CN111807140A - Cable reel paying-off speed reducing mechanism for cable laying and installation - Google Patents

Cable reel paying-off speed reducing mechanism for cable laying and installation Download PDF

Info

Publication number
CN111807140A
CN111807140A CN202010745226.XA CN202010745226A CN111807140A CN 111807140 A CN111807140 A CN 111807140A CN 202010745226 A CN202010745226 A CN 202010745226A CN 111807140 A CN111807140 A CN 111807140A
Authority
CN
China
Prior art keywords
cable
metal ball
fixedly connected
rotating shaft
disc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202010745226.XA
Other languages
Chinese (zh)
Inventor
汪媛格
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Kaixie Technology Co ltd
Original Assignee
Guangzhou Kaixie Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Kaixie Technology Co ltd filed Critical Guangzhou Kaixie Technology Co ltd
Priority to CN202010745226.XA priority Critical patent/CN111807140A/en
Publication of CN111807140A publication Critical patent/CN111807140A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H49/00Unwinding or paying-out filamentary material; Supporting, storing or transporting packages from which filamentary material is to be withdrawn or paid-out
    • B65H49/18Methods or apparatus in which packages rotate
    • B65H49/20Package-supporting devices
    • B65H49/30Swifts or skein holders
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H75/00Storing webs, tapes, or filamentary material, e.g. on reels
    • B65H75/02Cores, formers, supports, or holders for coiled, wound, or folded material, e.g. reels, spindles, bobbins, cop tubes, cans, mandrels or chucks
    • B65H75/18Constructional details
    • B65H75/30Arrangements to facilitate driving or braking
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00Handled material; Storage means
    • B65H2701/30Handled filamentary material
    • B65H2701/34Handled filamentary material electric cords or electric power cables

Landscapes

  • Unwinding Of Filamentary Materials (AREA)

Abstract

The invention relates to the technical field of cable installation and discloses a cable reel paying-off speed reducing mechanism for cable laying and installation. This a cable drum unwrapping wire speed reduction mechanism for cable laying installation, when cable drum slew velocity is too fast, the metal ball contacts with metal ball two for a moment for the joint card is in the position of stopper, thereby makes the disc speed reduce, makes the speed of axis of rotation one reduce through axis of rotation two this moment, thereby has reached and has prevented that the cable drum from rotating too fast effect. The disc speed reduces, and metal ball one does not contact with metal ball two this moment, and the joint no longer blocks the stopper, and disc speed resumes, and manifold cycles reduces cable drum speed, has reached the effect that prevents that cable drum deceleration in-process cable from being pulled bad.

Description

Cable reel paying-off speed reducing mechanism for cable laying and installation
Technical Field
The invention relates to the technical field of cable installation, in particular to a cable reel paying-off speed reducing mechanism for cable laying and installation.
Background
In the installation process is laid to the cable, because the cable mass ratio is great, generally need a large amount of personnel to stimulate the cable in the installation process of laying, if meet the slope highway section in the installation process, when the cable is discharged downwards from the upper end of slope, because the in-process of a large amount of personnel pulling cable, the cable can be put more and more fast, cable drum pivoted also can be more and more fast, and cable drum does not possess effective braking function, the incident takes place very easily this moment, and how effectual control cable slew velocity, prevent that cable drum from rotating too fast and become an important problem, therefore we have proposed a cable drum unwrapping wire reduction gears for cable laying installation.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides a cable drum paying-off speed reducing mechanism for cable laying and installation, which has the advantages of effectively controlling the rotation speed of a cable and preventing the cable drum from rotating too fast, and solves the problems that in the cable laying process, if a slope road section is met, when a cable is discharged downwards from the upper end of the slope, the cable is more and more quickly discharged in the process of pulling the cable by a large number of people, the rotation of the cable drum is more and more quick, the cable drum does not have an effective braking function, and safety accidents are easy to happen at the moment.
(II) technical scheme
In order to effectively control the rotation speed of the cable and prevent the cable reel from rotating too fast, the invention provides the following technical scheme: a cable drum paying-off speed reducing mechanism for cable laying and installation comprises a base, wherein a first supporting column is fixedly connected to the top of the base, a first rotating shaft is movably connected to the top of the first supporting column, a wire spool is fixedly connected to the outer side of the first rotating shaft, a conveyor belt is connected to the outer side of the first rotating shaft in a transmission mode, a second rotating shaft is connected to one side, away from the first rotating shaft, of the conveyor belt in a transmission mode, a disc is fixedly connected to the outer portion of the second rotating shaft, a second supporting column is fixedly connected to the top of the base, a circular ring is sleeved on the outer side of the disc, a clamping head is movably connected to the inner portion of the circular ring, a limiting block is fixedly connected to the outer side of the disc, a chute is formed in the disc, a first spring is fixedly connected to the left side of the inner portion of, an inner groove is formed in the circular ring, a second spring is fixedly connected inside the inner groove, and an electrorheological body is movably connected inside the inner groove.
Preferably, the first rotating shaft and the second rotating shaft are in transmission connection through a conveying belt.
Preferably, the top of the second support column is movably connected with one side of the second rotating shaft, and the top of the second support column is fixedly connected with the back of the circular ring.
Preferably, the number of the clamping joints and the number of the limiting blocks are eight, the distance between the two clamping joints is greater than the width of the limiting blocks, and the width of the clamping joints is less than the distance between the two limiting blocks.
Preferably, the distance from the left side of the chute to the center of the disc is smaller than the distance from the right side of the chute to the center of the disc.
Preferably, the metal ball has a positive charge, and the metal ball has a negative charge.
Preferably, an inner groove and a clamping joint are fixedly connected to two sides of the second spring respectively.
Preferably, the electrorheological fluid is solid under the condition of electrification and liquid under the condition of non-electrification, the main materials of the electrorheological fluid consist of gypsum, lime and carbon powder, and the electrorheological fluid is in electrical connection with the first metal ball and the second metal ball.
(III) advantageous effects
Compared with the prior art, the invention provides a cable reel paying-off speed reducing mechanism for cable laying and installation, which has the following beneficial effects:
1. this a cable drum unwrapping wire speed reduction mechanism for cable laying installation, through axis of rotation one and axis of rotation two, the disc, the stopper, metal ball one, the cooperation of metal ball two is used, when cable drum slew velocity is too fast, the metal ball contacts with metal ball two for a moment for the joint card is in the position of stopper, thereby make the disc speed reduce, make the speed of axis of rotation one reduce through axis of rotation two this moment, thereby reached and prevented that cable drum from rotating too fast effect.
2. This a cable drum unwrapping wire speed reduction mechanism for cable laying installation, through disc and current variant, metal ball one, metal ball two, the current variant, the joint, the cooperation of stopper is used, when cable drum slew velocity is too fast, metal ball one touches with metal ball two this moment, current variant circular telegram makes the joint block stopper, make disc speed reduce, metal ball one and metal ball two contactless this moment, the joint no longer blocks the stopper, disc speed resumes, manifold cycles reduces cable drum speed, the effect that prevents that the cable from being pulled out badly among the cable drum deceleration process has been reached.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic cross-sectional view of the ring structure of the present invention;
FIG. 3 is a partial schematic view of the inner tank structure of the present invention;
FIG. 4 is a schematic cross-sectional view of a disk structure of the present invention;
FIG. 5 is an enlarged view of the structure A of the present invention.
In the figure: 1. a base; 2. a first supporting column; 3. rotating a first shaft; 4. a wire spool; 5. a conveyor belt; 6. a second rotating shaft; 7. a disc; 8. a second supporting column; 9. a circular ring; 10. a clamping head; 11. a limiting block; 12. a chute; 13. a first spring; 14. a first metal ball; 15. a second metal ball; 16. an inner tank; 17. a second spring; 18. an electrorheological fluid.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-5, a cable reel paying-off speed reducing mechanism for cable laying and installation comprises a base 1, a first support column 2 is fixedly connected to the top of the base 1, a first rotating shaft 3 is movably connected to the top of the first support column 2, a wire reel 4 is fixedly connected to the outer side of the first rotating shaft 3, a cable is wound inside the wire reel 4, a conveyor belt 5 is connected to the outer side of the first rotating shaft 3 in a transmission manner, a second rotating shaft 6 is connected to one side, away from the first rotating shaft 3, of the conveyor belt 5 in a transmission manner, the first rotating shaft 3 and the second rotating shaft 6 are connected in a transmission manner through the conveyor belt 5, a disc 7 is fixedly connected to the outer side of the second rotating shaft 6, a second support column 8 is fixedly connected to the top of the second support column 8 in a movable manner, the top of the second support column 8, the inside of the ring 9 is movably connected with a clamping joint 10, the outer side of the disc 7 is fixedly connected with a limiting block 11, the number of the clamping joint 10 and the limiting block 11 is eight, the distance between the two clamping joints 10 is larger than the width of the limiting block 11, the width of the clamping joint 10 is smaller than the distance between the two limiting blocks 11, the inside of the disc 7 is provided with a chute 12, the distance from the left side of the chute 12 to the center of the disc 7 is smaller than the distance from the right side of the chute 12 to the center of the disc 7, the left side of the inside of the chute 12 is fixedly connected with a spring I13, one side of the spring I13, which is far away from the chute 12, is fixedly connected with a metal ball I14, the right side of the inside of the chute 12 is fixedly connected with a metal ball II 15, the metal ball I14 is provided with positive charge, the metal ball II 15 is provided with negative charge, the, the inside of the inner groove 16 is movably connected with an electrorheological body 18, the electrorheological body 18 is solid under the condition of electrification and liquid under the condition of non-electrification, the main materials of the electrorheological body 18 are composed of gypsum, lime and carbon powder, and the electrorheological body 18 is in electrical connection with the first metal ball 14 and the second metal ball 15.
The working principle is that when the rotation speed of the cable reel is too high, the cable is wound inside the wire spool 4, the rotation speed of the wire spool 4 is too high, the wire spool 4 is fixedly connected to the outer side of the first rotating shaft 3, the rotation speed of the first rotating shaft 3 is too high, the first rotating shaft 3 and the second rotating shaft 6 are in transmission connection through the conveyor belt 5, the rotation speed of the second rotating shaft 6 is too high, the disc 7 is fixedly connected to the outer portion of the second rotating shaft 6, the rotation speed of the disc 7 is too high, the inclined groove 12 is formed in the disc 7, the first spring 13 is fixedly connected to the left side of the inner portion of the inclined groove 12, the first metal ball 14 is fixedly connected to one side of the first spring 13, which is far away from the center of the disc 7, the first metal ball 14 moves in a direction far away from the center of the disc 7 under the action of centrifugal force, and the distance from the left side of the inclined groove 12 to the center, therefore, the first metal ball 14 moves to the right side of the inclined groove 12, and the second metal ball 15 is fixedly connected to the right side inside the inclined groove 12, so that the first metal ball 14 touches the second metal ball 15 when the cable reel rotates too fast.
Because the first metal ball 14 has positive charge, the second metal ball 15 has negative charge, the current variant 18 is solid when electrified and liquid when not electrified, the main materials of the current variant are gypsum, lime and carbon powder, the current variant 18 is electrically connected with the first metal ball 14 and the second metal ball 15, the current variant 18 can be changed from liquid state to solid state at the moment, because the current variant 18 is movably connected with the inside of the inner groove 16, the two sides of the spring 17 are respectively and fixedly connected with the inner groove 16 and the clamping joint 10, the current variant 18 can extrude the clamping joint 10 to the outside of the inner groove 16 at the moment, because the inner groove 16 is arranged inside the ring 9, the ring 9 is sleeved outside the disc 7, the clamping joint 10 can move towards the disc 7 at the moment, because the limiting block 11 is fixedly connected with the outside of the disc 7, the quantity of the clamping joint 10 and the limiting block 11 is eight, and the distance between the two clamping joints 10 is larger than the width of the limiting block 11, the width that joint 10 was connected to the card is less than the distance between two stopper 11, so joint 10 and stopper 11 can block this moment, again because the top of support column two 8 and the back fixed connection of ring 9, so disc 7 can be blocked by ring 9 this moment, the speed of disc 7 can reduce in the twinkling of an eye this moment, further make the speed of axis of rotation two 6 reduce in the twinkling of an eye, axis of rotation one 3 can reduce at speed under the frictional force condition of conveyer belt 5 this moment, further make the slew velocity of cable drum reduce, effectual control cable slew velocity has been reached, prevent that the cable drum from rotating too fast effect. Because the speed of the disc 7 is reduced, the first metal ball 14 is separated from the second metal ball 15 under the action of the first spring 13, the current transformer 18 is uncharged, the clamping connector 10 is separated from the limiting block 11 under the action of the second spring 17, the disc 7 can normally rotate, and the cable reel can be decelerated circularly for many times, so that the cable reel cannot suddenly stop in the deceleration process, and the effect of preventing the cable from being damaged by pulling in the deceleration process of the cable reel is achieved.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. The utility model provides a cable drum unwrapping wire speed reduction mechanism for cable laying installation, includes base (1), its characterized in that: the top of the base (1) is fixedly connected with a first support column (2), the top of the first support column (2) is movably connected with a first rotating shaft (3), the outer side of the first rotating shaft (3) is fixedly connected with a wire spool (4), the outer side of the first rotating shaft (3) is in transmission connection with a conveyor belt (5), one side, far away from the first rotating shaft (3), of the conveyor belt (5) is in transmission connection with a second rotating shaft (6), the outer part of the second rotating shaft (6) is fixedly connected with a disc (7), the top of the base (1) is fixedly connected with a second support column (8), the outer side of the disc (7) is sleeved with a ring (9), the inner part of the ring (9) is movably connected with a clamping joint (10), the outer side of the disc (7) is fixedly connected with a limit block (11), and the, the novel metal ball chute is characterized in that a first spring (13) is fixedly connected to the left side of the interior of the chute (12), a first metal ball (14) is fixedly connected to one side, away from the chute (12), of the first spring (13), a second metal ball (15) is fixedly connected to the right side of the interior of the chute (12), an inner groove (16) is formed in the interior of the circular ring (9), a second spring (17) is fixedly connected to the interior of the inner groove (16), and an electric current variable body (18) is movably connected to the interior of the inner groove (16).
2. The cable drum pay-off retarding mechanism for cable laying installations according to claim 1, characterized in that: and the first rotating shaft (3) and the second rotating shaft (6) are in transmission connection through a conveying belt (5).
3. The cable drum pay-off retarding mechanism for cable laying installations according to claim 1, characterized in that: the top of the second support column (8) is movably connected with one side of the second rotating shaft (6), and the top of the second support column (8) is fixedly connected with the back of the circular ring (9).
4. The cable drum pay-off retarding mechanism for cable laying installations according to claim 1, characterized in that: the number of the clamping joints (10) and the limiting blocks (11) is eight, the distance between the two clamping joints (10) is larger than the width of the limiting blocks (11), and the width of the clamping joints (10) is smaller than the distance between the two limiting blocks (11).
5. The cable drum pay-off retarding mechanism for cable laying installations according to claim 1, characterized in that: the distance from the left side of the chute (12) to the center of the disc (7) is less than the distance from the right side of the chute (12) to the center of the disc (7).
6. The cable drum pay-off retarding mechanism for cable laying installations according to claim 1, characterized in that: the first metal ball (14) has a positive charge, and the second metal ball (15) has a negative charge.
7. The cable drum pay-off retarding mechanism for cable laying installations according to claim 1, characterized in that: and the two sides of the second spring (17) are fixedly connected with an inner groove (16) and a clamping joint (10) respectively.
8. The cable drum pay-off retarding mechanism for cable laying installations according to claim 1, characterized in that: the electrorheological fluid (18) is solid under the electrified condition and liquid under the non-electrified condition, the main materials of the electrorheological fluid are gypsum, lime and carbon powder, and the electrorheological fluid (18) is in electrical connection with the first metal ball (14) and the second metal ball (15).
CN202010745226.XA 2020-07-29 2020-07-29 Cable reel paying-off speed reducing mechanism for cable laying and installation Withdrawn CN111807140A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010745226.XA CN111807140A (en) 2020-07-29 2020-07-29 Cable reel paying-off speed reducing mechanism for cable laying and installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010745226.XA CN111807140A (en) 2020-07-29 2020-07-29 Cable reel paying-off speed reducing mechanism for cable laying and installation

Publications (1)

Publication Number Publication Date
CN111807140A true CN111807140A (en) 2020-10-23

Family

ID=72863285

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010745226.XA Withdrawn CN111807140A (en) 2020-07-29 2020-07-29 Cable reel paying-off speed reducing mechanism for cable laying and installation

Country Status (1)

Country Link
CN (1) CN111807140A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112193923A (en) * 2020-10-30 2021-01-08 南京吉湾思商贸有限公司 Energy-concerving and environment-protective computer network line rolling specification adjustment and stall self-lock device
CN112419586A (en) * 2020-11-18 2021-02-26 南京灼祺华贸易有限公司 Automatic vending machine commodity falling speed's controlling means based on network science and technology
CN112428666A (en) * 2020-11-24 2021-03-02 温州纪惑网络科技有限公司 Intelligent printing device with safety protection function
CN112723215A (en) * 2020-12-24 2021-04-30 刘启俊 Winch stall self-locking device for preventing stall from hurting people in winch using process
CN112743633A (en) * 2020-12-03 2021-05-04 云和县瑞灵玩具有限公司 Higher wooden toy of security produces former material cutting device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112193923A (en) * 2020-10-30 2021-01-08 南京吉湾思商贸有限公司 Energy-concerving and environment-protective computer network line rolling specification adjustment and stall self-lock device
CN112419586A (en) * 2020-11-18 2021-02-26 南京灼祺华贸易有限公司 Automatic vending machine commodity falling speed's controlling means based on network science and technology
CN112428666A (en) * 2020-11-24 2021-03-02 温州纪惑网络科技有限公司 Intelligent printing device with safety protection function
CN112743633A (en) * 2020-12-03 2021-05-04 云和县瑞灵玩具有限公司 Higher wooden toy of security produces former material cutting device
CN112723215A (en) * 2020-12-24 2021-04-30 刘启俊 Winch stall self-locking device for preventing stall from hurting people in winch using process

Similar Documents

Publication Publication Date Title
CN111807140A (en) Cable reel paying-off speed reducing mechanism for cable laying and installation
CN112010186A (en) Crane hanging scaffold stall self-locking mechanism based on cable hoisting
CN111963591A (en) Brake assembly for stalling of ceiling fan
CN111987647B (en) Intelligent buried pipe wire passing device for water conservancy construction
US5186283A (en) Triple-wrap traction arrangement
CN203392774U (en) Automatic rope unwinding device of winch
CN112455402A (en) Electric automobile stall protection device that can automatic deceleration
CN105292996A (en) Belt deviation rectifying device and belt deviation rectifying method
CN112707251A (en) Cable manufacture accomodates and uses coiling mechanism
CN103991808A (en) Crane steel wire rope arranging device
CN112476488A (en) Stall maintenance protection device for industrial cutting robot
CN112476010A (en) Stall protection device for building material cutting knife
CN205312488U (en) Belt deviation -rectifying device
CN209418210U (en) High reliability cable processes safety-type stranding machine
CN204474058U (en) Stacker-reclaimer weight hammer type cable drum equipment
CN103303652B (en) A kind of stocker
CN212580069U (en) Synchronous wheel brake device of electric vehicle
CN112850525A (en) Motion limiting protection device for automobile crane
CN211393663U (en) Multi-lifting-point crawler crane anti-deflection angle structure
CN112573382A (en) Hoisting device for effectively realizing stall self-locking in pipeline transportation hoisting process
CN112456066A (en) Intelligent maintenance device for motor stall of screw conveyor
CN112374449A (en) Stall protection device in production lubricating oil transportation process
CN113770785A (en) Stall protection device based on building cutting machine
CN111055712A (en) Charging automatic butt joint device of new energy automobile
CN203903870U (en) A rope guide for a crane steel wire rope

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20201023

WW01 Invention patent application withdrawn after publication