Prior art keywords
target
intelligent
intelligent building
network connection
working
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010609743.4A
Other languages
Chinese (zh)
Other versions
CN111913395B (en
Inventor
赵志虎
徐茂峰
高平
陈东
崔文进
赵志卫
吉伟伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Purida Technology Group Co ltd
Original Assignee
Prada Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Prada Construction Co ltd filed Critical Prada Construction Co ltd
Priority to CN202010609743.4A priority Critical patent/CN111913395B/en
Publication of CN111913395A publication Critical patent/CN111913395A/en
Application granted granted Critical
Publication of CN111913395B publication Critical patent/CN111913395B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B15/00Systems controlled by a computer
    • G05B15/02Systems controlled by a computer electric
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/26Pc applications
    • G05B2219/2639Energy management, use maximum of cheap power, keep peak load low

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides an intelligent building energy-saving control method and system, wherein the method comprises the following steps: monitoring a target area corresponding to a target intelligent building in real time, and judging whether a target user exists in the target area according to a monitoring result; if so, controlling the target intelligent building corresponding to the target area to be in a working state; otherwise, controlling the target intelligent building corresponding to the target area to be in a dormant state. Whether a user exists or not is judged conveniently, intelligent control is further carried out on the target intelligent building, and energy conservation is facilitated.

Description

Intelligent building energy-saving control method and system
Technical Field
The invention relates to the technical field of energy-saving control, in particular to an intelligent building energy-saving control method and system.
Background
At present, a control system of each equipment terminal, for example, an illumination control system, an air-conditioning heating and ventilation control system, an elevator control system and the like, is arranged in an intelligent building system, and most of the control systems are constructed by a professional software platform based on a standard protocol, each control system is deployed on a specific server, and the control process of the control system for the corresponding equipment terminal is generally controlled in a linkage manner according to preset control logic and by combining equipment terminal data, but if the equipment is not used, the equipment is still in a working state all the time, more electric energy is consumed, so the invention provides an intelligent building energy-saving control method and system.
Disclosure of Invention
The invention provides an intelligent building energy-saving control method and system, which are used for solving the technical problems.
The invention provides an intelligent building energy-saving control method, which comprises the following steps:
monitoring a target area corresponding to a target intelligent building in real time, and judging whether a target user exists in the target area according to a monitoring result;
if so, controlling the target intelligent building corresponding to the target area to be in a working state;
otherwise, controlling the target intelligent building corresponding to the target area to be in a dormant state.
In one possible way of realisation,
the in-process of carrying out real-time supervision to the target area that target intelligence building corresponds still includes:
obtaining a set of intelligent devices associated with the target intelligent building;
recording device information of each intelligent device in the intelligent device set, wherein the device information comprises: the device name and the device model of the intelligent device;
counting actual electric energy consumption information and actual flow consumption information of the intelligent device within a preset time period based on the device information;
performing data analysis on the actual electric energy consumption information and the actual current consumption information based on a data consumption model to obtain an electric energy consumption value and a current consumption value;
judging whether the electric energy consumption value is in a first consumption range or whether the current consumption value is in a second consumption range;
if yes, controlling the corresponding intelligent device to be in a dormant state, and meanwhile, controlling the intelligent device in the dormant state to work according to a dormancy alternation rule.
In one possible way of realisation,
controlling the target intelligent building corresponding to the target area to be in a working state process, comprising the following steps:
monitoring and acquiring current position information of a target user in the target area, wherein the current position information comprises: current position coordinates, a current orientation of the target user;
monitoring and acquiring user information of a target user in the target area, wherein the user information comprises: the height information of the target user and the vision information of the target user;
based on the current position information and the user information, adjusting the working power of the intelligent device in the working state corresponding to the target intelligent building;
and meanwhile, adjusting the intelligent device in the working state to an angle position and a height position corresponding to the target user of the target area.
In one possible way of realisation,
in the process of controlling the target intelligent building corresponding to the target area to be in the working state, the method further comprises the following steps:
acquiring and acquiring a first working temperature of a first device which is continuously in a working state, a second working temperature of a second device which is continuously in a dormant state and a third working temperature of a third device which is converted between the working state and the dormant state in the target intelligent building within the current time period, and storing the acquired first working temperature, second working temperature and third working temperature based on a distributed storage structure;
performing linear analysis on the first working temperature, the second working temperature and the third working temperature based on the linear time sequence to obtain a temperature linear analysis result;
acquiring a first attribute of the first device, a second attribute of the second device and a third attribute of the third device, and correcting a temperature linear analysis result based on the first attribute, the second attribute and the third attribute to obtain a corrected temperature result;
judging whether the temperature correction result is within a preset temperature range, if so, controlling each device to work according to a preset working mode;
and otherwise, acquiring the weight value of each device and sequencing the devices from large to small, and meanwhile, controlling the fourth device to be in a dormant state continuously according to a preset regulation and control proportion and based on the weight value sequencing result until the corrected temperature result is smaller than the minimum temperature value in the preset temperature range.
In one possible way of realisation,
before controlling the target intelligent building corresponding to the target area to be in a working state, the method further comprises the following steps:
judging whether an external instruction is received before the target intelligent building is in a working state;
if yes, crawling the external instruction, judging the instruction type of the external instruction based on an instruction database, and determining the to-be-converted state of the target intelligent building according to the instruction type;
meanwhile, monitoring the current conversion state of the target intelligent building;
if the current conversion state is inconsistent with the state to be converted, indicating that the intelligent device in the target intelligent building is damaged, sending a plurality of groups of control instructions to the target intelligent building, and collecting control information of the target intelligent building based on the plurality of groups of control instructions;
and screening damaged intelligent devices in the target intelligent building according to the control information.
In one possible way of realisation,
the in-process of carrying out real-time supervision to the target area that target intelligence building corresponds still includes:
monitoring the target intelligent building based on a monitoring end to obtain a first data capacity of the monitoring end based on a monitoring result;
transmitting the monitoring result of the target intelligent building monitored by the monitoring end to a target terminal based on a preset gateway, and meanwhile, acquiring transmission flow and transmission electric energy consumed by the preset gateway for transmitting the monitoring result;
counting a second data capacity of the monitoring result received by the target terminal based on a data statistical model of the target terminal;
collecting working logs of the target intelligent building in real time, and counting the first log capacity of the working logs in the collecting process;
transmitting the collected working logs to a target terminal based on a preset gateway, and counting the second log capacity of the working logs based on the data statistical model;
judging whether the first data capacity, the second data capacity, the transmission flow, the transmission electric energy, the first log capacity and the second log capacity meet the energy-saving control condition, and if not, extracting the unsatisfied index;
and carrying out network migration on the target intelligent building under the preset gateway based on the unsatisfied index, and reducing the current working power of the target intelligent building.
In one possible way of realisation,
before controlling the target intelligent building corresponding to the target area to be in a working state, the method comprises the following steps:
establishing a network connection node between an intelligent device in the target intelligent building and an external network based on a pre-deployed network connection logic, wherein the network connection node is in network connection with at least one intelligent device;
acquiring historical operation data reports of intelligent devices connected with the same network connection node, constructing device characteristic vectors of the intelligent devices connected with the same network connection node based on the historical operation data reports, and acquiring corresponding device characteristic values based on the device characteristic vectors;
calculating a node loss value P of the same network connection node based on the device characteristic value and according to the following formula;
Figure BDA0002560578850000041
wherein r isiThe loss value of the ith intelligent device connected with the network connection node is represented; a represents the total number of intelligent devices connected with the same network connection node; f. ofiRepresenting the connection loss value of the ith intelligent device and the network connection node thereof under the same network connection node; giThe same network connection node is based on the energy distribution factor of the ith intelligent device;
Figure BDA0002560578850000051
representing the device characteristic value difference between the ith intelligent device and other intelligent devices under the same network connection node;
Figure BDA0002560578850000052
representing an average network loss value when data transmission is performed based on the same network connection node;
judging whether the node loss value exceeds a preset loss range, if so, calculating to obtain a total device loss value of the intelligent device connected with the same network connection node according to the following formula;
G=max{ri*fiwhere i ═ 1,2, 3.., a;
acquiring a maximum loss value in the total device loss values, and taking the intelligent device corresponding to the maximum loss value as an intelligent device to be adjusted;
selecting a new network connection node from the established network connection nodes of the intelligent device in the target intelligent building and the external network based on the device attribute of the intelligent device to be adjusted and the device energy-saving rule;
and establishing the network connection relationship between the intelligent device to be adjusted and the new network connection node.
The invention provides an intelligent building energy-saving control system, which comprises:
the monitoring module is used for monitoring a target area corresponding to the target intelligent building in real time;
the control module is used for judging whether a target user exists in the target area according to the monitoring result;
if so, controlling the target intelligent building corresponding to the target area to be in a working state;
otherwise, controlling the target intelligent building corresponding to the target area to be in a dormant state.
In one possible implementation manner, the method further includes:
an acquisition module for acquiring a set of intelligent devices associated with the target intelligent building;
a recording module, configured to record device information of each smart device in the set of smart devices, where the device information includes: the device name and the device model of the intelligent device;
the statistical module is used for counting the actual electric energy consumption information and the actual flow consumption information of the intelligent device in a preset time period based on the device information;
the analysis module is used for carrying out data analysis on the actual electric energy consumption information and the actual current consumption information based on a data consumption model to obtain an electric energy consumption value and a current consumption value;
the control module is further used for judging whether the electric energy consumption value is within a first consumption range or whether the current consumption value is within a second consumption range;
if yes, controlling the corresponding intelligent device to be in a dormant state, and meanwhile, controlling the intelligent device in the dormant state to work according to a dormancy alternation rule.
Additional features and advantages of the invention will be set forth in the description which follows, and in part will be obvious from the description, or may be learned by practice of the invention. The objectives and other advantages of the invention will be realized and attained by the structure particularly pointed out in the written description and claims hereof as well as the appended drawings.
The technical solution of the present invention is further described in detail by the accompanying drawings and embodiments.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the principles of the invention and not to limit the invention. In the drawings:
FIG. 1 is a flow chart of an intelligent building energy-saving control method according to an embodiment of the present invention;
FIG. 2 is a block diagram of an intelligent building energy-saving control system according to an embodiment of the present invention;
fig. 3 is another structural diagram of an intelligent building energy-saving control system according to an embodiment of the present invention.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are described herein for the purpose of illustration and explanation and not limitation.
The invention provides an intelligent building energy-saving control method, as shown in figure 1, comprising the following steps:
step 1: monitoring a target area corresponding to a target intelligent building in real time, and judging whether a target user exists in the target area according to a monitoring result;
step 2: if so, controlling the target intelligent building corresponding to the target area to be in a working state;
and step 3: otherwise, controlling the target intelligent building corresponding to the target area to be in a dormant state.
In this embodiment, a target intelligent building, for example, is a lighting control system, and when a target user exists in a lighting area corresponding to the lighting control system, the lighting control system is controlled to operate, otherwise, the lighting control system is in a dormant state, so that not only is energy-saving control achieved, but also the service life of the lighting control system is effectively prolonged.
In this embodiment, the target user is, for example, a human.
The beneficial effects of the above technical scheme are: whether a user exists or not is judged conveniently, intelligent control is conducted on the target intelligent building, and energy-saving control is achieved.
The invention provides an intelligent building energy-saving control method, which is used for monitoring a target area corresponding to a target intelligent building in real time and further comprises the following steps:
obtaining a set of intelligent devices associated with the target intelligent building;
recording device information of each intelligent device in the intelligent device set, wherein the device information comprises: the device name and the device model of the intelligent device;
counting actual electric energy consumption information and actual flow consumption information of the intelligent device within a preset time period based on the device information;
performing data analysis on the actual electric energy consumption information and the actual current consumption information based on a data consumption model to obtain an electric energy consumption value and a current consumption value;
judging whether the electric energy consumption value is in a first consumption range or whether the current consumption value is in a second consumption range;
if yes, controlling the corresponding intelligent device to be in a dormant state, and meanwhile, controlling the intelligent device in the dormant state to work according to a dormancy alternation rule.
In this embodiment, for example, the target intelligent building is a related lighting system, and the intelligent devices may be corresponding lamp devices, and each lamp device needs to consume a flow during the intelligent control process, so that the actual flow consumption information of the lamp device is obtained, and the lamp device needs to support its operation with electric energy during the intelligent control process, so that the actual electric energy consumption information of the lamp device is obtained.
The first consumption range and the second consumption range may be set according to the property of the lamp itself, for example.
The beneficial effects of the above technical scheme are: through the electric energy loss information and the flow loss information of obtaining every device to through carrying out data analysis to it, be convenient for obtain relevant consumption value, and then carry out the scale comparison through the range of taking a value with corresponding, control the state of device, be convenient for improve its energy-conserving efficiency, and through dormancy rule of turns, be convenient for improve the life-span of its device, and indirect realization energy-saving control.
The invention provides an intelligent building energy-saving control method, which comprises the following steps of controlling a target intelligent building corresponding to a target area to be in a working state:
monitoring and acquiring current position information of a target user in the target area, wherein the current position information comprises: current position coordinates, a current orientation of the target user;
monitoring and acquiring user information of a target user in the target area, wherein the user information comprises: the height information of the target user and the vision information of the target user;
based on the current position information and the user information, adjusting the working power of the intelligent device in the working state corresponding to the target intelligent building;
and meanwhile, adjusting the intelligent device in the working state to an angle position and a height position corresponding to the target user of the target area.
In this embodiment, for example, the user is at the position of point a of the lighting area corresponding to the lighting system, at this time, the lighting lamps 1,2 and 3 in the lighting area turn on the lighting, but at this time, the user faces the direction of the lighting lamp 1, and the position a is closest to the lighting lamp 1, and the height of the user is 1.5m, the eyesight information is good, at this time, the lighting lamps 2 and 3 may be turned off, the lighting lamp 1 continues to be turned on, and the height of the lighting lamp 1 is adjusted downward, and the working power of the lighting lamp 1 is increased.
The beneficial effects of the above technical scheme are: through obtaining target user's current position information, user information, be convenient for carry out the regulation of power, height and angle to intelligent in the building during intelligence, can improve the work pertinence of intelligent device, effectively avoid the possibility of other devices and this device simultaneous working, realize energy-conserving control, and be convenient for satisfy user's demand.
The invention provides an intelligent building energy-saving control method, which further comprises the following steps of in the process of controlling a target intelligent building corresponding to a target area to be in a working state:
acquiring and acquiring a first working temperature of a first device which is continuously in a working state, a second working temperature of a second device which is continuously in a dormant state and a third working temperature of a third device which is converted between the working state and the dormant state in the target intelligent building within the current time period, and storing the acquired first working temperature, second working temperature and third working temperature based on a distributed storage structure;
performing linear analysis on the first working temperature, the second working temperature and the third working temperature based on the linear time sequence to obtain a temperature linear analysis result;
acquiring a first attribute of the first device, a second attribute of the second device and a third attribute of the third device, and correcting a temperature linear analysis result based on the first attribute, the second attribute and the third attribute to obtain a corrected temperature result;
judging whether the temperature correction result is within a preset temperature range, if so, controlling each device to work according to a preset working mode;
and otherwise, acquiring the weight value of each device and sequencing the devices from large to small, and meanwhile, controlling the fourth device to be in a dormant state continuously according to a preset regulation and control proportion and based on the weight value sequencing result until the corrected temperature result is smaller than the minimum temperature value in the preset temperature range.
In this embodiment, since the intelligent building includes a plurality of intelligent devices, for example, a lighting system includes a plurality of lighting lamps, the lighting lamps need to be controlled, a part of the lighting lamps are continuously in a working state, at this time, the first device is used, a part of the lighting lamps are continuously in a dormant state, at this time, the second device is used; the rest illuminating lamps are in a working state and a dormant state and are switched back and forth, and the rest illuminating lamps are third devices.
In the embodiment, the working temperatures of different types of devices are obtained, so that the linear time series analysis can be conveniently carried out, the linear analysis result can be obtained, and the linear analysis result can be corrected according to the attribute of the corresponding device, so that the corrected temperature result can be obtained.
The operation mode of the device is controlled by judging whether the temperature is within a preset temperature range (preset), and the operation mode is, for example, based on the continuous operation of the device in intervals of time between the sleep mode and the operation mode.
In this embodiment, the weight values of the devices are sorted from large to small, such as: the sequencing result comprises 8 devices, the working time of the first 2 devices is 1 hour, the working time of the middle 3 devices is 40 minutes, and the rest 3 devices are in a dormant state, so that the regulation ratio of 2:3:3 is obtained.
At this time, the fourth period is the device corresponding to the rest 3 devices in the sleep state.
The beneficial effects of the above technical scheme are: the temperature of the intelligent device in different states is obtained, linear analysis and correction processing are carried out on the temperature, the reliability of the intelligent device is improved, the intelligent device is convenient to control to be in a dormant state in the fourth period by combining the weight value of the intelligent device, and therefore energy-saving control is effectively achieved.
The invention provides an intelligent building energy-saving control method, which comprises the following steps before controlling a target intelligent building corresponding to a target area to be in a working state:
judging whether an external instruction is received before the target intelligent building is in a working state;
if yes, crawling the external instruction, judging the instruction type of the external instruction based on an instruction database, and determining the to-be-converted state of the target intelligent building according to the instruction type;
meanwhile, monitoring the current conversion state of the target intelligent building;
if the current conversion state is inconsistent with the state to be converted, indicating that the intelligent device in the target intelligent building is damaged, sending a plurality of groups of control instructions to the target intelligent building, and collecting control information of the target intelligent building based on the plurality of groups of control instructions;
and screening damaged intelligent devices in the target intelligent building according to the control information.
In this embodiment, the external command is, for example, a test command for the smart device;
in this embodiment, the instruction types include, for example: the test type of the intelligent device, the test type of the network connection between the intelligent device and the outside, and the like.
In this embodiment, multiple sets of control instructions, for example, multiple test instructions, are used to test the smart device.
The beneficial effects of the above technical scheme are: through comparing whether the current conversion state is consistent with the state to be converted or not, the damaged intelligent device is convenient to screen, and the reliability of energy-saving control is improved.
The invention provides an intelligent building energy-saving control method, which is used for monitoring a target area corresponding to a target intelligent building in real time and further comprises the following steps:
monitoring the target intelligent building based on a monitoring end to obtain a first data capacity of the monitoring end based on a monitoring result;
