Flow configuration method, device, equipment and storage medium Download PDFInfo
- Publication number
- CN111798161A CN111798161A CN202010714547.3A CN202010714547A CN111798161A CN 111798161 A CN111798161 A CN 111798161A CN 202010714547 A CN202010714547 A CN 202010714547A CN 111798161 A CN111798161 A CN 111798161A
- Authority
- CN
- China
- Prior art keywords
- event
- flow
- editing operation
- determining
- development task
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06316—Sequencing of tasks or work
-
- A—HUMAN NECESSITIES
- A63—SPORTS; GAMES; AMUSEMENTS
- A63F—CARD, BOARD, OR ROULETTE GAMES; INDOOR GAMES USING SMALL MOVING PLAYING BODIES; VIDEO GAMES; GAMES NOT OTHERWISE PROVIDED FOR
- A63F13/00—Video games, i.e. games using an electronically generated display having two or more dimensions
- A63F13/60—Generating or modifying game content before or while executing the game program, e.g. authoring tools specially adapted for game development or game-integrated level editor
Abstract
The embodiment of the application provides a flow configuration method, a flow configuration device, a flow configuration equipment and a storage medium, which are applied to the technical field of computers, wherein the method comprises the following steps: determining an event to be configured of the target development task according to the input first editing operation aiming at the target development task, configuring the event to be configured according to the input configuration information aiming at the event to be configured, and acquiring a development flow file. According to the scheme, when the game development process changes, only the development process file needs to be configured on line, so that the communication cost is greatly reduced, and the development efficiency is improved.
Description
Technical Field
The present application relates to the field of computer technologies, and in particular, to a method, an apparatus, a device, and a storage medium for flow configuration.
Background
The game development process usually goes through different stages, such as an initial development stage, a middle development stage testing stage, a late development stage formal operation stage, and the like, and different game versions are usually iterated at each stage in order to realize better game experience, wherein a specific game development flow needs to be formulated for realizing each game version.
At present, an administrator usually makes an initial document of a game development process, and stores and shares the initial document to each executive, when a game version is updated, the game development process may also change, the administrator often notifies each executive of a change point through a communication tool, and each executive executes game development based on the change point and the initial document.
However, during the frequent change of the game development process, the communication cost is high and the communication effect is not good.
Disclosure of Invention
The present application aims to provide a flow configuration method, apparatus, device and storage medium to solve the problems of high communication cost and poor communication effect caused by the fact that a manager usually orally notifies a change point to an executive when a game development flow changes in the prior art.
In order to achieve the above purpose, the technical solutions adopted in the embodiments of the present application are as follows:
in a first aspect, an embodiment of the present application provides a method for configuring a process, where the method includes:
determining an event to be configured of a target development task according to an input first editing operation aiming at the target development task;
and configuring the event to be configured according to the input configuration information aiming at the event to be configured, and acquiring a development process file.
Optionally, the determining, according to an input first editing operation for a target development task, an event to be configured of the target development task includes:
determining a flow to be configured of the target development task according to the first editing operation;
and determining the event to be configured of the target development task according to the input second editing operation aiming at the process to be configured.
Optionally, the determining, according to the first editing operation, a to-be-configured flow of the target development task includes:
acquiring an optional flow to be configured of the target development task according to the first editing operation;
and determining the flows to be configured according to the input deletion operation aiming at part of the flows to be configured in the selectable flows to be configured.
Optionally, the determining, according to the first editing operation, a to-be-configured flow of the target development task includes:
acquiring an optional flow to be configured of the target development task according to the first editing operation;
and acquiring a new flow to be configured, and determining the selectable flow to be configured and the new flow to be configured as the flow to be configured of the target development task.
Optionally, the configuring the event to be configured according to the input configuration information for the event to be configured to obtain a development process file includes:
displaying a configuration page of the event to be configured according to an input third editing operation aiming at the event to be configured;
and configuring the event to be configured according to the configuration information on the configuration page to acquire a development process file.
Optionally, after determining the event to be configured of the target development task according to the input second editing operation for the flow to be configured, the method further includes:
and setting the execution sequence of the events to be configured.
Optionally, the configuration information includes at least one of the following information:
the identification information of the event to be configured, the attribute information of the event to be configured, and the execution information of the event to be configured.
In a second aspect, another embodiment of the present application provides a process configuration apparatus, including:
the system comprises a determining module, a processing module and a processing module, wherein the determining module is used for determining an event to be configured of a target development task according to an input first editing operation aiming at the target development task;
and the acquisition module is used for configuring the event to be configured according to the input configuration information aiming at the event to be configured and acquiring a development process file.
Optionally, the determining module is specifically configured to:
determining a flow to be configured of the target development task according to the first editing operation;
and determining the event to be configured of the target development task according to the input second editing operation aiming at the process to be configured.
Optionally, the determining module is specifically configured to:
acquiring an optional flow to be configured of the target development task according to the first editing operation;
and determining the flows to be configured according to the input deletion operation aiming at part of the flows to be configured in the selectable flows to be configured.
Optionally, the determining module is specifically configured to:
acquiring an optional flow to be configured of the target development task according to the first editing operation;
and acquiring a new flow to be configured, and determining the selectable flow to be configured and the new flow to be configured as the flow to be configured of the target development task.
Optionally, the obtaining module is specifically configured to:
displaying a configuration page of the event to be configured according to an input third editing operation aiming at the event to be configured;
and configuring the event to be configured according to the configuration information on the configuration page to acquire a development process file.
Optionally, the method further comprises:
and the setting module is used for setting the execution sequence of the events to be configured.
Optionally, the configuration information includes at least one of the following information:
the identification information of the event to be configured, the attribute information of the event to be configured, and the execution information of the event to be configured.
In a third aspect, another embodiment of the present application provides an electronic device, including a processor and a memory; the memory has stored therein executable instructions of the processor; wherein the processor is configured to perform the steps of the method of any of the above first aspects via execution of the executable instructions.
In a fourth aspect, another embodiment of the present application provides a computer-readable storage medium, which stores computer instructions that, when executed on an electronic device, cause the electronic device to perform the steps of any one of the methods of the first aspect.
The embodiment of the application provides a flow configuration method, a flow configuration device, equipment and a storage medium, wherein the method comprises the following steps: determining an event to be configured of the target development task according to the input first editing operation aiming at the target development task, configuring the event to be configured according to the input configuration information aiming at the event to be configured, and acquiring a development flow file. According to the scheme, when the game development process changes, only the development process file needs to be configured on line, so that the communication cost is greatly reduced, and the development efficiency is improved.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings that are required to be used in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present application and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings can be obtained from the drawings without inventive effort.
Fig. 1 shows a first flowchart of a flow configuration method provided in an embodiment of the present application;
FIG. 2 is a first diagram illustrating a page change provided by an embodiment of the present application;
fig. 3 shows a second flowchart of the flow configuration method according to the embodiment of the present application;
FIG. 4 is a diagram illustrating a second page change provided by an embodiment of the present application;
fig. 5 shows a third schematic flowchart of a flow configuration method provided in an embodiment of the present application;
FIG. 6 is a third schematic diagram illustrating a page change provided by an embodiment of the present application;
FIG. 7 is a schematic diagram illustrating a process flow configuration provided by an embodiment of the application;
fig. 8 is a schematic structural diagram illustrating a flow configuration apparatus provided in an embodiment of the present application;
fig. 9 shows a schematic structural diagram of an electronic device provided in an embodiment of the present application.
Detailed Description
In order to make the purpose, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it should be understood that the drawings in the present application are for illustrative and descriptive purposes only and are not used to limit the scope of protection of the present application. Additionally, it should be understood that the schematic drawings are not necessarily drawn to scale. The flowcharts used in this application illustrate operations implemented according to some embodiments of the present application. It should be understood that the operations of the flow diagrams may be performed out of order, and steps without logical context may be performed in reverse order or simultaneously. One skilled in the art, under the guidance of this application, may add one or more other operations to, or remove one or more operations from, the flowchart.
In addition, the described embodiments are only a part of the embodiments of the present application, and not all of the embodiments. The components of the embodiments of the present application, generally described and illustrated in the figures herein, can be arranged and designed in a wide variety of different configurations. Thus, the following detailed description of the embodiments of the present application, presented in the accompanying drawings, is not intended to limit the scope of the claimed application, but is merely representative of selected embodiments of the application. All other embodiments, which can be derived by a person skilled in the art from the embodiments of the present application without making any creative effort, shall fall within the protection scope of the present application.
It should be noted that in the embodiments of the present application, the term "comprising" is used to indicate the presence of the features stated hereinafter, but does not exclude the addition of further features. Furthermore, the terms "first," "second," "third," and "fourth," etc. in the description and claims of the present application and the accompanying drawings are used for distinguishing between similar elements and not necessarily for describing a particular sequential or chronological order.
The embodiment of the application provides a process configuration method, a device, equipment and a storage medium, aiming at the problems that when a game development process changes, a manager usually informs an executive of a change point orally, so that communication cost is high and transmission effect is poor, and the executive possibly executes corresponding operation based on an original game development process and has quality risk. The beneficial effects of the embodiment of the application are that: when the game development process changes, only the development process file needs to be configured on line, so that the communication cost is greatly reduced, and the development efficiency is improved.
The technical solution of the present application will be described in detail below with reference to specific examples. It should be noted that the following specific embodiments may be combined with each other, and the same or similar concepts or processes may not be described in detail in some embodiments.
Fig. 1 is a schematic flow diagram illustrating a flow configuration method according to an embodiment of the present disclosure, where an execution main body of the embodiment may be an electronic device, such as a mobile phone, a tablet computer, a notebook computer, and the like, which is not limited in this embodiment.
As shown in fig. 1, the flow configuration method provided in this embodiment includes the following steps:
s101, determining an event to be configured of the target development task according to the input first editing operation aiming at the target development task.
The target development task may be a target game version development task, and the target game may be any game, which is not limited in this embodiment. The to-be-configured event of the target development task refers to an event to be executed by the executive for the target development task, such as "risk assessment", "demand development", "problem regression", "version verification", and the like.
In this embodiment, the event to be configured corresponding to the target development task may be determined according to the first editing operation on the target development task. It can be understood that events to be configured corresponding to different target development tasks may be the same or different, and may be specifically set according to actual requirements, which is not limited in this embodiment.
The number of events to be configured for the target development task includes, but is not limited to, one.
S102, configuring the event to be configured according to the input configuration information aiming at the event to be configured, and acquiring a development process file.
The configuration information of the event to be configured refers to specific content of the event to be configured, taking the event to be configured as "risk assessment," as an example, the configuration information of the "risk assessment" may include executive personnel information of the risk assessment, specific content of the risk assessment, completion time, and the like, and may be specifically set according to actual requirements, which is not limited in this embodiment.
Optionally, the configuration information comprises at least one of the following information:
the method comprises the steps of identifying information of an event to be configured, attribute information of the event to be configured and execution information of the event to be configured.
The identification information of the event to be configured may be a name of the event to be configured, such as "risk assessment", that is, the name of the event to be configured is modified; the attribute information of the event to be configured may include specific content, completion time, and the like of the event to be configured, and also taking the event to be configured as "risk assessment" as an example, the identification information of the event to be configured may be modified to "on monday 17: 00, the risk assessment is performed, and the attribute information may include, for example, "weekly pushing to complete the development task in this week", "if the development requirement cannot be completed, it is necessary to assess whether the maintenance time is affected", "testing the content that has been developed, and assessing whether the risk exists", etc.
The execution information of the event to be configured may include an executive of the event to be configured, a medium mode of the event to be configured, and the like.
Alternatively, the manner of executing the event to be configured, i.e., the manner of confirming the event to be configured, may include QUALITY ASSURANCE (QA) personnel confirmation, program confirmation, and plan personnel confirmation, that is, who performed the event, for example.
Wherein the program confirmation comprises program value week confirmation and selected program confirmation. Program duty cycle confirmation refers to confirmation by a programmer on duty in the week; selecting program confirmation refers to confirmation by a designated programmer.
The following explains the embodiment with reference to fig. 2, where fig. 2 shows a schematic diagram of a page change provided in the embodiment of the present application, and referring to fig. 2, a task configuration page includes identifiers of multiple development tasks, and when a user clicks a target development task, a first editing operation for the target development task is obtained, or the task configuration page further includes an editing icon corresponding to the identifier of each development task, and when the user clicks the editing icon for the target development task, the first editing operation for the target development task is obtained; then, an event configuration page of the target development task can be entered, the event configuration page includes a plurality of identifiers of the events to be configured, then, a user can input configuration information of each event to be configured, and click the saving icon to obtain a development flow file, that is, the events to be configured are configured according to the input configuration information of the events to be configured, and the development flow file is obtained. The identifiers of the plurality of development tasks shown in fig. 2 are respectively denoted as: task 1, task 2, task 3, task 4 and task 5, wherein the target development task is task 2; the events to be configured are respectively recorded as: event 1, event 2, event 3.
It can be understood that the obtained development flow file may be in a text form, may also be in an event configuration page shown in fig. 2, may also be in a list form, and the like, which is not limited in this embodiment.
In an implementation of the present application, the task configuration page may further include a deletion icon corresponding to an identifier of each development task, and the user clicks the corresponding deletion icon to delete the corresponding development task.
In an implementation of the present application, the event configuration page may further include a deletion icon corresponding to an identifier of each event to be configured, and the user clicks the corresponding deletion icon to delete the corresponding event to be configured.
It should be noted that fig. 2 is only an exemplary illustration of the task configuration page and the event configuration page, and in practical applications, the above forms are included but not limited.
The process configuration method provided by the embodiment includes: determining an event to be configured of the target development task according to the input first editing operation aiming at the target development task, configuring the event to be configured according to the input configuration information aiming at the event to be configured, and acquiring a development flow file. According to the scheme, when the game development process changes, only the development process file needs to be configured on line, so that the communication cost is greatly reduced, and the development efficiency is improved.
Exemplarily, in one possible implementation of the present application, step S101 may include: and determining a to-be-configured flow of the target development task according to the first editing operation, and determining a to-be-configured event of the target development task according to the input second editing operation aiming at the to-be-configured flow. Reference is made in particular to the embodiment illustrated in figure 3 described below.
Fig. 3 shows a second flowchart of the flow configuration method provided in the embodiment of the present application, and as shown in fig. 3, the flow configuration method provided in the embodiment includes the following steps:
s201, determining a to-be-configured flow of the target development task according to the first editing operation.
S202, determining an event to be configured of the target development task according to the input second editing operation aiming at the process to be configured.
The flows to be configured refer to various flows to be executed to realize the target development task, for example, the flows may be "weekly maintenance flows", "non-stop maintenance flows", "overseas outsourcing flows", and the like, which may be specifically set according to actual requirements, and this embodiment does not limit the flows.
And determining the flow to be configured corresponding to the target development task according to the first editing operation on the target development task. It can be understood that flows to be configured corresponding to different target development tasks may be the same or different, and may be specifically set according to actual requirements, which is not limited in this embodiment.
Referring to fig. 4, the task configuration page includes a plurality of development task identifiers and an editing icon corresponding to each of the identifiers, when a user clicks the editing icon corresponding to a target development task, a first editing operation for the target development task is obtained, and then the process configuration page may be entered, where the process configuration page includes the identifiers of the processes to be configured, that is, the processes to be configured of the target development task are determined according to the first editing operation, the process configuration page further includes the editing icons corresponding to the processes to be configured, that is, the configuration process icons, and the number of the processes to be configured includes, but is not limited to, one. The identifiers of the plurality of development tasks shown in fig. 4 are respectively denoted as: task 1, task 2, task 3, task 4 and task 5, wherein the target development task is task 2; the identifiers of the flows to be configured are respectively recorded as: scheme 1, scheme 2, scheme 3, scheme 4 and scheme 5.
In an implementation of the present application, the process configuration page may further include a modification icon corresponding to each identifier of the process to be configured, and when the user clicks the corresponding modification icon, the corresponding identifier of the process to be configured is modified.
In an implementation of the present application, the process configuration page may further include a deletion icon corresponding to each identifier of the process to be configured, and the user clicks the corresponding deletion icon to delete the corresponding process to be configured.
In an implementation of the present application, the process configuration page may further include a modification icon corresponding to each identifier of the process to be configured, and when the user clicks the corresponding modification icon, the corresponding identifier of the process to be configured is modified.
Then, when the user clicks the editing icon corresponding to each identifier of the flow to be configured, a second editing operation for the flow to be configured is obtained, and then an event configuration page can be entered, wherein the event configuration page includes identifiers of a plurality of events to be configured, that is, the events to be configured of the target development task are determined according to the input second editing operation for the flow to be configured. Wherein, fig. 4 shows that the editing icon corresponding to the process 1 is clicked, the event configuration page of the process 1 is entered, and the displayed identifiers of the events to be configured are respectively marked as: event 1, event 2, event 3. According to the method, each event to be configured under each process to be configured corresponding to the target development task can be determined, then the user can input the configuration information of each event to be configured, and click the storage icon to obtain the development process file, that is, the event to be configured is configured according to the input configuration information of the event to be configured, and the development process file is obtained.
In an implementation of the present application, the event configuration page may further include a deletion icon corresponding to an identifier of each event to be configured, and the user clicks the corresponding deletion icon to delete the corresponding event to be configured.
It should be noted that fig. 2 is only an exemplary illustration of the task configuration page and the event configuration page, and in practical applications, the above forms are included but not limited.
Exemplarily, after determining the event to be configured of the target development task according to the input second editing operation for the flow to be configured, the method further includes:
and setting the execution sequence of the events to be configured.
Referring to fig. 4, the execution order of each event to be configured may be set, such as setting event 1 to 1, setting event 2 to 3, and setting event 3 to 2. Therefore, the sequence of each event is also included in the generated development flow file, so that subsequent executors can conveniently execute each event in sequence.
It should be noted that fig. 4 is only an exemplary illustration of the task configuration page, the process configuration interface, and the event configuration page, and in practical applications, the above forms are included but not limited.
In a possible implementation of the present application, a user may also delete a part of the processes to be configured according to actual requirements. Exemplarily, step S201 specifically includes:
acquiring an optional flow to be configured of a target development task according to the first editing operation;
and determining the flows to be configured according to the input deletion operation aiming at part of the flows to be configured in the selectable flows to be configured.
The selectable flows to be configured and the target development task have a corresponding relation, when the first editing operation aiming at the target development task is obtained, the selectable flows to be configured corresponding to the target development task can be obtained, and then the flows to be configured are determined according to the input deleting operation aiming at part of the flows to be configured in the selectable flows to be configured.
In a possible implementation of the present application, a user may also create a new flow to be configured according to actual requirements. Exemplarily, step S201 specifically includes:
acquiring an optional flow to be configured of a target development task according to the first editing operation;
and acquiring a new flow to be configured, and determining the selectable flow to be configured and the new flow to be configured as the flow to be configured of the target development task.
The selectable flow to be configured and the target development task have a corresponding relation, when the first editing operation aiming at the target development task is obtained, the selectable flow to be configured corresponding to the target development task can be obtained, then the flow to be configured can be newly established according to requirements, and the selectable flow to be configured and the new flow to be configured are determined as the flow to be configured of the target development task.
According to the flow configuration method provided by the embodiment, the flow to be configured of the target development task is determined according to the first editing operation, and the event to be configured of the target development task is determined according to the input second editing operation aiming at the flow to be configured. In the embodiment, the corresponding event to be configured is determined through the process to be configured, so that the development process file is configured on line subsequently, the communication cost is greatly reduced, and the development efficiency is improved.
Exemplarily, in one possible implementation of the present application, the step S102 specifically includes: and displaying a configuration page of the event to be configured according to the input third editing operation aiming at the event to be configured, configuring the event to be configured according to the configuration information on the configuration page, and acquiring a development flow file. Reference is made in particular to the embodiment illustrated in figure 5 described below.
Fig. 5 shows a third schematic flow chart of the flow configuration method provided in the embodiment of the present application, and as shown in fig. 5, the flow configuration method provided in the embodiment includes the following steps:
s301, determining an event to be configured of the target development task according to the input first editing operation aiming at the target development task.
For a specific implementation manner of step S301, refer to step S101 in the embodiment of fig. 1, which is not described herein again.
S302, displaying a configuration page of the event to be configured according to the input third editing operation aiming at the event to be configured.
And S303, configuring the event to be configured according to the configuration information on the configuration page, and acquiring a development process file.
After the event to be configured of the target development task is determined, the user may input a third editing operation for the event to be configured, so as to display the configuration page of the event to be configured, that is, the configuration page of the event to be configured is displayed according to the input third editing operation for the event to be configured. And then, configuring the event to be configured according to the input configuration information on the configuration page to obtain a development flow file.
The following explains the present embodiment with reference to fig. 6, where fig. 6 shows a third schematic diagram of page changes provided in the present embodiment, on the basis of the embodiment of fig. 4, an event configuration page may be entered according to an input second editing operation for a to-be-configured process, where the event configuration page includes a plurality of identifiers of to-be-configured events and an editing icon corresponding to each identifier of to-be-configured events, and when a user clicks the editing icon corresponding to the identifier of to-be-configured event, a third editing operation for the to-be-configured event is obtained, that is, according to the input third editing operation for the to-be-configured event, a configuration page for the to-be-configured event is displayed, a to-be-configured parameter is configured according to input configuration information, a development process file may be obtained after saving, that is, a to-be-configured event is configured according to the configuration information, and acquiring a development process file.
Illustratively, the configuration information includes at least one of the following information: the method comprises the steps of identifying information of an event to be configured, attribute information of the event to be configured and execution information of the event to be configured.
Alternatively, the manner of executing the event to be configured, i.e., the manner of confirming the event to be configured, may include QUALITY ASSURANCE (QA) personnel confirmation, program confirmation, and plan personnel confirmation, that is, who performed the event, for example.
Wherein the program confirmation comprises program value week confirmation and selected program confirmation. Program duty cycle confirmation refers to confirmation by a programmer on duty in the week; selecting program confirmation refers to confirmation by a designated programmer.
It should be noted that the identifications of the plurality of events to be configured shown in fig. 6 are respectively denoted as: and event 1, event 2 and event 3, wherein the editing icon corresponding to the event 1 is clicked, the configuration page of the event 1 is entered, and when the program is selected for confirmation, a secondary page is developed to display options for program value week confirmation and program selection confirmation. Of course, after the selection procedure is confirmed, the executive can also be selected on the page.
In one implementation of the present application, the event configuration page may further include:
the method comprises the steps of determining the execution sequence of events to be configured, confirming the information of executive personnel who have completed the events to be configured, reminding icons, deleting icons corresponding to the identifiers of the events to be configured, namely trash can icons, newly-built event icons, saving icons and the like, wherein the executive personnel corresponding to the events to be configured can be set by clicking the reminding icons, and the saving icons are used for saving the set execution sequence of the events to be configured. The method may be determined according to actual requirements, and this embodiment does not limit this.
In one implementation of the present application, the configuration page of the event to be configured may further include other options, for example, an option whether to trigger the event and an option whether to need to be expanded, where selecting the option of the trigger event indicates that after the event to be configured is completed, another event to be configured needs to be triggered and completed; selecting the need to expand option representation may also set other information. The method may be determined according to actual requirements, and this embodiment does not limit this.
Based on the above method embodiments, the following explains the technical solution with a specific embodiment.
Fig. 7 is a schematic diagram illustrating a process configuration process provided in an embodiment of the present application, and referring to fig. 7, the process configuration process may be implemented on a manifest (english name: checklist) platform, and specifically includes the following steps:
firstly, generating a development process file.
Firstly, a user logs in a checklist platform to determine a plurality of development tasks accessed to the platform, enters a process configuration page after clicking a target development task in the task configuration page, can display a plurality of default flows to be configured in the process configuration page, and can delete part of the flows to be configured or create the flows to be configured as required; then, clicking a to-be-configured flow, entering an event configuration page, displaying a plurality of default to-be-configured events on the event configuration page, deleting part of the to-be-configured events or creating new to-be-configured events according to requirements, entering the configuration page for each to-be-configured event, configuring the to-be-configured events on the configuration page according to input configuration information, then clicking a 'starting flow', after the starting flow, generating a development flow file, namely, a chenklist, by a platform according to the configuration, and sending the checklist to each executive.
As can be seen from fig. 7, a number of development tasks are written as: project 1, project 2 and project 3, wherein the target development task is project 1, and the flow to be configured corresponding to project 1 is recorded as: scheme 1, scheme 2 and scheme 3.
And secondly, executing a target development task.
Referring to fig. 8, fig. 8 shows a schematic diagram of a development flow file provided in an embodiment of the present application, and as can be seen from fig. 8, a target development task is executed according to a checklist, where the checklist is composed of an event 1 and an event 2 … …, and when an event 2 is clicked, that is, configuration information corresponding to the event 2 is displayed, each executor executes an event according to the configuration information. In addition, each event in the checklist also provides functions of confirmation, remarking, claiming, and assignment.
The confirmation function means that after a certain event is completed, the executive personnel can click to confirm; claim function refers to an event that the executive can also claim others; the remark function refers to that remark information can be added when an executive executes a certain event; assigning a function means that the executive can assign his time to others.
In one implementation of the present application, since each event sets the execution order, for example, event 1 is the first event, event 2 is the second event, and so on, event 10 is the 10 th event. When an event is completed, the next event may be automatically entered, at which point the platform may send a notification to the next executive to execute the event.
In addition, after a certain event is completed, the executive personnel can click to confirm, and then the user can log in the platform to check which event is executed in real time, which events are not executed and which events are executed.
Thirdly, storing the history
Generally, after the last executive completes execution of the corresponding configured event, the 'ending process' can be clicked, so that execution of the event is ended, the checklist after execution of the event can be stored in a history record, and a user can check the checklist by clicking 'checking history' on the platform, so that the execution condition of each event of the target development task in the development process can be known.
Based on the same inventive concept, a process configuration device corresponding to the process configuration method is also provided in the embodiments of the present application, and since the principle of solving the problem of the device in the embodiments of the present application is similar to that of the process configuration method described above in the embodiments of the present application, the implementation of the device may refer to the implementation of the method, and repeated details are not described again.
Fig. 8 shows a schematic structural diagram of a flow configuration apparatus provided in an embodiment of the present application, and as shown in fig. 8, the flow configuration apparatus 80 includes:
a determining module 801, configured to determine, according to an input first editing operation for a target development task, an event to be configured of the target development task;
the obtaining module 802 is configured to configure the event to be configured according to the input configuration information for the event to be configured, and obtain a development flow file.
Optionally, the determining module 801 is specifically configured to:
determining a flow to be configured of the target development task according to the first editing operation;
and determining the event to be configured of the target development task according to the input second editing operation aiming at the process to be configured.
Optionally, the determining module 801 is specifically configured to:
acquiring an optional flow to be configured of the target development task according to the first editing operation;
and determining the flows to be configured according to the input deletion operation aiming at part of the flows to be configured in the selectable flows to be configured.
Optionally, the determining module 801 is specifically configured to:
acquiring an optional flow to be configured of the target development task according to the first editing operation;
and acquiring a new flow to be configured, and determining the selectable flow to be configured and the new flow to be configured as the flow to be configured of the target development task.
Optionally, the obtaining module 802 is specifically configured to:
displaying a configuration page of the event to be configured according to an input third editing operation aiming at the event to be configured;
and configuring the event to be configured according to the configuration information on the configuration page to acquire a development process file.
Optionally, the method further comprises:
a setting module 803, configured to set an execution sequence of the events to be configured.
Optionally, the configuration information includes at least one of the following information:
the identification information of the event to be configured, the attribute information of the event to be configured, and the execution information of the event to be configured.
The description of the processing flow of each module in the device and the interaction flow between the modules may refer to the related description in the above method embodiments, and will not be described in detail here.
An electronic device 60 is further provided in the embodiment of the present application, and fig. 9 shows a schematic structural diagram of the electronic device provided in the embodiment of the present application, and as shown in fig. 9, the electronic device 90 includes:
a processor 901 and a memory 902;
the memory 902 stores executable instructions of the processor 901; wherein the processor 901 is configured to execute the steps of the above flow configuration method via executing the executable instructions.
Alternatively, the processor 901 and the memory 902 may be separate structures or may be an integrated structure integrated together. When the processor 901 and the memory 902 are separate structures, the memory 902 and the processor 901 may be coupled by a bus 903.
The embodiment of the present application further provides a computer-readable storage medium, where a computer program is stored on the computer-readable storage medium, and when the computer program is executed by a processor, the computer program executes the steps of the above-mentioned flow configuration method.
It can be clearly understood by those skilled in the art that, for convenience and brevity of description, the specific working processes of the system and the apparatus described above may refer to corresponding processes in the method embodiments, and are not described in detail in this application. In the several embodiments provided in the present application, it should be understood that the disclosed system, apparatus and method may be implemented in other ways. The above-described apparatus embodiments are merely illustrative, and for example, the division of the modules is merely a logical division, and there may be other divisions in actual implementation, and for example, a plurality of modules or components may be combined or integrated into another system, or some features may be omitted, or not executed. In addition, the shown or discussed mutual coupling or direct coupling or communication connection may be an indirect coupling or communication connection of devices or modules through some communication interfaces, and may be in an electrical, mechanical or other form.
In addition, functional units in the embodiments of the present application may be integrated into one processing unit, or each unit may exist alone physically, or two or more units are integrated into one unit. The functions, if implemented in the form of software functional units and sold or used as a stand-alone product, may be stored in a computer readable storage medium. Based on such understanding, the technical solution of the present invention may be embodied in the form of a software product, which is stored in a storage medium and includes instructions for causing a computer device (which may be a personal computer, a server, or a network device) to execute all or part of the steps of the method according to the embodiments of the present invention. And the aforementioned storage medium includes: various media capable of storing program codes, such as a usb disk, a removable hard disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a magnetic disk, or an optical disk.
The above description is only for the specific embodiments of the present application, but the scope of the present application is not limited thereto, and any person skilled in the art can easily conceive of the changes or substitutions within the technical scope of the present application, and shall be covered by the scope of the present application.
Claims (10)
1. A method for process configuration, the method comprising:
determining an event to be configured of a target development task according to an input first editing operation aiming at the target development task;
and configuring the event to be configured according to the input configuration information aiming at the event to be configured, and acquiring a development process file.
2. The method according to claim 1, wherein the determining the event to be configured of the target development task according to the input first editing operation for the target development task comprises:
determining a flow to be configured of the target development task according to the first editing operation;
and determining the event to be configured of the target development task according to the input second editing operation aiming at the process to be configured.
3. The method according to claim 2, wherein the determining the to-be-configured flow of the target development task according to the first editing operation comprises:
acquiring an optional flow to be configured of the target development task according to the first editing operation;
and determining the flows to be configured according to the input deletion operation aiming at part of the flows to be configured in the selectable flows to be configured.
4. The method according to claim 2, wherein the determining the to-be-configured flow of the target development task according to the first editing operation comprises:
acquiring an optional flow to be configured of the target development task according to the first editing operation;
and acquiring a new flow to be configured, and determining the selectable flow to be configured and the new flow to be configured as the flow to be configured of the target development task.
5. The method according to claim 1, wherein the configuring the event to be configured according to the input configuration information for the event to be configured to obtain a development process file comprises:
displaying a configuration page of the event to be configured according to an input third editing operation aiming at the event to be configured;
and configuring the event to be configured according to the configuration information on the configuration page to acquire a development process file.
6. The method according to claim 3, wherein after determining the event to be configured of the target development task according to the input second editing operation for the flow to be configured, the method further comprises:
and setting the execution sequence of the events to be configured.
7. The method according to any of claims 1-6, wherein the configuration information comprises at least one of the following information:
the identification information of the event to be configured, the attribute information of the event to be configured, and the execution information of the event to be configured.
8. A process configuration apparatus, comprising:
the system comprises a determining module, a processing module and a processing module, wherein the determining module is used for determining an event to be configured of a target development task according to an input first editing operation aiming at the target development task;
and the acquisition module is used for configuring the event to be configured according to the input configuration information aiming at the event to be configured and acquiring a development process file.
9. An electronic device comprising a processor and a memory; the memory has stored therein executable instructions of the processor; wherein the processor is configured to perform the method of any of claims 1-7 via execution of the executable instructions.
10. A computer-readable storage medium having stored thereon computer instructions which, when run on an electronic device, cause the electronic device to perform the method of any one of claims 1-7.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010714547.3A CN111798161A (en) | 2020-07-21 | 2020-07-21 | Flow configuration method, device, equipment and storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010714547.3A CN111798161A (en) | 2020-07-21 | 2020-07-21 | Flow configuration method, device, equipment and storage medium |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111798161A true CN111798161A (en) | 2020-10-20 |
Family
ID=72827080
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010714547.3A Pending CN111798161A (en) | 2020-07-21 | 2020-07-21 | Flow configuration method, device, equipment and storage medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111798161A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114443164A (en) * | 2022-01-14 | 2022-05-06 | 阳光保险集团股份有限公司 | Task processing method and device, electronic equipment and storage medium |
CN115526579A (en) * | 2021-11-26 | 2022-12-27 | 北京字跳网络技术有限公司 | Method and device for determining item flow, electronic equipment and storage medium |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040255265A1 (en) * | 2003-03-26 | 2004-12-16 | Brown William M. | System and method for project management |
US20060112122A1 (en) * | 2004-11-23 | 2006-05-25 | International Business Machines Corporation | Method, system, and storage medium for implementing business process modules |
CN104217270A (en) * | 2013-06-03 | 2014-12-17 | 深圳中兴网信科技有限公司 | Business process application file generating and execution methods, client, device and system |
CN104679488A (en) * | 2013-11-29 | 2015-06-03 | 亿阳信通股份有限公司 | Flow path customized development platform and method |
CN106201472A (en) * | 2016-06-24 | 2016-12-07 | 网易(杭州)网络有限公司 | The method for scheduling task of software development and device |
CN107632825A (en) * | 2017-08-18 | 2018-01-26 | 深圳怡化电脑股份有限公司 | A kind of business software development approach and device |
CN109324791A (en) * | 2017-08-18 | 2019-02-12 | 深圳怡化电脑股份有限公司 | Finance self-help terminal traffic process development approach, device and terminal device |
CN109408104A (en) * | 2018-09-18 | 2019-03-01 | 天津龙拳风暴科技有限公司 | A kind of method and device for obtaining game and integrating information |
CN109445785A (en) * | 2018-10-11 | 2019-03-08 | 平安科技(深圳)有限公司 | Workflow tool creation method, device and computer storage medium |
CN110443491A (en) * | 2019-08-01 | 2019-11-12 | 上海麦克风文化传媒有限公司 | A kind of Product development process management method |
-
2020
- 2020-07-21 CN CN202010714547.3A patent/CN111798161A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040255265A1 (en) * | 2003-03-26 | 2004-12-16 | Brown William M. | System and method for project management |
US20060112122A1 (en) * | 2004-11-23 | 2006-05-25 | International Business Machines Corporation | Method, system, and storage medium for implementing business process modules |
CN104217270A (en) * | 2013-06-03 | 2014-12-17 | 深圳中兴网信科技有限公司 | Business process application file generating and execution methods, client, device and system |
CN104679488A (en) * | 2013-11-29 | 2015-06-03 | 亿阳信通股份有限公司 | Flow path customized development platform and method |
CN106201472A (en) * | 2016-06-24 | 2016-12-07 | 网易(杭州)网络有限公司 | The method for scheduling task of software development and device |
CN107632825A (en) * | 2017-08-18 | 2018-01-26 | 深圳怡化电脑股份有限公司 | A kind of business software development approach and device |
CN109324791A (en) * | 2017-08-18 | 2019-02-12 | 深圳怡化电脑股份有限公司 | Finance self-help terminal traffic process development approach, device and terminal device |
CN109408104A (en) * | 2018-09-18 | 2019-03-01 | 天津龙拳风暴科技有限公司 | A kind of method and device for obtaining game and integrating information |
CN109445785A (en) * | 2018-10-11 | 2019-03-08 | 平安科技(深圳)有限公司 | Workflow tool creation method, device and computer storage medium |
CN110443491A (en) * | 2019-08-01 | 2019-11-12 | 上海麦克风文化传媒有限公司 | A kind of Product development process management method |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115526579A (en) * | 2021-11-26 | 2022-12-27 | 北京字跳网络技术有限公司 | Method and device for determining item flow, electronic equipment and storage medium |
CN114443164A (en) * | 2022-01-14 | 2022-05-06 | 阳光保险集团股份有限公司 | Task processing method and device, electronic equipment and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8276152B2 (en) | Validation of the change orders to an I T environment | |
EP2778929B1 (en) | Test script generation system | |
US20160342927A1 (en) | Systems and methods for providing an information technology interface | |
US9021312B1 (en) | Method and apparatus for visual pattern analysis to solve product crashes | |
CN110515679B (en) | Data acquisition method, device, equipment and storage medium | |
CN111798161A (en) | Flow configuration method, device, equipment and storage medium | |
CN110704095A (en) | Workflow-based configuration processing method and device, computer equipment and storage medium | |
CN113792341A (en) | Privacy compliance automation detection method, device, equipment and medium for application program | |
CN111695876A (en) | Approval process processing method, device, equipment and storage medium | |
CN107463391A (en) | Task processing method, device and equipment | |
CN109214785B (en) | Workflow implementation method, server and system | |
CN110648126A (en) | Payment type configuration method, device, server and storage medium | |
CN112817817B (en) | Buried point information query method, buried point information query device, computer equipment and storage medium | |
JP6642024B2 (en) | Management device, management method and management program | |
JP2008269401A (en) | Log management program and log management device | |
CN110704301B (en) | TPC-E automatic test method and TPC-E test system | |
CN110221952B (en) | Service data processing method and device and service data processing system | |
CN113577775A (en) | Method and device for checking art resource file, electronic device and storage medium | |
CN108960433B (en) | Method and system for running machine learning modeling process | |
CN114371866A (en) | Version reconfiguration test method, device and equipment of service system | |
CN111651259A (en) | Dependency relationship-based system management method and device and storage medium | |
CN111953583A (en) | Information processing system and method, electronic device, and computer-readable storage medium | |
CN112417259A (en) | Media resource processing method, device, equipment and storage medium | |
CN113656022B (en) | Software development method and device, computer equipment and storage medium | |
CN112383448B (en) | Monitoring data processing method and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |