CN111828730A - Construction process for installing inner sleeve steel pipe in jacking pipe - Google Patents

Construction process for installing inner sleeve steel pipe in jacking pipe Download PDF

Info

Publication number
CN111828730A
CN111828730A CN202010659720.4A CN202010659720A CN111828730A CN 111828730 A CN111828730 A CN 111828730A CN 202010659720 A CN202010659720 A CN 202010659720A CN 111828730 A CN111828730 A CN 111828730A
Authority
CN
China
Prior art keywords
pipe
pipe joint
jacking
vertical rod
transport vehicle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010659720.4A
Other languages
Chinese (zh)
Other versions
CN111828730B (en
Inventor
肖敏
李海峰
罗可
朱少华
吴梓鸿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wisdri Engineering and Research Incorporation Ltd
Wisdri Urban Construction Engineering Technology Co Ltd
Original Assignee
Wisdri Engineering and Research Incorporation Ltd
Wisdri Urban Construction Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wisdri Engineering and Research Incorporation Ltd, Wisdri Urban Construction Engineering Technology Co Ltd filed Critical Wisdri Engineering and Research Incorporation Ltd
Priority to CN202010659720.4A priority Critical patent/CN111828730B/en
Publication of CN111828730A publication Critical patent/CN111828730A/en
Application granted granted Critical
Publication of CN111828730B publication Critical patent/CN111828730B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/028Laying or reclaiming pipes on land, e.g. above the ground in the ground
    • F16L1/036Laying or reclaiming pipes on land, e.g. above the ground in the ground the pipes being composed of sections of short length
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/06Accessories therefor, e.g. anchors

Abstract

The invention discloses a construction process for installing an inner sleeve steel pipe in a jacking pipe, which comprises the following steps: completing a pipe jacking working well, a concrete pipe jacking and a receiving platform; hoisting the lifting transport vehicle to a pipe joint receiving platform; hoisting the first pipe joint to a pipe joint receiving platform; transporting the first pipe section into the concrete top pipe through a lifting transport vehicle, installing and fixing the first pipe section, and withdrawing the lifting transport vehicle from the first pipe section; hoisting the next pipe joint to a pipe joint receiving platform; conveying the pipe joint to be spliced with the previous pipe joint and installing and fixing the pipe joint by a lifting transport vehicle; and repeating the steps until all the pipe joints are installed and fixed in place. The pipe joint is installed in the narrow space, engineering equipment cost is reduced, the installation height and the gradient of the pipe joint can be accurately adjusted, the pipeline construction quality is guaranteed, the interaction between the pipe joint to be installed and the pipe jacking is reduced, the pipe jacking and the pipe joint damage are avoided, the transport vehicles work circularly, two ends of the two transport vehicles can work simultaneously, the installation efficiency is improved, and the construction period is greatly shortened.

Description

Construction process for installing inner sleeve steel pipe in jacking pipe
Technical Field
The invention relates to the technical field of pipeline construction, in particular to a construction process for installing an inner sleeve steel pipe in a jacking pipe.
Background
With the rapid development of the national urban infrastructure construction, the density of traffic networks and pipe networks such as urban roads, rail traffic, expressways, railways and the like is increased, and the crossing condition of the newly-built drainage pipe networks and the road networks is increased. When the existing facility safety and the surrounding environment are not influenced in the surrounding field, the newly-built drainage pipeline is generally constructed in an open cut mode. Along with the release of the excavation soil pressure of the foundation pit, when the supporting measures are not proper, the deformation and the displacement of a road structure are easily caused, and when the support passes through busy municipal roads, rail traffic, expressways and railways, open excavation construction is obviously not suitable, so that the pipe jacking construction method becomes a common and mature construction technology. The top pipe is generally made of reinforced concrete, and poor installation quality of rubber sealing rings between pipe joints can cause poor tightness of the whole pipe, so that related property rights units do not allow the reinforced concrete top pipe to be directly used as a drainage overflowing channel due to safety considerations of peripheral facilities of the top pipe, and an inner sleeve needs to be additionally installed in the top pipe to be used as an overflowing channel.
According to the traditional construction method of the jacking pipe and the inner sleeve, the jacking pipe construction is finished to form a channel, the elevation of the jacking pipe needs to be strictly controlled in the jacking construction process, and the jacking process is detected at any time to find that deviation is corrected at any time. And when the pipe jacking construction is finished, pouring concrete in the pipe jacking to serve as an inner sleeve foundation, when the inner sleeve is a steel pipe, hoisting the inner sleeve to the working well, welding the inner sleeve with the previous section of inner sleeve, and then jacking by the pipe jacking machine, so that the operation is repeated until all the construction is finished. Because the inner sleeve is pushed by the push bench, the installation precision of the inner sleeve cannot be adjusted and is difficult to control in the method; the jacking can be started only after the connection between the pipe section and the previous pipe section is completed, and the construction period of the method is long; in the jacking process, the friction force between the inner sleeve and the jacking pipe is large, the required driving force is large, the risk of damage of the inner sleeve and the jacking pipe is increased, and the quality is difficult to ensure; the push bench has long service time and increases the cost of engineering equipment. Therefore, an inner sleeve construction method which is simple in installation process, controllable in construction quality and capable of saving construction period and investment is urgently needed.
Disclosure of Invention
The invention aims to solve the technical problems that aiming at the defects in the prior art, the construction process for installing the inner sleeve steel pipe in the jacking pipe is provided, the pipe joint is installed in a narrow space, the cost of engineering instruments is reduced, the installation height and the gradient of the pipe joint can be accurately adjusted, the construction quality of a pipeline is ensured, the interaction between the pipe joint to be installed and the jacking pipe is reduced, the damage of the jacking pipe and the pipe joint is avoided, the transport vehicles work circularly, two ends of two transport vehicles can work simultaneously, the installation efficiency is improved, and the construction period is greatly shortened.
The technical scheme adopted by the invention for solving the technical problems is as follows:
a construction process for installing an inner sleeve steel pipe in a jacking pipe comprises the following steps:
1) the construction is completed with a pipe-jacking working well and a concrete pipe jacking, and the concrete pipe jacking is horizontally arranged at one side of the pipe-jacking working well and communicated with the pipe-jacking working well;
2) constructing a pipe joint receiving platform in the pipe-jacking working well, wherein the pipe joint receiving platform is arranged at the bottom of the pipe-jacking working well, and the height of the top of the pipe joint receiving platform is consistent with that of the bottom of the concrete pipe jacking;
3) hoisting the lifting transport vehicle to a pipe joint receiving platform from the outside of the pipe jacking working well, and moving the lifting transport vehicle into the concrete pipe jacking;
4) hoisting the first pipe joint from the outside of the pipe jacking working well to a pipe joint receiving platform;
5) penetrating the lifting transport vehicle into the first pipe joint, and supporting the first pipe joint;
6) transporting the first pipe section into the concrete top pipe through a lifting transport vehicle, installing and fixing the first pipe section, and withdrawing the lifting transport vehicle from the first pipe section;
7) hoisting the next pipe joint from the outside of the pipe jacking working well to a pipe joint receiving platform;
8) penetrating the lifting transport vehicle into the pipe joints and supporting the pipe joints;
9) transporting the pipe joint into a concrete jacking pipe through a lifting transport vehicle, splicing the pipe joint with the previous pipe joint, installing and fixing the pipe joint, and withdrawing the lifting transport vehicle from the pipe joint;
10) and repeating the steps 7) -9) until all the pipe joints are installed and fixed in place in the concrete top pipe.
According to above-mentioned technical scheme, the lift transport vechicle includes crossbeam and three pole setting, and three pole setting is first pole setting, second pole setting and third pole setting respectively, and first pole setting, second pole setting and third pole setting are arranged in proper order in the crossbeam bottom along length direction, and the distance between second pole setting and the third pole setting is greater than the length of tube coupling, all is equipped with altitude controller in first pole setting, second pole setting and the third pole setting, and the bottom of first pole setting, second pole setting and third pole setting all is equipped with the slide dolly.
According to the technical scheme, in the steps 5) and 8), after the lifting transport vehicle penetrates into the pipe joints, the cross beam is lifted through the second vertical rod and the third vertical rod height adjuster, and the first pipe joint is supported.
According to the technical scheme, the height adjuster comprises a sleeve, the upright rod comprises an upper upright rod and a lower upright rod, the upper end of the upper upright rod is connected with the cross beam, the lower end of the upper upright rod is connected with the sleeve through threads, the upper end of the lower upright rod is connected with the sleeve, and the lower end of the lower upright rod is connected with the sliding trolley.
According to the technical scheme, the rubber pad is arranged on the cross beam.
According to the technical scheme, in the step 9), the length of the first vertical rod is adjusted through the height adjuster in the process of splicing the pipe joint with the previous pipe joint, so that the first vertical rod enters the previous pipe joint to form a support, the second vertical rod is shortened through height adjustment, the pipe joint is spliced with the previous pipe joint, and then the pipe joint is installed and fixed.
According to the technical scheme, in the step 6) and the step 9), the installation and fixation process of the pipe joint specifically comprises the steps of arranging buttresses at two ends of the bottom of the pipe joint, and grouting concrete between the two buttresses and the bottom of the pipe joint.
According to the technical scheme, the front end and the rear end of the lifting transport vehicle are both connected with the dragging steel ropes, and the lifting transport vehicle can move back and forth in the concrete jacking pipe by dragging the dragging steel ropes.
The invention has the following beneficial effects:
according to the invention, the pipe joints are installed in a narrow space by dragging and lifting the lifting transport vehicle, so that the cost of engineering instruments is reduced, the installation height and the gradient of the pipe joints can be accurately adjusted, the construction quality of pipelines is ensured, the interaction between the pipe joints to be installed and the jacking pipes is reduced, the damage to the jacking pipes and the pipe joints is avoided, the transport vehicle works circularly, two ends of the two transport vehicles can work simultaneously, the installation efficiency is improved, and the construction period is greatly shortened.
Drawings
FIG. 1 is a schematic structural view of a lift truck according to an embodiment of the present invention;
FIG. 2 is a schematic diagram of jacking a pipe section in an embodiment of the present invention;
FIG. 3 is a schematic illustration of the installation of a first pipe section in an embodiment of the invention;
FIG. 4 is a schematic illustration of the transport of a second pipe section in an embodiment of the invention;
FIG. 5 is a schematic illustration of the second pipe section and the first pipe section assembled together in an embodiment of the present invention;
FIG. 6 is a cross-sectional view A-A of FIG. 5;
in the figure, 11-a pipe jacking working well and 12-a pipe joint receiving platform; 2-concrete top pipe, 301-first pipe joint, 311-first pipe joint buttress, 321-first pipe bottom grouted concrete, 302-second pipe joint, 312-second pipe joint buttress, 322-second pipe bottom grouted concrete, 4-lifting transport vehicle, 411-cross beam, 412-rubber pad, 421-first vertical rod, 422-second vertical rod, 423-third vertical rod, 431-first height adjuster, 432-second height adjuster, 433-third height adjuster, 441-trolley and 451-dragging steel rope.
Detailed Description
The present invention will be described in detail below with reference to the accompanying drawings and examples.
Referring to fig. 1 to 6, the construction process for installing the inner sleeve steel pipe in the jacking pipe in one embodiment provided by the invention is characterized by comprising the following steps:
1) after construction, the pipe-jacking working well 11 and the concrete pipe jacking 2 are completed, wherein the concrete pipe jacking 2 is horizontally arranged on one side of the pipe-jacking working well 11 and is communicated with the pipe-jacking working well 11;
2) the pipe joint receiving platform 12 is constructed in the pipe-jacking working well 11, the pipe joint receiving platform 12 is arranged at the bottom of the pipe-jacking working well 11, and the height of the top of the pipe joint receiving platform is consistent with that of the bottom of the concrete pipe jacking 2;
3) hoisting the lifting transport vehicle 4 from the outside of the pipe jacking working well 11 to a pipe joint receiving platform 12, and moving the lifting transport vehicle into the concrete pipe jacking 2;
4) hoisting a first pipe joint 301 from the outside of the pipe-jacking working well 11 to a pipe joint receiving platform 12;
5) penetrating the lifting transport vehicle 4 into the first pipe joint 301, and lifting up the first pipe joint 301;
6) the first pipe section 301 is transported into the concrete top pipe 2 through the lifting transport vehicle 4, the first pipe section 301 is installed and fixed, and the lifting transport vehicle 4 withdraws from the first pipe section 301;
7) hoisting the next pipe joint from the outside of the pipe-jacking working well 11 to a pipe joint receiving platform 12;
8) penetrating the lifting transport vehicle 4 into the pipe joint and supporting the pipe joint;
9) the pipe joint is transported into the concrete top pipe 2 through the lifting transport vehicle 4, the pipe joint and the previous pipe joint are spliced, installed and fixed, and the lifting transport vehicle 4 is withdrawn from the pipe joint;
10) and repeating the steps 7) -9) until all the pipe joints are installed and fixed in place in the concrete top pipe 2.
Further, lift transport vechicle 4 includes crossbeam 411 and three pole setting, and three pole setting is first pole setting 421, second pole setting 422 and third pole setting 423 respectively, and first pole setting 421, second pole setting 422 and third pole setting 423 arrange in proper order in crossbeam 411 bottom along length direction, and the distance between second pole setting 422 and the third pole setting 423 is greater than the length of tube coupling, all is equipped with altitude controller on first pole setting 421, second pole setting 422 and the third pole setting 423, and the bottom of first pole setting 421, second pole setting 422 and third pole setting 423 all is equipped with trolley 441.
Further, the first upright stanchion 421, the second upright stanchion 422 and the third upright stanchion 423 are respectively provided with a first height adjuster 431, a second height adjuster 432 and a third height adjuster 433.
Further, in the above steps 5) and 8), after the lifting transport cart 4 penetrates into the pipe joint, the cross beam 411 is lifted by the height adjuster of the second vertical rod 422 and the third vertical rod 423, so as to support the first pipe joint.
Further, the height adjuster comprises a sleeve, the upright comprises an upper upright and a lower upright, the upper end of the upper upright is connected with the cross beam 411, the lower end of the upper upright is connected with the sleeve through threads, the upper end of the lower upright is connected with the sleeve, and the lower end of the lower upright is connected with the trolley 441; the upright pole is stretched by rotating the sleeve.
Further, a rubber pad 412 is disposed on the cross beam 411.
Further, in the step 9), in the process of splicing the pipe joint with the previous pipe joint, the height adjuster 431 of the first vertical rod 421 is adjusted to enable the first vertical rod to reach a corresponding length, the first vertical rod enters the previous pipe joint to form a support, the second vertical rod 422 is shortened through height adjustment, the pipe joint is spliced with the previous pipe joint, and then the pipe joint is installed and fixed.
Further, in the step 6) and the step 9), the installation and fixation process of the pipe joint specifically includes arranging buttresses at two ends of the bottom of the pipe joint, and grouting concrete between the two buttresses and the bottom of the pipe joint.
Further, the pier at the bottom of the first pipe section 301 is a first pipe section pier 311, the grouted concrete between the two first pipe section piers 311 is first pipe bottom grouted concrete 321, the pier at the bottom of the second pipe section 302 is a second pipe section pier 312, and the grouted concrete between the two second pipe section piers 312 is second pipe bottom grouted concrete 322.
Furthermore, the front end and the rear end of the lifting transport vehicle 4 are both connected with a dragging steel rope, and the lifting transport vehicle 4 can move back and forth in the concrete jacking pipe 2 by dragging the dragging steel rope.
Furthermore, the transport vehicles work circularly, and two ends of the two transport vehicles can work simultaneously, so that the mounting efficiency is improved, and the construction period is greatly shortened.
The working process of the invention is as follows:
the method comprises the following steps: and (3) completing the pipe-jacking working well 11, the receiving well and the reinforced concrete sleeve pipe jacking in sequence, and dismantling and removing the pipe-jacking machine equipment.
Step two: the pipe joints are subjected to the construction of the platform 12.
And filling the pouring pipe joint receiving platform 12 with concrete in the working well, wherein the finished surface elevation of the pipe joint receiving platform 12 is the same as the elevation of the inner bottom of the pipeline of the constructed jacking pipe 2, and the step mainly provides a flat walking surface for the transport vehicle 4, so that the transport vehicle can stably walk after supporting the pipe joint.
Step three: manufacturing, installing and debugging a transport vehicle;
the transport vehicle is made of steel members, and the transport vehicle beam 411 and the three vertical rods 421-423 are fixed by bolts, so that later-stage disassembly is facilitated; the top of the transport vehicle beam 411 is provided with a rubber pad 412; the transport vehicle upright posts 421-423 are provided with height regulators 431-433, and the lengths of different upright posts can be respectively adjusted; the bottom of the upright post is supported by a pulley trolley 441;
the steel member model is determined according to the maximum weight of the pipe joints conveyed by the transport vehicle, the transport vehicle 4 is integrally firm and durable, the upper connecting plate and the lower connecting plate are convenient to mount and dismount, and the wheels of the sliding plate trolley 441 roll stably.
Step four: the first pipe joint 301 is hoisted, transported and installed;
the first pipe joint 301 is stably placed on the pipe joint receiving platform 12 by using hoisting equipment; the height adjusters 431 to 433 of the descending vertical rods provide traction force by the dragging steel ropes 451 to enable the transport cart 4 to pass through the first pipe joint 301, and the pulley trolleys on the second vertical rod 422 and the third vertical rod 423 are respectively positioned on the pipe joint receiving platform 12 on the outer sides of the two ends of the first pipe joint 301.
Height adjusters 432 and 433 on the lifting upright poles 422 and 423 are adjusted to jack the first pipe joint 301 up to leave the ground;
traction force is provided by the dragging steel rope 451 to enable the transport vehicle to slowly run to a specified installation position in the top pipe 2;
adjusting the height regulators 432 and 433 of the upright rods of the transport vehicle 4 again according to the requirements of pipeline design files to enable the elevation and the gradient of the first pipe joint 301 to meet the technical requirements; a buttress 311 is arranged at the bottom of the first pipe joint 301, and poured concrete 321 is used as a first pipe joint foundation;
step five: hoisting, transporting and installing the second pipe joint 302;
height adjusters 432 and 433 on the lifting vertical rods 422 and 423, and the first pipe joint 301 is supported and stabilized by the buttress 311;
the second pipe joint 302 is stably placed on the pipe joint receiving platform 12 by using hoisting equipment; traction provided by the towing ropes 451 causes the vehicle 4 to pass through the second pipe section 302; height adjusters 432 and 433 on the lifting vertical rods 422 and 423 are adjusted to jack the second pipe joint 302 up to leave the ground; the traction force provided by the dragging steel rope 451 enables the transport vehicle to slowly run to be close to the first pipe joint 301;
the height adjuster 431 of the lifting upright 421 is adjusted to make the trolley 441 higher than the bottom of the first pipe joint 301, and the dragging steel rope 451 drags the transport cart 4 to make the trolley 441 enter the first pipe joint 301; the height adjuster 431 on the vertical rod 421 is adjusted and lowered to fall in the first pipe joint, and the second pipe joint is supported by the vertical rods 421 and 423;
similarly, according to the requirements of pipeline design files, the height adjuster 431 on the upright 421 and the height adjuster 433 on the long upright 423 of the transport vehicle 4 are adjusted to make the elevation and the gradient of the second pipe joint 302 meet the technical requirements; the bottom of the first pipe section 302 is provided with a pier 312, and poured concrete 322 is used as the foundation of the second pipe section 302;
step six: connecting and repairing the first pipe joint and the second pipe joint;
step seven: hoisting, transporting and installing a third pipe joint; … … and so on until all pipe joints are installed.
According to the construction method of the casing pipe joint, the pipe joint is transported by the special transport vehicle instead of the conventional mode of transporting by the pipe jacking machine, so that the working time of the pipe jacking machine can be greatly shortened, and the equipment cost is reduced; the steel pipe is suspended in the air by the trolley in the whole process, so that the sleeve and the steel pipe are prevented from being damaged, and the service lives of the sleeve and the pipe joint are prolonged; through measuring the unwrapping wire and adjusting the travelling bogie height, adjustment tube coupling installation elevation, slope and concentricity, control tube coupling installation quality that can be more accurate.
The above is only a preferred embodiment of the present invention, and certainly, the scope of the present invention should not be limited thereby, and therefore, the present invention is not limited by the scope of the claims.

Claims (8)

1. A construction process for installing an inner sleeve steel pipe in a jacking pipe is characterized by comprising the following steps:
1) the construction is completed with a pipe-jacking working well and a concrete pipe jacking, and the concrete pipe jacking is horizontally arranged at one side of the pipe-jacking working well and communicated with the pipe-jacking working well;
2) constructing a pipe joint receiving platform in the pipe-jacking working well, wherein the pipe joint receiving platform is arranged at the bottom of the pipe-jacking working well, and the height of the top of the pipe joint receiving platform is consistent with that of the bottom of the concrete pipe jacking;
3) hoisting the lifting transport vehicle to a pipe joint receiving platform from the outside of the pipe jacking working well, and moving the lifting transport vehicle into the concrete pipe jacking;
4) hoisting the first pipe joint from the outside of the pipe jacking working well to a pipe joint receiving platform;
5) penetrating the lifting transport vehicle into the first pipe joint, and supporting the first pipe joint;
6) transporting the first pipe section into the concrete top pipe through a lifting transport vehicle, installing and fixing the first pipe section, and withdrawing the lifting transport vehicle from the first pipe section;
7) hoisting the next pipe joint from the outside of the pipe jacking working well to a pipe joint receiving platform;
8) penetrating the lifting transport vehicle into the pipe joints and supporting the pipe joints;
9) transporting the pipe joint into a concrete jacking pipe through a lifting transport vehicle, splicing the pipe joint with the previous pipe joint, installing and fixing the pipe joint, and withdrawing the lifting transport vehicle from the pipe joint;
10) and repeating the steps 7) -9) until all the pipe joints are installed and fixed in place in the concrete top pipe.
2. The construction process for installing the inner sleeve steel pipe in the pipe jacking according to claim 1, wherein the lifting transport vehicle comprises a cross beam and three vertical rods, the three vertical rods are respectively a first vertical rod, a second vertical rod and a third vertical rod, the first vertical rod, the second vertical rod and the third vertical rod are sequentially arranged at the bottom of the cross beam along the length direction, the distance between the second vertical rod and the third vertical rod is greater than the length of the pipe joint, height regulators are arranged on the first vertical rod, the second vertical rod and the third vertical rod, and sliding plate trolleys are arranged at the bottoms of the first vertical rod, the second vertical rod and the third vertical rod.
3. The construction process for installing the inner sleeve steel pipe in the jacking pipe as claimed in claim 2, wherein in the steps 5) and 8), after the lifting transport vehicle penetrates into the pipe joints, the cross beam is lifted through the height regulators of the second vertical rod and the third vertical rod to support the first pipe joint.
4. The construction process for installing an inner sleeve steel pipe in a jacking pipe as claimed in claim 2, wherein the height adjuster comprises a sleeve, the upright comprises an upper upright and a lower upright, the upper end of the upper upright is connected with the beam, the lower end of the upper upright is connected with the sleeve through a thread, the upper end of the lower upright is connected with the sleeve, and the lower end of the lower upright is connected with the trolley.
5. The construction process for installing the inner sleeve steel pipe in the jacking pipe as claimed in claim 2, wherein the cross beam is provided with a rubber pad.
6. The construction process for installing the inner sleeve steel pipe in the pipe-jacking according to claim 2, wherein in the step 9), the first vertical rod is adjusted to a corresponding length in the process of splicing the pipe joint with the previous pipe joint, the first vertical rod enters the previous pipe joint to form a support, the second vertical rod is shortened by adjusting the height, the pipe joint is spliced with the previous pipe joint, and then the pipe joint is installed and fixed.
7. The construction process for installing the inner sleeve steel pipe in the pipe jacking according to claim 1, wherein in the step 6) and the step 9), the installation and fixation process of the pipe joint is to arrange buttresses at two ends of the bottom of the pipe joint, and to arrange grouting concrete between the two buttresses and the bottom of the pipe joint.
8. The construction process for installing the inner sleeve steel pipe in the jacking pipe as claimed in claim 1, wherein the front end and the rear end of the lifting transport vehicle are both connected with dragging steel ropes, and the lifting transport vehicle moves back and forth in the concrete jacking pipe by dragging the dragging steel ropes.
CN202010659720.4A 2020-07-09 2020-07-09 Construction process for installing inner sleeve steel pipe in jacking pipe Active CN111828730B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010659720.4A CN111828730B (en) 2020-07-09 2020-07-09 Construction process for installing inner sleeve steel pipe in jacking pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010659720.4A CN111828730B (en) 2020-07-09 2020-07-09 Construction process for installing inner sleeve steel pipe in jacking pipe

Publications (2)

Publication Number Publication Date
CN111828730A true CN111828730A (en) 2020-10-27
CN111828730B CN111828730B (en) 2021-11-09

Family

ID=72899754

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010659720.4A Active CN111828730B (en) 2020-07-09 2020-07-09 Construction process for installing inner sleeve steel pipe in jacking pipe

Country Status (1)

Country Link
CN (1) CN111828730B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113236858A (en) * 2021-04-20 2021-08-10 武汉一冶建筑安装工程有限责任公司 Method for laying concrete cushion and steel pipe in top pipe
CN114562607A (en) * 2022-03-11 2022-05-31 北京市市政四建设工程有限责任公司 Method for municipal pipeline construction in jacking pipe
CN114857353A (en) * 2022-04-21 2022-08-05 中铁一局集团有限公司 Construction method of jacking pipe internally-penetrated steel sleeve steel steam pipeline

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4382325A (en) * 1980-09-15 1983-05-10 Cormier Lynn J Heavy pipe joining system
JP2003314749A (en) * 2002-04-18 2003-11-06 Jfe Koken Corp Long article propulsion device and long article propulsion method
KR100622226B1 (en) * 2006-01-23 2006-09-13 주식회사 도화종합기술공사 Installation apparatus of sewage box using rail
CN102575796A (en) * 2009-10-07 2012-07-11 阿克海底公司 A tool for a horizontal connecting device
FR2972043A1 (en) * 2011-02-25 2012-08-31 Atlantique Travaux Publics Installing device for use with towing vehicle i.e. lorry mounted crane, to install segmented pipes in open trench, has elongated beam comprising wheels to define positioning area for pipe segments and to support and guide pipe segments
US20150337986A1 (en) * 2014-05-20 2015-11-26 Benoit Bouchard Pipe joining device
CN206191060U (en) * 2016-10-08 2017-05-24 安顺集团建设有限公司 Gas pipeline push pipe construction structures
CN207119937U (en) * 2017-09-07 2018-03-20 北京市常青市政工程有限公司 Pipeline adjustment frame
EP3351690A1 (en) * 2017-01-24 2018-07-25 Stanton Bonna Concrete Ltd Pipe pusher
CN109084081A (en) * 2018-11-07 2018-12-25 北京特种机械研究所 A kind of upper tubulature road assembly method
CN109404610A (en) * 2018-11-07 2019-03-01 北京特种机械研究所 A kind of pipeline adaptation mounting plate
CN110529659A (en) * 2019-08-08 2019-12-03 浙江恒则熙交通科技有限公司 A kind of auxiliary device for connecting and transporting for pipe for escaping
CN110886343A (en) * 2019-11-21 2020-03-17 惠州市新业建筑工程有限公司 Municipal water supply pipeline construction structure and method
CN110965626A (en) * 2019-12-12 2020-04-07 中铁十八局集团第五工程有限公司 Shallow-buried underground excavation steel pipe installation construction process method
CN210461927U (en) * 2019-09-25 2020-05-05 四川华工石油装备有限公司 Petroleum pipeline conveying and connecting device
CN210800235U (en) * 2019-11-20 2020-06-19 周立冬 Butt joint hydraulic support for petroleum pipeline installation
CN111379901A (en) * 2020-04-15 2020-07-07 李恩侠 Pipeline butt-joint machine

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4382325A (en) * 1980-09-15 1983-05-10 Cormier Lynn J Heavy pipe joining system
JP2003314749A (en) * 2002-04-18 2003-11-06 Jfe Koken Corp Long article propulsion device and long article propulsion method
KR100622226B1 (en) * 2006-01-23 2006-09-13 주식회사 도화종합기술공사 Installation apparatus of sewage box using rail
CN102575796A (en) * 2009-10-07 2012-07-11 阿克海底公司 A tool for a horizontal connecting device
FR2972043A1 (en) * 2011-02-25 2012-08-31 Atlantique Travaux Publics Installing device for use with towing vehicle i.e. lorry mounted crane, to install segmented pipes in open trench, has elongated beam comprising wheels to define positioning area for pipe segments and to support and guide pipe segments
US20150337986A1 (en) * 2014-05-20 2015-11-26 Benoit Bouchard Pipe joining device
CN206191060U (en) * 2016-10-08 2017-05-24 安顺集团建设有限公司 Gas pipeline push pipe construction structures
EP3351690A1 (en) * 2017-01-24 2018-07-25 Stanton Bonna Concrete Ltd Pipe pusher
CN207119937U (en) * 2017-09-07 2018-03-20 北京市常青市政工程有限公司 Pipeline adjustment frame
CN109084081A (en) * 2018-11-07 2018-12-25 北京特种机械研究所 A kind of upper tubulature road assembly method
CN109404610A (en) * 2018-11-07 2019-03-01 北京特种机械研究所 A kind of pipeline adaptation mounting plate
CN110529659A (en) * 2019-08-08 2019-12-03 浙江恒则熙交通科技有限公司 A kind of auxiliary device for connecting and transporting for pipe for escaping
CN210461927U (en) * 2019-09-25 2020-05-05 四川华工石油装备有限公司 Petroleum pipeline conveying and connecting device
CN210800235U (en) * 2019-11-20 2020-06-19 周立冬 Butt joint hydraulic support for petroleum pipeline installation
CN110886343A (en) * 2019-11-21 2020-03-17 惠州市新业建筑工程有限公司 Municipal water supply pipeline construction structure and method
CN110965626A (en) * 2019-12-12 2020-04-07 中铁十八局集团第五工程有限公司 Shallow-buried underground excavation steel pipe installation construction process method
CN111379901A (en) * 2020-04-15 2020-07-07 李恩侠 Pipeline butt-joint machine

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张晓明等: "利用一种可移动提升就位装置安装地下管廊内管道技术", 《新技术推广与应用》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113236858A (en) * 2021-04-20 2021-08-10 武汉一冶建筑安装工程有限责任公司 Method for laying concrete cushion and steel pipe in top pipe
CN113236858B (en) * 2021-04-20 2023-09-15 武汉一冶建筑安装工程有限责任公司 Method for laying concrete cushion layer and steel pipe in jacking pipe
CN114562607A (en) * 2022-03-11 2022-05-31 北京市市政四建设工程有限责任公司 Method for municipal pipeline construction in jacking pipe
CN114857353A (en) * 2022-04-21 2022-08-05 中铁一局集团有限公司 Construction method of jacking pipe internally-penetrated steel sleeve steel steam pipeline
CN114857353B (en) * 2022-04-21 2024-04-05 中铁一局集团有限公司 Construction method for penetrating steel sleeve steel steam pipeline in jacking pipe

Also Published As

Publication number Publication date
CN111828730B (en) 2021-11-09

Similar Documents

Publication Publication Date Title
CN111828730B (en) Construction process for installing inner sleeve steel pipe in jacking pipe
CN108843857B (en) Municipal pipeline construction device and construction method
CN109826110B (en) Continuous beam swivel system with side-span ground slide
CN110230261B (en) Mounting construction method for upper frame beam of double-layer synchronous beam
CN107227686A (en) A kind of tunnel-type anchorage pre-stress system locating support construction method
CN108396749B (en) Installation system and installation method of steel support in foundation pit
CN107794945B (en) Movable assembly type template mounting and dismounting operation system and construction method thereof
CN111997043A (en) Segmented reinforcement cage and diaphragm wall construction method under low-clearance high-voltage line
CN104746432A (en) Carriageway slab transportation and installation vehicle capable of traveling on slab and beam
CN113818478B (en) Overweight prefabricated pipe gallery installation system and construction method thereof
CN212296389U (en) Scattered cable saddle portal mounting system in large-inclination-angle tunnel anchor
CN210370698U (en) Mould shifting trolley for shed tunnel lining arch construction
CN210288479U (en) Prefabricated medium plate transportation and installation device of full-composite assembly type reverse subway station
CN111503367A (en) Method for installing truss pipeline penetrating through high-speed culvert
CN110645004A (en) Method for turning over shield tunneling machine trolley in negative two-layer of operated station
CN114352033B (en) Steel structure beam and column support mounting construction method
CN111571206B (en) Method for mounting front cross beam and rear cross beam of extruder
CN220182010U (en) System for transversely moving mobile trolley between high-low parallel tracks
CN219637736U (en) Prefabricated assembled culvert installation device in narrow space
CN112302882B (en) Tubular pile discharging method and offshore wind power generation equipment
CN109457618B (en) Cast-in-place construction method for concrete main beam
CN214993215U (en) Culvert wall body support and whole sideslip device of template
CN219300072U (en) Inner-pulling installation device of large-diameter concrete pipeline winch
CN112429651B (en) Installation construction process for 1000-ton lifting frame equipment
CN117449320A (en) Construction and monitoring method of support system of subway station half-cover excavation foundation pit in flood plain soft soil area

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant