CN111985701B - 一种基于供电企业大数据模型库的用电预测方法 - Google Patents
一种基于供电企业大数据模型库的用电预测方法 Download PDFInfo
- Publication number
- CN111985701B CN111985701B CN202010756694.7A CN202010756694A CN111985701B CN 111985701 B CN111985701 B CN 111985701B CN 202010756694 A CN202010756694 A CN 202010756694A CN 111985701 B CN111985701 B CN 111985701B
- Authority
- CN
- China
- Prior art keywords
- data
- load
- prediction model
- model
- prediction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 32
- 238000013499 data model Methods 0.000 title claims abstract description 12
- 230000005611 electricity Effects 0.000 claims abstract description 65
- 238000012549 training Methods 0.000 claims abstract description 32
- 238000007781 pre-processing Methods 0.000 claims abstract description 23
- 238000013528 artificial neural network Methods 0.000 claims abstract description 19
- 238000004140 cleaning Methods 0.000 claims abstract description 11
- 230000009467 reduction Effects 0.000 claims abstract description 8
- 238000012706 support-vector machine Methods 0.000 claims abstract description 8
- 230000008859 change Effects 0.000 claims description 19
- 230000002159 abnormal effect Effects 0.000 claims description 15
- 230000000306 recurrent effect Effects 0.000 claims description 10
- 238000011524 similarity measure Methods 0.000 claims description 6
- 238000010606 normalization Methods 0.000 claims description 5
- 230000006870 function Effects 0.000 claims description 4
- 230000008569 process Effects 0.000 claims description 4
- 241001123248 Arma Species 0.000 claims description 3
- 230000004913 activation Effects 0.000 claims description 3
- 238000004458 analytical method Methods 0.000 claims description 3
- 238000007621 cluster analysis Methods 0.000 claims description 3
- 239000006185 dispersion Substances 0.000 claims description 3
- 238000013112 stability test Methods 0.000 claims description 3
- 230000009466 transformation Effects 0.000 claims description 3
- 238000011425 standardization method Methods 0.000 claims description 2
- 238000007405 data analysis Methods 0.000 description 8
- 238000007726 management method Methods 0.000 description 8
- 230000002354 daily effect Effects 0.000 description 7
- 239000011159 matrix material Substances 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 3
- 238000012937 correction Methods 0.000 description 3
- 238000007418 data mining Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000013213 extrapolation Methods 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 238000003745 diagnosis Methods 0.000 description 2
- 230000007613 environmental effect Effects 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 230000005856 abnormality Effects 0.000 description 1
- 230000001174 ascending effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000004836 empirical method Methods 0.000 description 1
- 230000003203 everyday effect Effects 0.000 description 1
- 238000010801 machine learning Methods 0.000 description 1
- 230000000737 periodic effect Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/21—Design, administration or maintenance of databases
- G06F16/215—Improving data quality; Data cleansing, e.g. de-duplication, removing invalid entries or correcting typographical errors
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/24—Querying
- G06F16/245—Query processing
- G06F16/2458—Special types of queries, e.g. statistical queries, fuzzy queries or distributed queries
- G06F16/2465—Query processing support for facilitating data mining operations in structured databases
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N3/00—Computing arrangements based on biological models
- G06N3/02—Neural networks
- G06N3/04—Architecture, e.g. interconnection topology
- G06N3/044—Recurrent networks, e.g. Hopfield networks
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N3/00—Computing arrangements based on biological models
- G06N3/02—Neural networks
- G06N3/04—Architecture, e.g. interconnection topology
- G06N3/049—Temporal neural networks, e.g. delay elements, oscillating neurons or pulsed inputs
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02D—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
- Y02D10/00—Energy efficient computing, e.g. low power processors, power management or thermal management
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- Human Resources & Organizations (AREA)
- General Physics & Mathematics (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Health & Medical Sciences (AREA)
- Databases & Information Systems (AREA)
- Data Mining & Analysis (AREA)
- General Engineering & Computer Science (AREA)
- General Health & Medical Sciences (AREA)
- Marketing (AREA)
- Computational Linguistics (AREA)
- Mathematical Physics (AREA)
- Software Systems (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Evolutionary Computation (AREA)
- Artificial Intelligence (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Computing Systems (AREA)
- Molecular Biology (AREA)
- Operations Research (AREA)
- Biophysics (AREA)
- Biomedical Technology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Educational Administration (AREA)
- Fuzzy Systems (AREA)
- Probability & Statistics with Applications (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010756694.7A CN111985701B (zh) | 2020-07-31 | 2020-07-31 | 一种基于供电企业大数据模型库的用电预测方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010756694.7A CN111985701B (zh) | 2020-07-31 | 2020-07-31 | 一种基于供电企业大数据模型库的用电预测方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111985701A CN111985701A (zh) | 2020-11-24 |
CN111985701B true CN111985701B (zh) | 2024-03-01 |
Family
ID=73444826
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010756694.7A Active CN111985701B (zh) | 2020-07-31 | 2020-07-31 | 一种基于供电企业大数据模型库的用电预测方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111985701B (zh) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112508734B (zh) * | 2020-11-27 | 2024-04-26 | 国网浙江省电力有限公司杭州供电公司 | 基于卷积神经网络的电力企业发电量的预测方法及装置 |
CN112990587B (zh) * | 2021-03-24 | 2023-10-24 | 北京市腾河智慧能源科技有限公司 | 一种对台区用电进行精准预测的方法及系统、设备、介质 |
CN113487062A (zh) * | 2021-05-31 | 2021-10-08 | 国网上海市电力公司 | 一种基于周期自动编码器的电力负荷预测方法 |
CN113256022B (zh) * | 2021-06-16 | 2023-02-24 | 广东电网有限责任公司 | 一种台区用电负荷预测方法及系统 |
CN113269468A (zh) * | 2021-06-17 | 2021-08-17 | 山东卓文信息科技有限公司 | 一种基于区块链的电力调度系统及其数据处理方法 |
CN113947201A (zh) * | 2021-08-02 | 2022-01-18 | 国家电投集团电站运营技术(北京)有限公司 | 电力分解曲线预测模型的训练方法、装置以及存储介质 |
CN114298388A (zh) * | 2021-12-21 | 2022-04-08 | 青岛鼎信通讯股份有限公司 | 一种基于台区融合终端历史数据的负荷预测方法 |
CN118095570A (zh) * | 2024-04-17 | 2024-05-28 | 北京智芯微电子科技有限公司 | 台区智能负荷预测方法、系统、电子设备、介质及芯片 |
Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004086896A (ja) * | 2002-08-06 | 2004-03-18 | Fuji Electric Holdings Co Ltd | 適応的予測モデル構築方法及び適応的予測モデル構築システム |
CN103559655A (zh) * | 2013-11-15 | 2014-02-05 | 哈尔滨工业大学 | 基于数据挖掘的微网新型馈线负荷的预测方法 |
KR101409025B1 (ko) * | 2013-05-20 | 2014-06-19 | 엘에스산전 주식회사 | 전기부하 예측 장치 및 보정 방법 |
CN104008430A (zh) * | 2014-05-29 | 2014-08-27 | 华北电力大学 | 一种构建拟境挖掘动态智能负荷预测模型的方法 |
CN104200277A (zh) * | 2014-08-12 | 2014-12-10 | 南方电网科学研究院有限责任公司 | 一种中长期电力负荷预测模型建立方法 |
CN105989544A (zh) * | 2015-03-04 | 2016-10-05 | 国家电网公司 | 一种配电台区自适应短期负荷预测方法 |
CN106844594A (zh) * | 2017-01-12 | 2017-06-13 | 南京大学 | 一种基于大数据的电力优化配置方法 |
CN107368932A (zh) * | 2017-08-09 | 2017-11-21 | 国网山东省电力公司经济技术研究院 | 一种适用于电网发展专业的负荷分析预测系统 |
CN108022004A (zh) * | 2017-11-16 | 2018-05-11 | 广东电网有限责任公司信息中心 | 一种多模型加权组合电力负荷预报的自适应权重训练方法 |
CN108491969A (zh) * | 2018-03-16 | 2018-09-04 | 国家电网公司 | 基于大数据的空间负荷预测模型构建方法 |
CN109359786A (zh) * | 2018-12-05 | 2019-02-19 | 国网江苏省电力有限公司扬州供电分公司 | 一种电力台区短期负荷预测方法 |
CN109508835A (zh) * | 2019-01-01 | 2019-03-22 | 中南大学 | 一种融合环境反馈的智慧电网短期电力负荷预测方法 |
WO2019183612A1 (en) * | 2018-03-23 | 2019-09-26 | Koniku Inc. | Methods of predicting emotional response to sensory stimuli based on individual traits |
CN110503256A (zh) * | 2019-08-14 | 2019-11-26 | 北京国网信通埃森哲信息技术有限公司 | 基于大数据技术的短期负荷预测方法及系统 |
CN110516912A (zh) * | 2019-07-24 | 2019-11-29 | 长沙恒电聚能电子科技有限公司 | 一种配电台区户变关系的识别方法 |
CN110796368A (zh) * | 2019-10-23 | 2020-02-14 | 北方工业大学 | 基于贝叶斯网络的社区配电网动态风险评估方法及装置 |
CN110929927A (zh) * | 2019-11-18 | 2020-03-27 | 国网甘肃省电力公司 | 一种应用配电网全域大数据的人工智能预测模型构方法 |
CN111178612A (zh) * | 2019-12-19 | 2020-05-19 | 绍兴大明电力设计院有限公司 | 一种网格用户基于大数据odps引擎的lstm负荷预测方法 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10325205B2 (en) * | 2014-06-09 | 2019-06-18 | Cognitive Scale, Inc. | Cognitive information processing system environment |
US10288166B2 (en) * | 2017-07-24 | 2019-05-14 | Caterpillar Inc. | System and method for predicting and responding to soft underfoot conditions |
-
2020
- 2020-07-31 CN CN202010756694.7A patent/CN111985701B/zh active Active
Patent Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004086896A (ja) * | 2002-08-06 | 2004-03-18 | Fuji Electric Holdings Co Ltd | 適応的予測モデル構築方法及び適応的予測モデル構築システム |
KR101409025B1 (ko) * | 2013-05-20 | 2014-06-19 | 엘에스산전 주식회사 | 전기부하 예측 장치 및 보정 방법 |
CN103559655A (zh) * | 2013-11-15 | 2014-02-05 | 哈尔滨工业大学 | 基于数据挖掘的微网新型馈线负荷的预测方法 |
CN104008430A (zh) * | 2014-05-29 | 2014-08-27 | 华北电力大学 | 一种构建拟境挖掘动态智能负荷预测模型的方法 |
CN104200277A (zh) * | 2014-08-12 | 2014-12-10 | 南方电网科学研究院有限责任公司 | 一种中长期电力负荷预测模型建立方法 |
CN105989544A (zh) * | 2015-03-04 | 2016-10-05 | 国家电网公司 | 一种配电台区自适应短期负荷预测方法 |
CN106844594A (zh) * | 2017-01-12 | 2017-06-13 | 南京大学 | 一种基于大数据的电力优化配置方法 |
CN107368932A (zh) * | 2017-08-09 | 2017-11-21 | 国网山东省电力公司经济技术研究院 | 一种适用于电网发展专业的负荷分析预测系统 |
CN108022004A (zh) * | 2017-11-16 | 2018-05-11 | 广东电网有限责任公司信息中心 | 一种多模型加权组合电力负荷预报的自适应权重训练方法 |
CN108491969A (zh) * | 2018-03-16 | 2018-09-04 | 国家电网公司 | 基于大数据的空间负荷预测模型构建方法 |
WO2019183612A1 (en) * | 2018-03-23 | 2019-09-26 | Koniku Inc. | Methods of predicting emotional response to sensory stimuli based on individual traits |
CN109359786A (zh) * | 2018-12-05 | 2019-02-19 | 国网江苏省电力有限公司扬州供电分公司 | 一种电力台区短期负荷预测方法 |
CN109508835A (zh) * | 2019-01-01 | 2019-03-22 | 中南大学 | 一种融合环境反馈的智慧电网短期电力负荷预测方法 |
CN110516912A (zh) * | 2019-07-24 | 2019-11-29 | 长沙恒电聚能电子科技有限公司 | 一种配电台区户变关系的识别方法 |
CN110503256A (zh) * | 2019-08-14 | 2019-11-26 | 北京国网信通埃森哲信息技术有限公司 | 基于大数据技术的短期负荷预测方法及系统 |
CN110796368A (zh) * | 2019-10-23 | 2020-02-14 | 北方工业大学 | 基于贝叶斯网络的社区配电网动态风险评估方法及装置 |
CN110929927A (zh) * | 2019-11-18 | 2020-03-27 | 国网甘肃省电力公司 | 一种应用配电网全域大数据的人工智能预测模型构方法 |
CN111178612A (zh) * | 2019-12-19 | 2020-05-19 | 绍兴大明电力设计院有限公司 | 一种网格用户基于大数据odps引擎的lstm负荷预测方法 |
Also Published As
Publication number | Publication date |
---|---|
CN111985701A (zh) | 2020-11-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111985701B (zh) | 一种基于供电企业大数据模型库的用电预测方法 | |
CN113962364B (zh) | 一种基于深度学习的多因素用电负荷预测方法 | |
US10873209B2 (en) | System and method for dynamic energy storage system control | |
US20190228329A1 (en) | Prediction system and prediction method | |
CN106779129A (zh) | 一种考虑气象因素的短期电力负荷预测方法 | |
CN111582911A (zh) | 一种多元用户与电网友好互动用电系统 | |
CN111260136A (zh) | 一种基于arima-lstm组合模型的楼宇短期负荷预测方法 | |
CN108491969A (zh) | 基于大数据的空间负荷预测模型构建方法 | |
CN106408223A (zh) | 基于气象相似日及误差校正的短期负荷预测方法 | |
CN104156783A (zh) | 计及气象累积效应的电力系统最大日负荷预测系统及方法 | |
CN113743673B (zh) | 一种台风期间的电力负荷预测方法 | |
CN114372360A (zh) | 用于电力负荷预测的方法、终端及存储介质 | |
CN112149890A (zh) | 基于用户用能标签的综合能源负荷预测方法及系统 | |
CN110909958A (zh) | 一种计及光伏并网功率的短期负荷预测方法 | |
CN111881961A (zh) | 基于数据挖掘的配电网故障风险等级预测方法 | |
CN114331001A (zh) | 一种自适应匹配的电力终端异常工单分派方法及系统 | |
CN114595861A (zh) | 基于mstl和lstm模型的中长期电力负荷预测方法 | |
CN115545333A (zh) | 一种多负荷日类型配电网负荷曲线预测方法 | |
CN115860797A (zh) | 一种适应新电价改革形势的电量需求预测方法 | |
CN114819395A (zh) | 一种基于长短期记忆神经网络和支持向量回归组合模型的行业中长期负荷预测方法 | |
CN113887809A (zh) | 双碳目标下配电网供需平衡方法、系统、介质及计算设备 | |
CN116644562B (zh) | 一种新能源电站运维费用评估系统 | |
CN110489893B (zh) | 一种基于可变权值的母线负荷预测方法及系统 | |
CN115905319B (zh) | 一种海量用户电费异常的自动识别方法及系统 | |
CN108345996B (zh) | 一种降低风电功率考核电量的系统及方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 1122 Yuanshen Road, Pudong New Area, Shanghai, 200122 Applicant after: STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER Co. Applicant after: EAST CHINA ELECTRIC POWER TEST AND RESEARCH INSTITUTE Co.,Ltd. Applicant after: Star link information technology (Shanghai) Co.,Ltd. Address before: 1122 Yuanshen Road, Pudong New Area, Shanghai, 200122 Applicant before: STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER Co. Applicant before: EAST CHINA ELECTRIC POWER TEST AND RESEARCH INSTITUTE Co.,Ltd. Applicant before: TRANSWARP TECHNOLOGY (SHANGHAI) Co.,Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |