CN111997381A - Quick construction equipment of city utility tunnel - Google Patents

Quick construction equipment of city utility tunnel Download PDF

Info

Publication number
CN111997381A
CN111997381A CN202010821102.5A CN202010821102A CN111997381A CN 111997381 A CN111997381 A CN 111997381A CN 202010821102 A CN202010821102 A CN 202010821102A CN 111997381 A CN111997381 A CN 111997381A
Authority
CN
China
Prior art keywords
fixedly connected
plate
construction equipment
walking
threaded rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010821102.5A
Other languages
Chinese (zh)
Inventor
王傲冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xingtai Polytechnic College
Original Assignee
Xingtai Polytechnic College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xingtai Polytechnic College filed Critical Xingtai Polytechnic College
Priority to CN202010821102.5A priority Critical patent/CN111997381A/en
Publication of CN111997381A publication Critical patent/CN111997381A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/162Handles to carry construction blocks
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells

Abstract

The invention belongs to the technical field of construction equipment, and particularly relates to rapid construction equipment for an urban underground comprehensive pipe gallery. According to the invention, through the matching among the servo motor, the left-handed threaded rod, the right-handed threaded rod and the threaded cylinder, the construction position can be adjusted according to the construction height when the screw is used, so that the screw is easier and more convenient to construct, and inconvenience caused by the fact that part of positions cannot be constructed is avoided.

Description

Quick construction equipment of city utility tunnel
Technical Field
The invention relates to the technical field of construction equipment, in particular to quick construction equipment for an urban underground comprehensive pipe gallery.
Background
Utility tunnel, be exactly underground city pipeline utility tunnel, build a tunnel space in the city underground promptly, with electric power, communication, various engineering pipelines such as gas, heat supply, plumbing collect in an organic whole, be equipped with special access hole, hoist and mount mouth and monitoring system, implement unified planning, unified design, unified construction and management, be the important infrastructure of guarantee city operation, especially in great city, the piping lane that needs to be built is also comparatively huge, what need use when carrying out the construction is called construction equipment.
However, the prior construction equipment has the following problems:
1. when the construction is carried out, the adjustment is inconvenient according to the construction height, and the construction effect is influenced;
2. when being under construction, the walking board is inconvenient to adjust, and the staff is inconvenient when using.
3. The shielding is inconvenient to carry out during the construction, so that unnecessary potential safety hazards are caused;
4. when the device is used, the device is inconvenient to fix, so that equipment slides, and potential safety hazards are caused.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides rapid construction equipment for an urban underground comprehensive pipe gallery, which solves the problems that the adjustment is inconvenient according to the construction height, the walking plate is inconvenient to adjust, the shielding is inconvenient, and the device is inconvenient to fix and put forward.
(II) technical scheme
In order to achieve the purpose, the invention provides the following technical scheme: a quick construction device for an urban underground comprehensive pipe gallery comprises a bottom plate, wherein a first mounting plate is fixedly connected to the top of the bottom plate, a servo motor is installed on the side edge of the first mounting plate, a left-handed threaded rod is fixedly connected to the output end of the servo motor, a right-handed threaded rod is fixedly connected to the end portion of the left-handed threaded rod, the end portion of the right-handed threaded rod is rotatably connected with the first mounting plate through a bearing, threaded cylinders are connected to the surface threads of the left-handed threaded rod and the right-handed threaded rod, a supporting plate is arranged at the top of the bottom plate, a second mounting plate is fixedly connected to the bottom of the supporting plate, a sliding rod is fixedly connected to the side edge of the second mounting plate, a sliding sleeve is connected to the surface of the sliding rod in a sliding manner, supporting rods are rotatably connected to the, the top sliding connection of first walking board has the second walking board, the pneumatic cylinder is installed to the side of backup pad, the tip and the second walking board fixed connection of pneumatic cylinder.
As a preferred technical solution of the present invention, the top portions of the first and second traveling plates are fixedly connected with a first fixed baffle, the top portion of the second traveling plate is fixedly connected with a second fixed baffle, the top portion of the first traveling plate is rotatably connected with a second movable baffle through a rotating shaft, and the top portion of the second traveling plate is rotatably connected with a first movable baffle through a rotating shaft.
As a preferable technical solution of the present invention, a first nut is fixedly connected to a side edge of the second fixed baffle, a first bolt is disposed on a side edge of the second fixed baffle, the first bolt penetrates into the first movable baffle, and the first bolt is in threaded connection with the first nut.
As a preferable technical solution of the present invention, a second bolt is disposed on a back surface of the second movable baffle, a second nut is fixedly connected to a surface of the first movable baffle, and the second nut is in threaded connection with the second bolt.
As a preferable technical scheme of the invention, the top of the bottom plate is fixedly connected with a threaded ring, the top of the bottom plate is connected with a screw rod in a penetrating way, the end part of the screw rod is fixedly connected with a friction plate, the friction plate is contacted with the ground, and the threaded ring is in threaded connection with the screw rod.
As a preferred technical solution of the present invention, the top of the second walking plate is fixedly connected with a material placing groove and an instrument placing groove, the top of the supporting plate is fixedly connected with a return spring, and the top of the return spring is fixedly connected with the first walking plate.
As a preferable technical scheme of the invention, the side edge of the supporting plate is fixedly connected with a guide rod, and the guide rod is connected with the second walking plate in a penetrating way.
As a preferable technical scheme of the invention, the top of the bottom plate is provided with a movable wheel, and a telescopic rod is fixedly connected between the bottom plate and the supporting plate.
(III) advantageous effects
Compared with the prior art, the invention provides quick construction equipment for an urban underground comprehensive pipe gallery, which has the following beneficial effects:
1. this quick construction equipment of city utility tunnel makes through the cooperation between servo motor, levogyration threaded rod, dextrorotation threaded rod and the thread section of thick bamboo can be according to the construction height control construction position when using to make light more convenient when being under construction, avoided partial position to fail to be under construction, thereby cause inconvenience.
2. This quick construction equipment of city utility tunnel makes through the cooperation between first walking board and the second walking board can effectually adjust the construction position as required when using for the staff can adjust according to the construction area when using, has avoided needing to move the device position many times when being under construction.
3. This quick construction equipment of city utility tunnel through the use of screw ring, lead screw and friction plate, plays spacing effect to removing the wheel to make when using, guaranteed the stability of device, make work get up safe and reliable more.
4. This quick construction equipment of city utility tunnel through the cooperation between first fixed stop, second fixed stop, first movable baffle and the second movable baffle make the effect of playing the protection to the personnel at top when being under construction, has also avoided the object at top to drop simultaneously and has caused unnecessary potential safety hazard.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a top view of the structure of the present invention;
FIG. 3 is a connection diagram of a first walking board and a second walking board according to the present invention;
FIG. 4 is a schematic view of the friction plate and bottom plate connection of the present invention;
fig. 5 is a schematic view of the connection between the support plate and the first travel plate according to the present invention.
In the figure: 1. a base plate; 2. a first mounting plate; 3. a servo motor; 4. a left-handed threaded rod; 5. a right-handed threaded rod; 6. a threaded barrel; 7. a support plate; 8. a second mounting plate; 9. a slide bar; 10. a sliding sleeve; 11. a support bar; 12. a first running board; 13. a second walking board; 14. a hydraulic cylinder; 15. a first fixed baffle; 16. a second fixed baffle; 17. a guide bar; 18. a first moving barrier; 19. a second moving barrier; 20. a first bolt; 21. a first nut; 22. a second nut; 23. a second bolt; 24. a threaded ring; 25. a screw rod; 26. a friction plate; 27. a material placement groove; 28. an instrument placement slot; 29. a return spring; 30. a moving wheel; 31. a telescopic rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Examples
Referring to fig. 1-5, the present invention provides the following technical solutions: a quick construction device for an urban underground comprehensive pipe gallery comprises a bottom plate 1, wherein a first mounting plate 2 is fixedly connected to the top of the bottom plate 1, a servo motor 3 is installed on the side edge of the first mounting plate 2, a left-handed threaded rod 4 is fixedly connected to the output end of the servo motor 3, a right-handed threaded rod 5 is fixedly connected to the end portion of the left-handed threaded rod 4, the end portion of the right-handed threaded rod 5 is rotatably connected with the first mounting plate 2 through a bearing, threaded cylinders 6 are connected to the surfaces of the left-handed threaded rod 4 and the right-handed threaded rod 5 through threads, a supporting plate 7 is arranged at the top of the bottom plate 1, a second mounting plate 8 is fixedly connected to the bottom of the supporting plate 7, slide rods 9 are fixedly connected to the side edge of the second mounting plate 8, slide sleeves 10 are slidably connected to the surfaces of the slide rods 9, supporting rods 11 are, the top of the first walking plate 12 is connected with a second walking plate 13 in a sliding mode, a hydraulic cylinder 14 is installed on the side edge of the supporting plate 7, and the end portion of the hydraulic cylinder 14 is fixedly connected with the second walking plate 13.
In this embodiment, play fixed effect through the first mounting panel 2 that sets up, make things convenient for bracing piece 11 to slide through setting up of sliding sleeve 10, play the effect of spacing direction through setting up of slide bar 9, play fixed effect through setting up of second mounting panel 8, set up to two through second walking board 13 for can remove towards both sides when using, make the area of construction bigger.
Specifically, the top of the first walking board 12 and the top of the second walking board 13 are both fixedly connected with a first fixed baffle 15, the top of the second walking board 13 is fixedly connected with a second fixed baffle 16, the top of the first walking board 12 is rotatably connected with a second movable baffle 19 through a rotating shaft, and the top of the second walking board 13 is rotatably connected with a first movable baffle 18 through a rotating shaft.
In this embodiment, the cooperation of the first fixed barrier 15, the second fixed barrier 16, the second movable barrier 19 and the first movable barrier 18 makes the worker work on the tops of the first walking board 12 and the second walking board 13 more safely and stably.
Specifically, the side of the second fixed baffle 16 is fixedly connected with a first nut 21, the side of the second fixed baffle 16 is provided with a first bolt 20, the first bolt 20 penetrates into the first movable baffle 18, and the first bolt 20 is in threaded connection with the first nut 21.
In this embodiment, the first movable barrier 18 is fixed by the first bolt 20 and the first nut 21, so that the first movable barrier 18 can shield the object after rotating.
Specifically, a second bolt 23 is arranged on the back surface of the second movable baffle plate 19, a second nut 22 is fixedly connected to the surface of the first movable baffle plate 18, and the second nut 22 is in threaded connection with the second bolt 23.
In this embodiment, the second nut 22 is screwed to the second bolt 23, so that the second movable barrier 19 is fixed after rotating, and the stability of the second movable barrier 19 is ensured.
Specifically, the top of the bottom plate 1 is fixedly connected with a threaded ring 24, the top of the bottom plate 1 is connected with a screw rod 25 in a penetrating manner, the end part of the screw rod 25 is fixedly connected with a friction plate 26, the friction plate 26 is in contact with the ground, and the threaded ring 24 is in threaded connection with the screw rod 25.
In the embodiment, the screw rod 25 is fixed by the arrangement of the threaded ring 24, so that the screw rod 25 is arranged.
Specifically, a material placing groove 27 and an instrument placing groove 28 are fixedly connected to the top of the second walking plate 13, a return spring 29 is fixedly connected to the top of the supporting plate 7, and the top of the return spring 29 is fixedly connected to the first walking plate 12.
In this embodiment, the material placement groove 27 and the instrument placement groove 28 facilitate placement of materials and instruments, so that the use is more convenient.
Specifically, a guide rod 17 is fixedly connected to a side edge of the support plate 7, and the guide rod 17 is connected with the second walking plate 13 in a penetrating manner.
In this embodiment, the guide rod 17 through setting up plays the effect of spacing support to the removal of second walking board 13 for second walking board 13 is when supporting better effect.
Specifically, the top of the bottom plate 1 is provided with a movable wheel 30, and an expansion link 31 is fixedly connected between the bottom plate 1 and the supporting plate 7.
In this embodiment, the setting through telescopic link 31 plays the effect of spacing direction for backup pad 7 is more stable when removing.
The working principle and the using process of the invention are as follows: when the device is used, the servo motor 3 is started as required to drive the left-handed threaded rod 4 and the right-handed threaded rod 5 to move, so that the threaded cylinder 6 drives the supporting rod 11 to rotate, so that the supporting plate 7 is supported, and the construction height is convenient to adjust as required, when the device is used, the second walking plate 13 is driven to slide on the top of the first walking plate 12 by starting the hydraulic cylinder 14, so that the construction position is adjusted as required, so that the device is more convenient to use, the device plays a role of shielding by the first fixed baffle plate 15, the second fixed baffle plate 16, the first movable baffle plate 18 and the second movable baffle plate 19, so that personnel and articles are effectively protected when the device is used, the first movable baffle plate 18 is fixed after the first movable baffle plate 18 rotates by the first bolt 20 and the first nut 21, it is fixed to second removal baffle 19 after conveniently rotating through second nut 22 and second bolt 23, rotate back drive friction plate 26 through lead screw 25 and contact with ground, thereby the stability of device when placing has been guaranteed, avoided removing the back through removing wheel 30, lead to the device to slide because of the atress, play the effect of placing material and apparatus through material standing groove 27 and apparatus standing groove 28, construction safety has further been guaranteed, play the effect of support through reset spring 29, make and play the effect that resets when second running plate 13 shifts out from first running plate 12 top.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that changes may be made in the embodiments and/or equivalents thereof without departing from the spirit and scope of the invention. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (8)

1. The utility model provides a city utility tunnel equipment of being under construction fast, includes bottom plate (1), its characterized in that: the top fixedly connected with first mounting panel (2) of bottom plate (1), servo motor (3) are installed to the side of first mounting panel (2), the output fixedly connected with levogyration threaded rod (4) of servo motor (3), the tip fixedly connected with dextrorotation threaded rod (5) of levogyration threaded rod (4), the tip of dextrorotation threaded rod (5) rotates with first mounting panel (2) through the bearing and is connected, the surface thread connection of levogyration threaded rod (4) and dextrorotation threaded rod (5) has a screw thread section of thick bamboo (6), the top of bottom plate (1) is provided with backup pad (7), the bottom fixedly connected with second mounting panel (8) of backup pad (7), the side fixedly connected with slide bar (9) of second mounting panel (8), the surface sliding connection of slide bar (9) has sliding sleeve (10), the bottom of sliding sleeve (10) and the top of a screw thread section of thick bamboo (6) are connected with bracing piece (11) through the pivot rotation respectively, the first walking board (12) of top fixedly connected with of backup pad (7), the top sliding connection of first walking board (12) has second walking board (13), pneumatic cylinder (14) are installed to the side of backup pad (7), the tip and the second walking board (13) fixed connection of pneumatic cylinder (14).
2. The rapid construction equipment for the urban underground comprehensive pipe gallery according to claim 1, characterized in that: the top of first walking board (12) and second walking board (13) is the first fixed stop of the equal fixedly connected with (15), the top fixedly connected with second fixed stop (16) of second walking board (13), the top of first walking board (12) is rotated through the pivot and is connected with second and removes baffle (19), the top of second walking board (13) is rotated through the pivot and is connected with first removal baffle (18).
3. The rapid construction equipment for the urban underground comprehensive pipe gallery according to claim 2, characterized in that: the side fixedly connected with first nut (21) of second fixed stop (16), the side of second fixed stop (16) is provided with first bolt (20), first bolt (20) run through to the inside of first movable baffle (18), first bolt (20) and first nut (21) threaded connection.
4. The rapid construction equipment for the urban underground comprehensive pipe gallery according to claim 3, characterized in that: the back of the second movable baffle (19) is provided with a second bolt (23), the surface of the first movable baffle (18) is fixedly connected with a second nut (22), and the second nut (22) is in threaded connection with the second bolt (23).
5. The rapid construction equipment for the urban underground comprehensive pipe gallery according to claim 1, characterized in that: the top fixedly connected with screw ring (24) of bottom plate (1), the top through connection of bottom plate (1) has lead screw (25), the tip fixedly connected with friction plate (26) of lead screw (25), friction plate (26) and ground contact, screw ring (24) and lead screw (25) threaded connection.
6. The rapid construction equipment for the urban underground comprehensive pipe gallery according to claim 1, characterized in that: the top of the second walking plate (13) is fixedly connected with a material placing groove (27) and an instrument placing groove (28), the top of the supporting plate (7) is fixedly connected with a return spring (29), and the top of the return spring (29) is fixedly connected with the first walking plate (12).
7. The rapid construction equipment for the urban underground comprehensive pipe gallery according to claim 1, characterized in that: the side edge of the supporting plate (7) is fixedly connected with a guide rod (17), and the guide rod (17) is in through connection with the second walking plate (13).
8. The rapid construction equipment for the urban underground comprehensive pipe gallery according to claim 1, characterized in that: the top of bottom plate (1) is installed and is removed wheel (30), fixedly connected with telescopic link (31) between bottom plate (1) and backup pad (7).
CN202010821102.5A 2020-08-14 2020-08-14 Quick construction equipment of city utility tunnel Pending CN111997381A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010821102.5A CN111997381A (en) 2020-08-14 2020-08-14 Quick construction equipment of city utility tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010821102.5A CN111997381A (en) 2020-08-14 2020-08-14 Quick construction equipment of city utility tunnel

Publications (1)

Publication Number Publication Date
CN111997381A true CN111997381A (en) 2020-11-27

Family

ID=73473705

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010821102.5A Pending CN111997381A (en) 2020-08-14 2020-08-14 Quick construction equipment of city utility tunnel

Country Status (1)

Country Link
CN (1) CN111997381A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5152368A (en) * 1989-07-17 1992-10-06 Heiden Gary J Scaffold
CN206554481U (en) * 2017-02-15 2017-10-13 马凤龙 A kind of portable scaffold
CN108166739A (en) * 2018-02-26 2018-06-15 姜慧 A kind of extensible safety lifting construction working platform
CN108625606A (en) * 2018-06-14 2018-10-09 莫小雨 A kind of steel construction positioning transmission scaffold
CN109128961A (en) * 2017-06-19 2019-01-04 潘素云 A kind of lifting apparatus for lathe transmission
CN210482961U (en) * 2019-07-18 2020-05-08 平湖市华舟市政园林建设有限公司 Workstation convenient to adjust for building construction

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5152368A (en) * 1989-07-17 1992-10-06 Heiden Gary J Scaffold
CN206554481U (en) * 2017-02-15 2017-10-13 马凤龙 A kind of portable scaffold
CN109128961A (en) * 2017-06-19 2019-01-04 潘素云 A kind of lifting apparatus for lathe transmission
CN108166739A (en) * 2018-02-26 2018-06-15 姜慧 A kind of extensible safety lifting construction working platform
CN108625606A (en) * 2018-06-14 2018-10-09 莫小雨 A kind of steel construction positioning transmission scaffold
CN210482961U (en) * 2019-07-18 2020-05-08 平湖市华舟市政园林建设有限公司 Workstation convenient to adjust for building construction

Similar Documents

Publication Publication Date Title
CN211716603U (en) Energy-saving gas boiler waste heat recovery device
CN208703275U (en) A kind of push pipe power device
CN111997381A (en) Quick construction equipment of city utility tunnel
CN219243107U (en) Site surveying instrument for construction engineering cost
CN206802477U (en) A kind of holder device for being easy to protect underground utilities
CN110721960A (en) Computer auxiliary equipment convenient to overhaul
CN113954989B (en) Manned operation equipment for repairing civil aircraft
CN214943986U (en) Novel geological survey probing device
CN206029325U (en) Supporting structure of manual longmen side milling head
CN207757272U (en) A kind of fixing device for aluminum extrusion cutter
CN206250654U (en) A kind of GW7 types disconnecting switch inspection platform
CN217343601U (en) Parallel double-spindle turning center
CN209363811U (en) A kind of high efficiency engineering steel pipe cutting device
CN217208786U (en) Engineering measuring instrument support for building engineering
CN213387515U (en) Small-size adjustable portal crane
CN211868038U (en) Mechanical drilling device for PCB
CN214772048U (en) Electric power intelligence fortune is examined robot convenient to overhaul
CN219106917U (en) Auxiliary frame for electric power construction
CN215862956U (en) Movable high position searchlighting equipment for hydraulic engineering
CN216178071U (en) Multi-angle pressing type aligning auxiliary device
CN212443595U (en) Auxiliary device of threading machine
CN216667145U (en) Portable land surveying and mapping frame
CN220017232U (en) Lighting device is used in TBM construction
CN219786903U (en) Machining device of cross steel structure
CN219746163U (en) Portable transformer construction overhauls processing platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20201127

RJ01 Rejection of invention patent application after publication