CN111827592A - Architectural design roof eaves mouth waterproof construction - Google Patents

Architectural design roof eaves mouth waterproof construction Download PDF

Info

Publication number
CN111827592A
CN111827592A CN202010702211.5A CN202010702211A CN111827592A CN 111827592 A CN111827592 A CN 111827592A CN 202010702211 A CN202010702211 A CN 202010702211A CN 111827592 A CN111827592 A CN 111827592A
Authority
CN
China
Prior art keywords
wall
plate
cornice
waterproof
roof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010702211.5A
Other languages
Chinese (zh)
Other versions
CN111827592B (en
Inventor
高飞飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Garber United Design Co., Ltd
Original Assignee
高飞飞
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 高飞飞 filed Critical 高飞飞
Priority to CN202010702211.5A priority Critical patent/CN111827592B/en
Publication of CN111827592A publication Critical patent/CN111827592A/en
Application granted granted Critical
Publication of CN111827592B publication Critical patent/CN111827592B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage; Sky-lights
    • E04D13/04Roof drainage; Drainage fittings in flat roofs, balconies or the like
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage; Sky-lights
    • E04D13/04Roof drainage; Drainage fittings in flat roofs, balconies or the like
    • E04D13/0404Drainage on the roof surface
    • E04D13/0481Drainage guiding provisions, e.g. deflectors or stimulation by inclined surfaces
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage; Sky-lights
    • E04D13/15Trimming strips; Edge strips; Fascias; Expansion joints for roofs
    • E04D13/158Trimming strips; Edge strips; Fascias; Expansion joints for roofs covering the overhang at the eave side, e.g. soffits, or the verge of saddle roofs
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage; Sky-lights
    • E04D13/16Insulating devices or arrangements in so far as the roof covering is concerned, e.g. characterised by the material or composition of the roof insulating material or its integration in the roof structure
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D13/00Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage; Sky-lights
    • E04D13/16Insulating devices or arrangements in so far as the roof covering is concerned, e.g. characterised by the material or composition of the roof insulating material or its integration in the roof structure
    • E04D13/1687Insulating devices or arrangements in so far as the roof covering is concerned, e.g. characterised by the material or composition of the roof insulating material or its integration in the roof structure the insulating material having provisions for roof drainage

Abstract

The invention relates to a building design roof cornice waterproof structure, relating to the technical field of building structures, wherein a ceiling plate is erected and fixed at the upper end of a cross wall, the upper end of the cross wall is fixedly provided with a support wall in a building way, an roof plate is erected at the upper end of a longitudinal wall, the front side wall of the upper end of the cross wall is fixedly provided with a cornice cantilever beam, the upper surface of the cornice cantilever beam is fixedly erected with a cornice plate, a first waterproof plate is erected and fixed at the upper end of the support wall, the vertical plate of the first waterproof plate is fixedly arranged on the rear side wall of the support wall, the upper end of the longitudinal wall is erected and fixed with a guide plate, the right side edge of the guide plate is fixedly provided with a guide groove, the front end of the guide groove passes through the support wall and is arranged at the front side of the support wall, the upper side wall of the cornice plate; it adds and is equipped with waterproof guide plate, can block the ponding of seepage to with the percolating water drainage to the outside of wall body, the rethread eaves mouth structure is discharged water, has strengthened the holistic anti seepage performance of structure.

