CN111809510A - Bearing-socket type prefabricated bridge pier connecting structure and construction method thereof - Google Patents

Bearing-socket type prefabricated bridge pier connecting structure and construction method thereof Download PDF

Info

Publication number
CN111809510A
CN111809510A CN202010812497.2A CN202010812497A CN111809510A CN 111809510 A CN111809510 A CN 111809510A CN 202010812497 A CN202010812497 A CN 202010812497A CN 111809510 A CN111809510 A CN 111809510A
Authority
CN
China
Prior art keywords
bearing platform
bearing
embedded
steel bars
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010812497.2A
Other languages
Chinese (zh)
Inventor
葛继平
赖路奇
王志刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Institute of Technology
Original Assignee
Shanghai Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Institute of Technology filed Critical Shanghai Institute of Technology
Priority to CN202010812497.2A priority Critical patent/CN111809510A/en
Publication of CN111809510A publication Critical patent/CN111809510A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a bearing-socket type prefabricated pier connecting structure, which comprises a prefabricated pier body and a bearing platform, wherein a bearing platform groove is formed in the bearing platform, a plurality of reserved bearing platform reinforcing steel bars arranged in the vertical direction are pre-embedded in the bearing platform, the prefabricated pier body sequentially comprises an exposed end, a bearing and an embedded end from top to bottom, the bearing is circumferentially provided with a plurality of reinforcing steel bar slots matched with the reserved bearing platform reinforcing steel bars, free ends of the reserved bearing platform reinforcing steel bars are respectively inserted into the reinforcing steel bar slots, the outer wall of the embedded end is provided with a plurality of annular raised upright column shear keys, the embedded end is embedded into the bearing platform groove, the lower surface of the bearing is placed on the upper surface of the bearing platform, grouting materials are respectively poured in the reinforcing steel bar slots and the bearing platform groove, the pouring amount of the grouting materials can be calculated by adopting the volume, the gap between the bearing platform and the prefabricated pier body is larger, the phenomenon of incomplete phenomenon is avoided, and, the construction fault tolerance rate is high, and the defects that potential safety hazards exist and the grouting fullness degree is not easy to check in the prior art can be overcome.

Description

Bearing-socket type prefabricated bridge pier connecting structure and construction method thereof
Technical Field
The invention relates to the technical field of bridge construction, in particular to a bearing-socket type prefabricated bridge pier connecting structure and a construction method thereof.
Background
The traditional construction of bridge substructure in China mainly comprises manual binding and on-site pouring, while prefabricated assembly type construction is a great change of construction mode and is an important measure for promoting supply side structural reform and novel traffic infrastructure construction. The method is favorable for saving labor force, reducing construction pollution and improving engineering quality and construction efficiency, thereby developing green construction.
In the prior art, for the assembly of an upright post and a bearing platform of a bridge structure prefabricated bridge pier, a grouting sleeve and a metal corrugated pipe are embedded in the upright post or the bearing platform, and a prestressed steel strand is adopted; because the splicing modes of the three commonly used embedded parts all need to embed a large number of embedded parts such as sleeves, corrugated pipes or prestressed pipelines in the upright posts or the bearing platforms; and the traditional socket joint type connection has the defects that the grouting fullness is difficult to check, and when the steel bar anchoring is insufficient, the larger potential safety hazard exists.
In addition, there are conventional socket joints where the upper and lower structures are joined by pouring fine concrete into the cup gap, which weakens the integrity of the platform. In order to ensure the reliability of the components, the socket depth is greatly increased, and the height of the bearing platform is generally increased, so that the construction cost is greatly increased.
Disclosure of Invention
The invention aims to provide a bearing-socket type prefabricated pier connecting structure and a construction method thereof. The assembly construction is simple, the construction fault tolerance rate is high, and the defects of potential safety hazards, difficulty in checking the filling degree of grouting and the like in the prior art can be overcome.
In order to solve the problems, the technical scheme of the invention is as follows:
a bearing-socket type prefabricated pier connecting structure comprises a prefabricated pier body and a bearing platform arranged below the prefabricated pier body;
the bearing platform is provided with a bearing platform groove with an upward opening, a plurality of bearing platform reserved steel bars arranged in the vertical direction are pre-embedded in the bearing platform, the plurality of bearing platform reserved steel bars are distributed on the outer side of the bearing platform groove along the circumference, and the bearing platform reserved steel bars extend out of the upper surface of the bearing platform to form free ends with certain lengths;
prefabricated pier shaft is from last to including exposing end, bearing and embedded end down in proper order, the bearing along the circumferencial direction seted up with a plurality of reinforcing bar slots of cushion cap reservation reinforcing bar assorted, it is a plurality of the free end of cushion cap reservation reinforcing bar inserts a plurality of respectively in the reinforcing bar slot, the outer wall of embedded end sets up the bellied stand shear force key of a plurality of annular, the cross sectional shape, the size of embedded end with the cross sectional shape, the size of cushion cap recess are matched with so the embedded end can imbed in the cushion cap recess, the lower surface of bearing is shelved in on the upper surface of cushion cap, in the reinforcing bar slot and all pour the grout material in the cushion cap recess.
Preferably, the upper surface of the bearing platform is provided with a water stop ring with a coaxial bearing platform groove on the outer side of the bearing.
Preferably, a hollow first metal corrugated pipe arranged in the vertical direction is pre-buried in the bearing platform, and the first metal corrugated pipe is used as the inner wall of the bearing platform groove.
Preferably, a plurality of second metal corrugated pipes matched with the reserved steel bars of the bearing platform are pre-embedded in the bearing along the circumferential direction, and the second metal corrugated pipes are used as the inner walls of the steel bar slots.
Preferably, the reserved steel bars of the bearing platform are vertical steel bars with 90-degree hooks at the bottoms.
Preferably, the ratio of the embedding depth of the embedding end to the diameter of the embedding end is greater than or equal to 0.7.
Preferably, a plurality of gaskets are arranged between the lower surface of the bearing and the upper surface of the bearing platform, and the gaskets are used for adjusting the bearing platform to be vertically connected with the embedded end.
Based on the same inventive concept, the invention also provides a construction method of the bearing-socket type prefabricated pier connection structure, which comprises the following steps:
fixing a bearing platform on a bridge pile foundation, wherein a bearing platform groove with an upward opening is formed in the bearing platform, a plurality of bearing platform reserved steel bars arranged along the vertical direction are pre-embedded in the bearing platform, the plurality of bearing platform reserved steel bars are distributed on the outer side of the bearing platform groove along the circumference, and the bearing platform reserved steel bars extend out of a free end with a certain length from the upper surface of the bearing platform;
pouring a proper amount of grouting material in the bearing platform groove;
the prefabricated pier body is hung on the bearing platform and sequentially comprises an exposed end, a bearing and an embedded end from top to bottom, the bearing is provided with a plurality of steel bar slots matched with reserved steel bars of the bearing platform along the circumferential direction, free ends of the reserved steel bars of the bearing platform are respectively inserted into the steel bar slots, the outer wall of the embedded end is provided with a plurality of annular raised upright column shear keys, the embedded end is embedded into the groove of the bearing platform and extrudes grouting material, and the gap between the groove of the bearing platform and the embedded end is filled with the grouting material;
and after the grouting material in the bearing platform groove is initially set, pouring the grouting material in the steel bar slot, and anchoring the reserved steel bar of the bearing platform.
Due to the adoption of the technical scheme, compared with the prior art, the invention has the following advantages and positive effects:
1) the invention provides a bearing-socket type prefabricated pier connecting structure, which comprises a prefabricated pier body and a bearing platform arranged below the prefabricated pier body, wherein a bearing platform groove with an upward opening is formed in the bearing platform, a plurality of reserved bearing platform reinforcing steel bars arranged along the vertical direction are pre-embedded in the bearing platform, the prefabricated pier body sequentially comprises an exposed end, a bearing and an embedded end from top to bottom, the bearing is provided with a plurality of reinforcing steel bar slots matched with the reserved bearing platform reinforcing steel bars along the circumferential direction, the free ends of the reserved bearing platform reinforcing steel bars are respectively inserted into the reinforcing steel bar slots, the outer wall of the embedded end is provided with a plurality of annular raised upright column shear keys, the embedded end is embedded into the bearing platform groove, the lower surface of the bearing is placed on the upper surface of the bearing platform, grouting materials are respectively poured in the reinforcing steel bar slots and the bearing platform groove, the pouring amount of the grouting materials can be calculated by adopting the volume, and the gap between the bearing platform, the method has the advantages of no incomplete phenomenon, simple assembly construction, high construction fault tolerance rate and capability of overcoming the defects of potential safety hazard and difficulty in checking the grouting fullness degree in the prior art.
2) According to the bearing-socket type prefabricated bridge pier connecting structure provided by the invention, the connection stress of the lower part structure is reliable, and the durability of the system can be improved; the stress performance of the structure in the vertical direction and the horizontal direction can be the same as that of a cast-in-place pier; the performance of the connecting part is enhanced, and the damage does not occur at the connecting part; the installation of no template on site saves the material expenditure; the prefabricated parts are firm and regular, and are convenient to hoist, mount and construct; the structure positioning is accurate enough, and the construction tolerance is large; the field construction time is short, the labor cost is reduced, and the construction period can be shortened.
Drawings
Fig. 1 is a schematic view of a bearing-socket type prefabricated pier connection structure provided by an embodiment of the invention;
FIG. 2 is a cross-sectional view taken along A-A of FIG. 1;
FIG. 3 is a schematic structural view of the platform of FIG. 1;
FIG. 4 is a schematic view illustrating pouring of grouting material in a groove of a bearing platform according to an embodiment of the present invention;
FIG. 5 is a schematic view of the installation and leveling of the prefabricated pier body in the embodiment of the invention;
FIG. 6 is a schematic view illustrating socket installation of a precast pier and a cap in accordance with an embodiment of the present invention;
fig. 7 is a schematic view illustrating pouring of grouting material into the steel bar inserting grooves according to the embodiment of the invention.
Description of reference numerals:
1: prefabricating a pier body; 11: an exposed end; 12: supporting; 121: inserting a steel bar into the slot; 1211: a second metal bellows; 13: an embedded end; 131: column shear keys; 2: a bearing platform; 21: a bearing platform groove; 211: a first metal bellows; 22: reserving reinforcing steel bars on the bearing platform; 23: a water stop ring; 3: a gasket; 4: bridge pile foundation.
Detailed Description
The present invention provides a bearing-socket type prefabricated pier connection structure and a construction method thereof, which will be described in detail with reference to the accompanying drawings and specific embodiments. Advantages and features of the present invention will become apparent from the following description and from the claims.
Example one
Referring to fig. 1 to 3, the invention provides a bearing-socket type prefabricated pier connection structure, which comprises a prefabricated pier body 1 and a bearing platform 2 arranged below the prefabricated pier body 1;
a bearing platform groove 21 with an upward opening is formed in the middle of the bearing platform 2 along the vertical direction, as shown in fig. 1, a plurality of bearing platform reserved steel bars 22 arranged along the vertical direction are pre-embedded in the bearing platform 2, as shown in fig. 2, in the present embodiment, twelve bearing platform reserved steel bars 22 are totally arranged, the twelve bearing platform reserved steel bars 22 are circumferentially distributed on the outer side of the bearing platform groove 21, and the bearing platform reserved steel bars 22 extend out of a free end with a certain length from the upper surface of the bearing platform 2;
in this embodiment, referring to fig. 1, a hollow first metal corrugated pipe 211 arranged along a vertical direction is embedded in the bearing platform 1, the first metal corrugated pipe 211 is used as an inner wall of the bearing platform groove 21, a water stop ring 23 coaxial with the bearing platform groove 21 is arranged on the outer side of the support 12 on the upper surface of the bearing platform 2, and the water stop ring 23 is used for stopping leakage of the grouting material injected later.
The prefabricated pier body 1 sequentially comprises an exposed end 11, a bearing 12 and an embedded end 13 from top to bottom, the bearing 12 is provided with a plurality of steel bar slots 121 matched with the reserved steel bars 22 of the bearing platform along the circumferential direction, the free ends of the reserved steel bars 22 of the bearing platform are respectively inserted into the plurality of steel bar slots 121, in the embodiment, a plurality of second metal corrugated pipes 1211 matched with the reserved steel bars 22 of the bearing platform are embedded in the bearing 12 along the circumferential direction, and the second metal corrugated pipes 1211 are used as the inner walls of the steel bar slots 121;
the embedded end 13 is used for being embedded into the bearing platform groove 21, the outer wall of the embedded end 13 is provided with a plurality of annular raised column shear keys 131, the first metal corrugated pipe 211 and the column shear keys 131 can provide anchoring strength between the prefabricated pier body 1 and the bearing platform 2, and if the first metal corrugated pipe 211 and the column shear keys 131 are not adopted, the insertion depth between the embedded end 13 and the bearing platform 2 and the thickness of a bottom plate of the bearing platform 2 need to be correspondingly increased; the section shape and size of the embedded end 13 are matched with those of the bearing platform groove 21 so that the embedded end 13 can be embedded into the bearing platform groove 21, when the prefabricated pier body 1 is assembled with the bearing platform 2, the lower surface of the bearing 12 is placed on the upper surface of the bearing platform 2, and high-strength grouting materials are poured in the steel bar slots 121 and the bearing platform groove 21 and are used for connecting the prefabricated pier body 1 and the bearing platform 2 into a whole;
the cross-sectional size and the reinforcing bars of the embedded end 14 are required to satisfy various technical requirements for keeping the bridge structure firm under normal use and bridge earthquake action, in the embodiment, the ratio of the embedded depth of the embedded end to the diameter of the embedded end is more than or equal to 0.7,
as a preferred example, a plurality of gaskets 3 are arranged between the lower surface of the support 13 and the upper surface of the bearing platform 2, and the gaskets 3 are used for adjusting the vertical connection between the bearing platform 2 and the embedded end 13.
The invention provides a bearing-socket type prefabricated bridge pier connecting structure, a bearing platform 2 is provided with a bearing platform groove 21 with an upward opening, a plurality of bearing platform reserved steel bars 22 arranged along the vertical direction are pre-embedded in the bearing platform 2, a prefabricated pier body 1 sequentially comprises an exposed end 11, a bearing 12 and an embedded end 13 from top to bottom, the bearing 12 is provided with a plurality of steel bar slots 121 matched with the bearing platform reserved steel bars 22 along the circumferential direction, the free ends of the plurality of bearing platform reserved steel bars 22 are respectively inserted into the steel bar slots 121, the outer wall of the embedded end 13 is provided with a plurality of annular raised upright column shear keys 131, the embedded end 13 is embedded into the bearing platform groove 21, the lower surface of the bearing 12 is placed on the upper surface of the bearing platform 2, grouting materials are respectively poured in the steel bar slots 121 and the bearing platform groove 21, the invention can adopt the volume to calculate the pouring amount of the grouting materials, and the gap between the bearing platform and the prefabricated pier body is larger, the method has the advantages of no incomplete phenomenon, simple assembly construction, high construction fault tolerance rate and capability of overcoming the defects of potential safety hazard and difficulty in checking the grouting fullness degree in the prior art.
Example two
Based on the same inventive concept, referring to fig. 4 to 7, the invention also provides a construction method of the bearing-socket type prefabricated pier connection structure, which comprises the following steps:
fixing a bearing platform 2 on a bridge pile foundation 4, wherein a bearing platform groove 21 with an upward opening is formed in the bearing platform 2, a plurality of bearing platform reserved steel bars 22 arranged in the vertical direction are pre-embedded in the bearing platform 2, the plurality of bearing platform reserved steel bars 22 are distributed on the outer side of the bearing platform groove 21 along the circumference, and free ends of a certain length extend out of the upper surface of the bearing platform 2 through the bearing platform reserved steel bars 22;
referring to fig. 4, a proper amount of high-strength grouting material is poured into the bearing platform groove 21;
referring to fig. 5, a prefabricated pier body 1 is hung on a bearing platform 2, a gasket 3 is arranged on the bearing platform 2 for adjusting the prefabricated pier body 1 to be vertically connected with the bearing platform 2, the prefabricated pier body 1 sequentially comprises an exposed end 11, a bearing 12 and an embedded end 13 from top to bottom, the bearing 12 is provided with a plurality of steel bar slots 121 matched with reserved steel bars 22 of the bearing platform along the circumferential direction, free ends of the reserved steel bars 22 of the bearing platform are respectively inserted into the steel bar slots 121, the outer wall of the embedded end 13 is provided with a plurality of annular raised column shear keys 131, referring to fig. 6, the embedded end 13 is embedded into the bearing platform groove 21 along the vertical direction and extrudes grouting material, the gap between the bearing platform groove 21 and the embedded end 13 is filled with the grouting material until the grouting material is extruded to the top surface of the bearing platform 2 and is blocked by a water stop ring 23, in the embodiment, a pre-buried hollow first metal corrugated pipe 211 arranged along the vertical direction is arranged in the bearing platform 1, the first metal corrugated pipe 211 is used as the inner wall of the bearing platform groove 21, the position of the embedded end 13 is adjusted, the upright column shear key 131 and the first metal corrugated pipe 211 are opposite to each other, a gap between the upright column shear key 131 and the first metal corrugated pipe 211 is filled with high-strength grouting material, the force transmission performance of the oppositely arranged shear keys is better than that of a male-female embedded type, and the anchoring strength between the bearing platform 2 and the prefabricated pier body 1 is higher;
referring to fig. 7, after the grouting material in the groove 21 of the bearing platform is initially set, the grouting material is poured into the steel bar slot 121, in this embodiment, a plurality of second metal corrugated pipes 1211 matched with the reserved steel bars 22 of the bearing platform are pre-embedded in the bearing 12 along the circumferential direction, the second metal corrugated pipes 1211 are used as the inner wall of the steel bar slot 121, a high-strength grouting material is poured into the second metal corrugated pipes 1211 reserved in the bearing 12 to anchor the reserved steel bars 22 of the bearing platform, and the prefabricated pier body 1 and the bearing 2 are connected into a whole after the high-strength grouting material is completely hardened.
The embodiments of the present invention have been described in detail with reference to the accompanying drawings, but the present invention is not limited to the above embodiments. Even if various changes are made to the present invention, it is still within the scope of the present invention if they fall within the scope of the claims of the present invention and their equivalents.

Claims (8)

1. A bearing-socket type prefabricated bridge pier connecting structure is characterized by comprising a prefabricated pier body and a bearing platform arranged below the prefabricated pier body;
the bearing platform is provided with a bearing platform groove with an upward opening, a plurality of bearing platform reserved steel bars arranged in the vertical direction are pre-embedded in the bearing platform, the plurality of bearing platform reserved steel bars are distributed on the outer side of the bearing platform groove along the circumference, and the bearing platform reserved steel bars extend out of the upper surface of the bearing platform to form free ends with certain lengths;
prefabricated pier shaft is from last to including exposing end, bearing and embedded end down in proper order, the bearing along the circumferencial direction seted up with a plurality of reinforcing bar slots of cushion cap reservation reinforcing bar assorted, it is a plurality of the free end of cushion cap reservation reinforcing bar inserts a plurality of respectively in the reinforcing bar slot, the outer wall of embedded end sets up the bellied stand shear force key of a plurality of annular, the cross sectional shape, the size of embedded end with the cross sectional shape, the size of cushion cap recess are matched with so the embedded end can imbed in the cushion cap recess, the lower surface of bearing is shelved in on the upper surface of cushion cap, in the reinforcing bar slot and all pour the grout material in the cushion cap recess.
2. The bearing-socket type prefabricated bridge pier connection structure of claim 1, wherein a water stop ring coaxial with the bearing platform groove is arranged on the upper surface of the bearing platform on the outer side of the bearing.
3. The bearing-socket type prefabricated bridge pier connection structure of claim 1, wherein a first metal corrugated pipe which is hollow and arranged in a vertical direction is embedded in the bearing platform, and the first metal corrugated pipe is used as an inner wall of a groove of the bearing platform.
4. The bearing-socket type prefabricated bridge pier connecting structure of claim 1, wherein a plurality of second metal corrugated pipes matched with reserved steel bars of the bearing platform are pre-embedded in the bearing along the circumferential direction, and the second metal corrugated pipes are used as inner walls of the steel bar inserting grooves.
5. The bearing-socket type prefabricated bridge pier connection structure of claim 1, wherein the reserved steel bars of the bearing platform are vertical steel bars with 90-degree hooks at the bottom.
6. The bearing-socket prefabricated pier connection structure of claim 1, wherein the ratio of the embedding depth of the embedded end to the diameter of the embedded end is 0.7 or more.
7. The bearing-socket type prefabricated bridge pier connection structure of claim 1, wherein a plurality of gaskets are arranged between the lower surface of the bearing and the upper surface of the bearing platform, and the gaskets are used for adjusting the vertical connection between the bearing platform and the embedded end.
8. A construction method for a bearing-socket type prefabricated bridge pier connecting structure is characterized by comprising the following steps:
fixing a bearing platform on a bridge pile foundation, wherein a bearing platform groove with an upward opening is formed in the bearing platform, a plurality of bearing platform reserved steel bars arranged along the vertical direction are pre-embedded in the bearing platform, the plurality of bearing platform reserved steel bars are distributed on the outer side of the bearing platform groove along the circumference, and the bearing platform reserved steel bars extend out of a free end with a certain length from the upper surface of the bearing platform;
pouring a proper amount of grouting material in the bearing platform groove;
the prefabricated pier body is hung on the bearing platform and sequentially comprises an exposed end, a bearing and an embedded end from top to bottom, the bearing is provided with a plurality of steel bar slots matched with reserved steel bars of the bearing platform along the circumferential direction, free ends of the reserved steel bars of the bearing platform are respectively inserted into the steel bar slots, the outer wall of the embedded end is provided with a plurality of annular raised upright column shear keys, the embedded end is embedded into the groove of the bearing platform and extrudes grouting material, and the gap between the groove of the bearing platform and the embedded end is filled with the grouting material;
and after the grouting material in the bearing platform groove is initially set, pouring the grouting material in the steel bar slot, and anchoring the reserved steel bar of the bearing platform.
CN202010812497.2A 2020-08-13 2020-08-13 Bearing-socket type prefabricated bridge pier connecting structure and construction method thereof Pending CN111809510A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010812497.2A CN111809510A (en) 2020-08-13 2020-08-13 Bearing-socket type prefabricated bridge pier connecting structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010812497.2A CN111809510A (en) 2020-08-13 2020-08-13 Bearing-socket type prefabricated bridge pier connecting structure and construction method thereof

Publications (1)

Publication Number Publication Date
CN111809510A true CN111809510A (en) 2020-10-23

Family

ID=72860230

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010812497.2A Pending CN111809510A (en) 2020-08-13 2020-08-13 Bearing-socket type prefabricated bridge pier connecting structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN111809510A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112176886A (en) * 2020-11-16 2021-01-05 山东高速建设管理集团有限公司 Double-steel sleeve socket connection structure of prefabricated bridge pier and construction method thereof
CN112502030A (en) * 2020-11-04 2021-03-16 安徽省交通规划设计研究总院股份有限公司 Prefabricated assembled bridge substructure slot-in type and socket joint formula built-up connection structure
CN112627017A (en) * 2021-01-11 2021-04-09 深圳市天健(集团)股份有限公司 Assembled pier with gradually-changed rigidity and replaceable energy consumption bar and construction method thereof
CN112627016A (en) * 2021-01-11 2021-04-09 深圳市天健(集团)股份有限公司 Assembled pier with self-resetting and strong energy consumption and construction method thereof
CN113373798A (en) * 2021-05-14 2021-09-10 同济大学 Prefabricated assembled pier and connecting method thereof
CN113668369A (en) * 2021-09-13 2021-11-19 江南大学 Socket type connection structure of prefabricated segment reinforced concrete pier and manufacturing method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112502030A (en) * 2020-11-04 2021-03-16 安徽省交通规划设计研究总院股份有限公司 Prefabricated assembled bridge substructure slot-in type and socket joint formula built-up connection structure
CN112176886A (en) * 2020-11-16 2021-01-05 山东高速建设管理集团有限公司 Double-steel sleeve socket connection structure of prefabricated bridge pier and construction method thereof
CN112627017A (en) * 2021-01-11 2021-04-09 深圳市天健(集团)股份有限公司 Assembled pier with gradually-changed rigidity and replaceable energy consumption bar and construction method thereof
CN112627016A (en) * 2021-01-11 2021-04-09 深圳市天健(集团)股份有限公司 Assembled pier with self-resetting and strong energy consumption and construction method thereof
CN113373798A (en) * 2021-05-14 2021-09-10 同济大学 Prefabricated assembled pier and connecting method thereof
CN113373798B (en) * 2021-05-14 2022-09-20 同济大学 Prefabricated assembled pier and connecting method thereof
CN113668369A (en) * 2021-09-13 2021-11-19 江南大学 Socket type connection structure of prefabricated segment reinforced concrete pier and manufacturing method

Similar Documents

Publication Publication Date Title
CN111809510A (en) Bearing-socket type prefabricated bridge pier connecting structure and construction method thereof
CN101672007B (en) Constructing method of precast pier footing for bridge
CN110886202A (en) Socket joint type node connection structure and construction method for prefabricated reinforced concrete hollow pier
CN105951880A (en) Assembled underground structure of precast concrete planks and construction method thereof
CN212452270U (en) Bearing-socket type prefabricated bridge pier connecting structure
CN107386127B (en) Bridge pier assembling device
CN111501525A (en) Prefabricated bridge pier column and bearing platform connecting structure with pier base and construction method thereof
CN112681117A (en) Connecting device and construction method for connecting part of bridge pier column and bearing platform
CN112112263A (en) Fabricated concrete beam-column joint using precast concrete tubular pile and construction method
CN115898118A (en) Prefabricated assembled railway platform canopy structure in medium and high intensity area and construction method
CN213741571U (en) Prefabricated column and beam column node for prefabricated concrete building structure reserved steel bar perforation
CN111764303A (en) Connecting structure and construction method of prefabricated pier stand column and bearing platform
CN205742262U (en) Concrete prefabricated board pin-connected panel underground structure
CN217378870U (en) Major diameter prestressed steel pipe concrete friction pile
CN114541242B (en) Anchor ear type concrete connection structure of assembled bridge pier column and pile foundation and construction method
CN212052262U (en) Prefabricated pier body and bridge
CN113481834A (en) Novel prefabricated assembled pier and construction method thereof
CN111456283A (en) Prefabricated assembly type shear wall component and construction method thereof
CN111502123A (en) Inverted grouting type precast concrete column structure and construction method thereof
CN218027734U (en) Embedded type isolation pile embedded into grouting pipe
CN218405520U (en) Pile foundation structure of prefabricated overhaul way for subway
CN215668978U (en) Steep-slope bridge pier body structure
CN212714493U (en) Prefabricated pier of assembling
CN220166654U (en) Segment spliced pier adopting gravity type grouting sleeve socket connection structure
CN219992428U (en) Pressure type uplift pile with non/slow bonding steel strand and cylindrical pressure bearing piece

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination