CN111894221A - Industrial external processing method for large-area multi-curve complex artistic veneer - Google Patents

Industrial external processing method for large-area multi-curve complex artistic veneer Download PDF

Info

Publication number
CN111894221A
CN111894221A CN202010587590.8A CN202010587590A CN111894221A CN 111894221 A CN111894221 A CN 111894221A CN 202010587590 A CN202010587590 A CN 202010587590A CN 111894221 A CN111894221 A CN 111894221A
Authority
CN
China
Prior art keywords
steel
processing
unit
veneer
unit components
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010587590.8A
Other languages
Chinese (zh)
Other versions
CN111894221B (en
Inventor
邓惠根
李佳
连珍
葛倩华
苏海龙
朱彤
江旖旎
朱卫中
张腾
戴泽敏
朱家佳
周漪芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Building Decoration Engineering Group Co Ltd
Original Assignee
Shanghai Building Decoration Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Building Decoration Engineering Group Co Ltd filed Critical Shanghai Building Decoration Engineering Group Co Ltd
Priority to CN202010587590.8A priority Critical patent/CN111894221B/en
Publication of CN111894221A publication Critical patent/CN111894221A/en
Application granted granted Critical
Publication of CN111894221B publication Critical patent/CN111894221B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0803Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Abstract

The invention relates to an industrialized external processing method of a large-area multi-curved complex artistic veneer, the large-area multi-curved complex artistic veneer installed in a large-scale artistic venue structurally comprises a basic framework, unit components and a wood veneer surface layer, and the external processing and splitting method comprises a splitting link, a processing link and an installation link. The invention relates to an external processing method of a large-area multi-bent complex artistic veneer, which comprises the steps of dividing an integral ribbon-shaped ornament, processing the divided ribbon-shaped ornament into unit components through an external factory, transporting the unit components to a site for splicing, and finally processing a wooden decorative surface.