Description

Architectural design roof eaves mouth waterproof construction
Technical Field
The invention relates to the technical field of building structures, in particular to a building design roof cornice waterproof structure.
Background
The cornice structure is a drainage structure in pitched roof structures, and a hollow structure is formed between the cornice plate which is picked out and the pitched roof, so that accumulated water flowing down on the roof is drained, and the accumulated water is prevented from entering a room through a gap of a supporting wall; eaves mouth structure in current structure only does the waterproof layer when building and lays, if the phenomenon that roof boarding leaked, then the back that leaks flowed down along the roof boarding lower surface, and the infiltration water very easily leaks into the room, causes destruction to roof board etc. need improve this kind of eaves mouth structure now, can be to above-mentioned phenomenon reinforcing drainage function.
Disclosure of Invention
The invention aims to provide a building design roof cornice waterproof structure which is reasonable in design and convenient to use, and aims to overcome the defects and shortcomings of the prior art.
In order to achieve the purpose, the invention adopts the technical scheme that: it comprises a transverse wall, a longitudinal wall, an roof panel, a cornice cantilever beam, a cornice panel and a roof panel, wherein the left end of the transverse wall and the front end of the longitudinal wall are fixedly built, the roof panel is fixedly erected at the upper end of the transverse wall, the left end of the roof panel is fixedly abutted against the upper end of the right side wall of the longitudinal wall, the upper end of the transverse wall is fixedly built with a supporting wall, the front side edge of the roof panel is clamped between the transverse wall and the supporting wall, the roof panel is erected at the upper end of the longitudinal wall, the roof panel is arranged above the roof panel, the upper end of the supporting wall is abutted against the lower surface of the roof panel, the cornice cantilever beam is fixedly arranged on the front side wall of the upper end of the transverse wall, the cornice panel is fixedly erected on the upper surface of the cornice cantilever beam, the rear side edge of the cornice panel is abutted against the front side wall of the supporting wall, the lower side wall of the front end of the roof panel is abutted against the front side edge of the cornice panel, the waterproof panel and the guide plate, one of, the riser of a waterproof board is fixed to be set up on the rear side wall of knee wall, the diaphragm front end of a waterproof board supports and establishes the upper end at the knee wall, the diaphragm rear end tilt up of a waterproof board sets up, the upper end of vertical wall is erect and is fixed with the guide plate, the fixed guiding gutter that is provided with in right side limit of guide plate, the front end of guiding gutter passes behind the knee wall, the setting is in the front side of knee wall, the fixed scattered water that is provided with of last lateral wall of eaves board, the preceding side downward sloping of scattered water sets up, the back side of scattered water supports and establishes on the front side of knee wall, the wash port is worn to establish to be fixed with by the left end of eaves board.
Further, the guiding gutter in inlay to establish and be fixed with the sleeve pipe, and the sleeve pipe is buried underground in the support wall, establish ties on the sleeve pipe and be provided with the check valve, the check valve is by lining up the setting forward backward, when ponding on the guide plate discharges through the guiding gutter, ponding discharges to eaves mouth one side through the sleeve pipe.
Further, the drain hole in insert and establish and be fixed with the drain pipe, all fixedly on the standpipe of drain pipe the two inside walls on, a side downward sloping setting that the stiff end was kept away from to the baffle, and the left side limit of the baffle on right side is provided with the below at left baffle, ponding on the eaves mouth board passes through the drain pipe and discharges, the baffle blocks the ponding of flowing backward that is blown into by wind.
Further, the lower side wall front end of roof boarding fixedly be provided with No. two waterproof boards, the activity of the back side of No. two waterproof boards is supported and is established the front end at eaves mouth outrigger, No. two waterproof boards keep off between the crack of eaves mouth board and roof boarding, block outside rainwater and get into inside the eaves mouth structure.
Furthermore, the rear side edge lower extreme of No. two waterproof boards fixedly be provided with the drainage groove, both ends opening setting about the drainage groove.
The working principle of the invention is as follows: the building structure is built according to the construction flow and is completed, in the working process of each functional part, the roof boarding is shielded, and the cooperation eaves mouth structure sluices the function, when the roof boarding takes place the seepage phenomenon, the percolating water flows down along the lower surface of roof boarding, when percolating water flows to a waterproof board department, a waterproof board drains percolating water drainage to the front side of knee wall, and drip and sluices on the eaves mouth board, when there is the leakage between roof boarding and the vertical wall, the percolating water falls back on the guide plate, flow to the guiding gutter and assemble, and discharge to the eaves mouth board through the guiding gutter and sluices, ponding on the eaves mouth board discharges to the front end through the scattered water.
After adopting the structure, the invention has the beneficial effects that:
1. the first waterproof board is erected at the upper end of the supporting wall, an included angle is formed between the transverse plate of the first waterproof board and the roof board, and the first waterproof board can be gathered on the first waterproof board after seepage water on the roof board flows down, is guided to the outer side of the supporting wall through the first waterproof board, drips on the cornice board and is finally discharged;
2. the eave plate is provided with the water dispersion plate, accumulated water can be discharged to one side far away from the transverse wall, and the accumulated water is prevented from accumulating on the side of the transverse wall to cause leakage;
3. the front end of the roof panel is provided with a second waterproof plate which can be blocked between the gap between the cornice plate and the roof panel, and can prevent rainwater from blowing in windy weather.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural view of the present invention.
Fig. 2 is a right side view of fig. 1.
Fig. 3 is a sectional view a-a in fig. 2.
Fig. 4 is a sectional view B-B in fig. 2.
Fig. 5 is an enlarged view of a portion C in fig. 3.
Description of reference numerals:
the water-proof roof comprises a transverse wall 1, a longitudinal wall 2, an roof panel 3, a cornice outrigger 4, a cornice panel 5, a roof panel 6, a first waterproof panel 7, a guide plate 8, a guide groove 9, water dispersing 10, a drain hole 11, a sleeve 12, a one-way valve 13, a drain pipe 14, a baffle 15, a second waterproof panel 16, a drainage groove 17 and a support wall 18.
Detailed Description
The invention will be further described with reference to the accompanying drawings.
Referring to fig. 1-5, the present embodiment comprises a cross wall 1, a longitudinal wall 2, an roof panel 3, a cornice outrigger 4, a cornice panel 5, and a ceiling panel 6, wherein the left end of the cross wall 1 is fixedly laid on the front end of the longitudinal wall 2, the ceiling panel 6 is fixedly laid on the upper end of the cross wall 1, the left end of the ceiling panel 6 is fixedly laid on the upper end of the right side wall of the longitudinal wall 2, the upper end of the cross wall 1 is fixedly laid on a support wall 18, the front side edge of the ceiling panel 6 is clamped between the cross wall 1 and the support wall 18, the roof panel 3 is arranged on the upper end of the longitudinal wall 2, the cornice panel 3 is arranged above the ceiling panel 6, the upper end of the support wall 18 is arranged on the lower surface of the roof panel 3, the cornice outrigger 4 is inserted and cast on the front side wall of the upper end of the cross wall 1, the cornice panel 5 is fixedly laid on the upper surface of the support wall 4, the rear side edge of the cornice panel 5 is arranged on the front side wall 18, the lower side wall of the front end of the roof panel 3 is abutted against the front side edge of the cornice plate 5;
the water-proof roof comprises a first water-proof plate 7 and a flow guide plate 8, wherein the first water-proof plate 7 is erected at the upper end of a support wall 18, a vertical plate bolt of the first water-proof plate 7 is fixed on the rear side wall of the support wall 18, the front end of a transverse plate of the first water-proof plate 7 is abutted against the upper end of the support wall 18, the rear end of the transverse plate of the first water-proof plate 7 is arranged in an upward inclined manner, a gap is formed between the first water-proof plate 7 and a roof panel 3, the upper end of a longitudinal wall 2 is erected and fixed with the flow guide plate 8, a flow guide groove 9 is integrally formed on the right side edge of the flow guide plate 8, the front end of the flow guide groove 9 passes through the support wall 18 and is arranged at the front side of the support wall 18, a sleeve 12 is fixedly welded in the flow guide groove 9, the sleeve 12 is embedded in the support wall 18, a one-way valve 13 is arranged on the sleeve 12 in series, the one-way valve 13 is arranged in a penetrating manner, accumulated water flows out through the sleeve 12, and the one-way valve 13 prevents the accumulated water from flowing backwards;
the upper side wall of the cornice plate 5 is poured with scattered water 10, the front side edge of the scattered water 10 is arranged in a downward inclined mode, the rear side edge of the scattered water 10 abuts against the front side edge of the supporting wall 18, a water drainage hole 11 is fixedly arranged at the left end of the cornice plate 5 in a penetrating mode, a water drainage pipe 14 is fixedly inserted into the water drainage hole 11, baffle plates 15 are fixedly screwed on the left inner side wall and the right inner side wall of a vertical pipe of the water drainage pipe 14, one side edge, away from the fixed end, of each baffle plate 15 is arranged in a downward inclined mode, the left side edge of the right baffle plate 15 is arranged below the left baffle plate 15, accumulated water on the cornice plate 5 falls out through the water drainage pipe;
roof boarding 3's lower lateral wall front end bolt fastening has waterproof board 16 No. two, the activity of the back side of waterproof board 16 No. two is supported and is established the front end at eaves mouth outrigger 4, the back side lower extreme integrated into one piece of waterproof board 16 No. two has drainage groove 17, both ends opening setting about drainage groove 17, waterproof board 16 No. two blocks the crack between eaves mouth board 5 and roof boarding 3, prevent that the rainwater from pouring into, and the ponding that falls down from its front side on eaves mouth board 5 drips on the rear surface of waterproof board 16 No. two, and assemble in drainage groove 17, discharge from the both ends of drainage groove 17.
The working principle of the specific embodiment is as follows: the house structure is built according to the construction process and is completed, in the working process of each functional part, roof boarding 3 is sheltered from, and cooperate the eaves mouth structure to carry out the function of sluicing, when roof boarding 3 takes place the seepage phenomenon, the percolating water flows down along the lower surface of roof boarding 3, when percolating water flows to a waterproof board 7 department, a waterproof board 7 drains percolating water to the front side of knee wall 18, and drip to drain on eaves mouth board 5, when having the leakage between roof boarding 3 and vertical wall 2, percolating water falls on guide plate 8 after, flow to and assemble in guiding gutter 9, and discharge to the eaves mouth board 5 through guiding gutter 9 and go out sluicing, ponding on eaves mouth board 5 discharges to the front end through water 10 that looses.
After adopting above-mentioned structure, this embodiment beneficial effect does:
1. the first waterproof plate 7 is erected at the upper end of the supporting wall 18, an included angle is formed between a transverse plate of the first waterproof plate 7 and the roof panel 3, and the water can be gathered on the first waterproof plate 7 after flowing down from the roof panel 3, guided to the outer side of the supporting wall 18 through the first waterproof plate 7, dripped on the cornice plate 5 and finally discharged;
2. the cornice plate 5 is provided with the water dispersing 10 which can discharge accumulated water to one side far away from the transverse wall 1, so that the accumulated water is prevented from accumulating on the side of the transverse wall 1 to cause leakage;
3. the front end of roof boarding 3 is provided with No. two waterproof boards 16, can keep off between the crack of eaves mouth board 5 and roof boarding 3, can prevent to cause the rainwater to blow in the strong wind weather.
The above description is only for the purpose of illustrating the technical solutions of the present invention and not for the purpose of limiting the same, and other modifications or equivalent substitutions made by those skilled in the art to the technical solutions of the present invention should be covered within the scope of the claims of the present invention without departing from the spirit and scope of the technical solutions of the present invention.

Claims (6)

1. A building design roof cornice waterproof structure comprises a transverse wall (1), a longitudinal wall (2), an roof panel (3), cornice outriggers (4), a cornice plate (5) and a roof panel (6), wherein the left end of the transverse wall (1) is fixedly built with the front end of the longitudinal wall (2), the roof panel (6) is fixedly built at the upper end of the transverse wall (1), the left end of the roof panel (6) is fixedly built at the upper end of the right side wall of the longitudinal wall (2), the upper end of the transverse wall (1) is fixedly built with a support wall (18), the front side edge of the roof panel (6) is clamped between the transverse wall (1) and the support wall (18), the roof panel (3) is fixedly built at the upper end of the longitudinal wall (2), the roof panel (3) is arranged above the roof panel (6), the upper end of the support wall (18) is fixedly arranged on the lower surface of the roof panel (3), the cornice outriggers (4) are fixedly arranged on the front side wall at the upper end of the transverse wall (1), set up on the upper surface of eaves mouth outrigger (4) and be fixed with eaves mouth board (5), the back side of eaves mouth board (5) supports to establish on the preceding lateral wall of knee wall (18), and lateral wall supports under the front end of roof boarding (3) establishes on the preceding side of eaves mouth board (5), its characterized in that: the novel water-proof wall structure further comprises a first waterproof plate (7) and a guide plate (8), wherein the first waterproof plate (7) is erected at the upper end of the support wall (18), a vertical plate of the first waterproof plate (7) is fixedly arranged on the rear side wall of the support wall (18), the front end of a transverse plate of the first waterproof plate (7) abuts against the upper end of the support wall (18), the rear end of the transverse plate of the first waterproof plate (7) is arranged in an upward inclined manner, the guide plate (8) is erected and fixed at the upper end of the longitudinal wall (2), a guide groove (9) is fixedly arranged on the right side edge of the guide plate (8), and the front end of the guide groove (9) penetrates through the support wall (18), the water distribution device is arranged on the front side of a supporting wall (18), the upper side wall of a cornice plate (5) is fixedly provided with water dispersion (10), the front side edge of the water dispersion (10) is arranged in a downward inclined mode, the rear side edge of the water dispersion (10) abuts against the front side edge of the supporting wall (18), and a water drainage hole (11) is fixedly formed in the left end of the cornice plate (5) in a penetrating mode.
2. The architecturally-designed roof cornice waterproofing structure according to claim 1, wherein: the guide groove (9) embedded establish and be fixed with sleeve pipe (12), and sleeve pipe (12) bury underground in knee wall (18), establish ties on sleeve pipe (12) and be provided with check valve (13), check valve (13) link up the setting by back forward, when ponding on guide plate (8) discharges through guide groove (9), ponding discharges to eaves mouth one side through sleeve pipe (12).
3. The architecturally-designed roof cornice waterproofing structure according to claim 1, wherein: wash port (11) interpolation establish and be fixed with drain pipe (14), all fixedly on the standpipe of drain pipe (14) the left and right sides inside wall be provided with baffle (15), baffle (15) keep away from a side downward sloping setting of stiff end, and the left side limit of baffle (15) on right side is provided with the below at left baffle (15), ponding on cornice board (5) is discharged through drain pipe (14), baffle (15) block by the ponding that flows backward that the wind blows in.
4. The architecturally-designed roof cornice waterproofing structure according to claim 1, wherein: roof boarding (3) the lower side wall front end fixed be provided with waterproof board No. two (16), the activity of the back side of waterproof board No. two (16) is supported and is established the front end at eaves mouth outrigger (4), waterproof board No. two (16) keep off between the crack of eaves mouth board (5) and roof boarding (3), block outside rainwater and get into inside the eaves mouth structure.
5. The architecturally-designed roof cornice waterproofing structure according to claim 1, wherein: the lower end of the rear side edge of the second waterproof plate (16) is fixedly provided with a drainage groove (17), and the left end and the right end of the drainage groove (17) are provided with openings.
6. The architecturally-designed roof cornice waterproofing structure according to claim 1, wherein: the working principle is as follows: the house structure is built according to the construction process, in the working process of each functional part, the roof panel (3) is shielded, and the eave structure is matched for draining water, when the roof panel (3) generates leakage, the leakage water flows down along the lower surface of the roof panel (3), when the leakage water flows to the position of the waterproof panel (7), the waterproof panel (7) drains the leakage water to the front side of the supporting wall (18), and the leakage water drips on the eave panel (5) for draining, when the leakage water exists between the roof panel (3) and the longitudinal wall (2), the leakage water flows to the guide groove (9) for converging after falling on the guide plate (8), and is discharged to the eave panel (5) through the guide groove (9) for draining, and the accumulated water on the eave panel (5) is discharged to the front end through the scattered water (10).
CN202010702211.5A 2020-07-21 2020-07-21 Architectural design roof eaves mouth waterproof construction Active CN111827592B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010702211.5A CN111827592B (en) 2020-07-21 2020-07-21 Architectural design roof eaves mouth waterproof construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010702211.5A CN111827592B (en) 2020-07-21 2020-07-21 Architectural design roof eaves mouth waterproof construction

Publications (2)

Publication Number Publication Date
CN111827592A true CN111827592A (en) 2020-10-27
CN111827592B CN111827592B (en) 2021-08-17

Family

ID=72923992

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010702211.5A Active CN111827592B (en) 2020-07-21 2020-07-21 Architectural design roof eaves mouth waterproof construction

Country Status (1)

Country Link
CN (1) CN111827592B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112682074A (en) * 2021-01-19 2021-04-20 中铁九局集团有限公司 Tunnel waterproof structure and construction method thereof

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1150622A (en) * 1997-08-05 1999-02-23 Sekisui Chem Co Ltd Roof structure with solar cell module and roof panel used for the same
JP2002206319A (en) * 2001-01-09 2002-07-26 Toyo Chem Co Ltd Eaves gutter hanging device
CN202280213U (en) * 2011-10-11 2012-06-20 浙江精工钢结构有限公司 Eave gutter with steel structure
CN204152041U (en) * 2014-09-30 2015-02-11 中建五局装饰幕墙有限公司 A kind of cornice stone material and aluminium alloy decorative structure
CN205077743U (en) * 2015-09-21 2016-03-09 北京北方空间建筑科技股份有限公司 Interior gutter node construction system
CN208088692U (en) * 2018-04-04 2018-11-13 苏州规划设计研究院股份有限公司 A kind of steel-structure roof drainage system
CN208379930U (en) * 2018-05-25 2019-01-15 齐鲁师范学院 Building roof cornice water-tight device
CN110469026A (en) * 2019-07-29 2019-11-19 中国一冶集团有限公司 A kind of architectural engineering waterproof construction and installation method
CN209686732U (en) * 2019-03-04 2019-11-26 陈耿 A kind of architectural design roof cornice waterproof structure
CN110965705A (en) * 2019-12-26 2020-04-07 贵州民族大学 Ponding structure is prevented to roof eaves mouth

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1150622A (en) * 1997-08-05 1999-02-23 Sekisui Chem Co Ltd Roof structure with solar cell module and roof panel used for the same
JP2002206319A (en) * 2001-01-09 2002-07-26 Toyo Chem Co Ltd Eaves gutter hanging device
CN202280213U (en) * 2011-10-11 2012-06-20 浙江精工钢结构有限公司 Eave gutter with steel structure
CN204152041U (en) * 2014-09-30 2015-02-11 中建五局装饰幕墙有限公司 A kind of cornice stone material and aluminium alloy decorative structure
CN205077743U (en) * 2015-09-21 2016-03-09 北京北方空间建筑科技股份有限公司 Interior gutter node construction system
CN208088692U (en) * 2018-04-04 2018-11-13 苏州规划设计研究院股份有限公司 A kind of steel-structure roof drainage system
CN208379930U (en) * 2018-05-25 2019-01-15 齐鲁师范学院 Building roof cornice water-tight device
CN209686732U (en) * 2019-03-04 2019-11-26 陈耿 A kind of architectural design roof cornice waterproof structure
CN110469026A (en) * 2019-07-29 2019-11-19 中国一冶集团有限公司 A kind of architectural engineering waterproof construction and installation method
CN110965705A (en) * 2019-12-26 2020-04-07 贵州民族大学 Ponding structure is prevented to roof eaves mouth

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112682074A (en) * 2021-01-19 2021-04-20 中铁九局集团有限公司 Tunnel waterproof structure and construction method thereof
CN112682074B (en) * 2021-01-19 2023-01-20 中铁九局集团有限公司 Tunnel waterproof structure and construction method thereof

Also Published As

Publication number Publication date
CN111827592B (en) 2021-08-17

Similar Documents

Publication Publication Date Title
CN204850272U (en) Building roof eaves mouth drainage structures
CN205857551U (en) A kind of Jing Qiang anti-stone material common fault structure of orientation water drainage of bearing down on one
CN111827592B (en) Architectural design roof eaves mouth waterproof construction
CN213015043U (en) Waterproof eaves structure for building
CN209855080U (en) Ancient building roofing eaves mouth water repellent construction structures
CN208502103U (en) A kind of sizing awning
CN208545900U (en) A kind of waterproof construction of roofing and concrete roof junction
CN212271421U (en) Building roof waterproof structure
CN211396332U (en) Architectural design roof eaves mouth watertight fittings
CN211038291U (en) Building structure for preventing water seepage of window
CN211200627U (en) Underground water supply and drainage concrete structure of house building
CN210395088U (en) Bridge drainage system hidden in guardrail
CN211080795U (en) Waterproof and breathable tile for building roof
CN208792519U (en) External wall stop water
CN208136951U (en) A kind of retaining wall for hydraulic engineering
CN217711424U (en) Anti-leakage pitched roof eaves gutter node structure
CN214614665U (en) Building side wall and newly-built roof waterproof construction
CN205776999U (en) A kind of steel building lighting roof
CN206219981U (en) A kind of Selection of Urban Pedestrian Overpass water guide discharge structure
CN212001975U (en) Roof system with waterproof and snow-blocking functions
CN220521776U (en) Waterproof structure of heavy-gradient inclined roof
CN208996327U (en) A kind of projecting roof cornice of rain-proof
CN220336263U (en) Roof parapet flashing structure
CN211229228U (en) Cornice structure
CN220644915U (en) Photovoltaic building water drainage tank structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20210803

Address after: 350000 floors 10-12, Lizhou group headquarters building, No. 116, Changle North Road, Yuefeng town, Jin'an District, Fuzhou City, Fujian Province

Applicant after: Garber United Design Co., Ltd

Address before: No.01-66, Xingmin village, Xixing street, Binjiang District, Hangzhou City, Zhejiang Province, 310052

Applicant before: Gao Feifei

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant