CN111861418A - Task generation method and device and electronic equipment - Google Patents

Task generation method and device and electronic equipment Download PDF

Info

Publication number
CN111861418A
CN111861418A CN202010751475.XA CN202010751475A CN111861418A CN 111861418 A CN111861418 A CN 111861418A CN 202010751475 A CN202010751475 A CN 202010751475A CN 111861418 A CN111861418 A CN 111861418A
Authority
CN
China
Prior art keywords
task
project
generating
target
type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010751475.XA
Other languages
Chinese (zh)
Inventor
王辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Miaoyi Biotechnology Co Ltd
Original Assignee
Shanghai Miaoyi Biotechnology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Miaoyi Biotechnology Co Ltd filed Critical Shanghai Miaoyi Biotechnology Co Ltd
Priority to CN202010751475.XA priority Critical patent/CN111861418A/en
Publication of CN111861418A publication Critical patent/CN111861418A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Engineering & Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a task generation method, a task generation device and electronic equipment, wherein the method comprises the following steps: receiving project information input by a user, wherein the project information comprises project basic information, project schemes, project standards and project ranges; decomposing the project according to the project basic information, the project scheme, the project standard and the project range to obtain the project type and the task range; and generating a target task according to the project type, the task range and a predefined task template. By the method and the device, the problems that the tasks are split manually, the split is not standard, the personal experience is evaluated completely, and no unified rule exists are solved, the problem that a large amount of time is consumed for splitting the tasks when the project is started is avoided, manual labor force is well liberated, and a large amount of labor time resources are released.

Description

Task generation method and device and electronic equipment
Technical Field
The invention relates to the field of communication, in particular to a task generation method and device and electronic equipment.
Background
At present, the management task of the clinical research project adopts a traditional task management mode, and the clinical research has the characteristics of wide test site range, dispersed personnel and multiple types of members cooperating with each other. Specifically, a, the task is manually split, and the items required to be prepared at the early stage of project starting are complicated and may have the problem of detail omission; b. the task splitting is not standardized and is performed by the personal experience, so that the task execution standards are different due to different task splitting persons when the tasks are split on the same type of project, and finally, no standard output data exists; c. the multi-task connection needs to be manually judged, and subsequent tasks are manually issued to corresponding executives, so that in the task execution process, after a task executor completes a certain task, the task of the next stage needs to be issued by a manager; d. problems and execution results generated in the task execution process are judged manually, so that the problems are solved through a telephone when an online cooperation system is lacked, and sometimes, cooperation is very difficult when a plurality of parties generate the problems; e. most of task monitoring adopts communication modes such as telephone and internet chat, and because clinical research members are in a remote collaboration mode most of time, project risks cannot be fed back to a collaboration party in time. The current mode is relatively inefficient in communication (telephone, email), no historical precious empirical data is deposited, no reference data is available in processing tasks, collaborators can only rely on personal experience, resulting in reduced efficiency; f. the data of the task execution process is managed by mails, documents and the like, so that the data generated by the execution process is not transparent enough, and important collaborative data is probably lost, so that the follow-up analysis and processing problems become complex and difficult.
Disclosure of Invention
The invention provides a task generation method, a task generation device and electronic equipment, aiming at the problems that in the related art, task splitting is performed manually, splitting is not standard, personal experience is evaluated completely, and unified rules are not available.
According to an aspect of the present invention, there is provided a task generating method including: receiving project information input by a user, wherein the project information comprises project basic information, project schemes, project standards and project ranges; according to the project basic information, the project scheme, the project standard and the project range, decomposing the project scheme to obtain the project type and the task range; and generating a target task according to the project type, the task range and a predefined task template.
Optionally, before generating the target task according to the project type, the task scope, and a predefined task template, the method further includes: acquiring a public part of a corresponding historical task according to the type of the project; and generating a task template according to the common part.
Optionally, after generating the target task according to the project type, the task scope, and a predefined task template, the method further includes: sending the target task to a server; receiving a task state responded by the server based on the target task; and executing the next operation according to the task state.
Optionally, performing the next operation according to the task state includes: when the task state is that the task is finished, judging whether the target task has a subsequent task; if the judgment result is yes, generating a target task corresponding to the subsequent task; if the judgment result is negative, ending the project corresponding to the target task; and returning the target task when the task state is that the audit is not passed.
Optionally, the receiving the task state of the server based on the target task response includes: and receiving the task state responded by the server based on the target task and the historical data corresponding to the target task, wherein the historical data is stored in the server.
Optionally, after generating the target task according to the project type, the task scope, and a predefined task template, the method further includes: detecting that the progress of the target task is abnormal; notifying the server of the abnormality; and receiving a processing instruction responded by the server, and processing the target task according to the processing instruction.
According to another aspect of the present invention, there is provided a task generating apparatus including: the system comprises a receiving module, a processing module and a display module, wherein the receiving module is used for receiving project information input by a user, and the project information comprises project basic information, project schemes, project standards and project ranges; the decomposition module is used for decomposing the project scheme according to the project basic information, the project scheme, the project standard and the project range to acquire the project type and the task range; and the generating module is used for generating the target task according to the project type, the task range and a predefined task template.
Optionally, the generating module is further configured to, before generating the target task according to the project type, the task range, and a predefined task template, obtain a common part of the corresponding historical task according to the project type; and generating a task template according to the common part.
According to yet another aspect of the present invention, there is provided a computer-readable storage medium storing computer instructions for causing a computer to perform any of the task generating methods described above.
According to still another aspect of the present invention, there is provided an electronic apparatus including: at least one processor; and a memory communicatively coupled to the at least one processor; wherein the memory stores a computer program executable by the at least one processor, the computer program being executable by the at least one processor to cause the at least one processor to perform any of the task generation methods described above.
According to the invention, project information input by a user is received, wherein the project information comprises project basic information, project schemes, project standards and project ranges; according to the project basic information, the project scheme, the project standard and the project range, decomposing the project scheme to obtain the project type and the task range; according to the project type, the task range and the predefined task template, the target task is generated, the problems that the task splitting is performed manually, the splitting is not standard, the personal experience is evaluated completely, and no unified rule exists are solved, the problem that a large amount of time is consumed for taking the split task when the project is started is avoided, manual labor is well liberated, and a large amount of labor resources are released.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the invention and together with the description serve to explain the invention without limiting the invention. In the drawings:
FIG. 1 is a flowchart illustrating a task generation method according to an embodiment of the present invention;
FIG. 2 is a schematic flow chart of a project according to an embodiment of the present invention;
FIG. 3 is a task processing flow diagram according to an embodiment of the invention;
FIG. 4 is a task data model definition diagram according to an embodiment of the invention;
FIG. 5 is a block diagram of a task generating apparatus according to an embodiment of the present invention;
fig. 6 is a block diagram of an electronic device according to an embodiment of the present invention.
Detailed Description
The invention will be described in detail hereinafter with reference to the accompanying drawings in conjunction with embodiments. It should be noted that the embodiments and features of the embodiments in the present application may be combined with each other without conflict.
In an embodiment of the present invention, a task generating method is provided, as shown in fig. 1, the method including:
s102, receiving project information input by a user, wherein the project information comprises project basic information, project schemes, project standards and project ranges;
s104, decomposing the project scheme according to the project basic information, the project scheme, the project standard and the project range to obtain the project type and the task range;
and S106, generating a target task according to the project type, the task range and a predefined task template.
By the method and the device, the problems that the tasks are split manually, the split is not standard, the personal experience is evaluated completely, and no unified rule exists are solved, the problem that a large amount of time is consumed for splitting the tasks when the project is started is avoided, manual labor force is well liberated, and a large amount of labor time resources are released.
The item basic information includes: project name, application party, test information, research type, test range, test requirement and other information; project protocols, also known as clinical study protocols, i.e. specific protocols for developing clinical studies, comprise: the subject, the place and what effect is achieved in the experiment indicate what is done specifically in the study and how to do; project criteria, also known as inclusion criteria: test participation subject selection standard, exclusion standard; project scope, also referred to as trial scope or business scope: refers to different matters needed to be done in the clinical research process, such as central screening and central starting.
Specifically, the task of combing different project types to be handled depends on the clinical study characteristics. When a project is started, the project basic information, the clinical research project (project scheme), the inclusion and exclusion standard (project standard), the test range (project range) and other information input by the project are used for carrying out scheme decomposition, and a corresponding execution task (target task) is generated in a project type dynamic configuration mode, so that the problem that a large amount of time is consumed for taking and splitting tasks when the project is started is solved. For example, the project basic information includes test information and project information, wherein the test information: the name of the apparatus or the name of the medicine, indication, test range, random and blind methods, and the project information: traffic type SMO CRO. Service scope: central starting and central management; project scenarios include target populations, study objectives, plans, and clinical study lots. The project type can be determined by testing the project information, and the task range of the project is determined by the test information and the project scheme, so that the task template used is determined.
The method can be completed in the system, for example, the system has configured the items needed to be completed by various project type clinical researches, and has configured the form content needed to complete the task. And decomposing the clinical research scheme, positioning the project execution range, and splitting the tasks to be executed, so that the corresponding tasks are initialized according to the project type and the system task template.
In another embodiment of the present invention, before generating the target task according to the project type, the task scope and the predefined task template, the method further includes: acquiring a public part of a corresponding historical task according to the type of the project; and generating a task template according to the common part.
Specifically, taking the central screening as an example, the central screening is a central task of screening willingness and qualification, and the tasks of all items are similar, so that the common part is extracted as a template, and when a project needs to be centrally screened later, the corresponding task can be directly initialized through the template.
In another embodiment of the present invention, after generating the target task according to the project type, the task scope, and the predefined task template, the method further includes: sending the target task to a server; receiving a task state responded by the server based on the target task; and executing the next operation according to the task state.
Specifically, the task dynamically generates the task according to different project types, and the corresponding member in the project automatically receives the task to be handled after the task is split. Tasks are divided into a plurality of types, and the states of the tasks are automatically determined through executed states or generated data; the state change of the task will affect the starting of the associated task, the starting of the associated task is completed, and the corresponding collaborators will receive a new batch of tasks to be handled. The completion of the task in its entirety or the generation of some data in the middle of the task determines the execution result of the whole project.
The related tasks comprise branch tasks and prepositive tasks of other tasks, and when the current task is completed, the subsequent tasks needing to be executed are started. It can also be understood that a subsequent task is not visible while the current task is not completed.
The data are task form data generated in task execution, and the task form data are data which need to be input by collaborators when a specific task is executed; the execution result may include: the project enters the next phase, the project terminates, and the project is abnormal, all determined by the results of the task.
In another embodiment of the present invention, the performing the next operation according to the task state comprises: when the task state is that the task is finished, judging whether the target task has a subsequent task; if the judgment result is yes, generating a target task corresponding to the subsequent task; if the judgment result is negative, ending the project corresponding to the target task; and returning the target task when the task state is that the audit is not passed.
Specifically, through a responsive task processing mode, corresponding task state change and subsequent tasks are automatically triggered in the task execution process, and the collaborator only needs to care about the task executed by the collaborator, so that the task processing logic is preset through the system, manual judgment is assisted, the risk caused by the manual judgment is reduced, and the cost is reduced. The task adopts a multi-person cooperation mode, each member can pay attention to data and task states generated by the task, and the result of multi-person cooperation is reflected in the task. Corresponding collaborators receive the reminding according to the change generated in the task execution process.
In another embodiment of the present invention, receiving the task state of the server based on the target task response comprises: and receiving the task state responded by the server based on the target task and the historical data corresponding to the target task, wherein the historical data is stored in the server.
Specifically, data generated by the task (including documents, dynamic data, solutions generated by processing problems) exists following the task itself. The tasks can be located through the data, and the related data can be acquired through the tasks. And in the same type of tasks, the empirical data can be communicated with each other and used as a basis and a reference for executing the tasks. Data reusability is improved, and management cost is reduced.
Wherein, the empirical data includes: data generated when a task was previously executed.
It should be noted that, in executing a task, the relevant person may obtain empirical data, i.e. in executing the same type of task, and under the same conditions, may refer to historical task data
Empirical data can be used in the scheme decomposition and the task separation, namely the scheme decomposition and the task separation can also refer to historical project execution data, and in addition, the previous task execution data has referential performance when selecting a center, planning and executing a specific task.
In another embodiment of the present invention, after generating the target task according to the project type, the task scope, and the predefined task template, the method further includes: detecting that the progress of the target task is abnormal; notifying the server of the abnormality; and receiving a processing instruction responded by the server, and processing the target task according to the processing instruction.
Specifically, during task execution, if the execution data and the plan do not match, or other abnormal conditions. The corresponding collaborators receive the prompt and dynamically generate the alarm type task at the same time, so that the manager can monitor which tasks are deviated from the plan and which tasks have risks from any overview, and the task progress and the execution condition are monitored in real time.
Wherein the execution data may include: and task form data generated in task execution, wherein the task form data is data which needs to be input by collaborators when a specific task is executed.
The plan may include: when the project is started, the manager is required to specify a project execution plan for the whole project by each center, for example, 10 patients are planned to be grouped in 7 months, and when the 7 months are grouped in less than 10 patients, the project execution is considered to be risky.
Data generated by task execution exists along with the task, collaborators can clearly see the task execution process, the task is transparent, and the task execution, communication and management costs are reduced.
The above method is described in detail below with specific examples.
1. Task model, as shown in FIG. 2:
a. generating a project initialization task and a scheme decomposition task by inputting information such as project basic information, clinical research schemes, inclusion and exclusion standards, test ranges and the like;
b. after the project initialization task and the scheme decomposition task are completed, generating a special task and a project general task according to the project type;
c. starting or creating a related task in the task execution process, wherein the completion of the task can also trigger a corresponding event to determine whether to generate a task of the next stage or complete a project;
d. the task cooperation data is uniformly stored and managed, the data can be obtained through the task, historical experience data can be obtained in the task execution process as reference, and the task execution suggestion is automatically prompted;
e. the task execution process is monitored by a task monitoring mechanism, any abnormal event informs a corresponding executor, and certain events generate corresponding abnormal processing tasks according to the definition.
2. Task processing flow, as shown in fig. 3:
after the task is submitted, the task is processed uniformly through a task mechanism, and the task type and the form content are identified;
different tasks correspond to different task forms for processing;
events are generated in the task and form processing processes, and operations such as task state change, related task starting, task changing, executive changing and the like are triggered through the events.
3. Task data template definition, as shown in FIG. 4:
the task is the abstraction of all events and forms, and different task types are defined aiming at different project types;
different tasks are associated with the forms in a one-to-one mode, and the forms define specific execution contents of the tasks;
defining trigger events (task states) aiming at tasks and forms, wherein the trigger events comprise state events, task association events, reminding events, alarm events and the like;
the processing results of the tasks are stored uniformly, and data query and statistics are facilitated.
The embodiment reduces the task splitting cost when the project is started; the consistency of task splitting is ensured, and the project execution standard is better met; the starting and the termination of the tasks and the automation of the triggering of the related tasks replace the time for allocating the tasks by managers; the task data is transparent, the communication cost of collaborators is greatly reduced, the historical data is used as experience data, and corresponding guidance experience is obtained through the task type; triggering early warning in an abnormal state of the task to enable a cooperative party to be in contact with the dynamic state of the task more quickly; through the responsive task driving, the labor cost is reduced, the project monitoring means is improved, the communication cost of collaborators is reduced, and the execution of the project is more efficient.
In an embodiment of the present invention, there is also provided a task generating apparatus, including:
a receiving module 52, configured to receive project information input by a user, where the project information includes project basic information, project schemes, project standards, and project ranges;
the decomposition module 54 is configured to perform project scheme decomposition according to the project basic information, the project scheme, the project standard and the project scope, and acquire a project type and a task scope;
and the generating module 56 is used for generating the target task according to the project type, the task range and the predefined task template.
In another embodiment of the present invention, the obtaining module 54 is further configured to obtain a corresponding personalized code group in the history front-end development file; replacing the set of personalization codes with the identification; and generating a front-end development file template according to the repeated code groups and the identifications in the history front-end development file.
In another embodiment of the present invention, the generating module 56 is further configured to, before generating the target task according to the project type, the task range, and the predefined task template, obtain a common part of the corresponding historical task according to the project type; and generating a task template according to the common part.
The embodiment of the present disclosure provides an electronic device, as shown in fig. 6, the electronic device includes one or more processors 61 and a memory 62, and one processor 63 is taken as an example in fig. 6.
The controller may further include: an input device 63 and an output device 64.
The processor 61, the memory 62, the input device 63 and the output device 64 may be connected by a bus or other means, as exemplified by the bus connection in fig. 6.
The processor 61 may be a Central Processing Unit (CPU). The processor 61 may also be other general purpose processors, Digital Signal Processors (DSPs), Application Specific Integrated Circuits (ASICs), Field Programmable Gate Arrays (FPGAs) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, or combinations thereof. A general purpose processor may be a microprocessor or the processor may be any conventional processor or the like.
The memory 62, which is a non-transitory computer readable storage medium, may be used to store non-transitory software programs, non-transitory computer executable programs, and modules, such as program instructions/modules corresponding to the control methods in the embodiments of the present disclosure. The processor 61 executes various functional applications of the server and data processing by running non-transitory software programs, instructions and modules stored in the memory 62, i.e. implements the method of the above-described method embodiment.
The memory 62 may include a storage program area and a storage data area, wherein the storage program area may store an operating system, an application program required for at least one function; the storage data area may store data created according to use of a processing device operated by the server, and the like. Further, the memory 62 may include high speed random access memory, and may also include non-transitory memory, such as at least one magnetic disk storage device, flash memory device, or other non-transitory solid state storage device. In some embodiments, the memory 62 may optionally include memory located remotely from the processor 61, which may be connected to a network connection device via a network. Examples of such networks include, but are not limited to, the internet, intranets, local area networks, mobile communication networks, and combinations thereof.
The input device 63 may receive input numeric or character information and generate key signal inputs related to user settings and function control of the processing device of the server. The output device 64 may include a display device such as a display screen.
One or more modules are stored in the memory 62, which when executed by the one or more processors 61, perform the method as shown in fig. 1.
It will be understood by those skilled in the art that all or part of the processes of the methods of the embodiments described above can be implemented by a computer program to instruct related hardware, and the program can be stored in a computer readable storage medium, and when executed, the program can include the processes of the embodiments of the motor control methods described above. The storage medium may be a magnetic disk, an optical disk, a Read-only memory (ROM), a Random Access Memory (RAM), a flash memory (FlashMemory), a hard disk (hard disk drive, abbreviated as HDD) or a Solid State Drive (SSD), etc.; the storage medium may also comprise a combination of memories of the kind described above.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (10)

1. A task generation method, comprising:
receiving project information input by a user, wherein the project information comprises project basic information, project schemes, project standards and project ranges;
according to the project basic information, the project scheme, the project standard and the project range, decomposing the project scheme to obtain a project type and a task range;
and generating a target task according to the project type, the task range and a predefined task template.
2. The method of claim 1, further comprising, before generating a target task according to the project type, the task scope, and a predefined task template:
acquiring a public part of a corresponding historical task according to the type of the project;
and generating the task template according to the public part.
3. The method of claim 1, further comprising, after generating a target task according to the project type, the task scope, and a predefined task template:
sending the target task to a server;
receiving a task state of the server based on the target task response;
and executing the next operation according to the task state.
4. The method of claim 3, wherein performing the next operation according to the task state comprises:
when the task state is task end, judging whether the target task has a subsequent task; if the judgment result is yes, generating a target task corresponding to the subsequent task; if the judgment result is negative, ending the project corresponding to the target task;
and returning the target task when the task state is that the audit is not passed.
5. The method of claim 3, wherein receiving the task state of the server based on the target task response comprises:
and receiving a task state responded by the server based on the target task and historical data corresponding to the target task, wherein the historical data is stored in the server.
6. The method according to any one of claims 1 to 5, further comprising, after generating a target task according to the project type, the task scope, and a predefined task template:
detecting that the progress of the target task is abnormal;
notifying the server of the anomaly;
and receiving a processing instruction responded by the server, and processing the target task according to the processing instruction.
7. A task generation apparatus, comprising:
the system comprises a receiving module, a processing module and a display module, wherein the receiving module is used for receiving project information input by a user, and the project information comprises project basic information, project schemes, project standards and project ranges;
the decomposition module is used for decomposing the project scheme according to the project basic information, the project scheme, the project standard and the project range to acquire a project type and a task range;
and the generating module is used for generating the target task according to the project type, the task range and a predefined task template.
8. The device of claim 7, wherein the generating module is further configured to, before generating the target task according to the project type, the task scope, and a predefined task template, obtain a common part of a corresponding historical task according to the project type; and generating the task template according to the public part.
9. A computer-readable storage medium storing computer instructions for causing a computer to perform the task generation method of any one of claims 1 to 7.
10. An electronic device, comprising: at least one processor; and a memory communicatively coupled to the at least one processor; wherein the memory stores a computer program executable by the at least one processor, the computer program being executable by the at least one processor to cause the at least one processor to perform the task generation method of any one of claims 1 to 7.
CN202010751475.XA 2020-07-30 2020-07-30 Task generation method and device and electronic equipment Pending CN111861418A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010751475.XA CN111861418A (en) 2020-07-30 2020-07-30 Task generation method and device and electronic equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010751475.XA CN111861418A (en) 2020-07-30 2020-07-30 Task generation method and device and electronic equipment

Publications (1)

Publication Number Publication Date
CN111861418A true CN111861418A (en) 2020-10-30

Family

ID=72946075

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010751475.XA Pending CN111861418A (en) 2020-07-30 2020-07-30 Task generation method and device and electronic equipment

Country Status (1)

Country Link
CN (1) CN111861418A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113988526A (en) * 2021-09-28 2022-01-28 南方电网深圳数字电网研究院有限公司 Management method and device for diversified tasks
CN114418711A (en) * 2021-12-24 2022-04-29 珠海大横琴科技发展有限公司 Method and device for automatically executing creation task
CN116959651A (en) * 2023-09-21 2023-10-27 中山大学肿瘤防治中心(中山大学附属肿瘤医院、中山大学肿瘤研究所) Clinical trial curative effect evaluation method, system, equipment and medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016071725A (en) * 2014-09-30 2016-05-09 富士通株式会社 Workflow control program, workflow control method and information processing unit
CN106910044A (en) * 2017-02-27 2017-06-30 努比亚技术有限公司 Project process based reminding method and system
CN107671887A (en) * 2017-08-22 2018-02-09 广东美的智能机器人有限公司 Robot self-test control method, robot and dispatch server
CN110264035A (en) * 2019-05-10 2019-09-20 平安科技(深圳)有限公司 Configuration method, device, terminal and the storage medium of workflow
CN110825579A (en) * 2019-09-18 2020-02-21 平安科技(深圳)有限公司 Server performance monitoring method and device, computer equipment and storage medium

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016071725A (en) * 2014-09-30 2016-05-09 富士通株式会社 Workflow control program, workflow control method and information processing unit
CN106910044A (en) * 2017-02-27 2017-06-30 努比亚技术有限公司 Project process based reminding method and system
CN107671887A (en) * 2017-08-22 2018-02-09 广东美的智能机器人有限公司 Robot self-test control method, robot and dispatch server
CN110264035A (en) * 2019-05-10 2019-09-20 平安科技(深圳)有限公司 Configuration method, device, terminal and the storage medium of workflow
CN110825579A (en) * 2019-09-18 2020-02-21 平安科技(深圳)有限公司 Server performance monitoring method and device, computer equipment and storage medium

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
葛娟等: "Microsoft Project 2003项目管理与应用", 31 October 2006, 北京交通大学出版社, pages: 22 - 25 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113988526A (en) * 2021-09-28 2022-01-28 南方电网深圳数字电网研究院有限公司 Management method and device for diversified tasks
CN114418711A (en) * 2021-12-24 2022-04-29 珠海大横琴科技发展有限公司 Method and device for automatically executing creation task
CN116959651A (en) * 2023-09-21 2023-10-27 中山大学肿瘤防治中心(中山大学附属肿瘤医院、中山大学肿瘤研究所) Clinical trial curative effect evaluation method, system, equipment and medium
CN116959651B (en) * 2023-09-21 2024-03-12 中山大学肿瘤防治中心(中山大学附属肿瘤医院、中山大学肿瘤研究所) Clinical trial curative effect evaluation method, system, equipment and medium

Similar Documents

Publication Publication Date Title
US11481209B2 (en) Intelligent software agent to facilitate software development and operations
CN111861418A (en) Task generation method and device and electronic equipment
CN109344170B (en) Stream data processing method, system, electronic device and readable storage medium
CN108711030A (en) The end-to-end project management platform integrated with artificial intelligence
CN109582301A (en) Method for processing business, device, equipment and the medium of task based access control scheduling system
US8489729B2 (en) System and method for social service event processing and management
CN107341643A (en) Visual flow methods of exhibiting and system
EP3710969B1 (en) Key-based logging for processing of structured data items with executable logic
US10083061B2 (en) Cloud embedded process tenant system for big data processing
CN112396397A (en) Operation and maintenance affair collection and management system
CN115841310A (en) Construction method of plan flow model, event processing method and device
CN113934832A (en) Interactive processing method, device, equipment, medium and program product based on session
CN107463391A (en) Task processing method, device and equipment
CN111523810A (en) Enterprise-level model management method, system, device and storage medium
CN111984882A (en) Data processing method, system and equipment
US11295260B2 (en) Multi-process workflow designer
CN111190817B (en) Method and device for processing software defects
US8151189B2 (en) Computer-implemented systems and methods for an automated application interface
CN109118151A (en) A kind of work order transaction methods and work order transacter
CN115794545A (en) Automatic processing method of operation and maintenance data and related equipment thereof
CN110515611B (en) Document number generation method
CN110347552B (en) Method and device for supporting real-time monitoring of configurable decision engine and electronic equipment
US9971665B2 (en) Subscription methods and systems for component information of a system
CN112862420A (en) Management system
CN116884107A (en) Automatic service resource inspection system, method, terminal and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination