CN111833030A - Data submission method and system of land information management system - Google Patents
Data submission method and system of land information management system Download PDFInfo
- Publication number
- CN111833030A CN111833030A CN202010973878.9A CN202010973878A CN111833030A CN 111833030 A CN111833030 A CN 111833030A CN 202010973878 A CN202010973878 A CN 202010973878A CN 111833030 A CN111833030 A CN 111833030A
- Authority
- CN
- China
- Prior art keywords
- flow
- configuration
- data
- customization data
- management system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 107
- 230000000694 effects Effects 0.000 claims description 7
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000011112 process operation Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Human Resources & Organizations (AREA)
- Tourism & Hospitality (AREA)
- Economics (AREA)
- Theoretical Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Primary Health Care (AREA)
- Development Economics (AREA)
- General Health & Medical Sciences (AREA)
- Data Mining & Analysis (AREA)
- Health & Medical Sciences (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The application provides a data submission method and system of a land information management system, which comprises the steps of obtaining flow customization data submitted by a user; analyzing whether the flow customization data is complete and legal; if the flow customization data is complete and legal, analyzing whether the service information and the flow type corresponding to the flow customization data are correct or not; if the business information and the process type are both correct, the process customization data is stored as it is, and whether the same type of configuration exists in the land information management system is analyzed according to the process type; and if the same type of configuration does not exist in the land information management system, customizing the data configuration flow according to the flow and storing flow configuration information. Through the mode, the user can flexibly configure the business process according to the requirement, so that each business process configuration process of the land information management system is more convenient and quicker, and the process configuration efficiency is improved.
Description
Technical Field
The application relates to the technical field of land information management, in particular to a data submission method and system of a land information management system.
Background
The unprecedented development of city construction and the implementation of land paid use laws and regulations lead the cadastral to change more and more frequently and the cadastral information amount to be larger and larger, thereby putting higher requirements on the cadastral management of cities and towns. In order to manage land information, a land information management system is gradually established, but the existing land information management system has a plurality of processes when business application is carried out, corresponding process operation steps are required to be configured for different business types, a large amount of time is required to be spent, and the process is inconvenient to modify. Therefore, it is necessary to provide a scheme to facilitate the configuration of the process of the land information management system more conveniently and quickly, and to improve the efficiency of the process configuration.
Disclosure of Invention
The application aims to provide a data submission method and system of a land information management system, which are used for realizing the technical effects of configuring the process of the land information management system more conveniently and quickly and improving the efficiency of process configuration.
In a first aspect, an embodiment of the present application provides a data submission method for a land information management system, including:
step A, acquiring flow customization data submitted by a user;
b, analyzing whether the flow customization data is complete and legal or not;
c, if the flow customization data is complete and legal, analyzing whether the service information and the flow type corresponding to the flow customization data are correct or not;
d, if the business information and the process type are both correct, the process customization data are stored in an original mode, and whether the same type of configuration exists in the land information management system or not is analyzed according to the process type;
and E, if the same type of configuration does not exist in the land information management system, customizing a data configuration flow according to the flow and storing flow configuration information.
Further, the step B includes:
analyzing whether the flow customization data has a starting node and an ending node, whether the flow is pulled from a starting node chain to the ending node, whether the connecting lines between the nodes are correct and whether the connecting lines are repeated;
if the flow customization data comprises a starting node and an ending node, the flow is that the starting node is chained to the ending node, the connecting lines between the nodes are correct, and the connecting lines are not repeated, the step C is continuously executed; otherwise, reminding the user to check the flow customization data.
Further, the service information comprises a right type, a registration subclass and a registration item; the step C comprises the following steps: analyzing whether the right type, the registration subclass and the registration items in the flow customization data need to register a book, a certificate or a certificate node and whether the flow type is correct or not; if the right type, the registration subclass and the registration items do not need to register a book, a certificate-making or a certificate-issuing node and the flow type is correct, continuing to execute the step D; otherwise, reminding the user to check the flow customization data.
Further, the method further comprises: and if the same type of configuration exists in the land information management system, modifying the existing configuration information into an invalid state, customizing a data configuration flow according to the flow and storing the flow configuration information.
Further, the step of customizing the data configuration flow according to the flow and storing the flow configuration information includes: converting the flow customization data into flow configuration data of an activiti system; and deploying an activiti process framework according to the process configuration data, and storing process configuration information.
Further, the method further comprises: and verifying whether the flow configuration information is correct or not through the flow customization data stored as it is.
In a second aspect, an embodiment of the present application provides a data submission system for a land information management system, including:
the acquisition module is used for acquiring the flow customization data submitted by the user;
the first analysis module is used for analyzing whether the process customization data is complete and legal or not;
the second analysis module is used for analyzing whether the business information and the process type corresponding to the process customization data are correct or not when the process customization data are complete and legal;
the third analysis module is used for storing the flow customization data in an original form and analyzing whether the same type of configuration exists in the land information management system according to the flow type when the business information and the flow type are both correct;
and the process configuration module is used for customizing the data configuration process according to the process and storing the process configuration information when the same type of configuration does not exist in the land information management system.
The beneficial effect that this application can realize is: by the data submission method provided by the embodiment of the application, a user can flexibly configure the business process according to the requirement, so that each business process configuration process of the land information management system is more convenient and quicker, and the process configuration efficiency is improved.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings that are required to be used in the embodiments of the present application will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present application and therefore should not be considered as limiting the scope, and that those skilled in the art can also obtain other related drawings based on the drawings without inventive efforts.
Fig. 1 is a schematic flow chart of a data submission method of a land information management system according to an embodiment of the present application;
fig. 2 is a schematic view of a data submission system topology structure of a land information management system according to an embodiment of the present application.
Icon: 10-a data submission system; 100-an acquisition module; 200-a first analysis module; 300-a second analysis module; 400-a third analysis module; 500-flow configuration module.
Detailed Description
The technical solutions in the embodiments of the present application will be described below with reference to the drawings in the embodiments of the present application.
It should be noted that: like reference numbers and letters refer to like items in the following figures, and thus, once an item is defined in one figure, it need not be further defined and explained in subsequent figures. Meanwhile, in the description of the present application, the terms "first", "second", and the like are used only for distinguishing the description, and are not to be construed as indicating or implying relative importance.
Referring to fig. 1, fig. 1 is a schematic flow chart illustrating a data submission method of a land information management system according to an embodiment of the present application.
The embodiment of the application provides a data submission method of a land information management system, which specifically comprises the following steps:
step A, acquiring flow customization data submitted by a user;
in one embodiment, the land information management system comprises a client (browser) and a server connected with the client, and a user can input flow customization data corresponding to a business flow in a configuration interface of the client (browser). The server can receive the flow customization data input by the user through an interface connected with the client (browser). Specifically, a user can drag a flow control piece on an interface of a client (browser), and a view layer of the land information management system packages information on the interface into flow customization data in a json format and then sends the flow customization data to a server.
B, analyzing whether the flow customization data is complete and legal or not;
in one embodiment, after the server obtains the process customization data input by the user, it may first analyze whether the process customization data is legal. Specifically, after the server acquires the process customization data input by the user, whether a starting node and an ending node exist in the process customization data, whether the process is pulled from a starting node chain to the ending node, whether a connecting line between the nodes is correct, and whether the connecting line is repeated can be analyzed; if the flow customization data comprises a starting node and an ending node, the flow is that the starting node is chained to the ending node, the connecting lines between the nodes are correct, and the connecting lines are not repeated, the step C is continuously executed; otherwise, reminding the user to check the flow customization data.
By the method, the integrity and the legality of each service flow customized by a user can be ensured, and errors of the configured flows are avoided.
C, if the flow customization data is complete and legal, analyzing whether the service information and the flow type corresponding to the flow customization data are correct or not;
in one embodiment, when the process customization data input by the user is complete and legal, the server may further analyze whether the business information and the process type corresponding to the process customization data are correct. Specifically, the business information includes a right type, a registration subclass, registration items, and the like of the land; when the flow customization data is complete and legal, the server can further analyze whether the right type, the registration subclass and the registration items in the flow customization data need to register, amend or issue nodes and whether the flow type is correct. If the right type, the registration subclass and the registration items do not need to register a book, a certificate-making or a certificate-issuing node and the flow type is correct, continuing to execute the step D; otherwise, reminding the user to check the flow customization data.
D, if the business information and the process type are both correct, the process customization data are stored in an original mode, and whether the same type of configuration exists in the land information management system or not is analyzed according to the process type;
in one embodiment, if the business information and the process type are both correct, the process customization data input by the user is stored as it is, and whether the same type of configuration already exists in the land information management system is analyzed according to the input process type. The flow customization data input by the user is stored in the original shape, so that the flow customization data can be returned to the front end for use when being modified.
In one embodiment, it may also be checked whether the generated flow is correct according to the data saved as such.
And E, if the same type of configuration does not exist in the land information management system, customizing a data configuration flow according to the flow and storing flow configuration information.
In one embodiment, if the same type of configuration does not exist in the land information management system, the flow can be configured according to the flow customization data and the flow configuration information is saved; specifically, the process customization data may be converted into process configuration data of the activiti system; and then deploying an activiti process framework according to the process configuration data, and storing process configuration information. If the same type of configuration exists in the land information management system; the existing configuration information is modified to be in an invalid state, and then the method is adopted to customize the data configuration flow according to the flow and store the flow configuration information.
It should be noted that, because of the special requirement of the flow, the flow configuration cannot be deleted and cannot be physically modified, that is, the flow is modified without modifying the original flow (if the original flow is modified, the flow configuration after modification is displayed when the flow before modification is displayed in the flow execution process, which is not in accordance with the actual flow), but the original flow state is set to be invalid and an effective flow configuration is added.
Please refer to fig. 2, fig. 2 is a schematic diagram of a data submission system topology of a land information management system according to an embodiment of the present application.
In an implementation manner, an embodiment of the present application further provides a data submission system 10 of a land information management system, including:
an obtaining module 100, configured to obtain flow customization data submitted by a user;
the first analysis module 200 is used for analyzing whether the process customization data is complete and legal;
the second analysis module 300 is configured to analyze whether the service information and the process type corresponding to the process customization data are correct when the process customization data are complete and legal;
a third analysis module 400, configured to, when the business information and the process type are both correct, store the process customization data as it is, and analyze whether the same type of configuration already exists in the land information management system according to the process type;
and the process configuration module 500 is used for configuring the process according to the process customization data and storing the process configuration information when the same type of configuration does not exist in the land information management system.
To sum up, the embodiment of the present application provides a data submission method and system for a land information management system, including obtaining flow customization data submitted by a user; analyzing whether the flow customization data is complete and legal; if the flow customization data is complete and legal, analyzing whether the service information and the flow type corresponding to the flow customization data are correct or not; if the business information and the process type are both correct, the process customization data is stored as it is, and whether the same type of configuration exists in the land information management system is analyzed according to the process type; and if the same type of configuration does not exist in the land information management system, customizing the data configuration flow according to the flow and storing flow configuration information. Through the mode, the user can flexibly configure the business process according to the requirement, so that each business process configuration process of the land information management system is more convenient and quicker, and the process configuration efficiency is improved.
The above description is only for the specific embodiments of the present application, but the scope of the present application is not limited thereto, and any person skilled in the art can easily conceive of the changes or substitutions within the technical scope of the present application, and shall be covered by the scope of the present application. Therefore, the protection scope of the present application shall be subject to the protection scope of the claims.
Claims (7)
1. A data submission method of a land information management system is characterized by comprising the following steps:
step A, acquiring flow customization data submitted by a user;
b, analyzing whether the flow customization data is complete and legal or not;
c, if the flow customization data is complete and legal, analyzing whether the service information and the flow type corresponding to the flow customization data are correct or not;
d, if the business information and the process type are both correct, the process customization data are stored in an original mode, and whether the same type of configuration exists in the land information management system or not is analyzed according to the process type;
and E, if the same type of configuration does not exist in the land information management system, customizing a data configuration flow according to the flow and storing flow configuration information.
2. The method of claim 1, wherein step B comprises:
analyzing whether the flow customization data has a starting node and an ending node, whether the flow is pulled from a starting node chain to the ending node, whether the connecting lines between the nodes are correct and whether the connecting lines are repeated;
if the flow customization data comprises a starting node and an ending node, the flow is that the starting node is chained to the ending node, the connecting lines between the nodes are correct, and the connecting lines are not repeated, the step C is continuously executed; otherwise, reminding the user to check the flow customization data.
3. The method of claim 2, wherein the service information includes a right type, a registration subclass, and a registration event; the step C comprises the following steps:
analyzing whether the right type, the registration subclass and the registration items in the flow customization data need to register a book, a certificate or a certificate node and whether the flow type is correct or not;
if the right type, the registration subclass and the registration items do not need to register a book, a certificate-making or a certificate-issuing node and the flow type is correct, continuing to execute the step D; otherwise, reminding the user to check the flow customization data.
4. The method of claim 1, further comprising:
and if the same type of configuration exists in the land information management system, modifying the existing configuration information into an invalid state, customizing a data configuration flow according to the flow and storing the flow configuration information.
5. The method of claim 1 or 4, wherein the step of configuring the process according to the customized data of the process and storing the process configuration information comprises:
converting the flow customization data into flow configuration data of an activiti system;
and deploying an activiti process framework according to the process configuration data, and storing process configuration information.
6. The method of claim 1, further comprising:
and verifying whether the flow configuration information is correct or not through the flow customization data stored as it is.
7. A data submission system for a land information management system, comprising:
the acquisition module is used for acquiring the flow customization data submitted by the user;
the first analysis module is used for analyzing whether the process customization data is complete and legal or not;
the second analysis module is used for analyzing whether the business information and the process type corresponding to the process customization data are correct or not when the process customization data are complete and legal;
the third analysis module is used for storing the flow customization data in an original form and analyzing whether the same type of configuration exists in the land information management system according to the flow type when the business information and the flow type are both correct;
and the process configuration module is used for customizing the data configuration process according to the process and storing the process configuration information when the same type of configuration does not exist in the land information management system.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010973878.9A CN111833030A (en) | 2020-09-16 | 2020-09-16 | Data submission method and system of land information management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010973878.9A CN111833030A (en) | 2020-09-16 | 2020-09-16 | Data submission method and system of land information management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111833030A true CN111833030A (en) | 2020-10-27 |
Family
ID=72918531
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010973878.9A Pending CN111833030A (en) | 2020-09-16 | 2020-09-16 | Data submission method and system of land information management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111833030A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8732282B1 (en) * | 2011-09-30 | 2014-05-20 | Emc Corporation | Model framework to facilitate robust programming of distributed workflows |
US20150294245A1 (en) * | 2014-04-14 | 2015-10-15 | Ajay R Nagar | Method and system for handling program, project and asset scheduling management with reserves management and application integration |
CN105700888A (en) * | 2016-01-14 | 2016-06-22 | 国网山东省电力公司物资公司 | Visualization rapid developing platform based on jbpm workflow engine |
CN107861749A (en) * | 2017-10-30 | 2018-03-30 | 国云科技股份有限公司 | The flow arranging system and its implementation of a kind of TU task unit based on configuration |
CN111081356A (en) * | 2019-11-07 | 2020-04-28 | 福建亿能达信息技术股份有限公司 | Method for flow management based on WEB |
CN111126932A (en) * | 2019-11-05 | 2020-05-08 | 紫光云(南京)数字技术有限公司 | Form-based flow chart configuration method |
CN111563724A (en) * | 2020-04-28 | 2020-08-21 | 嘿圆(上海)网络科技有限公司 | Method and system for guiding user operation on line by self-defining business process node |
-
2020
- 2020-09-16 CN CN202010973878.9A patent/CN111833030A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8732282B1 (en) * | 2011-09-30 | 2014-05-20 | Emc Corporation | Model framework to facilitate robust programming of distributed workflows |
US20150294245A1 (en) * | 2014-04-14 | 2015-10-15 | Ajay R Nagar | Method and system for handling program, project and asset scheduling management with reserves management and application integration |
CN105700888A (en) * | 2016-01-14 | 2016-06-22 | 国网山东省电力公司物资公司 | Visualization rapid developing platform based on jbpm workflow engine |
CN107861749A (en) * | 2017-10-30 | 2018-03-30 | 国云科技股份有限公司 | The flow arranging system and its implementation of a kind of TU task unit based on configuration |
CN111126932A (en) * | 2019-11-05 | 2020-05-08 | 紫光云(南京)数字技术有限公司 | Form-based flow chart configuration method |
CN111081356A (en) * | 2019-11-07 | 2020-04-28 | 福建亿能达信息技术股份有限公司 | Method for flow management based on WEB |
CN111563724A (en) * | 2020-04-28 | 2020-08-21 | 嘿圆(上海)网络科技有限公司 | Method and system for guiding user operation on line by self-defining business process node |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20210034336A1 (en) | Executing a process-based software application in a first computing environment and a second computing environment | |
CN111639287A (en) | Page processing method and device, terminal equipment and readable storage medium | |
WO2017162024A1 (en) | Method of developing component and template using visual expression, storage medium, and apparatus | |
US7913225B2 (en) | Error handling using declarative constraints in a graphical modeling tool | |
US20210208854A1 (en) | System and method for enhancing component based development models with auto-wiring | |
CN108279882B (en) | Framework generation method, device, equipment and computer readable medium | |
EP2492806A1 (en) | Unified interface for meta model checking, modifying, and reporting | |
CN103268226A (en) | Test script file generation method and device | |
US20150143267A1 (en) | SYSTEM AND METHOD FOR DEVELOPING A RULE-BASED EVENT-DRIVEN MULTI-LAYERED FRONTEND FOR BUSINESS SERVICES AND RENDERING THE GUIs ON MULTIPLE CLIENT DEVICES | |
CN113485927B (en) | Test data generation method, device, equipment and storage medium | |
CN115145560B (en) | Business orchestration method, apparatus, device, computer-readable medium, and program product | |
CN111124379A (en) | Page generation method and device, electronic equipment and storage medium | |
CN110704394A (en) | Report configuration modification method and device | |
CN113568614A (en) | Task issuing method, electronic device and storage medium | |
CN116341481B (en) | Clock file confirmation method and device, electronic equipment and storage medium | |
CN111143408B (en) | Event processing method and device based on business rule | |
CN113721910A (en) | Interface code generation method and device, electronic equipment and computer readable medium | |
CN113885886A (en) | Method, device, system and storage medium for processing activity service | |
CN111596905A (en) | Method, device, storage medium and terminal for generating java object | |
CN116185425A (en) | Event flow arrangement method, device, equipment and medium based on node combination | |
CN116028062A (en) | Target code generation method, NPU instruction display method and device | |
CN111833030A (en) | Data submission method and system of land information management system | |
CN115509668A (en) | Method, device and equipment for constructing front-end page analytic framework and storage medium | |
CN113112217B (en) | Business process configuration method, device, electronic equipment and computer readable medium | |
CN111880996B (en) | Bare metal data acquisition method, device, equipment and readable storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20201027 |
|
RJ01 | Rejection of invention patent application after publication |