CN111799811A - 电网中特高压换流站调相机与近区电厂的无功置换方法 - Google Patents
电网中特高压换流站调相机与近区电厂的无功置换方法 Download PDFInfo
- Publication number
- CN111799811A CN111799811A CN202010669811.6A CN202010669811A CN111799811A CN 111799811 A CN111799811 A CN 111799811A CN 202010669811 A CN202010669811 A CN 202010669811A CN 111799811 A CN111799811 A CN 111799811A
- Authority
- CN
- China
- Prior art keywords
- extra
- converter station
- high voltage
- reactive
- voltage converter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/12—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
- H02J3/16—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by adjustment of reactive power
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/18—Arrangements for adjusting, eliminating or compensating reactive power in networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/18—Arrangements for adjusting, eliminating or compensating reactive power in networks
- H02J3/1885—Arrangements for adjusting, eliminating or compensating reactive power in networks using rotating means, e.g. synchronous generators
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/36—Arrangements for transfer of electric power between ac networks via a high-tension dc link
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2203/00—Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
- H02J2203/10—Power transmission or distribution systems management focussing at grid-level, e.g. load flow analysis, node profile computation, meshed network optimisation, active network management or spinning reserve management
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2203/00—Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
- H02J2203/20—Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/30—Reactive power compensation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02E60/60—Arrangements for transfer of electric power between AC networks or generators via a high voltage DC link [HVCD]
Abstract
本发明涉及一种电网中特高压换流站调相机与近区电厂的无功置换方法,属于电网调度技术领域。本发明的特高压换流站调相机与近区电厂的无功置换方法,根据特高压换流站调相机AVC功能投入的电压条件和在特高压换流站调相机所在的高压直流换流站及近区电网建立二级电压控制区域,明确不同励磁控制模式之间的切换逻辑,对该区域实行特高压换流站调相机与电厂无功设备的协调控制,为特高压换流站调相机预留足够的无功裕度,提高了电网的静态电压稳定裕度,因而提高了电网暂态电压稳定水平。
Description
技术领域
本发明涉及一种电网中特高压换流站调相机与近区电厂的无功置换方法,属于电网调度技术领域。
背景技术
自动电压控制(以下简称AVC,Automatic Voltage Control)系统是实现输电网安全(提高电压稳定裕度)、经济(降低网络损耗)、优质(提高电压合格率)运行的重要手段。AVC系统架构在电网能量管理系统(EMS)之上,能够利用输电网实时运行数据,从输电网全局优化的角度科学决策出最佳的无功电压调整方案,自动下发给电厂、变电站以及下级电网调度机构执行。孙宏斌、张伯明、郭庆来在《基于软分区的全局电压优化控制系统设计》(电力系统自动化,2003年,第27卷第8期,16-20页)中说明了大电网自动电压控制的体系结构。
AVC系统的主站部分是在电力系统控制中心基于软件实现的,其对输电网的电压控制策略主要有对电厂各发电机无功控制策略以及对变电站的无功设备控制策略2类。其中对电厂各发电机的无功控制策略,目前采用的主要方式是:调度中心的AVC主站系统通过无功优化计算得到电厂各发电机组的无功调节量后,通过数据通信通道向电厂的AVC子站系统发送,电厂的AVC子站接收到发电机无功调整量后,根据当前电厂内各台发电机的运行状态,采用步进方式调整发电机发出的无功功率,直到达到AVC主站下发的调整量。对变电站的无功设备控制策略为对无功补偿设备的投切指令,无功设备主要包括电容器和电抗器,当投入电容器或切除电抗器时,母线电压升高;当切除电容器或投入电抗器时,母线电压降低。AVC主站下发投入或切除无功设备的指令,变电站内的自动化监控系统根据接收的指令,找到无功设备所连接的断路器并合上或断开断路器,以完成无功设备的投入或切除。
特高压换流站调相机具有良好的次暂态特性,故障发生瞬间可使电势不发生变化,并瞬时发出或吸收无功。将特高压换流站调相机安装在直流受端后,能发出无功,为电网电压提供支撑,特别是多直流馈入电网,能提高同时换相成功率,从而保证电网安全特高压换流站调相机具有良好的次暂态特性,故障发生瞬间可使电势不发生变化,并瞬时发出或吸收无功。将特高压换流站调相机安装在直流受端后,能发出无功,为电网电压提供支撑,特别是多直流馈入电网,能提高同时换相成功率,从而保证电网安全将特高压换流站调相机安装在直流送端后,能吸收无功,对暂态过电压予以限制,特别是新能源外送的直流送端,能对新能源的脱网予以有效抑制,使其输送比例符合要求。特高压换流站调相机具有良好的暂态特性,也就是强励特性,能在较短的时间内发出不少于额定功率两倍的无功。将特高压换流站调相机安装在直流受端后,如果系统产生故障使电压明显跌落,则特高压换流站调相机将开始强励,保证系统稳定,为直流功率与电压的恢复创造良好条件,起到避免电压崩溃的作用。
随着特高压直流建设的发展,我国已步入区域电网大容量特高压交直流互联新时代,电网“强直弱交”特性突出。华东电网作为世界上直流输电系统馈入最多的受端电网,直流系统带来的电压稳定等问题十分突出。直流换相失败及恢复过程中,会从系统吸收大量无功,若换相失败导致直流闭锁,将对电网稳定产生冲击。通过与其他无功设备对比,新一代特高压换流站调相机可以通过强励提供动态电压支撑,降低直流系统发生换相失败的风险,利用特高压换流站调相机次暂态特性抑制电压波动,系统电压迅速恢复,通过分析表明,特高压换流站调相机可以提高系统的静态电压稳定裕度,提高系统暂态电压稳定水平,解决受端电网各种类型的电压稳定问题。稳态运行时,特高压换流站调相机还可以维持电压稳定,作为区域电压调节手段。2015年底,国网公司决定在各区域电网内配置一定数量的特高压换流站调相机。华东电网的特高压换流站调相机配置在8个换流站:金华换流站、奉贤换流站、苏州换流站、政平换流站、淮安换流站、绍兴换流站、泰州换流站、古泉换流站,共计配置18台300Mvar特高压换流站调相机。特高压换流站调相机组采用特高压换流站调相机-变压器单元接线,接入500kV换流站母线,或接入500kV滤波器母线。电网应通过AVC控制保证受端电网保留足够的动态无功储备,动态无功补偿装置如何定位其角色是一个新问题。
发明内容
本发明的目的是提出一种电网中特高压换流站调相机与近区电厂的无功置换方法,明确不同励磁控制模式之间的切换逻辑,实行特高压换流站调相机与电厂无功设备的协调控制,为特高压换流站调相机预留足够的无功裕度,提高电网的静态电压稳定裕度,同时提高电网暂态电压稳定水平。
本发明提出的电网中特高压换流站调相机与近区电厂的无功置换方法,该方法包括以下步骤:
(1)设定自动电压控制周期为Tc;
(3)在每个自动电压控制周期Tc到来时,从电网自动电压控制系统中分别读取特高压换流站调相机S的无功正常运行点参数Qnom-s、特高压换流站调相机S无功置换门槛值参数Qmax和无功调节步长Qstep,并读取特高压换流站调相机S对特高压换流站500kV母线m的无功电压灵每度Cs-m,m∈K;
(4)从电网调度系统中读取特高压换流站内500kV母线m的电压量测值Vm,从电网自动电压控制系统中读取500kV母线m的运行上限参数值Vm-max和运行下限参数值Vm-min,对Vm进行判断:
Vm-min<Vm<Vm-max (1)
Vm≤Vm-min或Vm≥Vm-max (2)
若Vm满足式(1),则进入步骤(5),若Vm满足式(2),返回步骤(2);
(5)从电网调度系统中读取特高压换流站调相机S的实时无功功率量测值Qr-s,对Qr-s进行判断,若Qr-s≠Qnom-s,则进入步骤(6),若Qr-s=Qnom-s,则不需要进行无功置换,返回步骤(2);
(6)计算特高压换流站调相机S的无功置换量ΔQ,ΔQ=Qnom-s-Qr-s,对ΔQ进行判断,若|ΔQ|>Qstep,则计算特高压换流站调相机S实际无功置换量ΔQs,若ΔQ≥0则ΔQs=Qstep,若ΔQ<0则ΔQs=-(Qstep),进入步骤(7),若|ΔQ|≤Qstep,则返回步骤(2);
(7)根据步骤(2)中读取的特高压换流站调相机S对特高压换流站500kV母线m的无功电压灵敏度参数Cs-m,计算特高压换流站调相机S按无功置换量ΔQs进行调整后,特高压换流站500kV母线m电压值V’m,V’m=Vm+(Cs*ΔQs);
(8)对步骤(7)计算的V’m进行判断,若满足Vm-min<V’m<Vm-max,则进入步骤(10),若满足V’m≤Vm-min或者V’m≥Vm-max,则进入步骤(9);
(9)从电网自动电压控制系统中读取特高压换流站和近区500kV电厂内参与协调控制的500kV母线的灵敏度矩阵Csens-k,遍历灵敏度矩阵Csens-k中所有参与协调控制的500kV母线,读取参与协调控制的500kV母线对特高压换流站母线m的灵敏度,按灵敏度从大到小形成数组C[j][csens-j-m],其中j表示母线的编号,j∈K,csens-j-m表示编号为j的母线对特高压换流站母线m的灵敏度值,设j=1,若V’m≤Vm-min则进入步骤(9-1),若V’m≥Vm-max进入步骤(9-2);
(9-1-1)计算电厂协助提升特高压换流站母线m的电压调整量ΔVadd,ΔVadd=Vm-min-V’m,根据读到的编号为j的母线对特高压换流站母线m的灵敏度值csens-j-m,计算出组电厂的无功调整量ΔQj-add.
(9-1-2)从电网调度系统中读取电厂的可增无功值Qadd-j,对Qadd-j进行判断,若Qadd-j≥ΔQj-add,则进入步骤(9-1-3),若Qadd-j<ΔQj-add,则进入步骤(9-1-4);
(9-1-3)从电网调度系统中读取电厂的无功量测Qj、无功上限值Qmax-j和无功下限值Qmin-j,计算电厂参与协调的无功量测Q’j,Q’j=Qj+ΔQj-add,对无功量测Q’j进行判断,若Q’j≥Qmax-j,则进入步骤(9-1-3),若Q’j<Qmax-j,则电厂增加无功ΔQj-add;
(9-1-3)使j=j+1,返回步骤(9-1);
(9-2-1)计算电厂协助降低特高压换流站母线m的电压调整量ΔVdec,ΔVdec=V’m-Vm-max,根据读到的编号为j的母线对特高压换流站母线m的灵敏度值csens-j-m,计算出组电厂的无功调整量ΔQj-dec.
(9-2-2)从电网调度系统中读取电厂的减无功值Qdec-j,对Qdec-j进行判断,若Qdec-j≥ΔQj-dec,则进入步骤(9-1-3),若Qdec-j<ΔQj-dec,则进入步骤(9-1-4);
(9-2-3)从电网调度系统中读取电厂无功量测Qj、无功下限值Qmin-j,对电厂参与协调的无功量测Q’j,Q’j=Qj-ΔQj-dec进行判断,若Q’j≥Qmin-j,则进入步骤(9-1-3),若Q’j<Qmin-j,则电厂减少无功ΔQj-dec;
(10)对步骤(6)的特高压换流站调相机S的无功调整量ΔQs进行判断,若ΔQs>0,则特高压换流站调相机S投入容性无功功率ΔQs,若ΔQs=0,则特高压换流站调相机S保持原有无功功率不变,若ΔQs<0,则特高压换流站调相机S投入感性无功功率|ΔQs|,使得特高压换流站调相机S的无功值为无功正常运行点参数Qnom-s的范围,实现电网中特高压换流站调相机与电厂的无功置换。
本发明提出的电网中特高压换流站调相机与近区电厂的无功置换方法,其优点是:
本发明的特高压换流站调相机与近区电厂的无功置换方法,根据特高压换流站调相机AVC功能投入的电压条件和在特高压换流站调相机所在的高压直流换流站及近区电网建立二级电压控制区域,明确不同励磁控制模式之间的切换逻辑,对该区域实行特高压换流站调相机与电厂无功设备的协调控制,为特高压换流站调相机预留足够的无功裕度,提高了电网的静态电压稳定裕度,因而提高了电网暂态电压稳定水平。
附图说明
图1是本发明方法的流程框图。
具体实施方式
本发明提出的电网中特高压换流站调相机与近区电厂的无功置换方法,其流程框图如图1所示,该方法包括以下步骤:
(1)设定自动电压控制周期为Tc;
(3)在每个自动电压控制周期Tc到来时,从电网自动电压控制系统中分别读取特高压换流站调相机S的无功正常运行点参数Qnom-s、特高压换流站调相机S无功置换门槛值参数Qmax和无功调节步长Qstep,并读取特高压换流站调相机S对特高压换流站500kV母线m的无功电压灵每度Cs-m,m∈K;
(4)从电网调度系统中读取特高压换流站内500kV母线m的电压量测值Vm,从电网自动电压控制系统中读取500kV母线m的运行上限参数值Vm-max和运行下限参数值Vm-min,对Vm进行判断:
Vm-min<Vm<Vm-max (1)
Vm≤Vm-min或Vm≥Vm-max (2)
若Vm满足式(1),则进入步骤(5),若Vm满足式(2),返回步骤(2);
(5)从电网调度系统中读取特高压换流站调相机S的实时无功功率量测值Qr-s,对Qr-s进行判断,若Qr-s≠Qnom-s,则进入步骤(6),若Qr-s=Qnom-s,则不需要进行无功置换,返回步骤(2);
(6)计算特高压换流站调相机S的无功置换量ΔQ,ΔQ=Qnom-s-Qr-s,对ΔQ进行判断,若|ΔQ|>Qstep,则计算特高压换流站调相机S实际无功置换量ΔQs,若ΔQ≥0则ΔQs=Qstep,若ΔQ<0则ΔQs=-(Qstep),进入步骤(7),若|ΔQs|≤Qstep,则返回步骤(2);
(7)根据步骤(2)中读取的特高压换流站调相机S对特高压换流站500kV母线m的无功电压灵敏度参数Cs-m,计算特高压换流站调相机S按无功置换量ΔQs进行调整后,特高压换流站500kV母线m电压值V’m,V’m=Vm+(Cs*ΔQs);
(8)对步骤(7)计算的V’m进行判断,若满足Vm-min<V’m<Vm-max,则进入步骤(10),若满足V’m≤Vm-min或者V’m≥Vm-max,则进入步骤(9);
(9)从电网自动电压控制系统中读取特高压换流站和近区500kV电厂内参与协调控制的500kV母线的灵敏度矩阵Csens-k,遍历灵敏度矩阵Csens-k中所有参与协调控制的500kV母线,读取参与协调控制的500kV母线对特高压换流站母线m的灵敏度,按灵敏度从大到小形成数组C[j][csens-j-m],其中j表示母线的编号,j∈K,csens-j-m表示编号为j的母线对特高压换流站母线m的灵敏度值,设j=1,若V’m≤Vm-min则进入步骤(9-1),若V’m≥Vm-max进入步骤(9-2);
(9-1-1)计算电厂协助提升特高压换流站母线m的电压调整量ΔVadd,ΔVadd=Vm-min-V’m,根据读到的编号为j的母线对特高压换流站母线m的灵敏度值csens-j-m,计算出组电厂的无功调整量ΔQj-add.
(9-1-2)从电网调度系统中读取电厂的可增无功值Qadd-j,对Qadd-j进行判断,若Qadd-j≥ΔQj-add,则进入步骤(9-1-3),若Qadd-j<ΔQj-add,则进入步骤(9-1-4);
(9-1-3)从电网调度系统中读取电厂的无功量测Qj、无功上限值Qmax-j和无功下限值Qmin-j,计算电厂参与协调的无功量测Q’j,Q’j=Qj+ΔQj-add,对无功量测Q’j进行判断,若Q’j≥Qmax-j,则进入步骤(9-1-3),若Q’j<Qmax-j,则电厂增加无功ΔQj-add;
(9-1-3)使j=j+1,返回步骤(9-1);
(9-2-1)计算电厂协助降低特高压换流站母线m的电压调整量ΔVdec,ΔVdec=V’m-Vm-max,根据读到的编号为j的母线对特高压换流站母线m的灵敏度值csens-j-m,计算出组电厂Tj 500的无功调整量ΔQj-dec.
(9-2-2)从电网调度系统中读取电厂的减无功值Qdec-j,对Qdec-j进行判断,若Qdec-j≥ΔQj-dec,则进入步骤(9-1-3),若Qdec-j<ΔQj-dec,则进入步骤(9-1-4);
(9-2-3)从电网调度系统中读取电厂无功量测Qj、无功下限值Qmin-j,对电厂参与协调的无功量测Q’j,Q’j=Qj-ΔQj-dec进行判断,若Q’j≥Qmin-j,则进入步骤(9-1-3),若Q’j<Qmin-j,则电厂减少无功ΔQj-dec;
(10)对步骤(6)的特高压换流站调相机S的无功调整量ΔQs进行判断,若ΔQs>0,则特高压换流站调相机S投入容性无功功率ΔQs,若ΔQs=0,则特高压换流站调相机S保持原有无功功率不变,若ΔQs<0,则特高压换流站调相机S投入感性无功功率|ΔQs|,使得特高压换流站调相机S的无功值为无功正常运行点参数Qnom-s的范围,实现电网中特高压换流站调相机与电厂的无功置换。
Claims (1)
1.一种电网中特高压换流站调相机与近区电厂的无功置换方法,其特征在于,该方法包括以下步骤:
(1)设定自动电压控制周期为Tc;
(3)在每个自动电压控制周期Tc到来时,从电网自动电压控制系统中分别读取特高压换流站调相机S的无功正常运行点参数Qnom-s、特高压换流站调相机S无功置换门槛值参数Qmax和无功调节步长Qstep,并读取特高压换流站调相机S对特高压换流站500kV母线m的无功电压灵每度Cs-m,m∈K;
(4)从电网调度系统中读取特高压换流站内500kV母线m的电压量测值Vm,从电网自动电压控制系统中读取500kV母线m的运行上限参数值Vm-max和运行下限参数值Vm-min,对Vm进行判断:
Vm-min<Vm<Vm-max (1)
Vm≤Vm-min或Vm≥Vm-max (2)
若Vm满足式(1),则进入步骤(5),若Vm满足式(2),返回步骤(2);
(5)从电网调度系统中读取特高压换流站调相机S的实时无功功率量测值Qr-s,对Qr-s进行判断,若Qr-s≠Qnom-s,则进入步骤(6),若Qr-s=Qnom-s,则不需要进行无功置换,返回步骤(2);
(6)计算特高压换流站调相机S的无功置换量ΔQ,ΔQ=Qnom-s-Qr-s,对ΔQ进行判断,若|ΔQ|>Qstep,则计算特高压换流站调相机S实际无功置换量ΔQs,若ΔQ≥0则ΔQs=Qstep,若ΔQ<0则ΔQs=-(Qstep),进入步骤(7),若|ΔQs|≤Qstep,则返回步骤(2);
(7)根据步骤(2)中读取的特高压换流站调相机S对特高压换流站500kV母线m的无功电压灵敏度参数Cs-m,计算特高压换流站调相机S按无功置换量ΔQs进行调整后,特高压换流站500kV母线m电压值V’m,V’m=Vm+(Cs*ΔQs);
(8)对步骤(7)计算的V’m进行判断,若满足Vm-min<V’m<Vm-max,则进入步骤(10),若满足V’m≤Vm-min或者V’m≥Vm-max,则进入步骤(9);
(9)从电网自动电压控制系统中读取特高压换流站和近区500kV电厂内参与协调控制的500kV母线的灵敏度矩阵Csens-k,遍历灵敏度矩阵Csens-k中所有参与协调控制的500kV母线,读取参与协调控制的500kV母线对特高压换流站母线m的灵敏度,按灵敏度从大到小形成数组C[j][csens-j-m],其中j表示母线的编号,j∈K,csens-j-m表示编号为j的母线对特高压换流站母线m的灵敏度值,设j=1,若V’m≤Vm-min则进入步骤(9-1),若V’m≥Vm-max进入步骤(9-2);
(9-1-1)计算电厂协助提升特高压换流站母线m的电压调整量ΔVadd,ΔVadd=Vm-min-V’m,根据读到的编号为j的母线对特高压换流站母线m的灵敏度值csens-j-m,计算出组电厂的无功调整量ΔQj-add.
(9-1-2)从电网调度系统中读取电厂的可增无功值Qadd-j,对Qadd-j进行判断,若Qadd-j≥ΔQj-add,则进入步骤(9-1-3),若Qadd-j<ΔQj-add,则进入步骤(9-1-4);
(9-1-3)从电网调度系统中读取电厂的无功量测Qj、无功上限值Qmax-j和无功下限值Qmin-j,计算电厂参与协调的无功量测Q'j,Q'j=Qj+ΔQj-add,对无功量测Q'j进行判断,若Q'j≥Qmax-j,则进入步骤(9-1-3),若Q'j<Qmax-j,则电厂增加无功ΔQj-add;
(9-1-3)使j=j+1,返回步骤(9-1);
(9-2-1)计算电厂协助降低特高压换流站母线m的电压调整量ΔVdec,ΔVdec=V’m-Vm-max,根据读到的编号为j的母线对特高压换流站母线m的灵敏度值csens-j-m,计算出组电厂的无功调整量ΔQj-dec.
(9-2-2)从电网调度系统中读取电厂的减无功值Qdec-j,对Qdec-j进行判断,若Qdec-j≥ΔQj-dec,则进入步骤(9-1-3),若Qdec-j<ΔQj-dec,则进入步骤(9-1-4);
(9-2-3)从电网调度系统中读取电厂无功量测Qj、无功下限值Qmin-j,对电厂参与协调的无功量测Q'j,Q'j=Qj-ΔQj-dec进行判断,若Q'j≥Qmin-j,则进入步骤(9-1-3),若Q'j<Qmin-j,则电厂减少无功ΔQj-dec;
(10)对步骤(6)的特高压换流站调相机S的无功调整量ΔQs进行判断,若ΔQs>0,则特高压换流站调相机S投入容性无功功率ΔQs,若ΔQs=0,则特高压换流站调相机S保持原有无功功率不变,若ΔQs<0,则特高压换流站调相机S投入感性无功功率|ΔQs|,使得特高压换流站调相机S的无功值为无功正常运行点参数Qnom-s的范围,实现电网中特高压换流站调相机与电厂的无功置换。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010669811.6A CN111799811B (zh) | 2020-07-13 | 2020-07-13 | 电网中特高压换流站调相机与近区电厂的无功置换方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010669811.6A CN111799811B (zh) | 2020-07-13 | 2020-07-13 | 电网中特高压换流站调相机与近区电厂的无功置换方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111799811A true CN111799811A (zh) | 2020-10-20 |
CN111799811B CN111799811B (zh) | 2023-04-14 |
Family
ID=72808448
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010669811.6A Active CN111799811B (zh) | 2020-07-13 | 2020-07-13 | 电网中特高压换流站调相机与近区电厂的无功置换方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111799811B (zh) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100106338A1 (en) * | 2008-10-29 | 2010-04-29 | Korea Electric Power Corporation | Optimized system voltage control method through coordinated control of reactive power source |
CN107834567A (zh) * | 2017-11-30 | 2018-03-23 | 国家电网公司西北分部 | 特高压直流换流站与近区发电厂的无功电压协调控制方法 |
CN107959303A (zh) * | 2017-11-30 | 2018-04-24 | 国家电网公司 | 特高压直流换流站与近区变电站的无功电压协调控制方法 |
CN108493950A (zh) * | 2018-05-09 | 2018-09-04 | 国网湖南省电力有限公司 | 特高压直流近区多级电网协调自动电压控制方法及系统 |
CN108631350A (zh) * | 2018-04-27 | 2018-10-09 | 南瑞集团有限公司 | 一种抑制直流换相失败的换流站近区电容器紧急投切方法 |
CN109586311A (zh) * | 2018-12-12 | 2019-04-05 | 国家电网有限公司 | 一种调相机与直流换流站无功补偿装置的协调控制方法 |
CN109755953A (zh) * | 2019-02-20 | 2019-05-14 | 河海大学 | 一种调相机参与的交直流输电系统稳态电压协同控制方法 |
CN111082430A (zh) * | 2020-01-15 | 2020-04-28 | 国网湖南省电力有限公司 | 与特高压直流换流站无功电压控制相协调的调相机定电压控制方法、系统及介质 |
-
2020
- 2020-07-13 CN CN202010669811.6A patent/CN111799811B/zh active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100106338A1 (en) * | 2008-10-29 | 2010-04-29 | Korea Electric Power Corporation | Optimized system voltage control method through coordinated control of reactive power source |
CN107834567A (zh) * | 2017-11-30 | 2018-03-23 | 国家电网公司西北分部 | 特高压直流换流站与近区发电厂的无功电压协调控制方法 |
CN107959303A (zh) * | 2017-11-30 | 2018-04-24 | 国家电网公司 | 特高压直流换流站与近区变电站的无功电压协调控制方法 |
CN108631350A (zh) * | 2018-04-27 | 2018-10-09 | 南瑞集团有限公司 | 一种抑制直流换相失败的换流站近区电容器紧急投切方法 |
CN108493950A (zh) * | 2018-05-09 | 2018-09-04 | 国网湖南省电力有限公司 | 特高压直流近区多级电网协调自动电压控制方法及系统 |
CN109586311A (zh) * | 2018-12-12 | 2019-04-05 | 国家电网有限公司 | 一种调相机与直流换流站无功补偿装置的协调控制方法 |
CN109755953A (zh) * | 2019-02-20 | 2019-05-14 | 河海大学 | 一种调相机参与的交直流输电系统稳态电压协同控制方法 |
CN111082430A (zh) * | 2020-01-15 | 2020-04-28 | 国网湖南省电力有限公司 | 与特高压直流换流站无功电压控制相协调的调相机定电压控制方法、系统及介质 |
Non-Patent Citations (5)
Title |
---|
HAO XU ET AL.: "Optimizing_Scheme_of_Network_Performance_for_AVC_Control_System_of_Condenser_in_Shaoshan_Converter_Station", 《IEEE》 * |
MANG JIANG ET AL.: "Reactive Power and Voltage Control in VSC-HVDC Connected Wind Farms Considering Stochastic Wind Power", 《IEEE》 * |
杨方 等: "AGC与AVC协调控制和电压动态安全性", 《电力系统自动化》 * |
牛拴保 等: "计及分级式可控高抗的750KV联网通道自动电压控制", 《电力系统自动化》 * |
郭庆来 等: "自动电压控制中连续变量与离散变量的协调方法 (二)厂站协调控制", 《电力系统自动化》 * |
Also Published As
Publication number | Publication date |
---|---|
CN111799811B (zh) | 2023-04-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107834567B (zh) | 特高压直流换流站与近区发电厂的无功电压协调控制方法 | |
CN108400609B (zh) | 适应于调相机的抑制多馈入直流换相失败选址方法 | |
CN109378830B (zh) | 一种基于远距离输电的同步调相机选址方法 | |
CN112467753B (zh) | 一种无功置换方法及装置 | |
CN113452011B (zh) | 一种双联接变压器海上风电直流送出系统及控制方法 | |
EP3469679B1 (en) | Improvements relating to the interconnection of multiple renewable energy power plants | |
CN106599341B (zh) | 含柔性直流输电系统的安稳控制策略表生成方法 | |
CN106712068A (zh) | 一种并联混合直流输电系统及其无功调节优化方法 | |
CN111725814A (zh) | 特高压换流站调相机与变电站无功设备的无功置换方法 | |
CN110994624B (zh) | 避免特高压直流换流站故障引起电压越限的电压控制方法 | |
CN111799811B (zh) | 电网中特高压换流站调相机与近区电厂的无功置换方法 | |
CN111555337B (zh) | 一种面向直流弱受端电网提升直流受电能力的分析方法 | |
CN112134450B (zh) | 直流耗能装置与直流保护的配合方法及配合装置 | |
CN111276984B (zh) | 直流落地点近区电网一次调频分区协同控制的方法及系统 | |
CN112510763B (zh) | 一种源网荷协同控制系统及方法 | |
CN112600239A (zh) | 一种风电并网控制方法 | |
CN113241801A (zh) | 一种基于电压稳定约束的新能源临界渗透率确定方法及装置 | |
Hui et al. | Research on the influence of large scale offshore wind turbines integrated into Jiangsu power system | |
CN112086986B (zh) | 混合多馈入直流系统低压限流协调控制方法 | |
CN115940402A (zh) | 一种用于交直流协调控制的系统及方法 | |
WO2024093152A1 (zh) | 一种100%新能源送端电网的分布式电压钳位方法 | |
Cheng et al. | Coordinated Control Strategy for Fault-Blocking of Modular Multilevel Converter in Hybrid Cascaded Ultra High Voltage Direct Current Transmission Systems Based on Protection Signal | |
Chen et al. | Analysis and Discussion on Technical Requirements for Operation of Photovoltaic Power Generation | |
Sun et al. | Study on the Optimization of Renewable Energy LVRT Reactive Power Parameters based on Various Voltage Stability Constraints | |
Li et al. | Research on regional emergency DC power support strategy of VSC-MTDC transmission system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |