CN111945944A - Shallow ceiling system for preset emergency box board house and construction method thereof - Google Patents

Shallow ceiling system for preset emergency box board house and construction method thereof Download PDF

Info

Publication number
CN111945944A
CN111945944A CN202010832151.9A CN202010832151A CN111945944A CN 111945944 A CN111945944 A CN 111945944A CN 202010832151 A CN202010832151 A CN 202010832151A CN 111945944 A CN111945944 A CN 111945944A
Authority
CN
China
Prior art keywords
thread
shallow
shallow ceiling
telescopic
connecting piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010832151.9A
Other languages
Chinese (zh)
Other versions
CN111945944B (en
Inventor
方三陵
陈超
王雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN202010832151.9A priority Critical patent/CN111945944B/en
Publication of CN111945944A publication Critical patent/CN111945944A/en
Application granted granted Critical
Publication of CN111945944B publication Critical patent/CN111945944B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • E04B9/12Connections between non-parallel members of the supporting construction
    • E04B9/14Connections between non-parallel members of the supporting construction all the members being discontinuous and laying at least partly in the same plane

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Tents Or Canopies (AREA)

Abstract

The invention provides a shallow ceiling system for a preset emergency box-plank house and a construction method thereof, wherein the shallow ceiling system comprises a plurality of shallow ceiling keels and shallow ceiling connecting pieces, wherein the shallow ceiling keels are connected in pairs through the shallow ceiling connecting pieces to form a complete shallow ceiling system; shallow ceiling connector includes external connection spare, main part, telescopic fossil fragments connecting piece, and the main part is the cube structure, and main part top center is equipped with external connection spare, and the bottom center is equipped with the jib connecting hole, and on four sides of main part were located to telescopic fossil fragments connecting piece two bisymmetries, the end of shallow ceiling fossil fragments linked to each other with telescopic fossil fragments connecting piece. The invention has more convenient and simple construction, improves the space utilization rate and further reduces the construction cost.

Description

Shallow ceiling system for preset emergency box board house and construction method thereof
Technical Field
The invention belongs to the technical field of buildings, and particularly relates to a shallow ceiling system for a preset emergency box board house and a construction method of the shallow ceiling system.
Background
In the construction process of the emergency box-plate house, the suspended ceiling and the sealing operation of the suspended ceiling can be carried out behind electric wires, ventilation pipes and various equipment pipelines to ensure the air tightness of the house, so that the delivery and use time of the building is greatly influenced, and the emergency rescue and relief work is unfavorable.
Disclosure of Invention
The invention aims to solve the technical problems and provides a shallow ceiling system for a preset emergency box board house and a construction method thereof. And after the box board house is built, the shallow suspended ceiling can be installed and the sealing work can be completed. After the equipment is in place, the universal connector can be used for connecting the lower suspender to support the bridge, and the electric circuit and the equipment pipeline can be arranged in the bridge at the later stage. After the construction is finished, the bridge frame can be shielded and decorated according to requirements. The technical requirements of the emergency box board house are met, the construction period is guaranteed, and good social benefits are achieved.
The technical scheme adopted by the invention for solving the technical problems is as follows: the shallow ceiling system for the preset emergency box board house is characterized by comprising a plurality of shallow ceiling keels and shallow ceiling connecting pieces, wherein the shallow ceiling keels are connected in pairs through the shallow ceiling connecting pieces to form a complete shallow ceiling system; shallow ceiling connecting piece includes external connection spare, main part, telescopic fossil fragments connecting piece, the main part is the cube structure, and main part top center is equipped with external connection spare, bottom center are equipped with the jib connecting hole, telescopic fossil fragments connecting piece two bisymmetry is located on four sides of main part, the end of shallow ceiling fossil fragments links to each other with telescopic fossil fragments connecting piece.
According to the above scheme, telescopic fossil fragments connecting piece includes outer sleeve, inner skleeve and flexible adjusting device, flexible adjusting device includes upper and lower screw thread guide rail board and flexible adjusting screw, follows inner skleeve left and right both sides wall central line symmetry is equipped with the adjustment tank, upper and lower screw thread guide rail board correspond to the adjustment tank symmetry is located on the inner skleeve inner wall, flexible adjusting screw level is worn to locate the front end center of outer sleeve to pass the adjustment tank, the rotation regulation groove makes the inner skleeve move along the outer sleeve is flexible.
According to the scheme, the working surface of the upper and lower thread guide plates is sequentially provided with the right recovery thread, the right extension thread, the left recovery thread and the left extension thread from right to left at intervals, the right recovery thread and the left recovery thread are consistent in the turning direction, and the right extension thread and the left extension thread are consistent in the turning direction.
According to the above scheme, flexible adjusting screw includes knob and pole section, the knob is located the head of pole section, the position that is close to the knob on the pole section is equipped with right spacing collar, and the afterbody is equipped with left spacing collar, and the middle part interval is equipped with right screw thread and left screw thread, left and right screw thread with the right side is retrieved the screw thread, the right side is extended the screw thread, the left side is retrieved the screw thread and is extended the screw thread configuration meshing with the left side.
According to the scheme, the width of the left thread and the width of the right thread are larger than the space width between the right recovery thread and the right extension thread and the space width between the left recovery thread and the left extension thread.
According to the scheme, the left threads and the right threads are arranged at intervals along the circumferential direction of the rod section.
According to the scheme, the outer connecting piece is a cross-shaped connecting plate, and the four ends of the cross-shaped connecting plate are provided with bolt holes.
According to the scheme, the suspender connecting hole is provided with a sealing plate for sealing.
The construction method of the shallow ceiling system for the preset emergency box-board house is characterized by comprising the following steps:
s1), connecting the shallow ceiling connecting piece with the box plate house beam through a bolt hole on the outer connecting piece, aligning the shallow ceiling keel with the telescopic keel connecting piece after the shallow ceiling connecting piece is arranged as required, rotating the telescopic adjusting screw to enable the inner sleeve to extend out to be connected with the shallow ceiling keel, and sequentially connecting all the shallow ceiling keels to finish the installation of the shallow ceiling;
s2) mounting the veneer on the shallow ceiling keel, and completing sealing operation to complete the construction of the building part of the box-plate house;
and S3) when the pipeline and the air pipe are required to be installed, the connecting hole of the suspender is opened, and the suspender is screwed into the connecting hole of the suspender, so that the installation of the suspender is completed.
The invention has the beneficial effects that: the shallow ceiling system for the preset emergency box-board house and the construction method thereof are provided, the flat installation of the C-shaped keel is completed through the shallow ceiling connecting piece, the complex structural forms of the traditional ceiling main keel, the auxiliary keel, the cross-brace keel and the like are changed, and the construction is more convenient, simple and economic; and because of adopting the flush mounting structure, the suspended ceiling occupies little space, thus improving the space utilization rate and further reducing the construction cost; the invention takes the shallow ceiling connecting piece as a reliable force transmission structure, separates the building procedures of mounting heavy parts such as a bridge frame on a house, ensures the reliable stress, adjusts the construction procedures, and effectively compresses the construction period in emergency engineering; the invention uses the assembly concept, and the main body components can be recycled, thereby effectively reducing the cost. .
Drawings
Fig. 1 is an isometric view of a shallow ceiling connection according to one embodiment of the present invention.
Fig. 2 is a bottom isometric view of a shallow ceiling connection according to one embodiment of the invention.
Fig. 3 is an elevation view of a shallow ceiling connection according to one embodiment of the present invention.
Fig. 4 is a schematic structural view of a telescopic adjusting screw according to an embodiment of the present invention.
Fig. 5 is a schematic view of the thread distribution of the telescopic adjusting screw according to an embodiment of the present invention.
Fig. 6 is a schematic view of the thread distribution of the upper thread guide rail plate according to an embodiment of the present invention.
Figure 7 is a schematic view of a shallow ceiling grid installation in accordance with one embodiment of the present invention.
Detailed Description
For a better understanding of the present invention, reference is made to the following description taken in conjunction with the accompanying drawings and examples.
As shown in fig. 1-3 and 7, the shallow ceiling system for the pre-set emergency box-plank house comprises a plurality of shallow ceiling keels 1 and shallow ceiling connecting pieces 2, wherein the shallow ceiling keels are connected in pairs through the shallow ceiling connecting pieces to form a complete shallow ceiling system; shallow ceiling connector includes external connection spare 3, main part 4, telescopic fossil fragments connecting piece 5, and the main part is the cube structure, and main part top center is equipped with external connection spare, and the bottom center is equipped with jib connecting hole 6, and telescopic fossil fragments connecting piece two bisymmetries are located on four sides of main part, and the end of shallow ceiling fossil fragments links to each other with telescopic fossil fragments connecting piece.
Telescopic fossil fragments connecting piece includes outer sleeve 7, inner skleeve 8 and flexible adjusting device, flexible adjusting device includes screw thread guide rail plate 9, lower screw thread guide rail plate 10 and flexible adjusting screw 11, be equipped with adjustment tank 12 along the inner skleeve left and right both sides wall central line symmetry, upper and lower screw thread guide rail plate is located on the inner skleeve inner wall corresponding to the adjustment tank symmetry, the front end center of locating the outer sleeve is worn to flexible adjusting screw level, and pass the adjustment tank, rotatory adjustment tank makes the inner skleeve move along the outer sleeve is flexible.
As shown in fig. 6, the working surface of the upper and lower thread guide plates is provided with a right recovery thread 13, a right extension thread 14, a left recovery thread 15 and a left extension thread 16 at intervals from right to left, the rotation directions of the right recovery thread and the left recovery thread are consistent, and the rotation directions of the right extension thread and the left extension thread are consistent.
As shown in fig. 4 and 5, the telescopic adjusting screw comprises a knob 17 and a rod section, the knob is arranged at the head of the rod section, a right limit ring 18 is arranged at a position on the rod section close to the knob, a left limit ring 19 is arranged at the tail of the rod section, a right thread 20 and a left thread 21 are arranged at intervals in the middle of the rod section, and the left thread and the right thread are engaged with a right recovery thread, a right extension thread, a left recovery thread and a left extension thread in a configuration manner. According to the scheme, the left threads and the right threads are arranged at intervals along the circumferential direction of the rod section. Therefore, when the knob of the telescopic adjusting screw rod is rotated, the knob does not move up and down to cause derailment due to the reaction force between the threads. When the rotation direction needs to be switched, the gap between the right recovery thread and the right extension thread and the gap between the left recovery thread and the left extension thread enable the left thread and the right thread to respectively and smoothly move between the extension thread and the retraction thread, and if the gap is not arranged, the instantaneous switching of the extension guide rail and the retraction guide rail in use easily causes thread damage.
The knob is pressed leftwards to enable the right limiting ring to be in contact with the outer sleeve, at the moment, the right thread is meshed with the right extension thread, the left thread is meshed with the left extension thread, and the inner sleeve extends outwards along with the left extension thread when the knob is rotated rightwards. The purpose of connecting the keels is completed by simultaneously extending the inner sleeves of the shallow ceiling connecting pieces on the two sides of one C-shaped keel. When the C-shaped keel is disassembled, the knob is pulled rightwards to enable the left limiting ring to be in contact with the outer sleeve. At this point, the right threads engage the right withdrawal threads and the left threads engage the left withdrawal threads. And reversely rotating the knob, and withdrawing the inner sleeve inwards to detach the C-shaped keel. Furthermore, the shallow ceiling connecting piece can be detached for recycling by detaching the bolts on the outer connecting piece.
The width of the left and right screw threads is larger than the space width between the right recovery screw thread and the right extension screw thread and the space width between the left recovery screw thread and the left extension screw thread. After the keel is connected, the telescopic adjusting screw of the telescopic keel connecting piece is arranged on the positions, not attached to the outer sleeve, of the left limiting ring and the right limiting ring, the right thread is in contact with the right extending thread and the left extending thread at the same time, or in contact with the left withdrawing thread and the right withdrawing thread at the same time, and slight vibration and other acting forces cannot enable the telescopic adjusting screw to displace so as to guarantee safety. The outer connecting piece is a cross-shaped connecting plate, four ends of the cross-shaped connecting plate are provided with bolt holes 22, and the cross-shaped connecting plate is connected with the house beam through bolts and can also be connected through welding when necessary.
The hanger rod connecting hole is provided with a sealing plate for sealing, so that the air tightness of the box plate house building part is ensured.
The shallow ceiling connecting piece is connected with the box plate house beam through a bolt hole in the outer connecting piece. Arrange to accomplish after the shallow furred ceiling connecting piece according to the requirement and align C type fossil fragments and telescopic fossil fragments connecting piece, rotatory knob makes the inner skleeve stretch out, and the connection is accomplished according to this operation to the C type fossil fragments other end.
After the structure arrangement is completed, the veneer is installed on the keel, and the sealing operation is completed.
When the pipeline, the air pipe and the like need to be installed, the suspender is screwed into the suspender connecting hole. At the moment, the stress condition of the suspender is that the house beam → the outer connecting piece → the main body → the suspender are all stably connected, so the stress is reliable. According to the engineering requirement, the hanger rod is used for connecting the bridge frame or other components. The process has no influence on the roof after the sealing operation is finished.
The foregoing is only a preferred embodiment of the present invention; the scope of the invention is not limited thereto. Any person skilled in the art should be able to cover the technical scope of the present invention by equivalent or modified solutions and modifications within the technical scope of the present invention.

Claims (9)

1. The shallow ceiling system for the preset emergency box board house is characterized by comprising a plurality of shallow ceiling keels and shallow ceiling connecting pieces, wherein the shallow ceiling keels are connected in pairs through the shallow ceiling connecting pieces to form a complete shallow ceiling system; shallow ceiling connecting piece includes external connection spare, main part, telescopic fossil fragments connecting piece, the main part is the cube structure, and main part top center is equipped with external connection spare, bottom center are equipped with the jib connecting hole, telescopic fossil fragments connecting piece two bisymmetry is located on four sides of main part, the end of shallow ceiling fossil fragments links to each other with telescopic fossil fragments connecting piece.
2. The shallow ceiling system for the pre-set emergency box plank house of claim 1, wherein the telescopic keel connecting piece comprises an outer sleeve, an inner sleeve and a telescopic adjusting device, the telescopic adjusting device comprises an upper threaded guide rail plate, a lower threaded guide rail plate and a telescopic adjusting screw, adjusting grooves are symmetrically arranged along the central lines of the left side wall and the right side wall of the inner sleeve, the upper threaded guide rail plate and the lower threaded guide rail plate correspond to the adjusting grooves and are symmetrically arranged on the inner wall of the inner sleeve, the telescopic adjusting screw horizontally penetrates through the center of the front end of the outer sleeve and passes through the adjusting grooves, and the inner sleeve is enabled to move telescopically along the outer sleeve by rotating the adjusting grooves.
3. The shallow ceiling system for the pre-set emergency box board house according to claim 2, wherein a right recovery thread, a right extension thread, a left recovery thread and a left extension thread are sequentially arranged on the working surface of the upper and lower thread guide rail plates from right to left at intervals, the rotation directions of the right recovery thread and the left recovery thread are consistent, and the rotation directions of the right extension thread and the left extension thread are consistent.
4. The shallow ceiling system for the prefabricated emergency box board house as claimed in claim 3, wherein the telescopic adjusting screw comprises a knob and a rod section, the knob is disposed at the head of the rod section, a right limiting ring is disposed on the rod section at a position close to the knob, a left limiting ring is disposed at the tail of the rod section, a right thread and a left thread are disposed at intervals in the middle of the rod section, and the left and right threads are engaged with the right recovery thread, the right extension thread, the left recovery thread and the left extension thread.
5. The shallow ceiling system for a prefabricated emergency box board house as claimed in claim 4, wherein the width of the left and right threads is greater than the width of the space between the right recovery thread and the right extension thread and the width of the space between the left recovery thread and the left extension thread.
6. The shallow ceiling system for a prefabricated emergency box board house as claimed in claim 5, wherein the left and right threads are circumferentially spaced along the pole section.
7. The shallow ceiling system for the prefabricated emergency box board house as claimed in claim 1 or 5, wherein the external connecting member is a cross-shaped connecting plate, and bolt holes are formed in four ends of the cross-shaped connecting plate.
8. The shallow ceiling system for prefabricated emergency box board houses as claimed in claim 1, wherein the hanger bar connecting hole is provided with a sealing plate seal.
9. The construction method of the shallow ceiling system for the preset emergency box-board house is characterized by comprising the following steps:
s1), connecting the shallow ceiling connecting piece with the box plate house beam through a bolt hole on the outer connecting piece, aligning the shallow ceiling keel with the telescopic keel connecting piece after the shallow ceiling connecting piece is arranged as required, rotating the telescopic adjusting screw to enable the inner sleeve to extend out to be connected with the shallow ceiling keel, and sequentially connecting all the shallow ceiling keels to finish the installation of the shallow ceiling;
s2) mounting the veneer on the shallow ceiling keel, and completing sealing operation to complete the construction of the building part of the box-plate house;
and S3) when the pipeline and the air pipe are required to be installed, the connecting hole of the suspender is opened, and the suspender is screwed into the connecting hole of the suspender, so that the installation of the suspender is completed.
CN202010832151.9A 2020-08-18 2020-08-18 Shallow ceiling system for preset emergency box board house and construction method thereof Active CN111945944B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010832151.9A CN111945944B (en) 2020-08-18 2020-08-18 Shallow ceiling system for preset emergency box board house and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010832151.9A CN111945944B (en) 2020-08-18 2020-08-18 Shallow ceiling system for preset emergency box board house and construction method thereof

Publications (2)

Publication Number Publication Date
CN111945944A true CN111945944A (en) 2020-11-17
CN111945944B CN111945944B (en) 2021-11-26

Family

ID=73343639

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010832151.9A Active CN111945944B (en) 2020-08-18 2020-08-18 Shallow ceiling system for preset emergency box board house and construction method thereof

Country Status (1)

Country Link
CN (1) CN111945944B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2004293487A1 (en) * 2003-11-26 2005-06-09 RCR International Pty Ltd Improvements in bracket stripping
CN204531130U (en) * 2015-02-16 2015-08-05 浙江未来加电子商务有限公司 A kind of telescopic conversion layer connector
CN207714596U (en) * 2017-12-14 2018-08-10 江苏中南建设装饰有限公司 A kind of furred ceiling assembled lightgage steel joist frame
CN209384929U (en) * 2018-11-27 2019-09-13 国网上海综合能源服务有限公司 A kind of building energy conservation window of sound-insulating
CN111188448A (en) * 2020-01-13 2020-05-22 深圳市奇信集团股份有限公司 Unit type adjustable suspended ceiling structure
CN211258993U (en) * 2019-07-22 2020-08-14 华信唐山石油装备有限公司 Screw for mixed transportation pump

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2004293487A1 (en) * 2003-11-26 2005-06-09 RCR International Pty Ltd Improvements in bracket stripping
CN204531130U (en) * 2015-02-16 2015-08-05 浙江未来加电子商务有限公司 A kind of telescopic conversion layer connector
CN207714596U (en) * 2017-12-14 2018-08-10 江苏中南建设装饰有限公司 A kind of furred ceiling assembled lightgage steel joist frame
CN209384929U (en) * 2018-11-27 2019-09-13 国网上海综合能源服务有限公司 A kind of building energy conservation window of sound-insulating
CN211258993U (en) * 2019-07-22 2020-08-14 华信唐山石油装备有限公司 Screw for mixed transportation pump
CN111188448A (en) * 2020-01-13 2020-05-22 深圳市奇信集团股份有限公司 Unit type adjustable suspended ceiling structure

Also Published As

Publication number Publication date
CN111945944B (en) 2021-11-26

Similar Documents

Publication Publication Date Title
CN103358115A (en) Device for automatically lengthening graphite electrode
CN111945944B (en) Shallow ceiling system for preset emergency box board house and construction method thereof
CN107134703A (en) A kind of extra large cable repair joint protector for being applicable a variety of extra large cable format diameters
CN102064494B (en) Wire lifting device of electric power rush repair tower
CN105244827A (en) Fixing bracket and installation method of electrical end equipment
CN204627551U (en) Offshore petroleum drilling function flexible pipe connects and emergency release
CN204456542U (en) Bolt device of shifting block type curtain skeleton system
CN208479135U (en) A kind of adjustable cable draws lower facility
CN105648918A (en) Deviation device and construction method thereof
CN206893978U (en) A kind of extra large cable repair joint protector for being applicable a variety of extra large cable format diameters
CN105672677A (en) Support tool used for fabricated building wallboard installation and use method of support tool
CN105443867B (en) It is a kind of that there is the vertical shaft trailing cable fixture for being oriented to and avoiding
CN205863847U (en) The orientable bus duct of safety that a kind of power equipment is special
CN204760956U (en) Box -type substation wall bushing
CN204609092U (en) A kind of combined type conversion layer connector
CN204633266U (en) Pipe supporting structure for bus
CN209288643U (en) The manual repair outfit of high pressure screw thread
CN209001531U (en) A kind of building electric installation engineering adjustable junction box
CN208474612U (en) A kind of easy-to-dismount starting solenoid valve
CN206205554U (en) The attachment structure of cross-arm is mutually combined in a kind of tower for wine glass-shaped
CN204361635U (en) A kind of power overhead network reinforcement by connection device
CN206060048U (en) A kind of vertical type livewire work insulation lead wire temporary fastening device
CN206175001U (en) Embedding slot way for subway tunnel
CN206313378U (en) A kind of angle steel tower bracket fixing device
CN205544059U (en) Power line reinforcing apparatus

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant