjusting mechanism is arranged on the side wall of the mounting seat and used for adjusting the inclination angle of the display board.
Further, the dust cleans the mechanism and includes the strip that cleans, is used for driving the pay-off subassembly that the strip that cleans removed and two slide bars that set up respectively in the show board both sides, the one side that the strip that cleans is close to the show board is equipped with the brush cleaner, the length direction of cleaning the strip parallels with the long limit of show board, every the slide bar all parallels with the broadside of show board, the show board corresponds every slide bar and all is equipped with two mount pads, the slide bar is fixed between two mount pads.
Furthermore, the feeding assembly comprises a transmission shaft, a driving motor and two belt pulley sets, each belt pulley set comprises an upper belt pulley and a lower belt pulley, the upper belt pulley and the lower belt pulley are connected through a synchronous belt, the synchronous belts are fixedly connected with the sweeping strip, the upper belt pulleys are sleeved on two sides of the transmission shaft respectively, and an output shaft of the driving motor is coaxially connected with the transmission shaft.
Further, every single move angle guiding mechanism is including adjusting the strip and two fixing bases that set up respectively in the mount pad both sides, two be equipped with the guide bar between the fixing base, the length direction of guide bar parallels with the length direction of transmission silk pole, the cover is equipped with the sliding block that can slide on the guide bar, the bottom of installation side pipe is equipped with the connecting seat, it is articulated with the one end of adjusting the strip on the lateral wall of sliding block, the other end and the connecting seat of adjusting the strip are articulated.
Furthermore, every single move angle guiding mechanism still includes step motor and transmission lead screw, the both ends of transmission lead screw rotate with two fixing bases respectively and are connected, be equipped with on the sliding block with transmission lead screw thread fit's thread bush, step motor's output shaft and transmission lead screw are connected.
Furthermore, be equipped with between installation side pipe and the show board with both welded reinforcing plate.
Further, the rotating assembly comprises a worm, a rotating motor, a turbine sleeved on the rotating column and two bearing seats arranged at the top of the base at intervals, two ends of the worm are rotatably connected with the two bearing seats respectively, the turbine is in transmission fit with the worm, the rotating motor is arranged on the base, and an output shaft of the rotating motor is fixedly connected with the worm.
Further, construction progress analytic system is including project analysis module, database module, environmental sensor, vibrations sensor, image acquisition module and controller, main display screen, left display screen, right display screen, environmental sensor, vibrations sensor, project analysis module, database module, image acquisition module all with controller electric connection.
Furthermore, the image acquisition sensing module comprises a plurality of rotary cameras distributed on a construction site.
The invention also provides a display method of the construction progress display device, which comprises the following steps:
s1, the image acquisition module acquires images of construction scenes of a construction site;
s2: the project analysis module displays all collected project progress images on a main display screen in a data form, a left display screen displays a field image of a specified project, and the left display screen displays an estimated completion date;
s3: when the predicted completion date is lagged, judging whether the reason of the lag completion is a factor, if so, tracing back to the person responsible for the project; and if not, screening specific non-human factors under the action of the environment sensor and the vibration sensor.
The invention provides a construction progress display device and a display method thereof through improvement, compared with the prior art, the construction progress display device has the following improvements and advantages:
the dust cleaning mechanism is arranged, dust adhered to the main display screen, the left display screen and the right display screen can be cleaned through the dust cleaning mechanism, the dust is prevented from being adhered to the main display screen, the left display screen and the right display screen to influence real-time checking of workers, and the follow-up of the workers is facilitated; specifically, the driving motor works to drive the transmission shaft to rotate, so that the transmission shaft drives the two upper belt pulleys to rotate, and further the two synchronous belts synchronously rotate, so that the cleaning strip can drive the cleaning brush to move, and dust attached to the main display screen, the left display screen and the right display screen is cleaned at intervals; so as to avoid the influence on the watching of the manager caused by the dust attached to the main display screen, the left display screen and the right display screen.
Secondly, the vibration sensor is used for collecting mechanical quantity generated by vibration, the model of the vibration sensor is SW-420, the environment sensor is used for detecting construction environment such as temperature, humidity, weather condition and PM2.5 concentration, and transmits the environment parameters to the controller through electric signals, so that the controller transmits the electric signals to the right display screen to display the environment parameters, and whether the project progress is influenced by non-human factors or not can be conveniently and manually judged.
Thirdly, the angle of the display board can be automatically adjusted in multiple directions, the pitching angle adjusting mechanism is used for adjusting the pitching angle of the display board, a manager positioned at a high-rise can conveniently observe the display board, the practicability of the display board is improved, the stepping motor works to drive the transmission screw rod to rotate, the sliding block moves under the threaded fit of the transmission screw rod and the threaded sleeve, the sliding block drives the adjusting strip to move, and the adjusting strip moves the mounting square tube to adjust the inclination angle of the display board.
Fourthly, can rotate along its axis under the rotating assembly effect, make the show board rotate, the staff of the different positions of being convenient for can watch the project progress on the show board in real time, the rotating electrical machines work drives the worm and takes place to rotate, makes the worm drive rather than transmission fit's turbine and takes place to rotate, and then makes the column spinner take place to rotate, adjusts the horizontal angle of show board.
Drawings
The invention is further explained below with reference to the figures and examples:
FIG. 1 is a schematic view of a first angular perspective structure of the present invention;
FIG. 2 is a side view of the present invention;
FIG. 3 is a schematic view of a second angular perspective structure according to the present invention;
FIG. 4 is a partial perspective view of the present invention;
FIG. 5 is an enlarged view taken at A in FIG. 4;
FIG. 6 is a schematic perspective view of the dust sweeping mechanism of the present invention;
FIG. 7 is a schematic flow chart of a demonstration method of the present invention.
Description of reference numerals:
the cleaning device comprises a base 1, a rotating assembly 11, a worm 12, a rotating motor 13, a turbine 14, a bearing seat 15, a pitching angle adjusting mechanism 2, an adjusting strip 21, a fixing seat 22, a guide rod 23, a sliding block 24, a stepping motor 25, a transmission screw rod 26, a dust cleaning mechanism 3, a cleaning strip 31, a sliding rod 32, a cleaning brush 33, a feeding assembly 34, a transmission shaft 341, a driving motor 342, a belt pulley set 343, an upper belt pulley 344, a lower belt pulley 345, a synchronous belt 346, a display board 4, a main display screen 41, a left display screen 42, a right display screen 43, a rotating seat 5, a mounting seat 51, a mounting square tube 52, a rotating column 6 and a reinforcing plate 7.
Detailed Description
The present invention will be described in detail with reference to fig. 1 to 7, and the technical solutions in the embodiments of the present invention will be clearly and completely described, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The invention provides a construction progress display device and a display method thereof through improvement, as shown in fig. 1-7, the construction progress display device comprises a base 1 and a construction progress analysis system, and further comprises a pitching angle adjusting mechanism 2, a dust cleaning mechanism 3, a display plate 4, a rotating seat 5 and a rotating column 6 vertically arranged at the top of the base 1, wherein the display plate 4 is of a rectangular structure, the rotating column 6 is connected with the base 1 through a bearing, the top of the rotating seat 5 is provided with an installation seat 51, the top end of the installation seat 51 is provided with an installation square pipe 52 connected with the installation seat through a hinge shaft, and the display plate 4 is installed at the end part of the installation square pipe 52; the pitching angle adjusting mechanism 2 is used for adjusting the pitching angle of the display board 4, so that managers located in a high-rise building can observe conveniently, the practicability of the invention is improved, the dust attached to the main display screen 41, the left display screen 42 and the right display screen 43 can be cleaned through the dust cleaning mechanism 3, the dust is prevented from being attached to the main display screen 41, the left display screen 42 and the right display screen 43 to bring influence to real-time checking of workers, the workers can follow up conveniently, and the rotary column 6 can rotate along the axis under the action of external force.
A main display screen 41, a left display screen 42 and a right display screen 43 are arranged on the side wall of the display board 4, the left display screen 42 and the right display screen 43 are respectively arranged on two sides of the display board 4, and the dust cleaning mechanism 3 is arranged on the display board 4; the project analysis module is used for displaying all the collected project progress images on the main display 41 in a data form, the left display 42 is used for displaying the scene image of the specified project, and the left display 42 is used for displaying the predicted completion date.
The top of the base 1 is provided with a rotating assembly 11 for driving the rotating column 6 to rotate along the axis of the rotating column; the column spinner 6 can rotate along its axis under the effect of rotating assembly 11, makes the show board 4 rotate, and the staff of the different positions of being convenient for can watch the project progress on the show board 4 in real time.
The pitching angle adjusting mechanism 2 is arranged on the side wall of the mounting base 51, and the pitching angle adjusting mechanism 2 is used for adjusting the inclination angle of the display board 4; the pitching angle adjusting mechanism 2 is used for adjusting the pitching angle of the display board 4, so that a manager at a high-rise can conveniently observe the display board, and the practicability of the display board is improved.
Specifically, the dust cleaning mechanism 3 comprises a cleaning strip 31, a feeding assembly 34 for driving the cleaning strip 31 to move, and two sliding rods 32 respectively arranged at two sides of the display board 4, wherein a cleaning brush 33 is arranged at one side of the cleaning strip 31 close to the display board 4, the length direction of the cleaning strip 31 is parallel to the long side of the display board 4, each sliding rod 32 is parallel to the wide side of the display board 4, two mounting seats 51 are arranged on the display board 4 corresponding to each sliding rod 32, and the sliding rods 32 are fixed between the two mounting seats 51; slide bar 32 is used for leading the removal of cleaning strip 31, clean mechanism 3 through the dust and can clean main display 41, the dust that is stained with on left display 42 and the right display 43 cleans, avoid the dust to be stained with and attach main display 41, it brings the influence for staff's real-time look over on left display 42 and the right display 43, it follows up to be convenient for the staff, it is specific, it drives transmission shaft 341 and takes place to rotate to work by driving motor 342, make transmission shaft 341 drive two upper belt wheels 344 take place to rotate, and then make two synchronous belt 346 synchronous rotations, make cleaning strip 31 can drive cleaning brush 33 and remove, make cleaning brush 33 remove the in-process and clean main display 41, the dust that is stained with on left display 42 and the right display 43.
Specifically, the feeding assembly 34 includes a transmission shaft 341, a driving motor 342 and two pulley sets 343, each of the pulley sets 343 includes an upper pulley 344 and a lower pulley 345, the upper pulley 344 and the lower pulley 345 are connected by a synchronous belt 346, both the synchronous belts 346 are fixedly connected with the cleaning strip 31, the two upper pulleys 344 are respectively sleeved on both sides of the transmission shaft 341, and an output shaft of the driving motor 342 is coaxially connected with the transmission shaft 341; the driving motor 342 operates to drive the transmission shaft 341 to rotate, so that the transmission shaft 341 drives the two upper belt pulleys 344 to rotate, and further the two synchronous belts 346 rotate synchronously, so that the sweeping strip 31 can drive the sweeping brush 33 to move.
Specifically, the pitching angle adjusting mechanism 2 comprises an adjusting strip 21 and two fixing seats 22 respectively arranged at two sides of the mounting seat 51, a guide rod 23 is arranged between the two fixing seats 22, the length direction of the guide rod 23 is parallel to the length direction of the transmission screw rod 26, a sliding block 24 capable of sliding is sleeved on the guide rod 23, a connecting seat is arranged at the bottom of the mounting square tube 52, one end of the adjusting strip 21 is hinged on the side wall of the sliding block 24, and the other end of the adjusting strip 21 is hinged with the connecting seat; the pitching angle adjusting mechanism 2 is used for adjusting the pitching angle of the display board 4, so that a manager located in a high-rise building can conveniently observe the display board, the practicability of the display board is improved, the guide rod 23 is used for guiding the movement of the sliding block 24, the stepping motor 25 works to drive the transmission lead screw 26 to rotate, the sliding block 24 is moved under the threaded fit of the transmission lead screw 26 and the threaded sleeve, the sliding block 24 drives the adjusting strip 21 to move, the adjusting strip 21 drives the mounting square pipe 52 to move, the inclination angle of the mounting square pipe 52 is adjusted, the pitching angle of the display board 4 is adjusted, and the manager located in the high-rise building can conveniently observe the display board.
Specifically, the pitch angle adjusting mechanism 2 further comprises a stepping motor 25 and a transmission screw rod 26, two ends of the transmission screw rod 26 are respectively rotatably connected with the two fixing seats 22, a threaded sleeve in threaded fit with the transmission screw rod 26 is arranged on the sliding block 24, and an output shaft of the stepping motor 25 is connected with the transmission screw rod 26; the stepping motor 25 works to drive the transmission screw rod 26 to rotate, and the sliding block 24 moves under the threaded fit of the transmission screw rod 26 and the threaded sleeve, so that the sliding block 24 drives the adjusting strip 21 to move.
Specifically, a reinforcing plate 7 welded with the mounting square tube 52 and the display plate 4 is arranged between the mounting square tube and the display plate; the reinforcing plate 7 is used for reinforcing the connection between the square mounting tube 52 and the display board 4.
Specifically, the rotating assembly 11 comprises a worm 12, a rotating motor 13, a worm wheel 14 sleeved on the rotating column 6 and two bearing seats 15 arranged at the top of the base 1 at intervals, two ends of the worm 12 are respectively and rotatably connected with the two bearing seats 15, the worm wheel 14 is in transmission fit with the worm 12, the rotating motor 13 is arranged on the base 1, and an output shaft of the rotating motor 13 is fixedly connected with the worm 12; can rotate along its axis under the effect of rotating assembly 11, make show board 4 can rotate, the staff of the different positions of being convenient for can watch the project progress on the show board 4 in real time, and the work of rotating electrical machines 13 drives worm 12 and takes place to rotate, makes worm 12 drive rather than transmission fit's turbine 14 and takes place to rotate, and then makes the column spinner 6 take place to rotate, adjusts the horizontal angle of show board 4.
Specifically, the construction progress analysis system comprises a project analysis module, a database module, an environment sensor, a vibration sensor, an image acquisition module and a controller, wherein the main display screen 41, the left display screen 42, the right display screen 43, the environment sensor, the vibration sensor, the project analysis module, the database module and the image acquisition module are all electrically connected with the controller; the project analysis module displays all collected project progress images on a main display screen 41 in a data mode, a left display screen 42 displays field images of specified projects, the left display screen 42 displays predicted completion dates, a vibration sensor is used for collecting mechanical quantity generated by vibration, the type of the vibration sensor is SW-420, an environment sensor is used for detecting construction environments, such as temperature, humidity, weather conditions and PM2.5 concentration, and transmits environment parameters to a controller through electric signals, so that the controller transmits the electric signals to a right display screen 43 to display the environment parameters, manual follow-up judgment of whether project progress is influenced by non-human factors is facilitated, a database module stores an architectural model established by BIM, and the type of the controller is an 80C51 single chip microcomputer.
Specifically, the image acquisition sensing module comprises a plurality of rotary cameras distributed on a construction site; the rotary camera can rotate to collect images of project sites in multiple ranges.
The invention also provides a display method of the construction progress display device, which comprises the following steps:
s1, the image acquisition module acquires images of construction scenes of a construction site;
s2: the project analysis module displays all collected project progress images on a main display 41 in a data form, a left display 42 displays a site image of a specified project, and the left display 42 displays a predicted completion date;
s3: when the predicted completion date is lagged, judging whether the reason of the lag completion is a factor, if so, tracing back to the person responsible for the project; and if not, screening specific non-human factors under the action of the environment sensor and the vibration sensor.
The working principle of the invention is as follows: the angle of the display board 4 can be automatically adjusted in multiple directions, the pitching angle adjusting mechanism 2 is used for adjusting the pitching angle of the display board 4, so that a manager positioned in a high-rise building can conveniently observe the display board, the practicability of the invention is improved, the stepping motor 25 works to drive the transmission screw rod 26 to rotate, the sliding block 24 moves under the threaded fit of the transmission screw rod 26 and the threaded sleeve, the sliding block 24 drives the adjusting strip 21 to move, and the adjusting strip 21 drives the mounting square pipe 52 to move so as to adjust the inclination angle of the mounting square pipe 52; the display board 4 can rotate along the axis under the action of the rotating assembly 11, so that workers at different positions can watch the progress of a project on the display board 4 in real time, the rotating motor 13 works to drive the worm 12 to rotate, the worm 12 drives the worm wheel 14 in transmission fit with the worm to rotate, and the rotating column 6 rotates to adjust the horizontal angle of the display board 4;
at intervals, dust adhered to the main display screen 41, the left display screen 42 and the right display screen 43 can be cleaned through the dust cleaning mechanism 3, so that the dust is prevented from being adhered to the main display screen 41, the left display screen 42 and the right display screen 43 to influence the real-time viewing of workers, and the follow-up of the workers is facilitated; specifically, the driving motor 342 operates to drive the transmission shaft 341 to rotate, so that the transmission shaft 341 drives the two upper belt pulleys 344 to rotate, and further the two synchronous belts 346 rotate synchronously, so that the cleaning strip 31 can drive the cleaning brush 33 to move, and dust attached to the main display 41, the left display 42 and the right display 43 is cleaned in the moving process of the cleaning brush 33; the vibration sensor is used for collecting mechanical quantity generated by vibration, the model of the vibration sensor is SW-420, the environment sensor is used for detecting construction environment such as temperature, humidity, weather condition and PM2.5 concentration, and transmits the environment parameters to the controller through electric signals, so that the controller transmits the electric signals to the right display screen 43 to display the environment parameters, and whether project progress is influenced by non-human factors or not is conveniently judged manually and subsequently.
The previous description of the disclosed embodiments is provided to enable any person skilled in the art to make or use the present invention. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the invention. Thus, the present invention is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (10)

1. The utility model provides a construction progress display device, includes base (1) and construction progress analytic system, its characterized in that: the dust cleaning device is characterized by further comprising a pitching angle adjusting mechanism (2), a dust cleaning mechanism (3), a display board (4), a rotating seat (5) and a rotating column (6) vertically arranged at the top of the base (1), wherein the display board (4) is of a rectangular structure, the rotating column (6) is connected with the base (1) through a bearing, a mounting seat (51) is arranged at the top of the rotating seat (5), a mounting square pipe (52) connected with the mounting seat (51) through a hinge shaft is arranged at the top end of the mounting seat (51), and the display board (4) is mounted at the end part of the mounting square pipe (52);
a main display screen (41), a left display screen (42) and a right display screen (43) are arranged on the side wall of the display board (4), the left display screen (42) and the right display screen (43) are respectively arranged on two sides of the display board (4), and the dust cleaning mechanism (3) is arranged on the display board (4);
the top of the base (1) is provided with a rotating assembly (11) for driving the rotating column (6) to rotate along the axis of the rotating column;
the pitching angle adjusting mechanism (2) is arranged on the side wall of the mounting seat (51), and the pitching angle adjusting mechanism (2) is used for adjusting the inclination angle of the display board (4).
2. The construction progress display device according to claim 1, characterized in that: dust cleans mechanism (3) including cleaning strip (31), feeding assembly (34) and two slide bar (32) that set up respectively in show board (4) both sides that are used for driving cleaning strip (31) to remove, one side that cleaning strip (31) are close to show board (4) is equipped with brush cleaner (33), the length direction who cleans strip (31) parallels with the long limit of show board (4), every slide bar (32) all parallels with the broadside of show board (4), show board (4) correspond every slide bar (32) and all are equipped with two mount pads (51), slide bar (32) are fixed between two mount pads (51).
3. The construction progress display device according to claim 2, characterized in that: the feeding assembly (34) comprises a transmission shaft (341), a driving motor (342) and two belt pulley sets (343), each belt pulley set (343) comprises an upper belt pulley (344) and a lower belt pulley (345), the upper belt pulley (344) is connected with the lower belt pulley (345) through a synchronous belt (346), the two synchronous belts (346) are fixedly connected with the cleaning strip (31), the two upper belt pulleys (344) are respectively sleeved on two sides of the transmission shaft (341), and an output shaft of the driving motor (342) is coaxially connected with the transmission shaft (341).
4. The construction progress display device according to claim 1, characterized in that: every single move angle guiding mechanism (2) is including adjusting strip (21) and two fixing base (22) that set up respectively in mount pad (51) both sides, two be equipped with guide bar (23) between fixing base (22), the length direction of guide bar (23) parallels with the length direction of transmission lead screw (26), the cover is equipped with gliding sliding block (24) on guide bar (23), the bottom of installation side pipe (52) is equipped with the connecting seat, it is articulated with the one end of adjusting strip (21) on the lateral wall of sliding block (24), the other end and the connecting seat of adjusting strip (21) are articulated.
5. The construction progress display device according to claim 4, characterized in that: every single move angle guiding mechanism (2) still including step motor (25) and transmission lead screw (26), the both ends of transmission lead screw (26) rotate with two fixing bases (22) respectively and are connected, be equipped with on sliding block (24) with transmission lead screw (26) screw-thread fit's thread bush, the output shaft and the transmission lead screw (26) of step motor (25) are connected.
6. The construction progress display device according to claim 1, characterized in that: and a reinforcing plate (7) welded with the mounting square tube (52) and the display plate (4) is arranged between the mounting square tube and the display plate.
7. The construction progress display device according to claim 1, characterized in that: rotating assembly (11) include worm (12), rotating electrical machines (13), cover establish turbine (14) and two intervals on column spinner (6) set up bear seat (15) at base (1) top, the both ends of worm (12) bear seat (15) rotation with two respectively and are connected, turbine (14) and worm (12) transmission cooperation, rotating electrical machines (13) set up on base (1), the output shaft and worm (12) fixed connection of rotating electrical machines (13).
8. The construction progress display device according to claim 1, characterized in that: construction progress analysis system is including project analysis module, database module, environmental sensor, vibrations sensor, image acquisition module and controller, main display screen (41), left display screen (42), right display screen (43), environmental sensor, vibrations sensor, project analysis module, database module, image acquisition module all with controller electric connection.
9. The construction progress display device according to claim 8, characterized in that: the image acquisition sensing module comprises a plurality of rotary cameras distributed on a construction site.
10. The construction progress display device display method according to any one of claims 1 to 9, characterized by comprising:
s1, the image acquisition module acquires images of construction scenes of a construction site;
s2: the project analysis module displays all collected project progress images on a main display screen (41) in a data form, a left display screen (42) displays a site image of a specified project, and the left display screen (42) displays a predicted completion date;
s3: when the predicted completion date is lagged, judging whether the reason of the lag completion is a factor, if so, tracing back to the person responsible for the project; and if not, screening specific non-human factors under the action of the environment sensor and the vibration sensor.
CN202010692909.3A 2020-07-17 2020-07-17 Construction progress display device and display method thereof Pending CN112037648A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010692909.3A CN112037648A (en) 2020-07-17 2020-07-17 Construction progress display device and display method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010692909.3A CN112037648A (en) 2020-07-17 2020-07-17 Construction progress display device and display method thereof

Publications (1)

Publication Number Publication Date
CN112037648A true CN112037648A (en) 2020-12-04

Family

ID=73579844

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010692909.3A Pending CN112037648A (en) 2020-07-17 2020-07-17 Construction progress display device and display method thereof

Country Status (1)

Country Link
CN (1) CN112037648A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113658530A (en) * 2021-08-30 2021-11-16 西藏电建成勘院工程有限公司 Construction design information display device
CN114005349A (en) * 2021-11-26 2022-02-01 四川建筑职业技术学院 Construction progress model for building engineering management
CN114234008A (en) * 2021-12-23 2022-03-25 陕西理工大学 Public regional computer display is with show fixed knot structure
CN114278837A (en) * 2021-12-11 2022-04-05 盐城优易数据有限公司 Display system of asset management platform
CN114343359A (en) * 2021-12-18 2022-04-15 郭欢欢 Drawing show shelf that building can take precautions against earthquakes

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205354424U (en) * 2015-12-18 2016-06-29 无锡商业职业技术学院 Real demonstration teaching rack of instructing of rotatable PLC
CN205829887U (en) * 2016-07-27 2016-12-21 北京双圆工程咨询监理有限公司 A kind of building engineering construction Schedule monitoring system
CN208256219U (en) * 2018-06-12 2018-12-18 温泽坤 A kind of construction management progress display plate
CN110260127A (en) * 2019-07-02 2019-09-20 郑州铁路职业技术学院 A kind of construction management equipment based on BIM
CN209962475U (en) * 2019-01-24 2020-01-17 重庆建筑工程职业学院 Mental health education teaching show board
CN210378374U (en) * 2019-11-06 2020-04-21 张伟建 Statistics display device that building engineering cost was used
CN210535303U (en) * 2019-12-16 2020-05-15 台州职业技术学院 Construction management progress show board
CN111260325A (en) * 2019-07-23 2020-06-09 上海建工集团股份有限公司 Bridge construction progress management system based on BIM

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205354424U (en) * 2015-12-18 2016-06-29 无锡商业职业技术学院 Real demonstration teaching rack of instructing of rotatable PLC
CN205829887U (en) * 2016-07-27 2016-12-21 北京双圆工程咨询监理有限公司 A kind of building engineering construction Schedule monitoring system
CN208256219U (en) * 2018-06-12 2018-12-18 温泽坤 A kind of construction management progress display plate
CN209962475U (en) * 2019-01-24 2020-01-17 重庆建筑工程职业学院 Mental health education teaching show board
CN110260127A (en) * 2019-07-02 2019-09-20 郑州铁路职业技术学院 A kind of construction management equipment based on BIM
CN111260325A (en) * 2019-07-23 2020-06-09 上海建工集团股份有限公司 Bridge construction progress management system based on BIM
CN210378374U (en) * 2019-11-06 2020-04-21 张伟建 Statistics display device that building engineering cost was used
CN210535303U (en) * 2019-12-16 2020-05-15 台州职业技术学院 Construction management progress show board

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113658530A (en) * 2021-08-30 2021-11-16 西藏电建成勘院工程有限公司 Construction design information display device
CN114005349A (en) * 2021-11-26 2022-02-01 四川建筑职业技术学院 Construction progress model for building engineering management
CN114278837A (en) * 2021-12-11 2022-04-05 盐城优易数据有限公司 Display system of asset management platform
CN114343359A (en) * 2021-12-18 2022-04-15 郭欢欢 Drawing show shelf that building can take precautions against earthquakes
CN114343359B (en) * 2021-12-18 2023-12-15 合肥秋实城乡规划设计有限责任公司 Drawing show shelf that building can take precautions against earthquakes
CN114234008A (en) * 2021-12-23 2022-03-25 陕西理工大学 Public regional computer display is with show fixed knot structure
CN114234008B (en) * 2021-12-23 2023-09-26 陕西理工大学 Show fixed knot constructs for public district computer display

Similar Documents

Publication Publication Date Title
CN112037648A (en) Construction progress display device and display method thereof
CN112165568A (en) Monitoring device with adjustable structure for security protection
CN211699242U (en) Data mining network display device
CN114393218B (en) Be used for online supervisory equipment of metal 3D laser printing
CN113572934B (en) Digital operating room image acquisition control system
CN220980783U (en) Building site thing device of collecting evidence that falls
CN114659009A (en) Safety monitoring device based on bridge construction
CN220932714U (en) Dust online detection micro station
CN102944311B (en) A kind of Automatic chromaticity acquisition device
CN220543138U (en) Regional weather real-time monitoring device of organic tea garden
CN219013749U (en) Visual monitoring device based on stockline
CN218180016U (en) Building engineering environment monitoring device convenient to dismouting
CN215965005U (en) Construction environment monitoring device for building engineering convenient to remove
CN219122056U (en) Omnibearing visual detection device for stay cable anchor head
CN221010216U (en) Remote monitoring device for building construction management
CN213629531U (en) Enterprise safety production automatic monitoring and early warning device
CN216016983U (en) Security monitoring device applied to building intellectualization
CN116678587B (en) Sign board wind resistance performance detection equipment
CN219623706U (en) Traffic information acquisition device
CN219588462U (en) Display device for railway inspection
CN220823173U (en) On-line monitoring device for safety of construction engineering
CN213302913U (en) Visual display of construction project data
CN214251054U (en) Environment monitoring device with dustproof function
CN219453477U (en) Communication power environment monitoring device convenient to adjust
CN219432843U (en) Monitoring device in cabinet body

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20201204

RJ01 Rejection of invention patent application after publication