Description

Industrial external processing method for large-area multi-curve complex artistic veneer
Technical Field
The invention relates to the field of architectural decoration, in particular to an industrialized external processing method of a large-area multi-curve complex artistic veneer.
Background
In the present building construction field, by combining the BIM model with the digital construction system, many components in the building can be processed in different places, directly transported to the building construction site, and assembled into the building (such as GRG, arc ceiling aluminum plate, etc.). The prefabricated building components can be automatically completed through digital construction, and the components manufactured by the precision mechanical technology of a factory not only reduce construction errors, but also greatly improve the productivity of component manufacturing, so that the construction period of the whole building construction is shortened and the construction is easy to control.
For buildings with complicated special-shaped decorative surfaces, in particular to structures with artistic shapes such as ribbons, the prior art is that the structures are directly integrated by a base layer and a decorative surface through digital auxiliary design and technologies such as numerical control processing and the like, and then the structures are directly assembled on site. However, for the wood-faced streamer inside a large-scale venue, the requirements are high and strict, the requirements on the appearance precision are high, the requirements on acoustic requirements and smooth and seamless appearance are guaranteed, the situation that the streamer cannot be realized through direct assembly type assembly of one material is caused, and the streamer can be realized only through precise calculation and scientific piece-dividing construction.
At present, the mainstream special-shaped wood veneer in the industry is divided into parts according to the processing capacity of a factory and the specification of a plate, and a process seam is required to be left between wood veneer plates after the installation is finished. Aiming at the construction of the ribbon-shaped wood veneer on the inner wall surface of a theater, the requirements of rigidity and flexibility are met according to the shape, the internal and external corners are clear, and no parting is formed. Meanwhile, a series of problems such as acoustics, material resonance, fire prevention, temperature change influence, structural strength and the like need to be considered in a theater.
Disclosure of Invention
The invention aims to overcome the defects in the prior art and provide a novel industrial external processing method for large-area multi-curved complex artistic veneer. The industrialized external processing method of the ribbon-shaped decorative surface can realize reasonable piece division and high processing precision, and is suitable for industrialized production.
In order to achieve the purpose of the invention, the technical scheme provided by the invention patent is as follows:
the industrialized external processing method of the large-area multi-curved complex artistic veneer is characterized in that a ribbon-shaped veneer installed in a large artistic venue is of a semi-enclosed structure which is integrally C-shaped, the structure of the ribbon-shaped veneer comprises a basic unit framework, unit components and a wood veneer surface layer, the basic unit components are installed on the inner wall of the large artistic venue, the unit components are installed on the basic unit framework and spliced into ribbon shapes, the wood veneer surface layer is arranged on the spliced unit components, and the external processing link method comprises the following steps:
the method comprises the steps of firstly, dividing a three-dimensional model of a ribbon-shaped model, dividing the model according to the processing, transportation and economy of a factory, enabling the length of each unit component after dividing to be not more than 2.5 meters and the height of each unit component to be not more than 2 meters, keeping the continuity of the ribbon shape during dividing, manufacturing a coordinate control table and a processing size control table of each unit component, wherein each unit component after being numbered is provided with an independent processing model and a processing view;
secondly, processing the divided unit components in an external processing factory, manufacturing each unit component in a processing model and a processing view, wherein the unit components to be processed structurally comprise a basic layer framework, a steel framework is longitudinally used as a main body of the basic layer framework, flat steel bent by a numerical control machine tool is transversely used, the unit framework is manufactured by two steel frameworks, a plurality of flat steels and a plurality of support rods, and a steel plate mask is covered on the surface of the flat steel of the unit framework;
thirdly, synchronously processing two longitudinal steel frames between the adjacent unit components by A, B sleeves to keep the structural configurations of the two units the same, simultaneously punching holes on a numerical control machine tool to form corresponding connecting holes after the adjacent steel frames are aligned, screwing the knocking bolts through the connecting holes in the installation process, correcting the outer contour line of the surface while realizing the reinforcement connection, and ensuring that the arc of the outer contour line is smooth and continuous;
fourthly, designing a special working platform in an external processing factory to ensure the processing precision of the unit components, wherein the working platform comprises an operation table top and supporting legs, the four supporting legs are respectively arranged at the bottom of the square operation table top, criss-cross square grids are arranged on the operation table top of the working platform, scales are marked on the grids to serve as control coordinates, the steel frames are processed and welded on the working platform according to a processing view and a size control table, two adjacent AB steel frames are simultaneously processed during processing and welding, transversely bent flat steel is processed on the numerical control pipe bender, and control points are set according to the control size during flat steel processing to match the surface arc trend;
fifthly, assembling the processed steel frame, flat steel and skin into corresponding unit components by using a special processing and checking platform, assembling and manufacturing each unit component with a single number and adjacent unit components together, connecting the steel frames processed by the AB sleeve together by using bolts to ensure the connection precision of the adjacent unit components, arranging angle iron frames on two sides of the processing and checking platform, standing and fixing the steel frames according to coordinates, controlling the verticality and levelness of the base frame to control the precision, controlling the transverse flat steel manufactured by using a numerical control pipe bender to complete positioning by using the coordinates of a grid platform, and controlling the positioning by using at least five space points (X, Y and Z) for each transverse flat steel;
and sixthly, pre-assembling in a factory to assemble each manufactured unit component according to the number, assembling four to six adjacent unit components in groups in the factory, measuring and correcting the size, checking and correcting, and then shaping each unit component.
In the industrial external processing method of the large-area multi-curved complex artistic veneer, the operation mode of dividing the three-dimensional model of the ribbon-shaped modeling in the first step is as follows: firstly, carrying out space surveying and mapping on the interior of a large-scale venue finished by civil engineering construction, carrying out field scanning surveying and mapping by using a three-dimensional scanner, and generating a point cloud model from surveying and mapping points; integrating the generated point cloud model with a BIM model in the large venue to form a three-dimensional model of a lightweight solid grid surface; and finally, carrying out unit block division on the integral base layer surface of the complex special-shaped decorative surface on the three-dimensional model.
In the industrial external processing method of the large-area multi-curve complex artistic veneer, in the second step, four-point location information is output to the unit components, each output unit block is numbered, and simultaneously, the curved surface edge lines of the unit blocks are extracted and a three-dimensional wire frame model is derived.
In the third step, the unit component to be processed structurally comprises a base layer framework, a steel framework is longitudinally used as the main body of the base layer framework, two parallel supporting legs are arranged on two sides of the steel framework, a bending section conforming to the angle of a curved surface is arranged in the middle of the steel framework, two ends of the bending section are respectively fixed on the upper parts of the supporting legs, flat steel bent by a numerical control bending machine is transversely used, two ends of the flat steel are respectively fixed on the bending sections, supporting rods are arranged on the supporting legs of the two opposite steel frameworks, the two steel frameworks, the plurality of flat steel and the plurality of supporting rods are made into the unit framework, and the surface of the flat steel of the unit framework is covered with a steel plate mask.
In the industrial external processing method of the large-area multi-curve complex artistic veneer, the working platform in the fourth step comprises an operation table top and supporting legs, the four supporting legs are respectively arranged at the bottom of the square operation table top, criss-cross square grids are arranged on the operation table top of the working platform, scales are marked on the grids to be used as control coordinates, the steel frame is processed and welded on the working platform according to a processing view and a size control table, and two adjacent AB steel frames are simultaneously processed during processing and welding.
In the industrial external processing method of the large-area multi-curve complex artistic veneer, the fifth step of processing and checking platform structurally comprises a construction platform, the construction platform is laid on the ground in a factory building, one side of the construction platform is provided with a vertical fixed backing plate, one side of the construction platform, which is opposite to the backing plate, is provided with a pre-assembled support at a movable position, grids are respectively arranged on the construction platform and the backing plate, scales are arranged on the grids, longitudinally adjacent unit components are simultaneously manufactured on the construction platform of the processing and checking platform, four corresponding steel frames of the unit components are vertically fixed on the construction platform during manufacturing, one steel frame is used as a reference, a temporary fixing support is welded on the edge of the steel frame used as the reference to keep the vertical state of the steel frame, and the opposite steel frame and the adjacent steel frame are respectively fixed in place, two stability reinforcements are connected between a group of opposite steel frames, processed flat steel is fixed between the reference steel frame and the opposite steel frames, and the edge of the pre-assembled support close to the outermost side of the unit component combination is used as the outermost side support.
In the industrial external processing method of the large-area multi-curved complex artistic veneer of the invention, in the fifth step, when each unit component is installed on the steel frame, five coordinate points on the flat steel need to be controlled to be installed in place.
In the sixth step, when the external processing factory is pre-assembled, the processed unit components are firstly placed according to the serial numbers, four to five adjacent unit components are selected to be hoisted for pre-assembly, a support frame is erected in the field during pre-assembly to simulate a field installation scene, find out problems and mark deviations, and after the components are disassembled, the components are corrected.
Based on the technical scheme, the external processing part separating, processing and mounting method for the ribbon-shaped wood veneer decoration project obtains the following technical effects through practical application:
1. the invention aims at the design, production and installation engineering of ribbon-shaped ornaments in a large-scale art venue, and the large-scale ribbon-shaped ornaments have larger size, are integrally distributed in a C shape, have the installation height of dozens of meters and the length of dozens of meters, have the height of two to three meters, require the surfaces of the ornaments to have solid wood texture, are elegant and natural, meet the acoustic requirements and cannot generate the phenomenon that echo and the like influence the acoustic effect of the art venue, and the decoration form, the size height and the structural form have not been used before, thereby causing great difficulty for design and construction. The invention relates to a method for manufacturing a ribbon-shaped ornament, which aims at the situation, utilizes a digital technology to divide the integral ribbon-shaped ornament into pieces, then the pieces are processed into unit components through an external factory, then the unit components are transported to the site for splicing, and finally the wooden decorative surface is processed.
2. The invention discloses a method for designing a large-scale ribbon-shaped ornament, which is implemented by adopting a BIM mode, and then the internal dimension of a building after actual completion is measured on site to carry out reverse modeling, so that the overall characteristic of an actual ribbon is simulated, and piece splitting is carried out by utilizing software, the position of a longitudinal parallel mode is adopted during piece splitting, and the position of an internal corner line or an external corner line of the ribbon design is transversely selected, so that continuity and continuity are kept after piece splitting, the smoothness of transition is ensured, and the processing capacity and the transportation capacity of a factory are considered by the size of each unit component during piece splitting, so that hoisting, transportation and assembly are facilitated. When the parts are separated, the curved surfaces and the curved lines are processed to be straight as far as possible on the premise of not influencing the overall effect, and the difficulty and the cost of actual processing are reduced.
3. The invention discloses a method for processing unit components, which aims to ensure the precision and the processing convenience, and specially designs auxiliary tools, wherein the auxiliary tools comprise a working platform for processing a steel frame and a processing and checking platform for fixing the steel frame, flat steel and a steel covering surface, the method for processing the AB surface is adopted to practically ensure the corresponding degree of adjacent steel frames, simultaneously, mounting holes are processed to ensure accurate alignment during assembling, in addition, a numerical control bending machine is adopted for processing the flat steel to ensure the bending size to be in place, and the other function of the processing and checking platform is to assemble the adjacent unit components together for multiple integral assembling.
4. According to the invention, when the unit components are processed in an external processing factory, the matching consistency of adjacent unit components is ensured by adopting an AB surface processing mode, the verification and adjustment are carried out by adopting a pre-assembly mode of a plurality of unit components, and whether the unit components meet the drawing requirements and practical installation requirements is checked by simulating the actual installation environment, so that the manufacturing and installation precision is further ensured.
5. The unit component of the patent application of the invention is transported to a construction site, a special base layer framework is fixed at the installation position of the ribbon-shaped ornament in the construction site, the base layer framework is used as an installation support of the unit component and aims to ensure the accuracy of the installation position, the structure of the base layer component adopts the form of a front horizontal shelf, the rear end of the base layer component is connected to the wall of a building, a plurality of inclined struts are utilized to ensure that the base layer component can bear the weight of the whole ribbon, the design form of a plurality of horizontal shelves at the front end is the unit component which can be placed in place and can be adjusted in the transverse position, the problems of installation and adjustment are innovatively solved, and the installation convenience and the installation accuracy are further improved.
6. When the unit component is installed, a height marking point is determined on a basic framework and serves as an installation supporting point (Z), a horizontal coordinate point (Y) needs to be determined on the supporting point of each unit component, a final transverse coordinate point (X) is determined through in-out adjustment of a supporting frame on the basic framework, after positioning is completed, a total station is used for rechecking a control elevation, adjacent unit components are assembled in sequence after rechecking is qualified, and rechecking is carried out once after four unit components are installed so as to ensure installation accuracy.
7. After the unit components are assembled, firstly plaster laths are pasted on the back of the steel plate covering surface of the unit components for balancing weight, 35 kilograms of plaster plates are balanced per square meter to meet the acoustic requirement when the weight is balanced, then high-density laths are fixed on the surface of the steel plate covering surface, and finally, wood veneers are pasted on the high-density laths. The gypsum lath is convenient to mount in a form of being assembled behind and cannot cause the risk of surface paint skin and cracking, the gypsum lath is adopted as a counter weight to meet the acoustic requirement, and the dense small holes are distributed on the surface of the steel plate covering, so that the high-density lath is easier to be connected through environment-friendly glue, the connection strength is improved, and the subsequent cracking and opening are avoided. Through the surface treatment in a multilayer form, the large ribbon-shaped ornament can meet the acoustic requirements of an art venue, and the surface of the large ribbon-shaped ornament has a smooth, elegant and flexible dynamic shape, so that the wooden surface of the large ribbon-shaped ornament has more texture, and the double effects of technical benefits and social benefits are achieved.
Drawings
FIG. 1 is a flow chart of the operation of the industrial external processing method of the large-area multi-curved complex artistic veneer of the present invention.
FIG. 2 is a schematic structural view of a ribbon-shaped decorative surface in the industrial exterior processing method of a large-area multi-curved complex artistic veneer of the present invention.
FIG. 3 is a schematic view of the ribbon-shaped decorative surface of the industrial exterior finishing method for a large-area multi-curved complex artistic veneer of the present invention.
FIG. 4 is a schematic structural diagram of a working platform in the industrial exterior processing method of the large-area multi-curved complex artistic veneer of the present invention.
FIG. 5 is a schematic structural diagram of a processing and checking platform in the industrial external processing method of the large-area multi-curved complex artistic veneer of the present invention.
FIG. 6 is a schematic view of the assembly of adjacent unit members by the processing and checking platform in the industrial exterior processing method of the large-area multi-curved complex artistic veneer of the present invention.
FIG. 7 is a schematic view of a unit component in the industrial exterior finishing method of a large-area multi-curved complex artistic veneer according to the present invention.
FIG. 8 is a schematic structural diagram of a surface layer in the industrial exterior processing method of a large-area multi-curved complex artistic veneer of the present invention.
Detailed Description
The present invention will be described in further detail with reference to the drawings and specific examples, so as to understand the structure and operation of the outer working sub-part, the working and the installation method for the decoration of ribbon-like wood veneer, but the scope of the present invention should not be limited thereby.
The invention discloses a construction method for designing large-scale special-shaped ribbon-shaped decorations in large-scale buildings such as art venues and the like, and solves the problem that the installation and correction of actual decorations are completed from the beginning of a design model, so that an effect entity of art design is presented. Compared with other special-shaped multi-curved-surface ornaments in the prior art, the large-sized C-shaped ribbon-shaped ornament has higher complexity, and is characterized by large size, high installation position, more control points, obvious shape change and higher construction difficulty, can be directly applied without the existing construction process, and must be reconstructed from design, manufacture to specific construction. The invention adopts a digital auxiliary construction method to combine the internal structure requirements of a large-scale venue, aims at the appearance and performance requirements of a complex special-shaped decorative surface, particularly a large-scale wood veneer streamer, adopts a form of firstly scanning on site and modeling reversely, then combines the structure composition requirements, designs a proper base layer curved surface by using a computer, divides unit blocks, carries out factory processing and site installation on the unit blocks, and finally manufactures the whole artistic surface layer, ensures the solid wood texture of the artistic surface layer, realizes the warm and full artistic quality in the venue, shows the agility and elegant style of the streamer modeling, and has visual impression and impact force, thereby ensuring the structural performance and the acoustic artistic requirements of the wood veneer streamer.
The invention relates to a method for splitting, externally processing and installing a ribbon-shaped wood veneer decoration project, which is a process for displaying ribbon-shaped decorations designed by designers from a model drawing to a solid decoration. The ribbon-shaped decorative surface installed in the large-scale art venue is of a semi-enclosed structure which is C-shaped as a whole, the ribbon-shaped decorative surface comprises a basic framework, unit components and a wood decorative surface layer in structural composition, the basic framework is installed on the inner wall of the large-scale art venue, the unit components are installed on the basic framework and spliced into a ribbon shape, the wood decorative surface layer is arranged on the spliced unit components, and the method comprises a splitting link, an external processing link and an installation link, which are shown in figure 1.
The invention comprises the following steps in the part dividing link:
the method comprises the following steps of firstly, dividing a three-dimensional model of the ribbon shape, dividing the three-dimensional model according to factory processing, transportation capacity and economy, keeping the continuity of the ribbon shape when dividing each unit component, wherein the length of each unit component is not more than 2.5 m and the height of each unit component is not more than 2 m, and the operation mode of dividing the three-dimensional model of the ribbon shape is as follows: firstly, carrying out space surveying and mapping on the interior of a large-scale venue finished by civil engineering construction, carrying out field scanning surveying and mapping by using a three-dimensional scanner, and generating a point cloud model from surveying and mapping points; integrating the generated point cloud model with a BIM model in the large venue to form a three-dimensional model of a lightweight solid grid surface; and finally, carrying out unit block division on the integral base layer surface of the complex special-shaped decorative surface on the three-dimensional model.
And secondly, cutting longitudinally and transversely along a coordinate axis during splitting to ensure that the longitudinal split lines are perpendicular to a horizontal plane and are parallel to each other, wherein adjacent longitudinal split lines are the lengths of the unit components, transverse boundary lines are selected on internal corner lines or external corner lines of the ribbon shape, a coordinate system is kept unchanged during splitting to ensure the manufacturing and installation precision of each unit component after splitting, a parameterized software system Grasshopper is utilized to split the three-dimensional model of the ribbon into a plurality of unit components, each unit component is converted into an individual processing model, corresponding processing views are generated, four-point location information is output to the unit components, each output unit block is numbered, and simultaneously, curved surface edge lines of the unit blocks are extracted and a three-dimensional wire frame model is derived.
And thirdly, properly correcting the longitudinal dividing line of the unit component, and correcting the arc part approximate to the straight line into the straight line so as to control the machining precision. The design of the large-scale ribbon-shaped ornaments is completed in a BIM mode, the internal dimension of a building after actual completion is measured on site, reverse modeling is carried out, the overall characteristics of an actual ribbon are simulated, software is utilized for splitting, longitudinal parallel mode positions are adopted during splitting, the positions of internal corner lines or external corner lines of the ribbon design are transversely selected, continuity and continuity are guaranteed after splitting, the smoothness of transition is guaranteed, and the size of each unit component during splitting considers the processing capacity and the transportation capacity of a factory so as to facilitate hoisting transportation and assembly as the premise. When the parts are separated, the curved surfaces and the curved lines are processed to be straight as far as possible on the premise of not influencing the overall effect, and the difficulty and the cost of actual processing are reduced.
And fourthly, manufacturing a coordinate control table and a machining size control table of each unit component, wherein each numbered unit component is provided with an independent machining model and a machining view. The unit plate after being divided is converted into an independent processing model, the position and the size of the processing model are marked by coordinates of four corners, the processing model is further divided into parts and subjected to coordinate conversion, the further divided parts are divided into three dividing surfaces according to the longitudinal direction of the divided parts and parallel to a longitudinal dividing line, three intersection points are formed between the three dividing surfaces and each transverse dividing line, the dividing lines are provided with five intersection point coordinates for carrying out space position determination, the processing size and the control point of each converted unit plate are displayed on a size control table, the control point is marked by X, Y, Z three-dimensional coordinates, and the control point coordinates are converted from space coordinates where the unit plates are longitudinally arranged into processing platform coordinates where the unit plates are transversely arranged.
In the external processing link:
fifthly, processing the unit components after the parts are separated in an external processing factory, manufacturing each unit component in a processing model and a processing view, wherein the unit components to be processed structurally comprise a basic unit framework, a steel framework is longitudinally used for a main body of the basic unit framework, two sides of the steel framework are parallel supporting legs, a bending section which accords with a curved surface angle is arranged in the middle of the unit components, two ends of the bending section are respectively fixed on the upper portions of the supporting legs, flat steel which is bent by a numerical control bending machine is transversely used, two ends of the flat steel are respectively fixed on the bending sections, supporting rods are arranged on the supporting legs of the two opposite steel frameworks, the unit frameworks are manufactured by the two steel frameworks, a plurality of flat steels and a plurality of supporting rods, and the surface of the flat steel of the unit framework is covered with a steel plate mask.
Sixthly, synchronously processing two longitudinal steel frames between adjacent unit components by A, B sleeves to keep the structures of the two longitudinal steel frames the same, simultaneously punching holes on a numerical control machine tool to form corresponding connecting holes after the adjacent steel frames are aligned, screwing the knocking bolts through the connecting holes in the installation process, correcting the outer contour line of the surface while realizing the reinforcement connection, and ensuring that the arc of the outer contour line is smooth and continuous;
seventhly, designing a special working platform in an external processing factory to ensure the processing precision of the unit components, wherein the working platform comprises an operation table top and supporting legs, the four supporting legs are respectively arranged at the bottom of the square operation table top, criss-cross square grids are arranged on the operation table top of the working platform, scales are marked on the grids to serve as control coordinates, the steel frames are processed and welded on the working platform according to a processing view and a size control table, two adjacent AB steel frames are simultaneously processed during processing and welding, transversely bent flat steel is processed on the numerical control pipe bender, and control points are set according to the control size during flat steel processing to match the direction of an arc line on the surface;
eighthly, assembling the processed steel frame, flat steel and skin into corresponding unit components by using a special processing and checking platform, assembling and manufacturing each unit component which is singly numbered and adjacent unit components together, connecting the steel frames processed by the AB sleeve together by using bolts to ensure the connection precision of the adjacent unit components, arranging angle iron frames at two sides of the processing and checking platform, standing and fixing the steel frames according to coordinates, controlling the verticality and levelness of the basic frame to control the precision, controlling the transverse flat steel manufactured by using a numerical control pipe bender to complete positioning by using the coordinates of a grid platform, and controlling the positioning by using at least five space points (X, Y and Z) for each transverse flat steel;
and ninthly, pre-assembling in a factory to assemble each manufactured unit component according to the number, assembling four to six adjacent unit components in groups in the factory, measuring and correcting the size, and calibrating and correcting each unit component. According to the invention, when the unit components are processed in an external processing factory, the matching consistency of adjacent unit components is ensured by adopting an AB surface processing mode, the verification and adjustment are carried out by adopting a pre-assembly mode of a plurality of unit components, and whether the unit components meet the drawing requirements and practical installation requirements is checked by simulating the actual installation environment, so that the manufacturing and installation precision is further ensured.
In the installation step:
tenth, disassembling the corrected and shaped unit components, respectively transporting the unit components to a construction site, and placing the unit components in a classified manner so as to be convenient for actual assembly;
and a tenth step of manufacturing a field basic framework, wherein the height control of the basic framework is realized according to coordinates in a coordinate control table, the basic framework comprises a support frame fixed on the wall and a horizontal shelf positioned at the free end part of the support frame, inclined struts are further arranged between the support frame and the wall and between the horizontal shelf and the wall, a plurality of groups of horizontal shelves are arranged according to the height of the positions, and the outline shape of the basic framework is a ribbon-shaped trend. The unit component of the patent application of the invention is transported to a construction site, a special base layer framework is fixed at the installation position of the ribbon-shaped ornament in the construction site, the base layer framework is used as an installation support of the unit component and aims to ensure the accuracy of the installation position, the structure of the base layer component adopts the form of a front horizontal shelf, the rear end of the base layer component is connected to the wall of a building, a plurality of inclined struts are utilized to ensure that the base layer component can bear the weight of the whole ribbon, the design form of a plurality of horizontal shelves at the front end is the unit component which can be placed in place and can be adjusted in the transverse position, the problems of installation and adjustment are innovatively solved, and the installation convenience and the installation accuracy are further improved.
And a twelfth step, hoisting and positioning, namely determining a height marking point on the basic framework, wherein the height marking point is used as a mounting supporting point (Z), a horizontal coordinate point (Y) is required to be determined on the supporting point of each unit component, a final transverse coordinate point (X) is determined through the in-and-out adjustment of a supporting frame on the basic framework, after the positioning is completed, rechecking the control elevation by using a total station, assembling adjacent unit components in sequence after the rechecking is qualified, and rechecking once again after four unit components are mounted so as to ensure the mounting precision.
And step thirteen, sequentially assembling each unit component, finishing the assembly, reproducing the integral modeling of the three-dimensional model, carrying out counterweight and veneer installation, adhering gypsum laths on the back surfaces of the steel plate surfaces of the unit components for counterweight, balancing 35 kilograms of gypsum boards per square meter to meet the acoustic requirements during counterweight, fixing high-density laths on the surfaces of the steel plate surfaces, adhering wood skins on the high-density laths, and detecting the processing and installation operation of the accurately finished ribbon-shaped wood veneer. After the unit components are assembled, firstly pasting gypsum laths on the back of the steel plate covering surface of the unit components for balancing weight, balancing weight of 35 kilograms of gypsum plates per square meter to meet acoustic requirements during balancing weight, then fixing high-density laths on the surface of the steel plate covering surface, and finally pasting wood skin on the high-density laths. The gypsum lath is convenient to mount in a form of being assembled behind and cannot cause the risk of surface paint skin and cracking, the gypsum lath is adopted as a counter weight to meet the acoustic requirement, and the dense small holes are distributed on the surface of the steel plate covering, so that the high-density lath is easier to be connected through environment-friendly glue, the connection strength is improved, and the subsequent cracking and opening are avoided.
In the external processing and splitting method for the ribbon-shaped wood veneer decoration project, unit component processing needs to ensure precision and processing convenience, auxiliary tools are specially designed, the auxiliary tools comprise a working platform for processing a steel frame and a processing and checking platform for fixing the steel frame, a flat steel and a steel mask, the corresponding degree of adjacent steel frames is practically guaranteed by adopting an AB surface processing mode, meanwhile, mounting holes are processed to ensure accurate alignment during assembling, in addition, a numerical control bending machine is adopted for processing the flat steel to ensure that the bending size is in place, and the other function of the processing and checking platform is to joint the adjacent unit components together for integral multiple assembling.
As shown in fig. 4, the working platform in the seventh step includes an operation table and supporting legs, the four supporting legs are respectively arranged at the bottom of the square operation table, criss-cross square grids are arranged on the operation table of the working platform, and are marked with scales as control coordinates, the steel frames are processed and welded on the working platform according to the processing view and the size control table, and two adjacent steel frames AB are simultaneously processed during processing and welding.
As shown in fig. 5, the processing and checking platform structurally comprises a construction platform, the construction platform is laid on the ground in a factory building, one side of the construction platform is provided with a vertical fixed backer board, one side of the construction platform opposite to the backer board is provided with a pre-assembled support with a movable position, grids are respectively arranged on the construction platform and the backer board, the grids are provided with scales, longitudinally adjacent unit components are simultaneously manufactured on the construction platform of the processing and checking platform, four corresponding steel frames of the unit components are vertically fixed on the construction platform during manufacturing, one steel frame is used as a reference, a temporary fixing support is welded on the edge of the steel frame used as the reference to keep the vertical state, the corresponding steel frame and the adjacent steel frame are respectively fixed in place, and two stable reinforcements are connected between the opposite steel frames, and fixing the processed flat steel between the reference steel frame and the opposite steel frame, wherein the edge of the pre-assembled bracket close to the outermost side of the unit component combination is used as the outermost side support.
In the external processing and splitting method for the banderol wood veneer decoration project, in the eighth step, when each unit component is installed on the steel frame, five coordinate points on the flat steel need to be controlled to be installed in place.
The method is characterized in that in the ninth step, when the outer processing factory is pre-assembled, the processed unit components are firstly placed according to numbers, four to five adjacent unit components are selected to be hoisted for pre-assembly, a support frame is erected in a field during pre-assembly to simulate a field installation scene, problems are found out and deviation is marked, and correction is carried out after the support frame is disassembled.
In the external processing and splitting method for the ribbon-shaped wood veneer decoration project, in the tenth step, the field base layer framework is manufactured, the height control of the base layer framework is realized according to the coordinates in a coordinate control table, the base layer framework comprises a support frame fixed on a wall and a horizontal shelf arranged at the free end part of the support frame, inclined struts are further arranged between the support frame and the horizontal shelf and the wall, the horizontal shelf is provided with a plurality of groups according to the height of the position, and the outline shape of the base layer framework is in the ribbon shape. For the basic framework, in order to ensure the emphasis and the applicability of the basic framework, a combination of a vertical keel and a transverse keel is designed, wherein the position of the vertical keel corresponds to the position of a longitudinal dividing line, the transverse keel is fixed on the vertical keel, and the basic framework forms a staggered frame through the transverse keel and the longitudinal keel, so that a position foundation is provided for the installation of a subsequent unit component, and the installation convenience and the installation precision are ensured.
In the external processing and splitting method for the ribbon-shaped wood veneer decoration project, the unit components are hoisted and positioned on site in the twelfth step, a height marking point is determined on the base framework and serves as a mounting supporting point Z, a horizontal coordinate point Y needs to be determined on the supporting point of each unit component, a final horizontal coordinate point X is determined through in-out adjustment of a supporting frame on the base framework, after positioning is completed, a total station is used for rechecking the control elevation, after rechecking is qualified, adjacent unit components are assembled in sequence, and rechecking is carried out once after four unit components are mounted so as to ensure mounting accuracy. During installation, a first coordinate point of a first unit component is determined as a control point, and then other four coordinate points are rechecked through the total station, so that the first unit component is ensured to be correctly installed, and after the first unit component is installed, other vertical unit components are sequentially installed. The unit members are detected in real time during installation, and the accuracy of the installation process is ensured by detecting three levels of a single unit member, the unit members in the vertical direction and a ribbon part area formed by a plurality of unit members.
In the tenth step, each unit component is assembled in sequence, the assembly is completed, the integral modeling of a three-dimensional model is reproduced, the counterweight and the veneer installation are performed, firstly, gypsum laths are pasted on the back surfaces of steel plate covers on the unit components for counterweight, 35 kilograms of gypsum boards are weighed per square meter to meet the acoustic requirement when the counterweight is performed, then, high-density laths are fixed on the surfaces of the steel plate covers, the high-density laths are cut according to the length of the modeling, butt joint is performed in the length direction, the protruding parts are polished and chamfered, the linear correspondence between the linear type and the linear type of the steel plate covers is ensured to be consistent, finally, wood veneers are pasted on the high-density laths, the connecting parts are ensured to be in seamless butt joint when the wood veneers are pasted, and the processing and installation operation of the veneer which is completed without errors is detected. When wooden veneer laths are spliced, the veneer laths serving as covers adopt an integral laying form as the covers, and the veneers are subjected to finger joint according to all angles of the curved surface direction, so that the integrity of the final effect is ensured.
The invention aims at the design, production and installation engineering of ribbon-shaped ornaments in a large-scale art venue, and the large-scale ribbon-shaped ornaments have larger size, are integrally distributed in a C shape, have the installation height of dozens of meters and the length of dozens of meters, have the height of two to three meters, require the surfaces of the ornaments to have solid wood texture, are elegant and natural, meet the acoustic requirements and cannot generate the phenomenon that echo and the like influence the acoustic effect of the art venue, and the decoration form, the size height and the structural form have not been used before, thereby causing great difficulty for design and construction. The invention relates to a method for manufacturing a ribbon-shaped ornament, which aims at the situation, utilizes a digital technology to divide the integral ribbon-shaped ornament into pieces, then the pieces are processed into unit components through an external factory, then the unit components are transported to the site for splicing, and finally the wooden decorative surface is processed.

Claims (8)

1. The industrialized external processing method of the large-area multi-curved complex artistic veneer is characterized in that a ribbon-shaped veneer installed in a large artistic venue is of a semi-enclosed structure which is integrally C-shaped, the structure of the ribbon-shaped veneer comprises a basic unit framework, unit components and a wood veneer surface layer, the basic unit components are installed on the inner wall of the large artistic venue, the unit components are installed on the basic unit framework and spliced into ribbon shapes, the wood veneer surface layer is arranged on the spliced unit components, and the external processing link method comprises the following steps:
the method comprises the steps of firstly, dividing a three-dimensional model of a ribbon-shaped model, dividing the model according to the processing, transportation and economy of a factory, enabling the length of each unit component after dividing to be not more than 2.5 meters and the height of each unit component to be not more than 2 meters, keeping the continuity of the ribbon shape during dividing, manufacturing a coordinate control table and a processing size control table of each unit component, wherein each unit component after being numbered is provided with an independent processing model and a processing view;
secondly, processing the divided unit components in an external processing factory, manufacturing each unit component in a processing model and a processing view, wherein the unit components to be processed structurally comprise a basic layer framework, a steel framework is longitudinally used as a main body of the basic layer framework, flat steel bent by a numerical control machine tool is transversely used, the unit framework is manufactured by two steel frameworks, a plurality of flat steels and a plurality of support rods, and a steel plate mask is covered on the surface of the flat steel of the unit framework;
thirdly, synchronously processing two longitudinal steel frames between the adjacent unit components by A, B sleeves to keep the structural configurations of the two units the same, simultaneously punching holes on a numerical control machine tool to form corresponding connecting holes after the adjacent steel frames are aligned, screwing the knocking bolts through the connecting holes in the installation process, correcting the outer contour line of the surface while realizing the reinforcement connection, and ensuring that the arc of the outer contour line is smooth and continuous;
fourthly, designing a special working platform in an external processing factory to ensure the processing precision of the unit components, wherein the working platform comprises an operation table top and supporting legs, the four supporting legs are respectively arranged at the bottom of the square operation table top, criss-cross square grids are arranged on the operation table top of the working platform, scales are marked on the grids to serve as control coordinates, the steel frames are processed and welded on the working platform according to a processing view and a size control table, two adjacent AB steel frames are simultaneously processed during processing and welding, transversely bent flat steel is processed on the numerical control pipe bender, and control points are set according to the control size during flat steel processing to match the surface arc trend;
fifthly, assembling the processed steel frame, flat steel and skin into corresponding unit components by using a special processing and checking platform, assembling and manufacturing each unit component with a single number and adjacent unit components together, connecting the steel frames processed by the AB sleeve together by using bolts to ensure the connection precision of the adjacent unit components, arranging angle iron frames on two sides of the processing and checking platform, standing and fixing the steel frames according to coordinates, controlling the verticality and levelness of the base frame to control the precision, controlling the transverse flat steel manufactured by using a numerical control pipe bender to complete positioning by using the coordinates of a grid platform, and controlling the positioning by using at least five space points (X, Y and Z) for each transverse flat steel;
and sixthly, pre-assembling in a factory to assemble each manufactured unit component according to the number, assembling four to six adjacent unit components in groups in the factory, measuring and correcting the size, checking and correcting, and then shaping each unit component.
2. The industrial exterior finishing process for a complex artistic veneer with a large area and multiple curves according to claim 1, wherein the operation of dividing the three-dimensional model of the ribbon-like modeling in the first step is as follows: firstly, carrying out space surveying and mapping on the interior of a large-scale venue finished by civil engineering construction, carrying out field scanning surveying and mapping by using a three-dimensional scanner, and generating a point cloud model from surveying and mapping points; integrating the generated point cloud model with a BIM model in the large venue to form a three-dimensional model of a lightweight solid grid surface; and finally, carrying out unit block division on the integral base layer surface of the complex special-shaped decorative surface on the three-dimensional model.
3. The industrial exterior processing method for the large-area multi-curved complex artistic veneer according to claim 1, wherein in the second step, four-point location information is outputted for the unit components, each outputted unit block is numbered, and simultaneously, the edge lines of the curved surfaces of the unit blocks are extracted and the three-dimensional wire frame model is derived.
4. The method as claimed in claim 1, wherein the unit members to be processed in the third step structurally comprise a base frame, a steel frame is used in a longitudinal direction as a main body of the base frame, parallel legs are arranged at two sides of the steel frame, a bending section corresponding to a curved angle is arranged in the middle of the steel frame, two ends of the bending section are respectively fixed to the upper parts of the legs, a flat steel is bent in a transverse direction by a numerical control bending machine, two ends of the flat steel are respectively fixed to the bending sections, support rods are arranged on the legs of the two opposite steel frames, the unit frames are made of two steel frames, a plurality of flat steels and a plurality of support rods, and a steel plate mask is covered on the surface of the flat steel of the unit frame.
5. The industrial external processing method for the large-area multi-curved complex artistic veneer according to claim 1, wherein the working platform in the fourth step comprises an operation table top and supporting legs, the four supporting legs are respectively arranged at the bottom of the square operation table top, criss-cross square grids are arranged on the operation table top of the working platform, scales are marked on the grids to serve as control coordinates, the steel frames are processed and welded on the working platform according to a processing view and a size control table, and two adjacent AB steel frames are simultaneously processed during processing and welding.
6. The industrial external processing method of a large-area multi-curved complex artistic veneer according to claim 1, wherein in the fifth step, the processing and checking platform structurally comprises a construction platform, the construction platform is laid on the ground in a factory building, one side of the construction platform is provided with a vertically fixed backer, one side of the construction platform opposite to the backer is provided with a pre-assembled support at a movable position, grids are respectively arranged on the construction platform and the backer, scales are arranged on the grids, longitudinally adjacent unit components are simultaneously manufactured on the construction platform of the processing and checking platform, four corresponding steel frames of the unit components are vertically fixed on the construction platform during manufacturing, one steel frame is used as a reference, and a temporary fixing support is welded on the edge of the steel frame used as the reference to keep the vertical state, the opposite steel frames and the adjacent steel frames are respectively fixed in place, two stability reinforcements are connected between the opposite group of steel frames, processed flat steel is fixed between the reference steel frame and the opposite steel frame, and the edge of the pre-assembled support close to the outermost side of the unit component combination is used as the outermost side support.
7. The method of claim 1, wherein in the fifth step, each unit member is controlled to be installed in position at five coordinate points on the flat steel when each flat steel is installed on the steel frame.
8. The industrial external processing method for the large-area multi-curved complex artistic veneer as claimed in claim 1, wherein in the sixth step, when the external processing factory is pre-assembled, the processed unit components are firstly placed according to numbers, four to five adjacent unit components are selected to be hoisted for pre-assembly, a support frame is erected in a field during pre-assembly to simulate a field installation scene, problems are found and deviations are identified, and after the support frame is disassembled, correction is carried out.
CN202010587590.8A 2020-06-24 2020-06-24 Industrial external processing method for large-area multi-curve complex artistic facing Active CN111894221B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010587590.8A CN111894221B (en) 2020-06-24 2020-06-24 Industrial external processing method for large-area multi-curve complex artistic facing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010587590.8A CN111894221B (en) 2020-06-24 2020-06-24 Industrial external processing method for large-area multi-curve complex artistic facing

Publications (2)

Publication Number Publication Date
CN111894221A true CN111894221A (en) 2020-11-06
CN111894221B CN111894221B (en) 2023-04-25

Family

ID=73207797

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010587590.8A Active CN111894221B (en) 2020-06-24 2020-06-24 Industrial external processing method for large-area multi-curve complex artistic facing

Country Status (1)

Country Link
CN (1) CN111894221B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102102444A (en) * 2009-12-18 2011-06-22 上海市机械施工有限公司 Assembling and positioning construction method of large steel casting members
CN102561621A (en) * 2011-12-23 2012-07-11 苏州金螳螂建筑装饰股份有限公司 Novel installing structure of curved-surface modeling glass blocks
CN103541474A (en) * 2013-10-12 2014-01-29 浙江省建工集团有限责任公司 Construction method for using layering method to construct double-curved-surface stainless steel curtain wall
CN104912340A (en) * 2015-06-09 2015-09-16 华鼎建筑装饰工程有限公司 Construction method for double-curve triangular aluminum plate unit type hanging ceiling
CN105298143A (en) * 2015-05-12 2016-02-03 江苏南通六建建设集团有限公司 Construction method of multi-lateral double-curved-face open-type titanium composite board curtain wall
WO2016033770A1 (en) * 2014-09-04 2016-03-10 冯新林 Method for construction of suspended rhombic aluminum veneer shading curtain wall for exhibition hall
CN109441034A (en) * 2018-12-04 2019-03-08 华鼎建筑装饰工程有限公司 A kind of construction technology of BIM auxiliary hyperboloid Special-Shaped Column set square installation
CN111062069A (en) * 2019-11-14 2020-04-24 上海市建筑装饰工程集团有限公司 Digital construction auxiliary construction method suitable for complex multi-curved member of architectural decoration engineering

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102102444A (en) * 2009-12-18 2011-06-22 上海市机械施工有限公司 Assembling and positioning construction method of large steel casting members
CN102561621A (en) * 2011-12-23 2012-07-11 苏州金螳螂建筑装饰股份有限公司 Novel installing structure of curved-surface modeling glass blocks
CN103541474A (en) * 2013-10-12 2014-01-29 浙江省建工集团有限责任公司 Construction method for using layering method to construct double-curved-surface stainless steel curtain wall
WO2016033770A1 (en) * 2014-09-04 2016-03-10 冯新林 Method for construction of suspended rhombic aluminum veneer shading curtain wall for exhibition hall
CN105298143A (en) * 2015-05-12 2016-02-03 江苏南通六建建设集团有限公司 Construction method of multi-lateral double-curved-face open-type titanium composite board curtain wall
CN104912340A (en) * 2015-06-09 2015-09-16 华鼎建筑装饰工程有限公司 Construction method for double-curve triangular aluminum plate unit type hanging ceiling
CN109441034A (en) * 2018-12-04 2019-03-08 华鼎建筑装饰工程有限公司 A kind of construction technology of BIM auxiliary hyperboloid Special-Shaped Column set square installation
CN111062069A (en) * 2019-11-14 2020-04-24 上海市建筑装饰工程集团有限公司 Digital construction auxiliary construction method suitable for complex multi-curved member of architectural decoration engineering

Also Published As

Publication number Publication date
CN111894221B (en) 2023-04-25

Similar Documents

Publication Publication Date Title
CN106013535B (en) Double curved glass curtain wall pre-assembly method based on BIM
CN111062069B (en) Digital construction auxiliary construction method suitable for complex multi-curved member of building decoration engineering
US20210140169A1 (en) Self-forming weaving structure system for construction of spatial curved surface by elastic rod, and construction method thereof
CN111894222B (en) Large-area multi-curve complex artistic facing modular structure for indoor theatre and combination thereof
CN107990052A (en) A kind of pipeline assembled hanger installation method
CN109441034A (en) A kind of construction technology of BIM auxiliary hyperboloid Special-Shaped Column set square installation
CN108372693A (en) A kind of oversize single reflecting surface composite honeycomb sandwich structure and its manufacturing process
CN102661052A (en) Construction method of complex puzzle unit type curtain wall
CN112883462A (en) Digital manufacturing and construction method of special-shaped stone facing in large-scale venue
CN111894223B (en) Method for separating, externally processing and installing large-area multi-curved-surface artistic ribbon
Ryu et al. Case study of concrete surface design and construction method for freeform building based on BIM-focused on tri-bowl, Korea
CN112942849B (en) Efficient scaffold-free construction process for special-shaped curtain wall
CN103774851A (en) Assembling method of spatial curve-surface metal curtain wall
CN111005490A (en) Construction method for aluminum plate veneer of truss structure of large-space daylighting roof
CN111889962B (en) Assembly construction method for large-area multi-curve complex artistic facing
CN111894221B (en) Industrial external processing method for large-area multi-curve complex artistic facing
CN116771026A (en) Continuous multi-curved-surface sound-absorbing suspended ceiling and construction method
KR20170117735A (en) Method for constructing Atypical Architecture of a Curved Exterior Panel using Metal Plate having post and lintel constructione
CN213499836U (en) Shaping and accurate positioning processing device for large-area multi-curve complex wood veneer unit plate
CN213509289U (en) Modular composition structure of large-area multi-curve complex wood veneer
CN112883461A (en) Digital construction and construction precision AR detection method for steel frame structure in large-scale venue
CN111890507A (en) Shaping and accurate positioning processing device and processing method for multi-curve complex wood veneer unit plate
CN104372892B (en) Multicarity combines huge post and preparation method thereof
CN113360993B (en) BIM technology-based construction method for large-area complex-modeling suspended ceiling
CN110321620B (en) Design construction method of assembled house building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant