CN111770563B - A power saving method for wireless access backhaul equipment - Google Patents
A power saving method for wireless access backhaul equipment Download PDFInfo
- Publication number
- CN111770563B CN111770563B CN202010575763.4A CN202010575763A CN111770563B CN 111770563 B CN111770563 B CN 111770563B CN 202010575763 A CN202010575763 A CN 202010575763A CN 111770563 B CN111770563 B CN 111770563B
- Authority
- CN
- China
- Prior art keywords
- iab
- node
- node4
- donor
- heartbeat
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 36
- 230000008569 process Effects 0.000 claims abstract description 20
- 230000005540 biological transmission Effects 0.000 claims description 32
- 238000001514 detection method Methods 0.000 claims description 28
- 238000012790 confirmation Methods 0.000 claims description 14
- 230000006855 networking Effects 0.000 claims description 12
- 230000011664 signaling Effects 0.000 claims description 10
- 230000004913 activation Effects 0.000 claims description 5
- FFBHFFJDDLITSX-UHFFFAOYSA-N benzyl N-[2-hydroxy-4-(3-oxomorpholin-4-yl)phenyl]carbamate Chemical compound OC1=C(NC(=O)OCC2=CC=CC=C2)C=CC(=C1)N1CCOCC1=O FFBHFFJDDLITSX-UHFFFAOYSA-N 0.000 claims description 4
- 230000000737 periodic effect Effects 0.000 claims description 3
- 238000012544 monitoring process Methods 0.000 claims description 2
- 230000000694 effects Effects 0.000 abstract description 7
- 230000007246 mechanism Effects 0.000 abstract description 3
- 238000010295 mobile communication Methods 0.000 abstract description 3
- 230000005611 electricity Effects 0.000 abstract 1
- 238000004891 communication Methods 0.000 description 8
- 238000010586 diagram Methods 0.000 description 6
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000005265 energy consumption Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000005641 tunneling Effects 0.000 description 2
- 230000003213 activating effect Effects 0.000 description 1
- 239000013256 coordination polymer Substances 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000013507 mapping Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. Transmission Power Control [TPC] or power classes
- H04W52/02—Power saving arrangements
- H04W52/0203—Power saving arrangements in the radio access network or backbone network of wireless communication networks
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. Transmission Power Control [TPC] or power classes
- H04W52/02—Power saving arrangements
- H04W52/0203—Power saving arrangements in the radio access network or backbone network of wireless communication networks
- H04W52/0206—Power saving arrangements in the radio access network or backbone network of wireless communication networks in access points, e.g. base stations
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02D—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
- Y02D30/00—Reducing energy consumption in communication networks
- Y02D30/70—Reducing energy consumption in communication networks in wireless communication networks
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
Description
技术领域technical field
本发明属于移动通信技术领域,涉及一种无线接入回传设备的省电方法。The invention belongs to the technical field of mobile communication, and relates to a power saving method for wireless access backhaul equipment.
背景技术Background technique
与长期演进(Long Term Evolution,LTE)相比,5G新无线电(New Radio,NR)技术能够使用两个频段,即FR1和FR2,5G NR支持更大的带宽,特别使用毫米波FR2频段,方便使用大规模天线和多波束系统,因此5G NR能够提供更高的系统速率,为5G NR发展和应用IAB基站提供了条件。所谓接入和回传一体化基站(Integrated Access and Backhaul,IAB)基站,在3GPP R16版本正式引入,就是该基站集成了无线接入链路和无线回传链路,其中无线接入链路为UE与IAB基站之间通信链路,无线回传链路为IAB基站之间的通信链路,提供数据回传通路,因此IAB基站不需要有线传输网络进行数据回传。基于此,IAB基站更容易部署在密集场景,减轻了部署有线传输网络的负担。Compared with Long Term Evolution (LTE), 5G New Radio (NR) technology can use two frequency bands, namely FR1 and FR2. 5G NR supports larger bandwidth, especially the millimeter wave FR2 frequency band, which is convenient Using large-scale antennas and multi-beam systems, 5G NR can provide higher system rates, providing conditions for the development and application of IAB base stations for 5G NR. The so-called Integrated Access and Backhaul (IAB) base station was officially introduced in the 3GPP R16 version, that is, the base station integrates a wireless access link and a wireless backhaul link, where the wireless access link is The communication link between the UE and the IAB base station, and the wireless backhaul link is the communication link between the IAB base stations, providing a data backhaul path, so the IAB base station does not need a wired transmission network for data backhaul. Based on this, IAB base stations are easier to deploy in dense scenarios, reducing the burden of deploying wired transmission networks.
3GPP提供的IAB参考架构(SA模式),如图1所示。包含了一个IAB-donor基站和多个IAB-node基站。其中IAB-donor基站包含gNB-DU,gNB-CU-CP,gNB-CU-UP和潜在的其他功能。在实际部署时,IAB-donor基站可以基于上述功能进行集中式或分布式部署。The IAB reference architecture (SA mode) provided by 3GPP is shown in Figure 1. Contains one IAB-donor base station and multiple IAB-node base stations. The IAB-donor base station contains gNB-DU, gNB-CU-CP, gNB-CU-UP and potentially other functions. In actual deployment, IAB-donor base stations can be deployed in a centralized or distributed manner based on the above functions.
在部署的过程中,IAB-node和IAB-donor的通信是通过无线接入回传方式实现,无线接入回传的通信质量将直接影响到IAB-node提供用户数据传输能力。为了完成无线接入回传功能,3GPP提供的IAB-node由IAB-MT和IAB-DU组成,IAB-MT提供IAB-node和父节点之间的无线接入传输,IAB-DU提供IAB-node子节点之间的无线接入传输。如图2所示。During the deployment process, the communication between IAB-node and IAB-donor is realized through wireless access backhaul, and the communication quality of wireless access backhaul will directly affect the IAB-node's ability to provide user data transmission. In order to complete the wireless access backhaul function, the IAB-node provided by 3GPP consists of IAB-MT and IAB-DU. IAB-MT provides wireless access transmission between IAB-node and parent node, and IAB-DU provides IAB-node Wireless access transmission between child nodes. as shown in
从图2可以看出,IAB-node不仅具有无线接入回传功能,还应该具有路由选择和维护功能,当IAB-node无线回传信号质量较差或是拥塞情况下,能够自动选择其他路由来提供无线接入回传功能。根据3GPP中的TS38.300规范,已经提供了IAB-node的路由映射功能,父节点负责中继转发子节点需要回传的数据,由此越靠近IAB-donor节点回传的数据量也越大。如图3所示。As can be seen from Figure 2, IAB-node not only has the function of wireless access backhaul, but also has routing selection and maintenance functions. When the quality of the wireless backhaul signal of IAB-node is poor or congested, it can automatically select other routes. to provide wireless access backhaul. According to the TS38.300 specification in 3GPP, the route mapping function of the IAB-node has been provided. The parent node is responsible for relaying and forwarding the data that the child node needs to send back. Therefore, the closer the IAB-donor node is to send back the larger the amount of data. . As shown in Figure 3.
从上面关于无线接入回传系统工作原理,为了实现无线接入回传功能,IAB-MT和IAB-DU之间始终保持链路处于工作状态,并且在密集组网场景中,IAB-MT和IAB-DU都不能处于断电状态。并且每个IAB-node节点回传数据之间没有关联性,采用非续接收效果也不佳。所以在IAB网络运行过程中,IAB网络能耗是一个急需解决的问题。From the above about the working principle of the wireless access backhaul system, in order to realize the wireless access backhaul function, the link between the IAB-MT and the IAB-DU is always in a working state, and in a dense networking scenario, the IAB-MT and IAB-DU are in a working state. None of the IAB-DUs can be powered off. And there is no correlation between the data returned by each IAB-node node, and the effect of discontinuous reception is not good. Therefore, during the operation of the IAB network, the energy consumption of the IAB network is an urgent problem to be solved.
根据3GPP标准对IAB-donor设备和IAB-DU设备功能要求,注册到IAB-DU设备的终端数据需要回传到IAB-donor设备上,需要在IAB-MT和IAB-DU之间建立无线通信链路,提供IAB-DU设备数据回传到IAB-donor设备的传输通路,所以在IAB-DU设备和IAB-donor设备之间需要建立两条通路,即用于传输信令的流控制传输协议(简称:SCTP)通路和用于业务数据传输的隧道技术协议(简称:GTP-U)通路。According to the functional requirements of IAB-donor equipment and IAB-DU equipment according to the 3GPP standard, the terminal data registered to the IAB-DU equipment needs to be transmitted back to the IAB-donor equipment, and a wireless communication link needs to be established between IAB-MT and IAB-DU It provides a transmission path for IAB-DU equipment data back to IAB-donor equipment, so two paths need to be established between IAB-DU equipment and IAB-donor equipment, that is, the flow control transmission protocol for transmitting signaling ( Abbreviation: SCTP) path and Tunnel Technology Protocol (abbreviation: GTP-U) path for service data transmission.
为了保证IAB-donor设备和IAB-DU设备之间SCTP链路始终处于激活状态,即使两个SCTP端点之间没有数据传输,那么SCTP周期性发送心跳(简称:HEART BEAT)消息到对端,并且等待接收心跳确认(简称:HEARTBEAT ACK)。在实际工程中,IAB-donor设备和不同的IAB-DU设备之间发送和接收心跳时间没有相关性,造成了IAB-DU设备和IAB-MT设备之间通信不能采用非连续接收或是效果不佳。例如图1中,如果IAB-node4设备,IAB-node5设备和IAB-donor设备之间SCTP发送心跳不同步,那么势必造成了IAB-node2设备IAB-donor设备之间始终存在小量数据传输,造成无线回传链路使用无线资源效果不佳,然而在移动通信领域中,连接模式采用非连续接收是系统省电的基础。In order to ensure that the SCTP link between the IAB-donor device and the IAB-DU device is always in an active state, even if there is no data transmission between the two SCTP endpoints, SCTP periodically sends a heartbeat (referred to as: HEART BEAT) message to the peer, and Waiting to receive a heartbeat acknowledgment (short: HEARTBEAT ACK). In actual engineering, there is no correlation between the sending and receiving heartbeat time between the IAB-donor device and different IAB-DU devices, resulting in that the communication between the IAB-DU device and the IAB-MT device cannot use discontinuous reception or the effect is not good. good. For example, in Figure 1, if the heartbeat sent by SCTP is not synchronized between the IAB-node4 device, the IAB-node5 device and the IAB-donor device, it will inevitably cause a small amount of data transmission between the IAB-node2 device and the IAB-donor device. The wireless backhaul link is not effective in using wireless resources. However, in the field of mobile communication, the use of discontinuous reception in the connection mode is the basis for system power saving.
发明内容SUMMARY OF THE INVENTION
有鉴于此,本发明的目的在于提供一种无线接入回传设备的省电方法。In view of this, the purpose of the present invention is to provide a power saving method for a wireless access backhaul device.
为达到上述目的,本发明提供如下技术方案:To achieve the above object, the present invention provides the following technical solutions:
一种无线接入回传设备的省电方法,该方法包括进入DRX工作模式和退出DRX工作模式;A power saving method for wireless access backhaul equipment, the method includes entering a DRX working mode and exiting the DRX working mode;
过程一:进入DRX工作模式Process 1: Enter DRX working mode
步骤11:IAB-donor和IAB-node根据3GPP R16版本协议要求完成无线接入回传组网过程,在IAB-donor和每个IAB-node之间都建立SCTP链路和GTP-U/GTP-C链路;在IAB-donor中的SCTP端点称为主机SCTP端点;在IAB-node中的SCTP端点称为远端SCTP端点;Step 11: IAB-donor and IAB-node complete the wireless access backhaul networking process according to the 3GPP R16 version protocol requirements, and establish SCTP links and GTP-U/GTP- C link; SCTP endpoint in IAB-donor is called host SCTP endpoint; SCTP endpoint in IAB-node is called remote SCTP endpoint;
步骤12:IAB-donor设备中业务量检测模块,实时监视IAB-donor设备中的GPRS隧道协议用户平面GTP-U通道上每个IAB-node节点的回传业务数据和GPRS隧道协议控制平面GTP-C通道上传输信令数据;Step 12: The traffic detection module in the IAB-donor device monitors the backhaul service data of each IAB-node node and the GPRS tunneling protocol control plane GTP-U channel on the GPRS tunneling protocol user plane GTP-U channel in the IAB-donor device in real time. Transmission of signaling data on the C channel;
步骤13:业务量检测模块在一段时间内没有监视到IAB-node节点存在GTP-U回传业务数据,也没有检测到GTP-C信令数据,则判定IAB-node可以进入到空闲模式状态;Step 13: If the traffic detection module does not monitor that the IAB-node node has GTP-U return service data within a period of time, nor does it detect the GTP-C signaling data, it is determined that the IAB-node can enter the idle mode state;
如果业务量检测模块检测到GTP-U或是GTP-C上存在数据传输,则对应的IAB-node不能进入空闲模式;返回步骤12继续监视;If the traffic detection module detects that there is data transmission on GTP-U or GTP-C, the corresponding IAB-node cannot enter idle mode; return to step 12 to continue monitoring;
步骤14:业务量检测模块为进入空闲的IAB-node节点配置开始时间和周期时间,开始时间表示IAB-donor中主机SCTP端点发送心跳消息的开始时间,周期时间表示IAB-donor中主机SCTP端点发送心跳消息的周期时间;Step 14: The traffic detection module configures the start time and cycle time for the idle IAB-node nodes. The start time indicates the start time of the host SCTP endpoint in the IAB-donor sending the heartbeat message, and the cycle time indicates the host SCTP endpoint in the IAB-donor sends the heartbeat message. The cycle time of the heartbeat message;
步骤15:业务量检测模块将开始时间和周期时间配置到处于空闲模式的IAB-node对应的主机SCTP端点上,主机SCTP端点根据配置的开始时间和周期时间,周期性的发送心跳消息到对应的远端SCTP端点,并且等待远端SCTP端点回复心跳确认;Step 15: The traffic detection module configures the start time and cycle time to the host SCTP endpoint corresponding to the IAB-node in idle mode, and the host SCTP endpoint periodically sends a heartbeat message to the corresponding IAB-node according to the configured start time and cycle time. The remote SCTP endpoint, and wait for the remote SCTP endpoint to reply with a heartbeat confirmation;
步骤16:IAB-donor配置完成对应主机SCTP端点开始发送心跳时间和周期时间之后,配置空闲IAB-node节点的IAB-node父节点,其子节点IAB-node可以进入到空闲模式;父节点IAB-node收到该消息则通过本节点的IAB-DU配置空闲节点IAB-node的IAB-MT进入DRX工作模式;Step 16: After the IAB-donor configuration is completed and the corresponding host SCTP endpoint starts to send the heartbeat time and cycle time, configure the IAB-node parent node of the idle IAB-node node, and its child node IAB-node can enter the idle mode; the parent node IAB-node When the node receives the message, it configures the IAB-MT of the idle node IAB-node to enter the DRX working mode through the IAB-DU of the node;
步骤17:处于空闲模式的IAB-node节点仅仅在DRX工作模式的激活状态能够转发主机SCTP端点发送的心跳消息,或是远端IAB-node回复的心跳确认消息;处于DRX工作模式的非激活状态下,需要发送心跳消息或是心跳确认消息的IAB-node节点只能等待DRX工作激活状态时间到才能转发;IAB-node处于DRX工作模式下的非激活状态可以进行省电模式;Step 17: The IAB-node node in idle mode can forward the heartbeat message sent by the host SCTP endpoint or the heartbeat confirmation message replied by the remote IAB-node only in the active state of the DRX working mode; in the inactive state of the DRX working mode In this case, the IAB-node node that needs to send a heartbeat message or a heartbeat confirmation message can only wait for the DRX working activation state time before forwarding; the IAB-node in the inactive state in the DRX working mode can go into power saving mode;
过程二:退出DRX工作模式Process 2: Exit DRX working mode
步骤21:如果IAB-node进入空闲模式,驻留到空闲IAB-node的终端或是其子节点没有任何数据传输,那么IAB-node和父节点IAB-node之间无线传输将进入到DRX模式;Step 21: If the IAB-node enters the idle mode, and the terminal residing on the idle IAB-node or its child nodes does not have any data transmission, then the wireless transmission between the IAB-node and the parent node IAB-node will enter the DRX mode;
步骤22:IAB-donor收到来自核心网的寻呼请求,则IAB-donor采用DRX工作模式的激活状态发送寻呼请求到对应的IAB-node节点,然后IAB-node再根据寻呼内容,在对应的寻呼信道上发送寻呼消息;Step 22: The IAB-donor receives the paging request from the core network, then the IAB-donor adopts the active state of the DRX working mode to send the paging request to the corresponding IAB-node node, and then the IAB-node sends the paging request to the corresponding IAB-node according to the paging content. Send a paging message on the corresponding paging channel;
步骤23:IAB-donor或是IAB-node节点在DRX工作模式的激活状态下,接收到来自子节点IAB-node的回传数据,则IAB-donor配置回传过程中路过所有的IAB-node退出DRX工作模式。Step 23: When the IAB-donor or IAB-node node receives the return data from the child node IAB-node in the active state of the DRX working mode, the IAB-donor passes through all the IAB-nodes and exits during the return process. DRX working mode.
可选的,所述方法在一个IAB-donor节点和5个IAB-node节点的场景下,即IAB-node1,IAB-node2,IAB-node3是IAB-donor的子节点,IAB-donor是它们的父节点;IAB-node2是IAB-node4和IAB-node5的父节点,IAB-node4和IAB-node5是IAB-node2的子节点;父节点中的IAB-DU和IAB-MT采用无线接口进行链接,具体为:Optionally, the method is in the scenario of one IAB-donor node and five IAB-node nodes, that is, IAB-node1, IAB-node2, and IAB-node3 are child nodes of IAB-donor, and IAB-donor is their child node. Parent node; IAB-node2 is the parent node of IAB-node4 and IAB-node5, and IAB-node4 and IAB-node5 are the child nodes of IAB-node2; IAB-DU and IAB-MT in the parent node are linked by wireless interface, Specifically:
过程1:IAB-MT进入DRX工作模式Process 1: IAB-MT enters DRX working mode
步骤111:IAB组网完成之后,在IAB-donor和IAB-node2和IAB-node4分别建立F1链路,其中的IAB-donor和IAB-node4之间的F1链路需要在IAB-node2的IAB-DU和IAB-node4的IAB-MT之间建立无线通路,采用无线方式回传IAB-node4对应的F1接口数据;Step 111: After the IAB networking is completed, F1 links are established between IAB-donor, IAB-node2, and IAB-node4, respectively, and the F1 link between IAB-donor and IAB-node4 A wireless channel is established between the DU and the IAB-MT of the IAB-node4, and the F1 interface data corresponding to the IAB-node4 is returned wirelessly;
步骤112:如果在IAB-node4上驻留的终端,正在进行业务传输,那么在IAB-node2的IAB-DU和IAB-node4的IAB-MT之间需要同响应的回传带宽通道;如果存在多个终端进行业务,那么这些终端的数据都会通过回传通道上传到父节点IAB-node2,通过IAB-node2中继转发到IAB-donor;Step 112: If the terminal residing on IAB-node4 is in the process of service transmission, then the same response backhaul bandwidth channel is required between the IAB-DU of IAB-node2 and the IAB-MT of IAB-node4; If one terminal performs business, then the data of these terminals will be uploaded to the parent node IAB-node2 through the return channel, and forwarded to IAB-donor through the IAB-node2 relay;
在IAB-donor设备中的业务量检测模块,对应IAB-node2和IAB-node4对应的F1接口上传输的数据,即SCTP承载的F1AP数据,GTP-U承载的业务数据以及GTP-C信令数据;假设IAB-donor在一定时间T内,假定为10秒,在IAB-node4对应的F1接口上接收小于K字节/秒,假设1000字节/秒流量,那么IAB-donor中的业务量检测模块认为IAB-node4已经进入空闲模式,否则继续监视F1端口上传输的数据;The traffic detection module in the IAB-donor device corresponds to the data transmitted on the F1 interface corresponding to IAB-node2 and IAB-node4, that is, the F1AP data carried by SCTP, the service data carried by GTP-U and the signaling data of GTP-C ; Assuming that the IAB-donor receives less than K bytes/s on the F1 interface corresponding to IAB-node4 within a certain time T, assuming that it is 10 seconds, and assuming 1000 bytes/s traffic, then the traffic detection in the IAB-donor The module thinks that IAB-node4 has entered the idle mode, otherwise it continues to monitor the data transmitted on the F1 port;
步骤113:IAB-donor检测存在IAB-node进入空闲模式,假设在本实施例中假定IAB-node4进入空闲模式;则业务量检测模块生成开始时间和周期时间,在该实施例中可以假设在系统帧号SFN=1000或是IAB-donor一个固定时间基准偏移量开始,以及相隔时间10秒发送一次心跳消息,配置到IAB-node对应的主机SCTP端点,以便IAB-node4对应在IAB-donor中对应主机SCTP端点发送心跳开始时间和周期时间;Step 113: The IAB-donor detects that there is an IAB-node entering the idle mode, assuming that IAB-node4 enters the idle mode in this embodiment; then the traffic detection module generates the start time and the cycle time, in this embodiment, it can be assumed that the system Frame number SFN=1000 or IAB-donor starts with a fixed time base offset, and sends a heartbeat message every 10 seconds, and configures it to the host SCTP endpoint corresponding to IAB-node, so that IAB-node4 corresponds to IAB-donor. Corresponding host SCTP endpoint sends heartbeat start time and cycle time;
步骤114:IAB-donor还通过IAB-donor和IAB-node2之间的F1接口通知主机SCTP端点发送心跳开始时间和周期时间;IAB-node2中的IAB-DU重配置IAB-node4的IAB-MT资源,进入DRX工作模式;Step 114: IAB-donor also informs the host SCTP endpoint to send heartbeat start time and cycle time through the F1 interface between IAB-donor and IAB-node2; IAB-DU in IAB-node2 reconfigures the IAB-MT resource of IAB-node4 , enter the DRX working mode;
步骤115:IAB-donor中的主机SCTP端点在开始时间,以周期时间间隔发送心跳消息到IAB-node4的远端SCTP端点;并且等待远端SCTP端点回复心跳确认消息;Step 115: The host SCTP endpoint in the IAB-donor sends a heartbeat message to the remote SCTP endpoint of IAB-node4 at periodic time intervals at the start time; and waits for the remote SCTP endpoint to reply the heartbeat confirmation message;
步骤116:IAB-node2收到IAB-donor发送到IAB-node4的心跳消息,在IAB-node4的IAB-MT的DRX工作激活周期将心跳消息发送到IAB-MT,在IAB-node4内部将IAB-MT收到的心跳消息转发到IAB-DU的远端SCTP端点;远端SCTP端点收到之后立即回复心跳确认;Step 116: IAB-node2 receives the heartbeat message sent by IAB-donor to IAB-node4, sends the heartbeat message to IAB-MT during the DRX work activation period of IAB-MT of IAB-node4, and sends IAB- The heartbeat message received by the MT is forwarded to the remote SCTP endpoint of the IAB-DU; the remote SCTP endpoint returns a heartbeat confirmation immediately after receiving it;
过程2:IAB-MT退出DRX工作模式Process 2: IAB-MT exits DRX working mode
步骤221:处于空闲模式的IAB-node4节点,IAB-node2的IAB-DU和IAB-node4的IAB-MT之间采用DRX工作模式;在IAB-donor和IAB-DU之间建立完成F1接口链路;Step 221: For the IAB-node4 node in idle mode, the DRX working mode is adopted between the IAB-DU of IAB-node2 and the IAB-MT of IAB-node4; the F1 interface link is established and completed between the IAB-donor and the IAB-DU ;
步骤222:IAB-donor中业务量检测模块检测F1接口上的数据,具体包括了GTP-U/GTP-C以及SCTP链路上的数据;如果数据流量超过一定门限,假设该实施例中定义为2000字节/秒,则IAB-donor认为IAB-node4节点已经退出空闲模式,判定驻留在IAB-node4上的终端发起做业务过程,需要进行业务数据传输;Step 222: The traffic detection module in the IAB-donor detects the data on the F1 interface, which specifically includes the data on the GTP-U/GTP-C and SCTP links; if the data traffic exceeds a certain threshold, it is assumed that in this embodiment, it is defined as 2000 bytes/second, then IAB-donor considers that the IAB-node4 node has exited the idle mode, and determines that the terminal residing on the IAB-node4 initiates a business process and needs to perform business data transmission;
步骤223:IAB-donor中的业务量检测模块通知IAB-node4对应的主机SCTP端点取消发送心跳消息的开始时间和周期时间;Step 223: The traffic detection module in the IAB-donor notifies the host SCTP endpoint corresponding to the IAB-node4 to cancel the start time and cycle time of sending the heartbeat message;
步骤224:IAB-donor通过F1接口(IAB-donor和IAB-node2之间的F1接口)通知IAB-node已经退出空闲模式,则IAB-node2中的IAB-DU将重配IAB-node中的IAB-MT无线资源,退出DRX工作模式。Step 224: The IAB-donor informs the IAB-node that it has exited the idle mode through the F1 interface (the F1 interface between the IAB-donor and the IAB-node2), then the IAB-DU in the IAB-node2 will reconfigure the IAB in the IAB-node2 -MT radio resource, exit DRX working mode.
本发明的有益效果在于:The beneficial effects of the present invention are:
第一:在5G无线接入回传系统中,没有提供一套完整的省电机制,亦从5G的IAB组网到实际工作过程中,IAB-DU和IAB-MT之间没有空闲模式,只有连接模式,无论是否存在用户处于激活业务过程,IAB-donor和IAB-node都不能进入空闲模式。这大大增加IAB的运营成本,也不符合环保能耗要求,本发明提供了一种IAB工作机制,为IAB能够进行省电提供了条件。First: In the 5G wireless access backhaul system, there is no complete set of power-saving mechanisms, and from the 5G IAB networking to the actual working process, there is no idle mode between IAB-DU and IAB-MT, only In the connected mode, no matter whether there is a user in the process of activating the service, neither the IAB-donor nor the IAB-node can enter the idle mode. This greatly increases the operating cost of the IAB, and does not meet the requirements of environmental protection and energy consumption. The present invention provides an IAB working mechanism, which provides conditions for the IAB to save power.
第二:IAB-donor和IAB-node中,在IAB-DU和IAB-MT之间的无线链路处于连续收发下,省电效果最佳,但是这不符合IAB组网工作目标,IAB-DU和IAB-MT之间无线传输从空闲模式进入到连接模式,需要时间较长,影响了业务的实时性,本发明选择使用DRX非连续接收模式,既可以支持省电模式,同时又不影响业务的实时性。Second: In IAB-donor and IAB-node, the wireless link between IAB-DU and IAB-MT is in continuous transmission and reception, and the power saving effect is the best, but this does not meet the goal of IAB networking, IAB-DU The wireless transmission between the IAB-MT and the IAB-MT takes a long time to enter the connection mode from the idle mode, which affects the real-time performance of the service. The present invention chooses to use the DRX discontinuous reception mode, which can support the power saving mode without affecting the service. real-time.
第三:在IAB组网中,IAB-donor中的主机SCTP端点和IAB-node中的SCTP端点,在没有任何数据传输的时候,将周期性发送心跳消息,但是每条SCTP连接的心跳发送时间和周期没有相关性,使得IAB-DU和IAB-MT不能很好的进入DRX工作模式。本发明则在IAB-donor统一所有发送心跳消息的主机SCTP端点采用的开始时间和周期时间。使得在IAB-DU和IAB-MT之间的数据几乎在一个时间内进行发送,有利于DRX工作模式进行传输,提高IAB省电效果。Third: In the IAB networking, the host SCTP endpoint in the IAB-donor and the SCTP endpoint in the IAB-node will periodically send heartbeat messages when there is no data transmission, but the heartbeat sending time of each SCTP connection There is no correlation with the cycle, so that IAB-DU and IAB-MT cannot enter the DRX working mode well. The present invention unifies the start time and cycle time adopted by all host SCTP endpoints that send heartbeat messages in the IAB-donor. The data between the IAB-DU and the IAB-MT is sent almost within a time, which is beneficial to the transmission in the DRX working mode and improves the power saving effect of the IAB.
本发明的其他优点、目标和特征在某种程度上将在随后的说明书中进行阐述,并且在某种程度上,基于对下文的考察研究对本领域技术人员而言将是显而易见的,或者可以从本发明的实践中得到教导。本发明的目标和其他优点可以通过下面的说明书来实现和获得。Other advantages, objects, and features of the present invention will be set forth in the description that follows, and will be apparent to those skilled in the art based on a study of the following, to the extent that is taught in the practice of the present invention. The objectives and other advantages of the present invention may be realized and attained by the following description.
附图说明Description of drawings
为了使本发明的目的、技术方案和优点更加清楚,下面将结合附图对本发明作优选的详细描述,其中:In order to make the objectives, technical solutions and advantages of the present invention clearer, the present invention will be preferably described in detail below with reference to the accompanying drawings, wherein:
图1为3GPP推荐的IAB参考架构(SA模式);Figure 1 shows the IAB reference architecture (SA mode) recommended by 3GPP;
图2为IAB-node中的父节点和子节点关系;Figure 2 shows the parent node and child node relationship in IAB-node;
图3为在BAP子层中关于路由和BH RLC信道选择图;Fig. 3 is about routing and BH RLC channel selection diagram in the BAP sublayer;
图4为支持省电方式的无线接入回传原理图;FIG. 4 is a schematic diagram of wireless access backhaul supporting power saving mode;
图5为无线回传系统进入DRX工作模式;Figure 5 shows that the wireless backhaul system enters the DRX working mode;
图6为无线回传系统退出DRX工作模式;Figure 6 shows the wireless backhaul system exiting the DRX working mode;
图7为IAB组网结构;Figure 7 shows the IAB networking structure;
图8为IAB-node中支持F1-U协议的协议架构图;Figure 8 is a diagram of the protocol architecture supporting the F1-U protocol in IAB-node;
图9为IAB-node中支持F1-C协议的协议架构图;Fig. 9 is a protocol architecture diagram that supports the F1-C protocol in IAB-node;
图10为IAB-MT的NAS和RRC连接的协议结构图;Fig. 10 is the protocol structure diagram of NAS and RRC connection of IAB-MT;
图11为IAB-MT进入DRX工作模式;Figure 11 shows the IAB-MT entering the DRX working mode;
图12为IAB-MT退出DRX工作模式。Figure 12 shows the IAB-MT exiting the DRX working mode.
具体实施方式Detailed ways
以下通过特定的具体实例说明本发明的实施方式,本领域技术人员可由本说明书所揭露的内容轻易地了解本发明的其他优点与功效。本发明还可以通过另外不同的具体实施方式加以实施或应用,本说明书中的各项细节也可以基于不同观点与应用,在没有背离本发明的精神下进行各种修饰或改变。需要说明的是,以下实施例中所提供的图示仅以示意方式说明本发明的基本构想,在不冲突的情况下,以下实施例及实施例中的特征可以相互组合。The embodiments of the present invention are described below through specific specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and various details in this specification can also be modified or changed based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that the drawings provided in the following embodiments are only used to illustrate the basic idea of the present invention in a schematic manner, and the following embodiments and features in the embodiments can be combined with each other without conflict.
其中,附图仅用于示例性说明,表示的仅是示意图,而非实物图,不能理解为对本发明的限制;为了更好地说明本发明的实施例,附图某些部件会有省略、放大或缩小,并不代表实际产品的尺寸;对本领域技术人员来说,附图中某些公知结构及其说明可能省略是可以理解的。Among them, the accompanying drawings are only used for exemplary description, and represent only schematic diagrams, not physical drawings, and should not be construed as limitations of the present invention; in order to better illustrate the embodiments of the present invention, some parts of the accompanying drawings will be omitted, The enlargement or reduction does not represent the size of the actual product; it is understandable to those skilled in the art that some well-known structures and their descriptions in the accompanying drawings may be omitted.
本发明实施例的附图中相同或相似的标号对应相同或相似的部件;在本发明的描述中,需要理解的是,若有术语“上”、“下”、“左”、“右”、“前”、“后”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以及特定的方位构造和操作,因此附图中描述位置关系的用语仅用于示例性说明,不能理解为对本发明的限制,对于本领域的普通技术人员而言,可以根据具体情况理解上述术语的具体含义。The same or similar numbers in the drawings of the embodiments of the present invention correspond to the same or similar components; in the description of the present invention, it should be understood that if there are terms “upper”, “lower”, “left” and “right” , "front", "rear" and other indicated orientations or positional relationships are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the indicated device or element must be It has a specific orientation, as well as a specific orientation structure and operation, so the terms describing the positional relationship in the accompanying drawings are only used for exemplary illustration, and should not be construed as a limitation of the present invention. situation to understand the specific meaning of the above terms.
为了更加清楚说明本发明在具体IAB组网过程中应用,下面就采用一个IAB-donor节点和5个IAB-node节点的案例进行说明。IAB-node1,IAB-node2,IAB-node3是IAB-donor的子节点,IAB-donor是它们的父节点。IAB-node2是IAB-node4和IAB-node5的父节点,IAB-node4和IAB-node5是IAB-node2的子节点。父节点中的IAB-DU和IAB-MT采用无线接口进行传输链接。如果采用5G无线接入回传,那么无线回传链路采用5G通信方式实现,如果采用4G无线接入回传,那么无线回传链路采用4G通信方式实现。具体如图7所示。In order to more clearly illustrate the application of the present invention in a specific IAB networking process, a case of using one IAB-donor node and five IAB-node nodes is described below. IAB-node1, IAB-node2, IAB-node3 are child nodes of IAB-donor, and IAB-donor is their parent node. IAB-node2 is the parent node of IAB-node4 and IAB-node5, and IAB-node4 and IAB-node5 are the child nodes of IAB-node2. The IAB-DU and IAB-MT in the parent node use the wireless interface for transmission link. If 5G wireless access and backhaul is used, the wireless backhaul link is realized by 5G communication. If 4G wireless access and backhaul is used, the wireless backhaul link is realized by 4G communication. Specifically as shown in Figure 7.
根据3GPP的定义要求,具体参考TS38.300的描述,在IAB-donor和IAB-node之间存在F1接口,F1接口将支持SCTP和GTP-U/GTP-C的数据(包括业务数据和信令数据)传输,F1接口支持用户面的协议结构如图8所示,F1接口支持控制面的协议结构如图9所示。另外在父节点IAB-node中的IAB-DU和IAB-node子节点IAB-MT之间的信令控制协议结构图10所示。IAB-MT和IAB-DU之间采用无线回传方式进行中继。IAB-donor和IAB-node之间通过F1接口连接,F1接口承载GTP-U/GTP-C和F1AP的内容。According to the definition requirements of 3GPP, refer specifically to the description of TS38.300, there is an F1 interface between IAB-donor and IAB-node, and the F1 interface will support SCTP and GTP-U/GTP-C data (including service data and signaling Figure 8 shows the protocol structure of the F1 interface supporting the user plane, and the protocol structure that the F1 interface supports the control plane is shown in Figure 9. In addition, the structure of the signaling control protocol between the IAB-DU in the parent node IAB-node and the IAB-node child node IAB-MT is shown in FIG. 10 . Wireless backhaul is used for relay between IAB-MT and IAB-DU. The IAB-donor and the IAB-node are connected through the F1 interface, and the F1 interface carries the contents of GTP-U/GTP-C and F1AP.
为了支持IAB组网的正常工作,IAB-MT和IAB-DU之间提供足够的无线回传资源,用于中继F1接口上的F1AP和GTP-U数据,即使在IAB-node上没有驻留任何用户,也没有用户进行业务传输,F1接口处于空闲状态,其中承载F1AP接口的SCTP也需要周期发送心跳消息到对端,并且等待对方回复心跳确认消息,以检查链路是否正常,以及链路质量。IAB-MT在收发心跳消息和心跳确认消息的时候,也同时进行IAB-DU和IAB-MT之间上下行同步。In order to support the normal operation of IAB networking, sufficient wireless backhaul resources are provided between IAB-MT and IAB-DU for relaying F1AP and GTP-U data on the F1 interface, even if they do not reside on the IAB-node Any user, and no user performs service transmission, the F1 interface is in an idle state, and the SCTP carrying the F1AP interface also needs to periodically send heartbeat messages to the peer, and wait for the peer to reply with a heartbeat confirmation message to check whether the link is normal and the link quality. When IAB-MT sends and receives heartbeat messages and heartbeat confirmation messages, it also performs uplink and downlink synchronization between IAB-DU and IAB-MT at the same time.
正常情况下,在IAB-donor和每个IAB-node中的SCTP端点独立工作,所以即使处于空闲模式的IAB-donor和IAB-node收发心跳消息在时间上没有任何相关性。导致了即使IAB-node没有业务数据传输,在IAB-MT和IAB-DU之间总存在小量数据包传输。导致IAB-node始终不能进入省电模式,或省电效果不佳。Under normal circumstances, the SCTP endpoints in the IAB-donor and each IAB-node work independently, so even if the IAB-donor and IAB-node in idle mode send and receive heartbeat messages, there is no time correlation. As a result, even if the IAB-node has no service data transmission, there is always a small amount of data packet transmission between the IAB-MT and the IAB-DU. As a result, the IAB-node cannot enter the power saving mode all the time, or the power saving effect is not good.
根据本发明方法在IAB-donor中增加了业务量检测模块,该模块实时监视F1接口上的数据传输情况,如果业务量检测模块在一段时间没有收到来自IAB-node在GTP-U/GTP-C上回传数据,或是在SCTP链路上仅仅存在心跳消息和心跳确认消息,那么业务量检测模块则请求对应的IAB-node节点可以进入空闲模式。业务量检测模块生成用于SCTP端点发送心跳消息开始时间和周期时间。IAB-donor通过F1AP接口将确定开始时间和周期时间配置对应的空闲IAB-node的父节点上。IAB-node父节点通过IAB-DU对空闲节点IAB-MT进行资源重配置,请求父节点的IAB-DU和空闲IAB-node节点的IAB-MT进行DRX工作模式。According to the method of the present invention, a traffic detection module is added to the IAB-donor, which monitors the data transmission on the F1 interface in real time. The data is returned on the C, or there are only heartbeat messages and heartbeat confirmation messages on the SCTP link, then the traffic detection module requests the corresponding IAB-node node to enter the idle mode. The traffic detection module generates the start time and cycle time for the SCTP endpoint to send the heartbeat message. The IAB-donor will determine the start time and cycle time on the parent node of the corresponding idle IAB-node through the F1AP interface. The parent node of the IAB-node reconfigures the resources of the idle node IAB-MT through the IAB-DU, and requests the IAB-DU of the parent node and the IAB-MT of the idle IAB-node node to perform the DRX working mode.
在该实施例中,根据本发明的要求涉及两个主要过程,IAB-MT进入DRX工作模式和IAB-MT退出DRX工作模式。In this embodiment, two main procedures are involved in accordance with the requirements of the present invention, the IAB-MT entering the DRX operating mode and the IAB-MT exiting the DRX operating mode.
过程1:IAB-MT进入DRX工作模式Process 1: IAB-MT enters DRX working mode
步骤1:IAB组网完成之后,在IAB-donor和IAB-node2和IAB-node4分别建立F1链路,其中IAB-donor和IAB-node4之间的F1链路需要在IAB-node2的IAB-DU和IAB-node4的IAB-MT之间建立无线通路,采用无线方式回传IAB-node4对应的F1接口数据。如图11中1,2,3步。Step 1: After the IAB networking is completed, F1 links are established between IAB-donor, IAB-node2 and IAB-node4, respectively. The F1 link between IAB-donor and IAB-node4 needs to be in the IAB-DU of IAB-node2. A wireless channel is established between the IAB-MT of the IAB-node4, and the F1 interface data corresponding to the IAB-node4 is returned wirelessly.
步骤2:如果在IAB-node4上驻留的终端,正在进行业务传输,那么在IAB-node2的IAB-DU和IAB-node4的IAB-MT之间需要相应的回传带宽通道。如果存在多个终端进行业务,那么这些终端的数据会通过回传通道上传到父节点IAB-node2,通过IAB-node2中继转发到IAB-donor。Step 2: If the terminal residing on the IAB-node4 is performing service transmission, a corresponding backhaul bandwidth channel is required between the IAB-DU of the IAB-node2 and the IAB-MT of the IAB-node4. If there are multiple terminals performing services, the data of these terminals will be uploaded to the parent node IAB-node2 through the return channel, and forwarded to the IAB-donor through the IAB-node2 relay.
在IAB-donor设备中的业务量检测模块,检测对应IAB-node2和IAB-node4对应的F1接口上传输的数据(SCTP承载的F1AP数据,GTP-U承载的业务数据以及GTP-C信令数据)。假设IAB-donor在一定时间T内(假定为10秒),在IAB-node4对应的F1接口上接收小于K字节/秒(假设1000字节/秒)流量,那么IAB-donor中的业务量检测模块认为IAB-node4可以进入空闲模式,否则继续监视F1端口上传输的数据。如图11中4,5步。The traffic detection module in the IAB-donor device detects the data transmitted on the F1 interface corresponding to IAB-node2 and IAB-node4 (F1AP data carried by SCTP, service data carried by GTP-U and GTP-C signaling data) ). Assuming that the IAB-donor receives less than K bytes/s (assumed 1000 bytes/s) traffic on the F1 interface corresponding to IAB-node4 within a certain time T (assumed to be 10 seconds), then the traffic in the IAB-donor The detection module thinks that IAB-node4 can enter the idle mode, otherwise it continues to monitor the data transmitted on the F1 port.
步骤3:IAB-donor检测存在IAB-node进入空闲模式,假设在本实施例中假定IAB-node4进入空闲模式。则业务量检测模块生成开始时间和周期时间,在该实施例中可以假设在系统帧号SFN=1000(或是IAB-donor一个固定时间基准偏移量)开始,以及相隔时间10秒发送一次心跳消息,配置到IAB-node对应的主机SCTP端点,以便IAB-node4对应在IAB-donor中对应主机SCTP端点发送心跳开始时间和周期时间。如图11中6,7步。Step 3: The IAB-donor detects that the IAB-node enters the idle mode, assuming that the IAB-node4 enters the idle mode in this embodiment. Then the traffic detection module generates the start time and cycle time. In this embodiment, it can be assumed that the system frame number SFN=1000 (or a fixed time reference offset of IAB-donor) starts, and a heartbeat is sent at an interval of 10 seconds. The message is configured to the host SCTP endpoint corresponding to the IAB-node, so that the IAB-node4 sends the heartbeat start time and cycle time corresponding to the host SCTP endpoint in the IAB-donor. Steps 6 and 7 in Figure 11.
步骤4:IAB-donor还通过IAB-donor和IAB-node2之间的F1接口通知主机SCTP端点发送心跳开始时间和周期时间。IAB-node2中的IAB-DU重配置IAB-node4的IAB-MT资源,进入DRX工作模式。如图11中8,9,10步。Step 4: IAB-donor also informs the host SCTP endpoint to send heartbeat start time and cycle time through the F1 interface between IAB-donor and IAB-node2. The IAB-DU in IAB-node2 reconfigures the IAB-MT resource of IAB-node4 and enters the DRX working mode. Steps 8, 9, and 10 in Figure 11.
步骤5:IAB-donor中的主机SCTP端点在开始时间,以周期时间间隔发送心跳消息到IAB-node4的远端SCTP端点。并且等待远端SCTP端点回复心跳确认消息。如图11中11,14步。Step 5: The host SCTP endpoint in the IAB-donor sends a heartbeat message to the remote SCTP endpoint of IAB-node4 at periodic intervals at the start time. And wait for the remote SCTP endpoint to reply with a heartbeat confirmation message. Steps 11 and 14 in Figure 11.
步骤6:IAB-node2收到IAB-donor发送到IAB-node4的心跳消息,在IAB-node4的IAB-MT的DRX工作激活周期将心跳消息发送到IAB-MT,在IAB-node4内部将IAB-MT收到的心跳消息转发到IAB-DU的远端SCTP端点。远端SCTP端点收到之后立即回复心跳确认。如图11中12,13步。Step 6: IAB-node2 receives the heartbeat message sent by IAB-donor to IAB-node4, sends the heartbeat message to IAB-MT during the DRX work activation cycle of IAB-MT of IAB-node4, and sends IAB- The heartbeat message received by the MT is forwarded to the remote SCTP endpoint of the IAB-DU. The remote SCTP endpoint immediately replies with a heartbeat acknowledgment after receiving it. Steps 12 and 13 in Figure 11.
过程2:IAB-MT退出DRX工作模式Process 2: IAB-MT exits DRX working mode
步骤1:处于空闲模式的IAB-node4节点,IAB-node2的IAB-DU和IAB-node4的IAB-MT之间采用DRX工作模式。在IAB-donor和IAB-DU之间建立完成F1接口链路。如图12中1,2,3步。Step 1: For the IAB-node4 node in idle mode, the DRX working mode is adopted between the IAB-DU of IAB-node2 and the IAB-MT of IAB-node4. The F1 interface link is established between the IAB-donor and the IAB-DU.
步骤2:IAB-donor中业务量检测模块检测F1接口上的数据,具体包括了GTP-U/GTP-C以及SCTP链路上的数据。如果数据流量超过一定门限,假设该实施例中定义为2000字节/秒,则IAB-donor认为IAB-node4节点可以退出空闲模式,判定驻留在IAB-node4上的终端发起做业务过程,需要进行业务数据传输。如图12中4,5步。Step 2: The traffic detection module in the IAB-donor detects the data on the F1 interface, which specifically includes the data on the GTP-U/GTP-C and SCTP links. If the data flow exceeds a certain threshold, assuming that it is defined as 2000 bytes/second in this embodiment, the IAB-donor considers that the IAB-node4 node can exit the idle mode, and determines that the terminal residing on the IAB-node4 initiates a business process, which requires Carry out business data transmission.
步骤3:IAB-donor中的业务量检测模块通知IAB-node4对应的主机SCTP端点取消发送心跳消息的开始时间和周期时间。如图12中6步。Step 3: The traffic detection module in the IAB-donor notifies the host SCTP endpoint corresponding to the IAB-node4 to cancel the start time and cycle time of sending the heartbeat message. Step 6 in Figure 12.
步骤4:IAB-donor通过F1接口(IAB-donor和IAB-node2之间的F1接口)通知IAB-node可以退出空闲模式,则IAB-node2中的IAB-DU将重配IAB-node中的IAB-MT无线资源,退出DRX工作模式。如图12中7,8步。Step 4: IAB-donor informs IAB-node through F1 interface (F1 interface between IAB-donor and IAB-node2) that it can exit idle mode, then IAB-DU in IAB-node2 will reconfigure IAB in IAB-node -MT radio resource, exit DRX working mode. Steps 7 and 8 in Figure 12.
最后说明的是,以上实施例仅用以说明本发明的技术方案而非限制,尽管参照较佳实施例对本发明进行了详细说明,本领域的普通技术人员应当理解,可以对本发明的技术方案进行修改或者等同替换,而不脱离本技术方案的宗旨和范围,其均应涵盖在本发明的权利要求范围当中。Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and not to limit them. Although the present invention has been described in detail with reference to the preferred embodiments, those of ordinary skill in the art should understand that the technical solutions of the present invention can be Modifications or equivalent replacements, without departing from the spirit and scope of the technical solution, should all be included in the scope of the claims of the present invention.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010575763.4A CN111770563B (en) | 2020-06-22 | 2020-06-22 | A power saving method for wireless access backhaul equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010575763.4A CN111770563B (en) | 2020-06-22 | 2020-06-22 | A power saving method for wireless access backhaul equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111770563A CN111770563A (en) | 2020-10-13 |
CN111770563B true CN111770563B (en) | 2022-05-20 |
Family
ID=72721586
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010575763.4A Active CN111770563B (en) | 2020-06-22 | 2020-06-22 | A power saving method for wireless access backhaul equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111770563B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114786210B (en) * | 2022-04-21 | 2025-02-11 | 重庆邮电大学 | A backhaul routing optimization method in a 5G IAB inactive state |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110351807A (en) * | 2018-04-04 | 2019-10-18 | 中兴通讯股份有限公司 | Access selection method and device |
CN110636570A (en) * | 2018-06-25 | 2019-12-31 | 中兴通讯股份有限公司 | Method and device for processing IAB node information in IAB network |
CN110636643A (en) * | 2018-06-21 | 2019-12-31 | 中兴通讯股份有限公司 | Method and device for sending and receiving data packet and transmission system of data packet |
CN110649997A (en) * | 2018-06-26 | 2020-01-03 | 电信科学技术研究院有限公司 | Data processing method and device |
-
2020
- 2020-06-22 CN CN202010575763.4A patent/CN111770563B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110351807A (en) * | 2018-04-04 | 2019-10-18 | 中兴通讯股份有限公司 | Access selection method and device |
CN110636643A (en) * | 2018-06-21 | 2019-12-31 | 中兴通讯股份有限公司 | Method and device for sending and receiving data packet and transmission system of data packet |
CN110636570A (en) * | 2018-06-25 | 2019-12-31 | 中兴通讯股份有限公司 | Method and device for processing IAB node information in IAB network |
CN110649997A (en) * | 2018-06-26 | 2020-01-03 | 电信科学技术研究院有限公司 | Data processing method and device |
Non-Patent Citations (1)
Title |
---|
5G IAB基站启动建立连接过程研究;王俊等;《通信技术》;20190430;第52卷(第4期);全文 * |
Also Published As
Publication number | Publication date |
---|---|
CN111770563A (en) | 2020-10-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20210112471A1 (en) | Method for establishing a fronthaul interface, method for performing access for a ue, method and apparatus for performing a handover for a ue, data forwarding method, user equipment and base station | |
EP2161945B1 (en) | A method for terminating connection to wireless relay station | |
US8570945B2 (en) | Method and apparatus for transmitting data in DLS wireless network | |
US20220039188A1 (en) | Systems, devices, and methods for handling radio link failures in wireless relay networks | |
US20220095194A1 (en) | Systems, devices, and methods for handling radio link failures in wireless relay networks | |
JP7531688B2 (en) | COMMUNICATION METHOD AND COMMUNICATION DEVICE APPLIED TO INTEGRATED ACCESS AND BACKHAUL IAB SYSTEM - Patent application | |
CN113826410B (en) | Method and device for deactivating IAB node | |
US20230084017A1 (en) | Methods and apparatus of sidelink relay based data communication | |
CN103782644B (en) | Information transferring method and system, agent equipment, the access device of back haul link | |
US20180049256A1 (en) | System and Method for Efficient Connection Setup and Communication for Power Conscious Devices | |
WO2023011245A1 (en) | Communication method and communication apparatus | |
JP2008515317A (en) | Wireless network interconnection using master / slave nodes | |
WO2021151247A1 (en) | Connection management in multi-hop networks | |
EP3858092A1 (en) | Systems, devices, and methods for handling radio link monitoring and radio link failures in wireless relay networks | |
EP3459291B1 (en) | System and method for paging in a communications system | |
WO2021026706A1 (en) | F1 interface management method and apparatus | |
WO2021151254A1 (en) | Connection management in multi-hop networks | |
CN115297548A (en) | Base station apparatus, terminal apparatus and control method of cellular communication network for relay communication | |
CN111770563B (en) | A power saving method for wireless access backhaul equipment | |
KR20140041740A (en) | Communication method in wlan sysem | |
GB2618409A (en) | Integrated access and backhaul timing mode signalling | |
WO2021087924A1 (en) | Communication method and device | |
WO2022205485A1 (en) | Information sending and receiving method and apparatus | |
WO2023131091A1 (en) | Communication method and apparatus | |
EP3398383B1 (en) | Method for operating a capillary network gateway |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |