CN112000556B - Client program downtime display method and device and readable medium - Google Patents

Client program downtime display method and device and readable medium Download PDF

Info

Publication number
CN112000556B
CN112000556B CN202010642909.2A CN202010642909A CN112000556B CN 112000556 B CN112000556 B CN 112000556B CN 202010642909 A CN202010642909 A CN 202010642909A CN 112000556 B CN112000556 B CN 112000556B
Authority
CN
China
Prior art keywords
downtime
data
weight
client program
processor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010642909.2A
Other languages
Chinese (zh)
Other versions
CN112000556A (en
Inventor
夏运思
刘明城
张治良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Xishanju Network Technology Co ltd
Original Assignee
Guangzhou Xishanju Network Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Xishanju Network Technology Co ltd filed Critical Guangzhou Xishanju Network Technology Co ltd
Priority to CN202010642909.2A priority Critical patent/CN112000556B/en
Publication of CN112000556A publication Critical patent/CN112000556A/en
Application granted granted Critical
Publication of CN112000556B publication Critical patent/CN112000556B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/30Monitoring
    • G06F11/32Monitoring with visual or acoustical indication of the functioning of the machine
    • G06F11/324Display of status information
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/30Monitoring
    • G06F11/34Recording or statistical evaluation of computer activity, e.g. of down time, of input/output operation ; Recording or statistical evaluation of user activity, e.g. usability assessment
    • G06F11/3452Performance evaluation by statistical analysis

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Quality & Reliability (AREA)
  • Bioinformatics & Cheminformatics (AREA)
  • Computer Hardware Design (AREA)
  • Probability & Statistics with Applications (AREA)
  • Evolutionary Biology (AREA)
  • Bioinformatics & Computational Biology (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Digital Computer Display Output (AREA)
  • User Interface Of Digital Computer (AREA)

Abstract

The invention relates to a client program downtime display method, a device and a readable medium, wherein the method comprises the following steps: s100, collecting multiple downtime data of multiple computer devices; s200, weighting one or more items in the downtime data to obtain corresponding weight values; and S300, recalculating downtime sequencing of the weighted computer equipment and displaying. The beneficial effects of the invention are as follows: the two standards of the traditional mode are combined into one weight, so that the serious program of the problem is more definite, and the important problem caused by downtime due to habit is reduced.

Description

Client program downtime display method and device and readable medium
Technical Field
The invention relates to the field of data analysis, in particular to a client program downtime display method, a device and a readable medium.
Background
The existing software is more and more complex and huge, and is a client software program of a computer end or a mobile end, and due to the fact that code writing is not strict, downtime occurs, and once the downtime occurs, small consequences can be caused to a publisher. In order to quickly find and solve the downtime, the downtime information is collected in each program, and then the downtime is repaired after screening according to the collected information.
The current popular practice is that information such as the number of crashes, the probability of crashes, the number of affected users, the rate of affected users, the crashed modules and the like are displayed to developers together, so that the developers can determine which crashes need to be repaired or not.
Disclosure of Invention
The invention aims to at least solve one of the technical problems in the prior art, and provides a client program downtime display method, a client program downtime display device and a readable medium, which realize accurate monitoring of client program downtime.
The technical scheme of the invention comprises a client program downtime display method, which is characterized by comprising the following steps: s100, collecting multiple downtime data of multiple computer devices; s200, weighting one or more items in the downtime data to obtain corresponding weight values; and S300, recalculating downtime sequencing of the weighted computer equipment and displaying.
According to the client program downtime display method, downtime data comprise downtime number, downtime equipment number, downtime probability ratio and equipment downtime probability ratio.
The client program downtime display method according to the present invention, wherein S200 specifically includes: and setting corresponding weights for the downtime number and the downtime equipment, wherein the weight of the downtime equipment number=2×the weight of the downtime number.
The client program downtime display method comprises the following steps: the weight of the downtime equipment number and the weight of the downtime number can be set in a self-defined manner.
According to the client program downtime display method, the step S300 is to reorder the weight values obtained in the step S200.
The client program downtime display method comprises the following steps: and setting weights of one or more pieces of downtime data, and combining the corresponding weights of one or more pieces of downtime data into one weight.
The technical scheme of the invention also comprises a device for displaying downtime of the client program, which comprises a memory, a processor and a computer program stored in the memory and capable of running on the processor, and is characterized in that the processor realizes any one of the above steps when executing the computer program.
The technical solution of the present invention further comprises a computer readable storage medium storing a computer program, characterized in that the computer program when executed by a processor implements the method steps as described in any of the above.
The beneficial effects of the invention are as follows: the two standards of the traditional mode are combined into one weight, so that the serious program of the problem is more definite, and the important problem caused by downtime due to habit is reduced.
Drawings
The invention is further described below with reference to the drawings and examples;
FIG. 1 is a general flow diagram according to an embodiment of the present invention;
2a and 2b show downtime sequencing charts after weight calculation;
FIG. 3 is a chart showing downtime ranking after weight calculation according to an embodiment of the present invention;
fig. 4 shows a schematic view of an apparatus according to an embodiment of the invention.
Detailed Description
Reference will now be made in detail to the present embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein the accompanying drawings are used to supplement the description of the written description so that one can intuitively and intuitively understand each technical feature and overall technical scheme of the present invention, but not to limit the scope of the present invention.
In the description of the present invention, a number means one or more, a number means two or more, and greater than, less than, exceeding, etc. are understood to not include the present number, and above, below, within, etc. are understood to include the present number. The description of the first and second is for the purpose of distinguishing between technical features only and should not be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated or implicitly indicating the precedence of the technical features indicated.
In the description of the present invention, unless explicitly defined otherwise, terms such as arrangement and the like should be construed broadly, and those skilled in the art can reasonably determine the specific meaning of the terms in the present invention in combination with the specific contents of the technical scheme.
FIG. 1 is a general flow diagram according to an embodiment of the present invention; the process comprises the following steps: s100, collecting multiple downtime data of multiple computer devices; s200, weighting one or more items in the downtime data to obtain corresponding weight values; and S300, recalculating downtime sequencing of the weighted computer equipment and displaying.
Fig. 2a,2b show downtime ranking graphs before and after weighting calculation according to an embodiment of the invention. Fig. 2 is a ranking of unweighted downtime books, while fig. 2b is a ranking of unweighted downtime equipment numbers. However, if the downtime data is as before, the number 2 downtime is 1425 times, but the number of affected machines is 100, which is far smaller than 1194 of the 3 rd row, if the number 2 downtime is ranked second according to the conventional method, and in practical cases, the importance of the number is lower than that of the number 3.
Fig. 3 shows a weighted downtime ranking graph according to an embodiment of the present invention. The optimized ranking algorithm is shown in fig. 3, and it can be seen that the problem 2, recalculated by weight, has been ranked in the 5 th priority position. The machine number (weight) =2×downtime number (weight), and the algorithm can be adjusted according to the project reality.
Fig. 4 shows a schematic view of an apparatus according to an embodiment of the invention. Comprising the following steps: memory 100, processor 200. Wherein the memory is for storing acquired FPS data, wherein the processor is for executing the computer program implementation: collecting a plurality of pieces of downtime data of a plurality of pieces of computer equipment; weighting one or more items of downtime data to obtain a corresponding weight value; and recalculating the downtime sequencing of the weighted computer equipment and displaying.
The embodiments of the present invention have been described in detail with reference to the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made within the knowledge of one of ordinary skill in the art without departing from the spirit of the present invention.

Claims (3)

1. The client program downtime display method is characterized by comprising the following steps:
s100, collecting multiple downtime data of multiple computer devices; the downtime data comprise the downtime number, the downtime equipment number, the downtime probability ratio and the equipment downtime probability ratio;
s200, weighting one or more items in the downtime data to obtain corresponding weight values; the step S200 specifically includes: setting corresponding weights for the downtime number and the downtime equipment number, wherein the weight of the downtime equipment number=2×the weight of the downtime number, and the calculation mode of the weight of the downtime equipment number is customized according to the project;
s300, recalculating downtime sequencing of the computer equipment subjected to the weighting treatment and displaying; the step S300 is to reorder the weight values obtained in the step S200;
setting the weight of one or more pieces of downtime data, and combining the corresponding weight of one or more pieces of downtime data into one weight;
and the downtime data are FPS data, and the FPS data are ranked after being weighted and combined, so that accurate monitoring of the downtime of the client program is completed.
2. An apparatus for downtime display of a client program, the apparatus comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the method steps of claim 1 when the computer program is executed by the processor.
3. A computer readable storage medium storing a computer program, which when executed by a processor performs the method steps of claim 1.
CN202010642909.2A 2020-07-06 2020-07-06 Client program downtime display method and device and readable medium Active CN112000556B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010642909.2A CN112000556B (en) 2020-07-06 2020-07-06 Client program downtime display method and device and readable medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010642909.2A CN112000556B (en) 2020-07-06 2020-07-06 Client program downtime display method and device and readable medium

Publications (2)

Publication Number Publication Date
CN112000556A CN112000556A (en) 2020-11-27
CN112000556B true CN112000556B (en) 2023-04-28

Family

ID=73467965

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010642909.2A Active CN112000556B (en) 2020-07-06 2020-07-06 Client program downtime display method and device and readable medium

Country Status (1)

Country Link
CN (1) CN112000556B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103281367A (en) * 2013-05-22 2013-09-04 北京蓝汛通信技术有限责任公司 Load balance method and device
CN109522180A (en) * 2018-10-22 2019-03-26 武汉联影医疗科技有限公司 Data analysing method, device and equipment based on monitoring operational system service
CN110766320A (en) * 2019-10-23 2020-02-07 北京新机场建设指挥部 Method and device for evaluating operation safety of airport intelligent power grid

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10846292B2 (en) * 2013-03-14 2020-11-24 Vmware, Inc. Event based object ranking in a dynamic system
CN104252401B (en) * 2014-08-29 2017-02-15 北京阅联信息技术有限公司 Weight based device status judgment method and system thereof
CN105550099B (en) * 2015-12-08 2018-05-01 江苏电力信息技术有限公司 A kind of SAP system method for evaluating state
CN109639490B (en) * 2018-12-18 2020-09-18 网宿科技股份有限公司 Downtime notification method and device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103281367A (en) * 2013-05-22 2013-09-04 北京蓝汛通信技术有限责任公司 Load balance method and device
CN109522180A (en) * 2018-10-22 2019-03-26 武汉联影医疗科技有限公司 Data analysing method, device and equipment based on monitoring operational system service
CN110766320A (en) * 2019-10-23 2020-02-07 北京新机场建设指挥部 Method and device for evaluating operation safety of airport intelligent power grid

Also Published As

Publication number Publication date
CN112000556A (en) 2020-11-27

Similar Documents

Publication Publication Date Title
US6704016B1 (en) Method and apparatus for the graphical presentation of selected data
US20190333297A1 (en) Vehicle data stream displaying method and system, and vehicle diagnostic device
CN107784558A (en) A kind of commodity sort method and device
CN107908336A (en) Method for refreshing, device, storage medium and the terminal of list control
EP3408752B1 (en) Object management and visualization using a computing device
CN108335723A (en) Test validity judgment method and device
CN105302828B (en) Page label information display method and device and electronic equipment
CN106681701A (en) Task display method and device
CN112000556B (en) Client program downtime display method and device and readable medium
CN107146073B (en) Learning prompting method, terminal device and computer readable storage medium
US8887077B2 (en) Synchronized graphical and tabular performance data display
CN106033576B (en) Object information display method and device
US20160063871A1 (en) Online learning style automated diagnostic system, online learning style automated diagnostic method and non-transitory computer readable recording medium
CN105893614A (en) Information recommendation method and device and electronic equipment
CN113064895B (en) Incremental updating method, device and system for map
CN115795133A (en) Data loading method and device, electronic equipment and storage medium
CN108198474A (en) A kind of learning data generation method, device and equipment
CN115421691A (en) Data rolling method and device based on virtual list and computer equipment
CN114218477A (en) Display interface control method and device and electronic equipment
CN111388994B (en) Method, device, equipment and storage medium for processing virtual props in game
CN114791930A (en) Data display method and device, electronic equipment and storage medium
CN111523766B (en) Driving risk assessment method and device, electronic equipment and readable storage medium
CN114647786A (en) Book recommendation method, electronic device and storage medium
CN108108220A (en) Character string animation effect implementation method and device based on text control
CN107688527A (en) Defect display methods and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 4th Floor, No. 6, 8, Jianzhong Road, Tianhe District, Guangzhou City, Guangdong Province, 510000 Room No. 406

Applicant after: Guangzhou Xishanju Network Technology Co.,Ltd.

Address before: 3-04-1, No. 309, Huangpu Avenue, Tianhe District, Guangzhou, Guangdong 510000

Applicant before: GUANGZHOU SEASUN ENTERTAINMENT NETWORK TECHNOLOGY Co.,Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant