CN111895596A - Control method and device for defrosting of air conditioner and air conditioner - Google Patents

Control method and device for defrosting of air conditioner and air conditioner Download PDF

Info

Publication number
CN111895596A
CN111895596A CN201910371822.3A CN201910371822A CN111895596A CN 111895596 A CN111895596 A CN 111895596A CN 201910371822 A CN201910371822 A CN 201910371822A CN 111895596 A CN111895596 A CN 111895596A
Authority
CN
China
Prior art keywords
air conditioner
defrosting
point temperature
temperature
frost point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910371822.3A
Other languages
Chinese (zh)
Other versions
CN111895596B (en
Inventor
许文明
罗荣邦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Haier Air Conditioner Gen Corp Ltd
Qingdao Haier Co Ltd
Original Assignee
Qingdao Haier Air Conditioner Gen Corp Ltd
Qingdao Haier Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Haier Air Conditioner Gen Corp Ltd, Qingdao Haier Co Ltd filed Critical Qingdao Haier Air Conditioner Gen Corp Ltd
Priority to CN201910371822.3A priority Critical patent/CN111895596B/en
Publication of CN111895596A publication Critical patent/CN111895596A/en
Application granted granted Critical
Publication of CN111895596B publication Critical patent/CN111895596B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/30Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
    • F24F11/41Defrosting; Preventing freezing
    • F24F11/42Defrosting; Preventing freezing of outdoor units
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/50Control or safety arrangements characterised by user interfaces or communication
    • F24F11/61Control or safety arrangements characterised by user interfaces or communication using timers
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/62Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
    • F24F11/63Electronic processing
    • F24F11/64Electronic processing using pre-stored data
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F2140/00Control inputs relating to system states
    • F24F2140/20Heat-exchange fluid temperature

Abstract

The application relates to a control method and device for defrosting of an air conditioner and the air conditioner. The control method comprises the following steps: under the condition that an air conditioner completes a defrosting process, acquiring the defrosting duration of the defrosting process executed by the air conditioner; correcting the frost point temperature based on the defrosting time of the defrosting process executed by the air conditioner; and controlling the air conditioner to perform defrosting judgment on whether to trigger the next defrosting process or not based on the corrected frost point temperature. The control method for defrosting of the air conditioner, provided by the embodiment of the disclosure, can correct the frost point temperature by using the defrosting time of the air conditioner executing the defrosting process, so that the problems of large error between the frost point temperature and the actual working condition and inaccurate triggering of the defrosting process caused by the fact that the dew point temperature is used for determining the frost point temperature and the working state of the components of the air conditioner changes in the prior art can be solved, and the defrosting function of the air conditioner can be controlled more accurately.

Description

Control method and device for defrosting of air conditioner and air conditioner
Technical Field
The present disclosure relates to the field of air conditioner defrosting technologies, and for example, to an air conditioner and a defrosting control method thereof.
Background
Along with the improvement of living standard of people, air conditioning equipment has also gone into thousands of households, the use of domestic air conditioners and central air conditioners is more and more common, the requirement of users on the comfort level of the air conditioners is more and more high, the problems existing in the use process of the air conditioners are also gradually exposed, and one of the problems is the problem that an outdoor unit of the air conditioner is frosted and frozen when the air conditioner operates in severe cold climate. When the air conditioner operates in a low-temperature area or an area with large wind and snow, the condensed water flow on the outer surface of the condenser of the outdoor unit can drop on the base plate, the condenser and the base plate of the air conditioner can be frozen under the condition that the air conditioner operates for a long time, the condensed ice layer on the outdoor unit can obstruct the heat exchange between the internal refrigerant and the outdoor environment, the refrigerating efficiency of the air conditioner is reduced, in order to ensure the heating effect of the air conditioner, the air conditioner has to operate with increased power, and the extra consumption of electric energy and the use cost of a user are increased.
Therefore, some conventional air conditioners have a defrosting function to solve the problem of frost and ice formation of an outdoor unit of the air conditioner, for example, heating the outdoor unit by a heating device provided in the outdoor unit, or defrosting and melting ice in an outdoor heat exchanger by a high-temperature refrigerant discharged from a compressor. Here, before the air conditioner starts the defrosting function, the air conditioner generally determines whether a temperature condition in which frost is easily condensed has been reached by combining the temperature of the external coil detected by the outdoor sensor with the frost point temperature, and then determines whether the defrosting function is started.
In the process of implementing the embodiments of the present disclosure, it is found that at least the following problems exist in the related art: factors influencing the frosting degree of the outdoor unit of the air conditioner not only comprise external environment factors, but also comprise influence factors of the self state of the air conditioner; however, the air conditioner generally uses the dew point temperature calculated by parameters such as the external ambient temperature as the frost point temperature for judging whether the air conditioner needs defrosting, so that under the conditions that the variation of the parameters such as the external ambient temperature before and after defrosting of the air conditioner is small, the working states of all parts of the air conditioner per se also change, if the frost point temperature determined in the manner is still used for judging and controlling whether the air conditioner needs defrosting, a larger error exists between the actual frost state of the air conditioner and the actual frost formation state of the air conditioner, which easily causes the problems of false triggering of the defrosting function, frequent triggering and the like, and therefore, the requirement that the defrosting function is triggered by the precise control of the air conditioner cannot be met.
Disclosure of Invention
The following presents a simplified summary in order to provide a basic understanding of some aspects of the disclosed embodiments. This summary is not an extensive overview nor is intended to identify key/critical elements or to delineate the scope of such embodiments but rather as a prelude to the more detailed description that is presented later.
The embodiment of the disclosure provides a control method for defrosting of an air conditioner.
In some embodiments, the control method comprises:
under the condition that an air conditioner completes a defrosting process, acquiring the defrosting duration of the defrosting process executed by the air conditioner;
correcting the frost point temperature based on the defrosting time of the defrosting process executed by the air conditioner;
and controlling the air conditioner to perform defrosting judgment on whether to trigger the next defrosting process or not based on the corrected frost point temperature.
The embodiment of the disclosure provides a control device for defrosting of an air conditioner.
In some embodiments, the control device comprises:
a first acquisition module configured to: under the condition that an air conditioner completes a defrosting process, acquiring the defrosting duration of the defrosting process executed by the air conditioner;
a temperature modification module configured to: correcting the frost point temperature based on the defrosting time of the defrosting process executed by the air conditioner;
a defrost determination module configured to: and controlling the air conditioner to perform defrosting judgment on whether to trigger the next defrosting process or not based on the corrected frost point temperature.
The embodiment of the disclosure provides an air conditioner.
In some embodiments, the air conditioner includes the aforementioned control device.
The embodiment of the disclosure provides an electronic device.
In some embodiments, an electronic device includes:
at least one processor; and
a memory communicatively coupled to the at least one processor; wherein the content of the first and second substances,
the memory stores instructions executable by the at least one processor, which when executed by the at least one processor, cause the at least one processor to perform the aforementioned control method.
The disclosed embodiments provide a computer-readable storage medium.
In some embodiments, a computer-readable storage medium stores computer-executable instructions configured to perform the aforementioned control method.
Some technical solutions provided by the embodiments of the present disclosure can achieve the following technical effects:
the control method for defrosting of the air conditioner, provided by the embodiment of the disclosure, can correct the frost point temperature by using the defrosting time of the air conditioner executing the defrosting process, so that the problems of large error between the frost point temperature and the actual working condition and inaccurate triggering of the defrosting process caused by the fact that the dew point temperature is used for determining the frost point temperature and the working state of the components of the air conditioner changes in the prior art can be solved, and the defrosting function of the air conditioner can be controlled more accurately.
The foregoing general description and the following description are exemplary and explanatory only and are not restrictive of the application.
Drawings
One or more embodiments are illustrated by way of example in the accompanying drawings, which correspond to the accompanying drawings and not in limitation thereof, in which elements having the same reference numeral designations are shown as like elements and not in limitation thereof, and wherein:
fig. 1 is a schematic flow chart of a control method for defrosting an air conditioner according to an embodiment of the present disclosure;
fig. 2 is a schematic flowchart of a control method for defrosting an air conditioner according to another embodiment of the present disclosure;
fig. 3 is a flowchart illustrating a control method for defrosting an air conditioner according to another embodiment of the present disclosure;
fig. 4 is a schematic structural diagram of a control device for defrosting an air conditioner according to an embodiment of the present disclosure;
fig. 5 is a schematic structural diagram of an electronic device provided in an embodiment of the present disclosure.
Detailed Description
So that the manner in which the features and elements of the disclosed embodiments can be understood in detail, a more particular description of the disclosed embodiments, briefly summarized above, may be had by reference to the embodiments, some of which are illustrated in the appended drawings. In the following description of the technology, for purposes of explanation, numerous details are set forth in order to provide a thorough understanding of the disclosed embodiments. However, one or more embodiments may be practiced without these details. In other instances, well-known structures and devices may be shown in simplified form in order to simplify the drawing.
Fig. 1 is a schematic flow chart of a control method for defrosting an air conditioner according to an embodiment of the present disclosure.
As shown in fig. 1, an embodiment of the present disclosure provides a control method for defrosting an air conditioner, including:
s101, acquiring defrosting duration of a defrosting process executed by an air conditioner under the condition that the defrosting process executed by the air conditioner is finished;
in the embodiment of the present disclosure, the operation of correcting the frost point temperature is performed after the air conditioner has completed a certain defrosting process.
Here, after the air conditioner completes one defrosting process, the defrosting time length occupied by the defrosting process can be determined; in this way, in the embodiment of the present disclosure, after the air conditioner completes a certain defrosting process, the frost point temperature of the air conditioner is corrected according to the defrosting duration of the defrosting process, and the corrected frost point temperature is used for defrosting judgment of the next defrosting process to be executed.
Optionally, the air conditioner in the embodiment of the present disclosure is provided with a timing module, where the timing module may be configured to count a defrosting duration of a defrosting process executed by the air conditioner each time, that is, starting timing at an initial time when the defrosting process is executed by the air conditioner and ending timing at a completion time, where a time between the initial time and the completion time is a defrosting duration of the current defrosting process; and the defrosting time counted by the timing module of the air conditioner is stored as historical operation data.
S102, correcting the frost point temperature based on the defrosting duration of the defrosting process executed by the air conditioner;
in some optional embodiments, the corrected frost point temperature is a preset temperature value of one or more different temperature values pre-stored in the air conditioner, such as 0 ℃, 2 ℃, and the like; in step S102, the air conditioner corrects the selected set temperature value based on the defrosting time of the defrosting process;
in other alternative embodiments, the frost point temperature value is a value calculated by a preset parameter. Here, the air conditioner takes the dew point temperature of the current working condition as the frost point temperature to be corrected; the dew point temperature can be calculated by the following dew point calculation formula:
Tes=A*Tai+B;
wherein Tes is dew point temperature, A is a calculation coefficient of outdoor environment temperature, Tai is the outdoor environment temperature, and B is a calculation constant;
the dew point temperature is calculated by the above dew point calculation formula, and then the dew point temperature can be used as the frost point temperature to be corrected in step S102.
Therefore, in the embodiment of the present disclosure, before executing step S102, the flow steps of the control method further include: acquiring the outdoor environment temperature of the air conditioner; and calculating according to a dew point calculation formula to obtain a dew point temperature, and taking the dew point temperature as the frost point temperature to be corrected.
Here, the air conditioner is further provided with a temperature sensor located in the outdoor unit, and the temperature sensor can be used for detecting real-time outdoor environment temperature of the outdoor environment, so that the frost point temperature to be corrected can be determined according to the above flow steps by acquiring the outdoor environment parameters detected by the temperature sensor.
And S103, controlling the air conditioner to perform defrosting judgment on whether to trigger the next defrosting process or not based on the corrected frost point temperature.
Optionally, in step S103, the detected outdoor environment temperature or outdoor coil temperature may be compared with the corrected frost point temperature, and when the outdoor environment temperature or outdoor coil temperature is less than the corrected frost point temperature, it is determined that the air conditioner triggers the next defrosting process; otherwise, the air conditioner is judged not to trigger the next defrosting process.
The control method for defrosting of the air conditioner, provided by the embodiment of the disclosure, can correct the frost point temperature by using the defrosting time of the air conditioner executing the defrosting process, so that the problems of large error between the frost point temperature and the actual working condition and inaccurate triggering of the defrosting process caused by the fact that the dew point temperature is used for determining the frost point temperature and the working state of the components of the air conditioner changes in the prior art can be solved, and the defrosting function of the air conditioner can be controlled more accurately.
In some optional embodiments, the specific execution process of step S103 includes: acquiring the temperature of an outdoor coil of an air conditioner; comparing the temperature of the outdoor coil with the corrected frost point temperature, and judging that the air conditioner triggers the next defrosting process under the condition that the temperature of the outdoor coil is less than the corrected frost point temperature; and under the condition that the temperature of the outer coil is greater than or equal to the corrected frost point temperature, judging that the air conditioner does not trigger the next defrosting process.
In the embodiment of the present disclosure, the outdoor unit of the air conditioner is further provided with a temperature sensor, and the temperature sensor can be used for detecting the real-time outdoor coil temperature of the coil of the outdoor unit; therefore, the step is to obtain the temperature of the outdoor coil detected by the temperature sensor;
illustratively, the corrected frost point temperature is-1 ℃; when the temperature of the outdoor coil acquired from the temperature sensor is-2 ℃, the temperature is lower than-1 ℃ below zero 2 ℃, and then the air conditioner is judged to trigger the next defrosting process; and when the temperature of the outdoor coil acquired from the temperature sensor is 3 ℃, the temperature of minus 1 ℃ is less than 3 ℃, and the next defrosting process triggered by the air conditioner is judged.
When the air conditioner is judged not to trigger the next defrosting process, the process is ended; alternatively, the air conditioner may re-perform the flow of the frost point temperature correction and the defrosting determination of steps S101 to S103 after a certain time.
In the above embodiment of the present disclosure, the specific defrosting manner of the defrosting process triggered by the air conditioner does not relate to the innovative point of the present application, and therefore is not described in detail.
In some optional embodiments, after the air conditioner is started at this time and the defrosting process is not executed yet, the air conditioner does not correct the frost point temperature, and the frost point temperature on which the defrosting determination is performed before the air conditioner executes the first defrosting process is a temperature value that is not corrected, such as the dew point temperature calculated by the above parameter calculation formula.
Therefore, the flow steps of the control method of the present application further include: acquiring the execution times of a defrosting process of the air conditioner after the starting; and controlling the air conditioner to judge whether to trigger the defrosting of the next defrosting process or not based on the dew point temperature when the execution frequency of the defrosting process is zero.
The air conditioner counts the execution times of the defrosting process after starting up, and the initial value of the counting is 0; the counting is increased by 1 every time the air conditioner executes a defrosting process; therefore, after the air conditioner is started at the time and before the defrosting process is executed for the first time, the counting of the defrosting process by the air conditioner is 0, and at the time, the air conditioner is controlled to perform defrosting judgment on whether the next defrosting process is triggered or not based on the dew point temperature.
And when the air conditioner is shut down after the operation is finished, the air conditioner clears the count of the defrosting process.
Fig. 2 is a flowchart illustrating a control method for defrosting an air conditioner according to another embodiment of the present disclosure.
As shown in fig. 2, the embodiment of the present disclosure provides a control method for defrosting an air conditioner, where the flow defined by the control method is performed after the air conditioner has completed a certain defrosting flow; the method specifically comprises the following steps:
s201, acquiring defrosting duration of a defrosting process executed by an air conditioner;
s202, matching and obtaining a temperature correction value corresponding to defrosting duration based on the defrosting duration of the air conditioner defrosting execution process and a preset incidence relation;
in an embodiment of the disclosure, the correlation is configured to characterize a correspondence of one or more defrost durations to temperature correction values; in a preset incidence relation, when the defrosting time length is less than or equal to the first time length, the temperature correction value is a negative value; when the defrosting time length is longer than the first time length and is shorter than or equal to the second time length, the temperature correction value is zero; and when the defrosting time length is longer than the second time length, the temperature correction value is a positive value.
For example, a selectable defrost duration versus temperature correction is shown in table 1.
Figure BDA0002050237710000061
Figure BDA0002050237710000071
TABLE 1
In table 1, the first time period is 3 minutes, and the corresponding temperature correction value is-1 ℃ when the defrosting time period is less than or equal to 3 minutes; the second time period is 5 minutes, and the corresponding temperature correction value is 0 ℃ when the defrosting time period is more than 3 minutes and less than or equal to 5 minutes; the first time duration is 3 minutes, and the corresponding temperature correction value is 1 ℃, 3 ℃ and the like when the defrosting time duration is more than or equal to 5 minutes; therefore, in step S202, the air conditioner may find and match the temperature correction value corresponding to the defrosting time period through the table.
The correlation is a value determined by calculation through experiments and the like before the air conditioner leaves a factory, and is prestored in a control device such as a computer board, a processor and the like of the air conditioner.
S203, correcting the frost temperature based on the temperature correction value obtained by matching;
in the embodiment of the present disclosure, the sum of the frost point temperature and the temperature correction value is calculated in step S203 to obtain the corrected frost point temperature.
And S204, controlling the air conditioner to perform defrosting judgment whether to trigger the next defrosting process or not based on the corrected frost point temperature.
In the embodiment of the present disclosure, the specific execution process of step S204 may refer to the foregoing embodiments, which are not described herein again.
According to the control method for defrosting of the air conditioner, the temperature correction value corresponding to the defrosting time length of the air conditioner for executing the defrosting process is searched and matched through the preset incidence relation, and then the frost point temperature is corrected according to the temperature correction value, so that the frost point temperature adaptive to the current working condition can be accurately determined, and the air conditioner can trigger the defrosting process of the air conditioner more accurately.
Fig. 3 is a flowchart illustrating a control method for defrosting an air conditioner according to another embodiment of the present disclosure.
As shown in fig. 3, the embodiment of the present disclosure provides a control method for defrosting an air conditioner, where the flow defined by the control method is performed after the air conditioner has completed a certain defrosting flow; the method specifically comprises the following steps:
s301, acquiring the accumulated running time of the heating mode of the air conditioner during the current startup;
in the embodiment of the disclosure, timing is started after the air conditioner is started, and the accumulated running time is the total time of the heating mode between the current time and the time when the air conditioner is started;
for example, the time when the air conditioner is turned on this time is 11:00, the time when the air conditioner executes step S301 is 13:10, where 11:00 to 11:30 are heating operation states, 11:30 to 11:50 are standby states, 11:50 to 12:30 are heating operation states, 12:30 to 12:35 are defrosting states defined by a defrosting process, 12:35 to 13:00 are heating operation states, 13:00 to 13:02 are defrosting states, and 13:02 to 13:10 are heating operation states, then the operation time period of the heating state when the air conditioner is turned on this time may be obtained and includes 30 minutes of 11:00 to 11:30, 40 minutes of 11:50 to 12:30, 25 minutes of 12:35 to 13:00, and 8 minutes of 13:02 to 13:10, and the sum of the operation time period of the heating state is 103 minutes, which is the cumulative operation time period of the heating mode.
In the embodiment of the disclosure, the frost point temperature is corrected by combining the accumulated operation time of heating and the defrosting time.
S302, acquiring the defrosting duration of the defrosting process executed by the air conditioner;
the defrosting time length obtained in step S302 is 8 minutes from the time period of 13:00 to 13:02 in the embodiment of the present disclosure shown in connection with step S301;
s303, matching to obtain a temperature correction value corresponding to the duration combination based on the duration combination and a preset incidence relation;
in an embodiment of the disclosure, the correlation is configured to characterize a correspondence of one or more time duration combinations to temperature correction values; the duration combination at least comprises duration intervals in which the defrosting duration and the accumulated running duration of the heating mode are respectively located.
For example, table 2 shows a selectable combination of time periods in relation to temperature correction values.
Duration combination (unit: minute) Temperature correction value (Unit:. degree. C.)
T < 3 and T < T1 -1
T is more than 3 and less than or equal to 5 and T is more than T1 0
T is more than 5 and less than or equal to 9, and T is more than T1 1
t>9 and T is not limited 3
TABLE 2
Wherein T is defrosting time duration, and T is accumulated running time duration of the heating mode. In step S304, the air conditioner may find and match the temperature correction value corresponding to the duration combination through the table.
The correlation is a value determined by calculation through experiments and the like before the air conditioner leaves a factory, and is prestored in a control device such as a computer board, a processor and the like of the air conditioner.
S304, correcting the frost point temperature based on the temperature correction value obtained by matching;
in the embodiment of the present disclosure, the sum of the frost point temperature and the temperature correction value is calculated in step S304 to obtain the corrected frost point temperature.
And S305, controlling the air conditioner to perform defrosting judgment on whether to trigger the next defrosting process or not based on the corrected frost point temperature.
In the embodiment of the present disclosure, the specific execution process of step S305 may refer to the foregoing embodiments, which are not described herein again.
The control method for defrosting of the air conditioner, which is disclosed in the embodiment of the disclosure, searches for and matches a temperature correction value corresponding to a duration combination through a preset incidence relation, and further corrects the temperature of a frost point according to the temperature correction value, wherein the duration combination can simultaneously reflect the duration occupied by two different flows of a heating mode and a last defrosting flow after the air conditioner is started up and operated, and the frosting degree can be influenced because the air conditioner operates an outdoor unit in the heating mode to absorb heat, so that the defrosting duration of the last defrosting flow and the accumulated operating duration of the heating mode are comprehensively considered, and the next defrosting flow can be triggered more easily, so that the air conditioner triggers the defrosting flow adaptive to the current working condition more accurately.
Fig. 4 is a schematic structural diagram of a control device for defrosting of an air conditioner according to an embodiment of the present disclosure.
As shown in fig. 4, the embodiment of the present disclosure provides a control device 4 for defrosting an air conditioner, which is applied to an air conditioner and can control the air conditioner to execute the control flow shown in the foregoing embodiment. The control device 4 includes:
a first obtaining module 41 configured to: under the condition that the defrosting process executed by the air conditioner is completed, acquiring the defrosting duration of the defrosting process executed by the air conditioner;
a temperature modification module 42 configured to: correcting the frost point temperature based on the defrosting duration of the defrosting process executed by the air conditioner;
a defrost determination module 43 configured to: and controlling the air conditioner to perform defrosting judgment whether to trigger the next defrosting process or not based on the corrected frost point temperature.
In some optional embodiments, the temperature modification module 42 is configured to:
matching to obtain a temperature correction value corresponding to defrosting duration based on the defrosting duration of the defrosting process executed by the air conditioner and a preset incidence relation; wherein the correlation is configured to characterize a correspondence of one or more defrost durations and temperature correction values;
and correcting the frost point temperature based on the temperature correction value obtained by matching.
In some optional embodiments, the first obtaining module 41 is further configured to: acquiring the accumulated running time of the heating mode of the air conditioner during the starting-up;
the temperature modification module 42 is configured to:
matching to obtain a temperature correction value corresponding to the duration combination based on the association relation between the duration combination and the preset relation; wherein the correlation is configured to characterize a correspondence of one or more time duration combinations and the temperature correction value; the duration combination at least comprises duration intervals in which the defrosting duration and the accumulated running duration of the heating mode are respectively located;
and correcting the frost point temperature based on the temperature correction value obtained by matching.
In some optional embodiments, the temperature modification module 41 is configured to:
and calculating the sum of the frost point temperature and the temperature correction value to obtain the corrected frost point temperature.
In some optional embodiments, the control apparatus 4 further comprises a second obtaining module 44 configured to: acquiring the temperature of an outdoor coil of an air conditioner;
the defrost determination module 43 is configured to:
under the condition that the temperature of the outdoor coil pipe is lower than the corrected frost point temperature, judging that the air conditioner triggers the next defrosting process;
and under the condition that the temperature of the outdoor coil is greater than or equal to the corrected frost point temperature, judging that the air conditioner does not trigger the next defrosting process.
In some optional embodiments, the control device 4 further comprises:
a third obtaining module 45 configured to: acquiring the outdoor environment temperature of the air conditioner;
a calculation module 46 configured to: and calculating according to a dew point calculation formula to obtain a dew point temperature, and taking the dew point temperature as the frost point temperature to be corrected.
In some optional embodiments, the control apparatus further comprises a fourth obtaining module 47 configured to: acquiring the execution times of a defrosting process of the air conditioner after the starting;
the defrost determination module 43 is further configured to: and controlling the air conditioner to judge whether to trigger the defrosting of the next defrosting process or not based on the dew point temperature when the execution frequency of the defrosting process is zero.
The specific execution manner of the control flow executed by the control device to control the air conditioner in the present application may refer to the corresponding part of the foregoing embodiments of the control method, and is not described herein again.
The embodiment of the disclosure also provides an air conditioner, which comprises the control device provided in the previous embodiment.
The embodiment of the present disclosure also provides a computer-readable storage medium storing computer-executable instructions configured to execute the control method for defrosting an air conditioner provided in the above embodiment.
Embodiments of the present disclosure also provide a computer program product including a computer program stored on a computer-readable storage medium, the computer program including program instructions that, when executed by a computer, cause the computer to execute the control method of defrosting an air conditioner provided in the above-described embodiments.
The computer-readable storage medium described above may be a transitory computer-readable storage medium or a non-transitory computer-readable storage medium.
An embodiment of the present disclosure further provides an electronic device, a structure of which is shown in fig. 5, where the electronic device includes:
at least one processor (processor)500, such as processor 500 in FIG. 5; and a memory (memory)501, and may further include a Communication Interface 502 and a bus 503. The processor 500, the communication interface 502, and the memory 501 may communicate with each other via a bus 503. Communication interface 502 may be used for information transfer. The processor 500 may call logic instructions in the memory 501 to execute the control method of air conditioner defrosting provided in the above-described embodiment.
In addition, the logic instructions in the memory 501 may be implemented in the form of software functional units and may be stored in a computer readable storage medium when the logic instructions are sold or used as independent products.
The memory 501 is a computer-readable storage medium, and can be used for storing software programs, computer-executable programs, such as program instructions/modules corresponding to the methods in the embodiments of the present disclosure. The processor 500 executes functional applications and data processing by running software programs, instructions and modules stored in the memory 501, so as to implement the control method for defrosting the air conditioner in the above method embodiment.
The memory 501 may include a storage program area and a storage data area, wherein the storage program area may store an operating system, an application program required for at least one function; the storage data area may store data created according to the use of the terminal device, and the like. Further, the memory 501 may include a high-speed random access memory and may also include a nonvolatile memory.
The technical solution of the embodiments of the present disclosure may be embodied in the form of a software product, where the computer software product is stored in a storage medium and includes one or more instructions to enable a computer device (which may be a personal computer, a server, or a network device) to execute all or part of the steps of the method of the embodiments of the present disclosure. And the aforementioned storage medium may be a non-transitory storage medium comprising: a U-disk, a removable hard disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a magnetic disk or an optical disk, and other various media capable of storing program codes, and may also be a transient storage medium.
The above description and drawings sufficiently illustrate embodiments of the disclosure to enable those skilled in the art to practice them. Other embodiments may incorporate structural, logical, electrical, process, and other changes. The examples merely typify possible variations. Individual components and functions are optional unless explicitly required, and the sequence of operations may vary. Portions and features of some embodiments may be included in or substituted for those of others. The scope of the disclosed embodiments includes the full ambit of the claims, as well as all available equivalents of the claims. As used in this application, although the terms "first," "second," etc. may be used in this application to describe various elements, these elements should not be limited by these terms. These terms are only used to distinguish one element from another. For example, a first element could be termed a second element, and, similarly, a second element could be termed a first element, unless the meaning of the description changes, so long as all occurrences of the "first element" are renamed consistently and all occurrences of the "second element" are renamed consistently. The first and second elements are both elements, but may not be the same element. Furthermore, the words used in the specification are words of description only and are not intended to limit the claims. As used in the description of the embodiments and the claims, the singular forms "a", "an" and "the" are intended to include the plural forms as well, unless the context clearly indicates otherwise. Similarly, the term "and/or" as used in this application is meant to encompass any and all possible combinations of one or more of the associated listed. Furthermore, the terms "comprises" and/or "comprising," when used in this application, specify the presence of stated features, integers, steps, operations, elements, and/or components, but do not preclude the presence or addition of one or more other features, integers, steps, operations, elements, components, and/or groups thereof. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other like elements in a process, method or apparatus that comprises the element. In this document, each embodiment may be described with emphasis on differences from other embodiments, and the same and similar parts between the respective embodiments may be referred to each other. For methods, products, etc. of the embodiment disclosures, reference may be made to the description of the method section for relevance if it corresponds to the method section of the embodiment disclosure.
Those of skill in the art would appreciate that the various illustrative elements and algorithm steps described in connection with the embodiments disclosed herein may be implemented as electronic hardware or combinations of computer software and electronic hardware. Whether such functionality is implemented as hardware or software may depend upon the particular application and design constraints imposed on the solution. Skilled artisans may implement the described functionality in varying ways for each particular application, but such implementation decisions should not be interpreted as causing a departure from the scope of the disclosed embodiments. It can be clearly understood by the skilled person that, for convenience and brevity of description, the specific working processes of the system, the apparatus and the unit described above may refer to the corresponding processes in the foregoing method embodiments, and are not described herein again.
In the embodiments disclosed herein, the disclosed methods, products (including but not limited to devices, apparatuses, etc.) may be implemented in other ways. For example, the above-described apparatus embodiments are merely illustrative, and for example, the division of the units may be merely a logical division, and in actual implementation, there may be another division, for example, multiple units or components may be combined or integrated into another system, or some features may be omitted, or not executed. In addition, the shown or discussed mutual coupling or direct coupling or communication connection may be an indirect coupling or communication connection through some interfaces, devices or units, and may be in an electrical, mechanical or other form. The units described as separate parts may or may not be physically separate, and parts displayed as units may or may not be physical units, may be located in one place, or may be distributed on a plurality of network units. Some or all of the units can be selected according to actual needs to implement the present embodiment. In addition, functional units in the embodiments of the present disclosure may be integrated into one processing unit, or each unit may exist alone physically, or two or more units are integrated into one unit.
The flowchart and block diagrams in the figures illustrate the architecture, functionality, and operation of possible implementations of systems, methods and computer program products according to embodiments of the present disclosure. In this regard, each block in the flowchart or block diagrams may represent a module, segment, or portion of code, which comprises one or more executable instructions for implementing the specified logical function(s). In some alternative implementations, the functions noted in the block may occur out of the order noted in the figures. For example, two blocks shown in succession may, in fact, be executed substantially concurrently, or the blocks may sometimes be executed in the reverse order, depending upon the functionality involved. Each block of the block diagrams and/or flowchart illustrations, and combinations of blocks in the block diagrams and/or flowchart illustrations, can be implemented by special purpose hardware-based systems that perform the specified functions or acts, or combinations of special purpose hardware and computer instructions.

Claims (10)

1. A control method for defrosting of an air conditioner is characterized by comprising the following steps:
under the condition that an air conditioner completes a defrosting process, acquiring the defrosting duration of the defrosting process executed by the air conditioner;
correcting the frost point temperature based on the defrosting time of the defrosting process executed by the air conditioner;
and controlling the air conditioner to perform defrosting judgment on whether to trigger the next defrosting process or not based on the corrected frost point temperature.
2. The control method according to claim 1, wherein the correcting a frost point temperature based on a defrosting time period for which the air conditioner has performed the defrosting process includes:
matching to obtain a temperature correction value corresponding to the defrosting duration based on the correlation between the defrosting duration of the air conditioner executing the defrosting process and the preset correlation; wherein the correlation is configured to characterize a correspondence of one or more defrost durations to temperature correction values;
and correcting the frost point temperature based on the temperature correction value obtained by matching.
3. The control method according to claim 1,
before the correcting the frost point temperature based on the defrosting time period for which the air conditioner has performed the defrosting process, the control method further includes: acquiring the accumulated running time of the heating mode of the air conditioner during the starting-up;
correcting the frost point temperature based on the defrosting time length of the defrosting process executed by the air conditioner, wherein the correcting comprises the following steps:
matching to obtain a temperature correction value corresponding to the duration combination based on the association relation between the duration combination and the preset relation; wherein the correlation is configured to characterize a correspondence of one or more of the combinations of durations and temperature correction values; the time length combination at least comprises time length intervals in which the defrosting time length and the accumulated running time length of the heating mode are respectively positioned;
and correcting the frost point temperature based on the temperature correction value obtained by matching.
4. The control method according to claim 2 or 3, wherein the correcting the frost point temperature based on the temperature correction value obtained by matching includes:
and calculating the sum of the frost point temperature and the temperature correction value to obtain the corrected frost point temperature.
5. The control method according to claim 4,
the control method further comprises the following steps: acquiring the temperature of an outdoor coil of the air conditioner;
the defrosting judgment of whether to trigger the next defrosting process or not based on the corrected frost point temperature by controlling the air conditioner comprises the following steps:
under the condition that the temperature of the outdoor coil pipe is lower than the corrected frost point temperature, judging that the air conditioner triggers the next defrosting process;
and under the condition that the temperature of the outdoor coil pipe is greater than or equal to the corrected frost point temperature, judging that the air conditioner does not trigger the next defrosting process.
6. The control method according to claim 1, wherein before correcting the frost point temperature based on a defrosting time period of a defrosting process that the air conditioner has performed, the control method further comprises:
acquiring the outdoor environment temperature of the air conditioner;
and calculating according to a dew point calculation formula to obtain a dew point temperature, and taking the dew point temperature as the frost point temperature to be corrected.
7. The control method according to claim 6, characterized by further comprising:
acquiring the execution times of a defrosting process of the air conditioner after the starting;
and under the condition that the execution times of the defrosting process is zero, controlling the air conditioner to judge whether to trigger the defrosting of the next defrosting process or not based on the dew point temperature.
8. A control device for defrosting of an air conditioner, comprising:
a first acquisition module configured to: under the condition that an air conditioner completes a defrosting process, acquiring the defrosting duration of the defrosting process executed by the air conditioner;
a temperature modification module configured to: correcting the frost point temperature based on the defrosting time of the defrosting process executed by the air conditioner;
a defrost determination module configured to: and controlling the air conditioner to perform defrosting judgment on whether to trigger the next defrosting process or not based on the corrected frost point temperature.
9. The control device of claim 8, wherein the temperature modification module is configured to:
matching to obtain a temperature correction value corresponding to the defrosting duration based on the correlation between the defrosting duration of the air conditioner executing the defrosting process and the preset correlation; wherein the correlation is configured to characterize a correspondence of one or more defrost durations to temperature correction values;
and correcting the frost point temperature based on the temperature correction value obtained by matching.
10. An air conditioner characterized by comprising the control device according to any one of claims 8 to 9.
CN201910371822.3A 2019-05-06 2019-05-06 Control method and device for defrosting of air conditioner and air conditioner Active CN111895596B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910371822.3A CN111895596B (en) 2019-05-06 2019-05-06 Control method and device for defrosting of air conditioner and air conditioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910371822.3A CN111895596B (en) 2019-05-06 2019-05-06 Control method and device for defrosting of air conditioner and air conditioner

Publications (2)

Publication Number Publication Date
CN111895596A true CN111895596A (en) 2020-11-06
CN111895596B CN111895596B (en) 2022-06-10

Family

ID=73169379

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910371822.3A Active CN111895596B (en) 2019-05-06 2019-05-06 Control method and device for defrosting of air conditioner and air conditioner

Country Status (1)

Country Link
CN (1) CN111895596B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112923514A (en) * 2021-02-25 2021-06-08 青岛海尔空调电子有限公司 Control method for defrosting of air conditioner
CN113339940A (en) * 2021-05-31 2021-09-03 珠海格力电器股份有限公司 Air conditioner defrosting control method and device, storage medium and air conditioner
CN113865148A (en) * 2021-09-27 2021-12-31 广东美的制冷设备有限公司 Heat pump unit, control method thereof and computer readable storage medium

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1381698A (en) * 2001-04-18 2002-11-27 广东科龙电器股份有限公司 Air conditioner and its defrosting method
JP2005331139A (en) * 2004-05-19 2005-12-02 Toshiba Corp Refrigerator
JP2009287811A (en) * 2008-05-28 2009-12-10 Sharp Corp Air conditioner
CN104913455A (en) * 2015-06-05 2015-09-16 美的集团武汉制冷设备有限公司 Defrosting control method, defrosting control device and defrosting control terminal for air conditioner
CN105605840A (en) * 2016-02-01 2016-05-25 浙江丹特卫顿热泵有限公司 Intelligent defrosting method with learning function
CN106196480A (en) * 2016-07-28 2016-12-07 珠海格力电器股份有限公司 Defrosting control method and device
CN107036347A (en) * 2017-04-25 2017-08-11 广东海悟科技有限公司 Can intelligent defrosting heat pump air conditioner, the computer-readable recording medium of heat pump air conditioner
CN107449105A (en) * 2017-07-05 2017-12-08 青岛海尔空调器有限总公司 A kind of control method of air-conditioner defrosting
CN107655150A (en) * 2017-10-16 2018-02-02 广东美的暖通设备有限公司 Air-conditioner defrosting control device and method
CN109269016A (en) * 2018-08-02 2019-01-25 珠海格力电器股份有限公司 A kind of defrosting control method, device and heat pump unit

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1381698A (en) * 2001-04-18 2002-11-27 广东科龙电器股份有限公司 Air conditioner and its defrosting method
JP2005331139A (en) * 2004-05-19 2005-12-02 Toshiba Corp Refrigerator
JP2009287811A (en) * 2008-05-28 2009-12-10 Sharp Corp Air conditioner
JP5227661B2 (en) * 2008-05-28 2013-07-03 シャープ株式会社 Air conditioner
CN104913455A (en) * 2015-06-05 2015-09-16 美的集团武汉制冷设备有限公司 Defrosting control method, defrosting control device and defrosting control terminal for air conditioner
CN105605840A (en) * 2016-02-01 2016-05-25 浙江丹特卫顿热泵有限公司 Intelligent defrosting method with learning function
CN106196480A (en) * 2016-07-28 2016-12-07 珠海格力电器股份有限公司 Defrosting control method and device
CN107036347A (en) * 2017-04-25 2017-08-11 广东海悟科技有限公司 Can intelligent defrosting heat pump air conditioner, the computer-readable recording medium of heat pump air conditioner
CN107449105A (en) * 2017-07-05 2017-12-08 青岛海尔空调器有限总公司 A kind of control method of air-conditioner defrosting
CN107655150A (en) * 2017-10-16 2018-02-02 广东美的暖通设备有限公司 Air-conditioner defrosting control device and method
CN109269016A (en) * 2018-08-02 2019-01-25 珠海格力电器股份有限公司 A kind of defrosting control method, device and heat pump unit

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112923514A (en) * 2021-02-25 2021-06-08 青岛海尔空调电子有限公司 Control method for defrosting of air conditioner
CN113339940A (en) * 2021-05-31 2021-09-03 珠海格力电器股份有限公司 Air conditioner defrosting control method and device, storage medium and air conditioner
CN113865148A (en) * 2021-09-27 2021-12-31 广东美的制冷设备有限公司 Heat pump unit, control method thereof and computer readable storage medium

Also Published As

Publication number Publication date
CN111895596B (en) 2022-06-10

Similar Documents

Publication Publication Date Title
CN111895593B (en) Control method and device for defrosting of air conditioner and air conditioner
CN112050369B (en) Control method and control device for defrosting of air conditioner and air conditioner
CN111895596B (en) Control method and device for defrosting of air conditioner and air conditioner
CN110749041B (en) Operation control method and system of air conditioner, air conditioner and storage medium
CN108917094A (en) A kind of defrosting control method, device and air conditioner
CN112050376A (en) Control method and control device for defrosting of air conditioner and air conditioner
CN112050375A (en) Control method and control device for defrosting of air conditioner and air conditioner
CN111895597B (en) Control method and device for defrosting of air conditioner and air conditioner
CN111895602B (en) Control method and device for defrosting of air conditioner and air conditioner
CN110017593B (en) Air source heat pump unit, control method and device thereof and storage medium
CN111895601A (en) Control method and device for defrosting of air conditioner and air conditioner
CN108644971B (en) Control method and device for defrosting of air conditioner, storage medium and processor
CN111895600B (en) Control method and device for defrosting of air conditioner and air conditioner
CN112781286B (en) Defrosting control method and device and air-cooled module unit
CN112050373A (en) Control method and control device for defrosting of air conditioner and air conditioner
CN111895595B (en) Control method and device for defrosting of air conditioner and air conditioner
CN111895599B (en) Control method and device for defrosting of air conditioner and air conditioner
CN111895591B (en) Control method and device for defrosting of air conditioner and air conditioner
CN110470012B (en) Control method and device for defrosting of air conditioner and air conditioner
CN110470009B (en) Control method and device for defrosting of air conditioner and air conditioner
CN112050370A (en) Control method and control device for defrosting of air conditioner and air conditioner
CN111895592B (en) Control method and device for defrosting of air conditioner and air conditioner
CN110986277A (en) Method and device for self-cleaning control of air conditioner and air conditioner
CN111895598B (en) Control method and device for defrosting of air conditioner and air conditioner
CN112050367B (en) Control method and control device for defrosting of air conditioner and air conditioner

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 266101 Haier Industrial Park, 1 Haier Road, Laoshan District, Shandong, Qingdao

Applicant after: QINGDAO HAIER AIR CONDITIONER GENERAL Corp.,Ltd.

Applicant after: Haier Zhijia Co., Ltd

Address before: 266101 Haier Industrial Park, 1 Haier Road, Laoshan District, Shandong, Qingdao

Applicant before: QINGDAO HAIER AIR CONDITIONER GENERAL Corp.,Ltd.

Applicant before: Haier Limited by Share Ltd, Qingdao

GR01 Patent grant
GR01 Patent grant