transmitting the monitoring result of the target intelligent building monitored by the monitoring end to a target terminal based on a preset gateway, and meanwhile, acquiring transmission flow and transmission electric energy consumed by the preset gateway for transmitting the monitoring result;
counting a second data capacity of the monitoring result received by the target terminal based on a data statistical model of the target terminal;
collecting working logs of the target intelligent building in real time, and counting the first log capacity of the working logs in the collecting process;
transmitting the collected working logs to a target terminal based on a preset gateway, and counting the second log capacity of the working logs based on the data statistical model;
judging whether the first data capacity, the second data capacity, the transmission flow, the transmission electric energy, the first log capacity and the second log capacity meet the energy-saving control condition, and if not, extracting the unsatisfied index;
and carrying out network migration on the target intelligent building under the preset gateway based on the unsatisfied index, and reducing the current working power of the target intelligent building.
In the embodiment, the energy-saving control condition is judged by acquiring the capacity before and after transmission, wherein the first data capacity and the second data capacity are acquired at the monitoring end directly based on the monitoring result, and the second data capacity is acquired at the target terminal according to the monitoring result after transmission;
in this embodiment, the first log capacity is obtained before transmission based on the predetermined gateway, and the second log capacity is obtained after transmission based on the predetermined gateway.
In this embodiment, the network moves forward, such as the intelligent building connected L1 gateway, where it is migrated to the L2 gateway.
The beneficial effects of the above technical scheme are: by measuring and comparing the data capacity of the monitoring result, the data capacity of the working log, the transmission flow and the transmission electric energy, whether network migration is needed or not is effectively determined, the working power is reduced, and energy-saving control is further achieved.
The invention provides an intelligent building energy-saving control method, which comprises the following steps of before controlling a target intelligent building corresponding to a target area to be in a working state:
establishing a network connection node between an intelligent device in the target intelligent building and an external network based on a pre-deployed network connection logic, wherein the network connection node is in network connection with at least one intelligent device;
acquiring historical operation data reports of intelligent devices connected with the same network connection node, constructing device characteristic vectors of the intelligent devices connected with the same network connection node based on the historical operation data reports, and acquiring corresponding device characteristic values based on the device characteristic vectors;
calculating a node loss value P of the same network connection node based on the device characteristic value and according to the following formula;
Figure BDA0002560578850000121
wherein r isiThe loss value of the ith intelligent device connected with the network connection node is represented; a represents the total number of intelligent devices connected with the same network connection node; f. ofiRepresenting the connection loss value of the ith intelligent device and the network connection node thereof under the same network connection node; giThe same network connection node is based on the energy distribution factor of the ith intelligent device;
Figure BDA0002560578850000122
representing the device characteristic value difference between the ith intelligent device and other intelligent devices under the same network connection node;
Figure BDA0002560578850000123
representing an average network loss value when data transmission is performed based on the same network connection node;
judging whether the node loss value exceeds a preset loss range, if so, calculating to obtain a total device loss value of the intelligent device connected with the same network connection node according to the following formula;
G=max{ri*fiwhere i ═ 1,2, 3.., a;
acquiring a maximum loss value in the total device loss values, and taking the intelligent device corresponding to the maximum loss value as an intelligent device to be adjusted;
selecting a new network connection node from the established network connection nodes of the intelligent device in the target intelligent building and the external network based on the device attribute of the intelligent device to be adjusted and the device energy-saving rule;
and establishing the network connection relationship between the intelligent device to be adjusted and the new network connection node.
The beneficial effects of the above technical scheme are: by deploying the network connection nodes, energy-saving control of each intelligent device is facilitated, device characteristic values under the same network connection node are facilitated to be obtained by obtaining historical operation data reports of the intelligent devices, node loss values are calculated, whether the loss of the node is reasonable or not is conveniently and effectively determined, when the node is unreasonable, the intelligent device corresponding to the maximum loss value is obtained, a new network connection node is selected to be connected, loss of the network connection node is reduced, load balancing is facilitated, and effective energy-saving control is achieved.
The invention provides an intelligent building energy-saving control system, as shown in fig. 2, comprising:
the monitoring module is used for monitoring a target area corresponding to the target intelligent building in real time;
the control module is used for judging whether a target user exists in the target area according to the monitoring result;
if so, controlling the target intelligent building corresponding to the target area to be in a working state;
otherwise, controlling the target intelligent building corresponding to the target area to be in a dormant state.
The beneficial effects of the above technical scheme are: whether a user exists or not is judged conveniently, intelligent control is conducted on the target intelligent building, and energy-saving control is achieved.
The invention provides an intelligent building energy-saving control system, as shown in fig. 3, further comprising:
an acquisition module for acquiring a set of intelligent devices associated with the target intelligent building;
a recording module, configured to record device information of each smart device in the set of smart devices, where the device information includes: the device name and the device model of the intelligent device;
the statistical module is used for counting the actual electric energy consumption information and the actual flow consumption information of the intelligent device in a preset time period based on the device information;
the analysis module is used for carrying out data analysis on the actual electric energy consumption information and the actual current consumption information based on a data consumption model to obtain an electric energy consumption value and a current consumption value;
the control module is further used for judging whether the electric energy consumption value is within a first consumption range or whether the current consumption value is within a second consumption range;
if yes, controlling the corresponding intelligent device to be in a dormant state, and meanwhile, controlling the intelligent device in the dormant state to work according to a dormancy alternation rule.
The beneficial effects of the above technical scheme are: through the electric energy loss information and the flow loss information of obtaining every device to through carrying out data analysis to it, be convenient for obtain relevant consumption value, and then carry out the scale comparison through the range of taking a value with corresponding, control the state of device, be convenient for improve its energy-conserving efficiency, and through dormancy rule of turns, be convenient for improve the life-span of its device, and indirect realization energy-saving control.
It will be apparent to those skilled in the art that various changes and modifications may be made in the present invention without departing from the spirit and scope of the invention. Thus, if such modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include such modifications and variations.

Claims (9)

1. An intelligent building energy-saving control method is characterized by comprising the following steps:
monitoring a target area corresponding to a target intelligent building in real time, and judging whether a target user exists in the target area according to a monitoring result;
if so, controlling the target intelligent building corresponding to the target area to be in a working state;
otherwise, controlling the target intelligent building corresponding to the target area to be in a dormant state.
2. The intelligent building energy-saving control method according to claim 1, wherein in the process of monitoring the target area corresponding to the target intelligent building in real time, the method further comprises:
obtaining a set of intelligent devices associated with the target intelligent building;
recording device information of each intelligent device in the intelligent device set, wherein the device information comprises: the device name and the device model of the intelligent device;
counting actual electric energy consumption information and actual flow consumption information of the intelligent device within a preset time period based on the device information;
performing data analysis on the actual electric energy consumption information and the actual current consumption information based on a data consumption model to obtain an electric energy consumption value and a current consumption value;
judging whether the electric energy consumption value is in a first consumption range or whether the current consumption value is in a second consumption range;
if yes, controlling the corresponding intelligent device to be in a dormant state, and meanwhile, controlling the intelligent device in the dormant state to work according to a dormancy alternation rule.
3. The intelligent building energy-saving control method according to claim 1, wherein the controlling the target intelligent building corresponding to the target area to be in the working state comprises:
monitoring and acquiring current position information of a target user in the target area, wherein the current position information comprises: current position coordinates, a current orientation of the target user;
monitoring and acquiring user information of a target user in the target area, wherein the user information comprises: the height information of the target user and the vision information of the target user;
based on the current position information and the user information, adjusting the working power of the intelligent device in the working state corresponding to the target intelligent building;
and meanwhile, adjusting the intelligent device in the working state to an angle position and a height position corresponding to the target user of the target area.
4. The intelligent building energy-saving control method according to claim 1, wherein in the process of controlling the target intelligent building corresponding to the target area to be in the working state, the method further comprises:
acquiring and acquiring a first working temperature of a first device which is continuously in a working state, a second working temperature of a second device which is continuously in a dormant state and a third working temperature of a third device which is converted between the working state and the dormant state in the target intelligent building within the current time period, and storing the acquired first working temperature, second working temperature and third working temperature based on a distributed storage structure;
performing linear analysis on the first working temperature, the second working temperature and the third working temperature based on the linear time sequence to obtain a temperature linear analysis result;
acquiring a first attribute of the first device, a second attribute of the second device and a third attribute of the third device, and correcting a temperature linear analysis result based on the first attribute, the second attribute and the third attribute to obtain a corrected temperature result;
judging whether the temperature correction result is within a preset temperature range, if so, controlling each device to work according to a preset working mode;
and otherwise, acquiring the weight value of each device and sequencing the devices from large to small, and meanwhile, controlling the fourth device to be in a dormant state continuously according to a preset regulation and control proportion and based on the weight value sequencing result until the corrected temperature result is smaller than the minimum temperature value in the preset temperature range.
5. The intelligent building energy-saving control method according to claim 1, wherein before controlling the target intelligent building corresponding to the target area to be in the working state, the method further comprises:
judging whether an external instruction is received before the target intelligent building is in a working state;
if yes, crawling the external instruction, judging the instruction type of the external instruction based on an instruction database, and determining the to-be-converted state of the target intelligent building according to the instruction type;
meanwhile, monitoring the current conversion state of the target intelligent building;
if the current conversion state is inconsistent with the state to be converted, indicating that the intelligent device in the target intelligent building is damaged, sending a plurality of groups of control instructions to the target intelligent building, and collecting control information of the target intelligent building based on the plurality of groups of control instructions;
and screening damaged intelligent devices in the target intelligent building according to the control information.
6. The intelligent building energy-saving control method according to claim 1, wherein in the process of monitoring the target area corresponding to the target intelligent building in real time, the method further comprises:
monitoring the target intelligent building based on a monitoring end to obtain a first data capacity of the monitoring end based on a monitoring result;
transmitting the monitoring result of the target intelligent building monitored by the monitoring end to a target terminal based on a preset gateway, and meanwhile, acquiring transmission flow and transmission electric energy consumed by the preset gateway for transmitting the monitoring result;
counting a second data capacity of the monitoring result received by the target terminal based on a data statistical model of the target terminal;
collecting working logs of the target intelligent building in real time, and counting the first log capacity of the working logs in the collecting process;
transmitting the collected working logs to a target terminal based on a preset gateway, and counting the second log capacity of the working logs based on the data statistical model;
judging whether the first data capacity, the second data capacity, the transmission flow, the transmission electric energy, the first log capacity and the second log capacity meet the energy-saving control condition, and if not, extracting the unsatisfied index;
and carrying out network migration on the target intelligent building under the preset gateway based on the unsatisfied index, and reducing the current working power of the target intelligent building.
7. The intelligent building energy-saving control method according to claim 1, wherein before controlling the target intelligent building corresponding to the target area to be in the working state, the method comprises:
establishing a network connection node between an intelligent device in the target intelligent building and an external network based on a pre-deployed network connection logic, wherein the network connection node is in network connection with at least one intelligent device;
acquiring historical operation data reports of intelligent devices connected with the same network connection node, constructing device characteristic vectors of the intelligent devices connected with the same network connection node based on the historical operation data reports, and acquiring corresponding device characteristic values based on the device characteristic vectors;
calculating a node loss value P of the same network connection node based on the device characteristic value and according to the following formula;
Figure FDA0002560578840000041
wherein r isiThe loss value of the ith intelligent device connected with the network connection node is represented; a represents the total number of intelligent devices connected with the same network connection node; f. ofiRepresenting the connection loss value of the ith intelligent device and the network connection node thereof under the same network connection node; giThe same network connection node is based on the energy distribution factor of the ith intelligent device;
Figure FDA0002560578840000042
representing the device characteristic value difference between the ith intelligent device and other intelligent devices under the same network connection node;
Figure FDA0002560578840000043
representing an average network loss value when data transmission is performed based on the same network connection node;
judging whether the node loss value exceeds a preset loss range, if so, calculating to obtain a total device loss value of the intelligent device connected with the same network connection node according to the following formula;
G=max{ri*fiwhere i ═ 1,2, 3.., a;
acquiring a maximum loss value in the total device loss values, and taking the intelligent device corresponding to the maximum loss value as an intelligent device to be adjusted;
selecting a new network connection node from the established network connection nodes of the intelligent device in the target intelligent building and the external network based on the device attribute of the intelligent device to be adjusted and the device energy-saving rule;
and establishing the network connection relationship between the intelligent device to be adjusted and the new network connection node.
8. An intelligent building energy-saving control system is characterized by comprising:
the monitoring module is used for monitoring a target area corresponding to the target intelligent building in real time;
the control module is used for judging whether a target user exists in the target area according to the monitoring result;
if so, controlling the target intelligent building corresponding to the target area to be in a working state;
otherwise, controlling the target intelligent building corresponding to the target area to be in a dormant state.
9. The intelligent building energy conservation control system of claim 8, further comprising:
an acquisition module for acquiring a set of intelligent devices associated with the target intelligent building;
a recording module, configured to record device information of each smart device in the set of smart devices, where the device information includes: the device name and the device model of the intelligent device;
the statistical module is used for counting the actual electric energy consumption information and the actual flow consumption information of the intelligent device in a preset time period based on the device information;
the analysis module is used for carrying out data analysis on the actual electric energy consumption information and the actual current consumption information based on a data consumption model to obtain an electric energy consumption value and a current consumption value;
the control module is further used for judging whether the electric energy consumption value is within a first consumption range or whether the current consumption value is within a second consumption range;
if yes, controlling the corresponding intelligent device to be in a dormant state, and meanwhile, controlling the intelligent device in the dormant state to work according to a dormancy alternation rule.
CN202010609743.4A 2020-06-29 2020-06-29 Intelligent building energy-saving control method and system Active CN111913395B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010609743.4A CN111913395B (en) 2020-06-29 2020-06-29 Intelligent building energy-saving control method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010609743.4A CN111913395B (en) 2020-06-29 2020-06-29 Intelligent building energy-saving control method and system

Publications (2)

Publication Number Publication Date
CN111913395A true CN111913395A (en) 2020-11-10
CN111913395B CN111913395B (en) 2021-05-04

Family

ID=73226079

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010609743.4A Active CN111913395B (en) 2020-06-29 2020-06-29 Intelligent building energy-saving control method and system

Country Status (1)

Country Link
CN (1) CN111913395B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114061092A (en) * 2021-11-12 2022-02-18 珠海大横琴科技发展有限公司 Control method and device of temperature adjusting equipment

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101655689A (en) * 2008-08-19 2010-02-24 马海英 Virtual machine device of intelligent remote controller with remote controllable operation interface
CN104238370A (en) * 2014-09-12 2014-12-24 广州极联智能科技有限公司 Smart home control method, device and system
CN104657152A (en) * 2015-03-16 2015-05-27 联想(北京)有限公司 Data transmission management method and electronic equipment
CN104684208A (en) * 2015-01-09 2015-06-03 深圳声物互动科技有限公司 LED cloud lamp with WiFi and remote WiFi awakening system
CN105005291A (en) * 2015-08-17 2015-10-28 黄可斌 Smart home control method, smart home control device and smart home control system
CN105353631A (en) * 2015-11-25 2016-02-24 小米科技有限责任公司 Method and apparatus for adjusting working modes
CN105357734A (en) * 2015-11-20 2016-02-24 小米科技有限责任公司 Method and device used for controlling access to WIFI hot spot
CN105392170A (en) * 2015-09-30 2016-03-09 联想(北京)有限公司 Information processing method and electronic device
CN105607504A (en) * 2016-03-15 2016-05-25 美的集团股份有限公司 Intelligent home system, and intelligent home control apparatus and method
CN105700363A (en) * 2016-01-19 2016-06-22 深圳创维-Rgb电子有限公司 Method and system for waking up smart home equipment voice control device
CN106842968A (en) * 2017-02-08 2017-06-13 浙江吉利控股集团有限公司 A kind of control method, apparatus and system
CN109557821A (en) * 2018-11-23 2019-04-02 陕西师范大学 A kind of energy efficiency supervision plateform system

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101655689A (en) * 2008-08-19 2010-02-24 马海英 Virtual machine device of intelligent remote controller with remote controllable operation interface
CN104238370A (en) * 2014-09-12 2014-12-24 广州极联智能科技有限公司 Smart home control method, device and system
CN104684208A (en) * 2015-01-09 2015-06-03 深圳声物互动科技有限公司 LED cloud lamp with WiFi and remote WiFi awakening system
CN104657152A (en) * 2015-03-16 2015-05-27 联想(北京)有限公司 Data transmission management method and electronic equipment
CN105005291A (en) * 2015-08-17 2015-10-28 黄可斌 Smart home control method, smart home control device and smart home control system
CN105392170A (en) * 2015-09-30 2016-03-09 联想(北京)有限公司 Information processing method and electronic device
CN105357734A (en) * 2015-11-20 2016-02-24 小米科技有限责任公司 Method and device used for controlling access to WIFI hot spot
CN105353631A (en) * 2015-11-25 2016-02-24 小米科技有限责任公司 Method and apparatus for adjusting working modes
CN105700363A (en) * 2016-01-19 2016-06-22 深圳创维-Rgb电子有限公司 Method and system for waking up smart home equipment voice control device
CN105607504A (en) * 2016-03-15 2016-05-25 美的集团股份有限公司 Intelligent home system, and intelligent home control apparatus and method
CN106842968A (en) * 2017-02-08 2017-06-13 浙江吉利控股集团有限公司 A kind of control method, apparatus and system
CN109557821A (en) * 2018-11-23 2019-04-02 陕西师范大学 A kind of energy efficiency supervision plateform system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114061092A (en) * 2021-11-12 2022-02-18 珠海大横琴科技发展有限公司 Control method and device of temperature adjusting equipment
CN114061092B (en) * 2021-11-12 2023-09-08 珠海大横琴科技发展有限公司 Control method and device of temperature regulating equipment

Also Published As

Publication number Publication date
CN111913395B (en) 2021-05-04

Similar Documents

Publication Publication Date Title
CN112650580B (en) Industrial big data monitoring system based on edge calculation
CN116540576B (en) Building energy-saving management system based on digital twin and intelligent building
CN111913395B (en) Intelligent building energy-saving control method and system
CN117036104B (en) Intelligent electricity utilization method and system based on electric power Internet of things
CN111787123A (en) Intelligent heat supply network operation and maintenance management system
CN116545954A (en) Communication gateway data transmission method and system based on Internet of things
CN114662751B (en) Garden multifunctional short-term load forecasting and optimizing method based on LSTM
CN116125204A (en) Fault prediction system based on power grid digitization
CN111225398B (en) Micro-grid wireless sensor network energy consumption optimization method based on cooperative coverage
CN117091242A (en) Evaluation method, temperature setting method and system for air conditioner temperature control load cluster
CN116839186A (en) Intelligent control device of central air conditioner
CN116170881A (en) Cross-domain resource allocation and unloading method and system based on edge calculation
CN117650628B (en) Energy efficiency management system based on self-adaptive preconditioning scene
CN116880231B (en) Multi-terminal interaction method and device based on intelligent home
CN114489309A (en) Intelligent optimization energy-saving method for electricity consumption of machine room based on depth algorithm
CN117439128B (en) Multi-element energy storage and new energy collaborative planning configuration method
CN115224741B (en) Distributed photovoltaic low-voltage grid-connected adjusting system and method
CN116430748B (en) Energy-saving control method and system based on intelligent equipment
CN114707711B (en) Multi-time scale optimal scheduling method and system for park refrigerating unit
CN114726659B (en) Energy-saving control system and method for edge gateway
CN109405198B (en) Operation and maintenance energy-saving system for clean room of factory system and corresponding operation and maintenance energy-saving optimization method
CN115225660A (en) Method, system, device and medium for processing communication data in energy storage system
CN116647586A (en) Method for realizing remote control of water and fertilizer integrated intelligent pump house by cloud computing
CN114413439A (en) Self-learning-based central air conditioner operation expert database management method and system
CN117422254A (en) Information processing method, device, equipment and storage medium for intelligent park

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 224000 6007, 6008, 6009, South Building, Yancheng International Venture Capital Center, No. 5, Renmin Road South, Yannan High tech Zone, Yancheng City, Jiangsu Province (CND)

Patentee after: Purida Technology Group Co.,Ltd.

Address before: Room 6017, North building, Yancheng international venture capital center, No.5 Renmin South Road, Xindu street, Chengnan New District, Yancheng City, Jiangsu Province, 224000

Patentee before: Prada Construction Co.,Ltd.

CP03 Change of name, title or address