CN111794556A - Building jacking control system and method - Google Patents

Building jacking control system and method Download PDF

Info

Publication number
CN111794556A
CN111794556A CN202010710689.2A CN202010710689A CN111794556A CN 111794556 A CN111794556 A CN 111794556A CN 202010710689 A CN202010710689 A CN 202010710689A CN 111794556 A CN111794556 A CN 111794556A
Authority
CN
China
Prior art keywords
jack
following
jacking
building
hydraulic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010710689.2A
Other languages
Chinese (zh)
Inventor
董海涛
王海洋
孙仲谋
梁建博
曹亚飞
李志盛
吴二军
闫洋洋
苟金成
王海
赵殿峰
杨世杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Tonggang Architectural Engineering Co ltd
Original Assignee
Shanghai Tonggang Architectural Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Tonggang Architectural Engineering Co ltd filed Critical Shanghai Tonggang Architectural Engineering Co ltd
Priority to CN202010710689.2A priority Critical patent/CN111794556A/en
Publication of CN111794556A publication Critical patent/CN111794556A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/06Separating, lifting, removing of buildings; Making a new sub-structure
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/06Separating, lifting, removing of buildings; Making a new sub-structure
    • E04G23/065Lifting of buildings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to a building jacking control system and a method, wherein the system comprises: a jacking mechanism and a control mechanism; wherein: the climbing mechanism comprises a plurality of groups of jacks for jacking the building, wherein: the jack comprises a plurality of follow-up jacks and a hydraulic jack; the hydraulic jack is matched with the plurality of follow-up jacks to carry out jacking construction; the control mechanism comprises a control program in a computer, and the control program controls the jacking mechanism through the hydraulic pump station. According to the invention, the plurality of follow-up jacks and the hydraulic jack are matched to carry out jacking construction on the building, so that the using amount of equipment is reduced, and the construction cost and the construction period are reduced, thereby ensuring that the whole construction process is safer and the construction cost is lower.

Description

Building jacking control system and method
Technical Field
The invention relates to a building jacking control system and method.
Background
In the prior art, the jacking construction of buildings and methods thereof are generally two types: the first method is that two groups of hydraulic jacks are used for alternately jacking construction; and in the second method, a group of hydraulic jacks and a group of following protection devices are matched for jacking. The two control methods for the hydraulic jack can realize double control of force and displacement. In the jacking engineering of large buildings, the weight and the volume of the buildings are large, the more control points are jacked, and the control precision of each control point must be accurately mastered. In the actual jacking process, the jacking of a large building needs to be divided into a plurality of control points, and each control point needs to be synchronously controlled to form resultant force so as to realize double control of force and displacement.
Due to the jacking of the large building, the accurate control of force and displacement is difficult to realize through a hydraulic jack. The key points are as follows: jacking displacement control is difficult; and when the hydraulic system leaks, a safety accident occurs. For the protection of the jack, there are two common methods, one is: the hydraulic jack is not mechanically protected; the second method comprises the following steps: mechanical protection is added, and the mechanical protection has no jacking force and only follows the support (also called following the roof). The following jack is often used in cooperation with a hydraulic jack, and has the advantages of safety and reliability; but has the disadvantages of large volume and high construction cost.
The invention discloses a hydraulic follow-up supporting device, which is a combination of a hydraulic jack and follow-up protection, and is disclosed in Chinese patent No. ZL201310038243. The hydraulic follow-up jack has the advantages that: the hydraulic jack is integrated with the hydraulic jack, and the cost is low.
Disclosure of Invention
Aiming at the problems of difficult double control of force and displacement and high cost in the prior art, the invention aims to provide a building jacking control system and method which are low in cost and combine a plurality of follow-up jacks and a hydraulic jack with the follow-up jacks
In order to solve the technical problem, the invention is realized in such a way that a building following jacking system and a control method thereof comprise the following steps: a computer control system, an at least hydraulic power unit, at least a set of climbing mechanism, its characterized in that: the device also comprises at least one pressure sensor and at least one position sensor; the jacking mechanism comprises a hydraulic jack, a following jack and N-1 following jacks, wherein the hydraulic jack is connected with the N-1 following jacks in series, and the hydraulic jack is connected with one following jack in parallel; at least one pressure sensor is arranged on the hydraulic pump station, and at least one displacement sensor is arranged at the jacking part of the building; according to the connection, one or more points on the building can be jacked, and the flow steps of the control method are as follows:
step 1: controlling the force and displacement of a hydraulic jack, a following jack and a following jack which are arranged at a supporting point on a building by using a hydraulic pump station;
step 2: the hydraulic pump station works;
and step 3: when the hydraulic jack lifts upwards, the following jack automatically follows upwards to protect the hydraulic jack; meanwhile, the N follow-up jacks automatically follow up to increase the jacking force;
and 4, step 4: the control program reads data of a displacement sensor arranged on a building; when the displacement does not reach the highest value, returning to the step 2; when the displacement reaches the maximum value, skipping to the step 5;
and 5: the control program automatically closes the hydraulic pump station, and the hydraulic jack is locked by the following jack to play a role in protecting the hydraulic jack; simultaneously, the follow-up jack stops.
The N is greater than 2 and less than 10.
The control system and the construction method thereof have the advantages that: the difficulty of double control is reduced; meanwhile, the function of combining the jacking and the protection of the follow-up jack is adopted; the use of the following roof is reduced, the construction cost is saved, and the safety of jacking construction is not reduced.
Drawings
FIG. 1 is a schematic view of the overall structure of an embodiment of the present invention;
FIG. 2 is a flow chart of method steps in one embodiment of the present invention;
FIG. 3 is a flow chart of method steps in one embodiment of the present invention.
Detailed Description
The conception, the specific structure and the technical effects of the present invention will be further described with reference to the accompanying drawings to fully understand the objects, the features and the effects of the present invention.
As shown in fig. 1, the present invention has the following constitution: a building jacking control system, comprising: a jacking mechanism 100 and a control system 300; the jacking mechanism 100 can control one point (one group) or multiple points (multiple groups) of support of the building according to the requirements of the project, and the jacking of one support point of the building can adopt one hydraulic jacking mechanism or one group of hydraulic jacking mechanisms. Wherein: the hydraulic jacking mechanism comprises N-1 follow-up jacks 102 and a hydraulic jack 101; the hydraulic jack 101 is matched with the N-1 follow-up jacks 102 to carry out jacking construction; when the hydraulic jack lifts upwards, the following jack automatically follows upwards to protect the hydraulic jack; the N is determined according to the weight of the building.
The control mechanism 300 includes a control program in a computer that operates the jacking mechanism 100 through the hydraulic pump station 400.
Specifically, the following jacking system for the building and the control method thereof comprise the following steps: a computer control system, a hydraulic power unit, its characterized in that: the lifting device also comprises a group of lifting mechanisms, at least one pressure sensor and at least one position sensor; the group of jacking mechanisms comprises a hydraulic jack, a following jack and N-1 following jacks; at least one pressure sensor is arranged on the hydraulic pump station, and at least one displacement sensor is arranged at the jacking part of the building; according to the connection, the flow steps of the control method are as follows:
step S11: controlling the force and displacement of a hydraulic jack, a following jack and a following jack which are arranged at a supporting point on a building by using a hydraulic pump station;
step S12: the hydraulic pump station works;
step S13: when the hydraulic jack lifts upwards, the following jack automatically follows upwards to protect the hydraulic jack; meanwhile, the N follow-up jacks automatically follow up to increase the jacking force;
step S14: the control program reads the data of the displacement sensor arranged on the building, and returns to the step 2 when the displacement does not reach the highest value; when the displacement reaches the maximum value, skipping to the step 5;
step S15: the control program automatically closes the hydraulic pump station, and the hydraulic jack is locked by the following jack to play a role in protecting the hydraulic jack; simultaneously, the follow-up jack stops.
The N is greater than 2 and less than 10.
The control system and the construction method thereof have the advantages that: the difficulty of double control is reduced; meanwhile, as the follow-up jack is adopted, the function of combining jacking and protection is achieved; the use of the following roof is reduced, the construction cost is saved, and the safety of jacking construction is not reduced.
Furthermore, the control program is a PLC control program. The technical effects of the embodiment are as follows: it is right through setting up the PLC control program climbing mechanism 100 controls, can be more convenient effectual control climbing mechanism 100.
Furthermore, the building jacking control system further comprises a following protection mechanism 200, and the following protection mechanism 200 is in fit connection with the hydraulic jack 101. The technical effects of the embodiment are as follows: by arranging the following protection mechanism 200, the whole building jacking control system can be subjected to following protection.
Furthermore, the following protection mechanisms 200 are respectively connected with the hydraulic jacks 101 in a matching manner. The technical effects of the embodiment are as follows: the following protection mechanism 200 is arranged to better perform following protection on the whole building jacking control system.
Further, the building jacking control system further comprises a control display screen connected with the control mechanism 300 for controlling the jacking mechanism 100 and the control mechanism 300. The technical effects of the embodiment are as follows: the whole building jacking control system can be controlled more conveniently by setting the control display screen.
Furthermore, the control display screen comprises control keys. The technical effects of the embodiment are as follows: through set up control button in controlling the display screen, can be more convenient control whole building jacking control system.
As shown in fig. 2, the present invention further provides a building jacking control method, which comprises the following steps: s101, controlling the force and displacement of a building by using a hydraulic jack 101; s102, controlling the jacking force of the building by using a plurality of follow-up jacks 102; and S103, operating the hydraulic jack 101 and the follow-up jack 102 through a hydraulic pump station 400 by using a control program.
Further, the operation of the hydraulic jack 101 and the following jack 102 by the hydraulic pump station 400 by the control program includes: and a PLC control program is used for controlling the hydraulic jack 101 and the follow-up jack 102 through the hydraulic pump station 400. The technical effects of the embodiment are as follows: it is right through setting up the PLC control program climbing mechanism 100 controls, can be more convenient effectual control climbing mechanism 100.
Still further, the method further comprises: a plurality of following protection mechanisms 200 are arranged for mechanical following protection. The technical effects of the embodiment are as follows: the following protection mechanism 200 is arranged to better perform following protection on the whole building jacking control system.
Still further, the method further comprises: and controlling the jacking of the building by using the control display screen. The technical effects of the embodiment are as follows: the whole building jacking control system can be controlled more conveniently by setting the control display screen.
Compared with the prior art, the invention has the advantages that: the plurality of follow-up jacks 102 and the hydraulic jack 101 are arranged to cooperate to jack up the building, so that the using amount of equipment is reduced, and the construction cost and the construction period are reduced, so that the whole construction process is safer, and the construction cost is lower.

Claims (2)

1. A building following jacking system and a control method thereof comprise the following steps: a computer control system, an at least hydraulic power unit, at least a set of climbing mechanism, its characterized in that: the device also comprises at least one pressure sensor and at least one position sensor; the jacking mechanism comprises a hydraulic jack, a following jack and N-1 following jacks, wherein the hydraulic jack is connected with the N-1 following jacks in series, and the hydraulic jack is connected with one following jack in parallel; at least one pressure sensor is arranged on the hydraulic pump station, and at least one displacement sensor is arranged at the jacking part of the building; according to the connection, one or more points on the building can be jacked, and the flow steps of the control method are as follows:
step 1: controlling the force and displacement of a hydraulic jack, a following jack and a following jack which are arranged at a supporting point on a building by using a hydraulic pump station;
step 2: the hydraulic pump station works;
and step 3: when the hydraulic jack lifts upwards, the following jack automatically follows upwards to protect the hydraulic jack; meanwhile, the N follow-up jacks automatically follow up to increase the jacking force;
and 4, step 4: the control program reads data of a displacement sensor arranged on a building; when the displacement does not reach the highest value, returning to the step 2; when the displacement reaches the maximum value, skipping to the step 5;
and 5: the control program automatically closes the hydraulic pump station, and the hydraulic jack is locked by the following jack to play a role in protecting the hydraulic jack; simultaneously, the follow-up jack stops.
2. The building following jacking system and the control method thereof according to claim 1, wherein: the N is greater than 2 and less than 10.
CN202010710689.2A 2020-07-22 2020-07-22 Building jacking control system and method Pending CN111794556A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010710689.2A CN111794556A (en) 2020-07-22 2020-07-22 Building jacking control system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010710689.2A CN111794556A (en) 2020-07-22 2020-07-22 Building jacking control system and method

Publications (1)

Publication Number Publication Date
CN111794556A true CN111794556A (en) 2020-10-20

Family

ID=72827492

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010710689.2A Pending CN111794556A (en) 2020-07-22 2020-07-22 Building jacking control system and method

Country Status (1)

Country Link
CN (1) CN111794556A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113683002A (en) * 2021-08-24 2021-11-23 上海先为土木工程有限公司 Synchronous falling protection system following jack and control method
CN114477001A (en) * 2021-12-28 2022-05-13 上海天演建筑物移位工程股份有限公司 Multi-point variable-frequency alternative synchronous jacking hydraulic control system with suspension compensation and method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101806152A (en) * 2009-02-12 2010-08-18 上海天演建筑物移位工程有限公司 Automatic following support system and method
CN106638322A (en) * 2016-12-28 2017-05-10 海波重型工程科技股份有限公司 Steel box beam pushing and deviation correcting method for walking type multiple-point continuous pushing technique
CN108252981A (en) * 2018-04-18 2018-07-06 上海天演建筑物移位工程股份有限公司 A kind of building elevating safety protective device and its application method
CN108612340A (en) * 2018-06-26 2018-10-02 上海天演建筑物移位工程股份有限公司 A kind of large area building suspends and jacking system and its application method
CN209493266U (en) * 2019-01-07 2019-10-15 上海海塔机械制造有限公司 A kind of synchronous jacking system using in Yu Haiyang's industry
CN110482431A (en) * 2018-05-14 2019-11-22 长江三峡通航管理局 A kind of band mechanical self-latching protection synchronous lifting device and control method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101806152A (en) * 2009-02-12 2010-08-18 上海天演建筑物移位工程有限公司 Automatic following support system and method
CN106638322A (en) * 2016-12-28 2017-05-10 海波重型工程科技股份有限公司 Steel box beam pushing and deviation correcting method for walking type multiple-point continuous pushing technique
CN108252981A (en) * 2018-04-18 2018-07-06 上海天演建筑物移位工程股份有限公司 A kind of building elevating safety protective device and its application method
CN110482431A (en) * 2018-05-14 2019-11-22 长江三峡通航管理局 A kind of band mechanical self-latching protection synchronous lifting device and control method
CN108612340A (en) * 2018-06-26 2018-10-02 上海天演建筑物移位工程股份有限公司 A kind of large area building suspends and jacking system and its application method
CN209493266U (en) * 2019-01-07 2019-10-15 上海海塔机械制造有限公司 A kind of synchronous jacking system using in Yu Haiyang's industry

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113683002A (en) * 2021-08-24 2021-11-23 上海先为土木工程有限公司 Synchronous falling protection system following jack and control method
CN114477001A (en) * 2021-12-28 2022-05-13 上海天演建筑物移位工程股份有限公司 Multi-point variable-frequency alternative synchronous jacking hydraulic control system with suspension compensation and method
CN114477001B (en) * 2021-12-28 2024-03-26 上海天演建筑物移位工程股份有限公司 Multi-point variable frequency alternative synchronous jacking hydraulic control system and method with suspension compensation

Similar Documents

Publication Publication Date Title
CN111794556A (en) Building jacking control system and method
CN101551673B (en) Automatic leveling system of multipoint electric support platform
JP4948041B2 (en) Bridge erection method
CN102053624B (en) Leveling method based on four-point support and electromechanical automatic leveling system
TWI580842B (en) Integrated Control System for Bridge Roof
CN205398004U (en) Automobile repair elevating gear
CN104112054A (en) Numerical value assessment method of anti-collapse capability of existing buildings
CN208266878U (en) Pattern foundation pit supporting structure intelligence support device
CN104603042A (en) Jacking device
CN102180426B (en) Follow-up supporting device and method
CN105040986A (en) Modular mounting technology for steel-structure door type frame roof system
CN110331676B (en) Pile column type flexible pier deviation rectifying construction device and construction method thereof
CN110360191A (en) A kind of multi-point leveling control system
KR20150047058A (en) Incremental launching automation system of the bridge upper structure
KR101654702B1 (en) System for lifting and controlling a structure and method thereof
CN110714956B (en) Large array surface antenna stacking type lifting control system and method thereof
CN111502251A (en) Method for correcting torsion deviation in construction of silo slip form system
CN211496802U (en) Intelligent servo steel supporting system
CN208500213U (en) A kind of aircraft jack high-precise synchronization lift control system
US8935890B2 (en) Apparatus and method for reverse rectification
CN102505863B (en) Wireless laser synchronous control device for multi-rail slide construction
CN210665325U (en) Assembled high temperature loading test platform
CN103879891A (en) Hydraulic system, lifting equipment and lifting equipment state transition method
CN208869211U (en) The double cylinder jacking systems of derrick crane
CN206553962U (en) A kind of device rectified a deviation for bridge lifting

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20201020