CN111753352A - System construction method and device of green building scheme and generation method and device thereof - Google Patents

System construction method and device of green building scheme and generation method and device thereof Download PDF

Info

Publication number
CN111753352A
CN111753352A CN202010379435.7A CN202010379435A CN111753352A CN 111753352 A CN111753352 A CN 111753352A CN 202010379435 A CN202010379435 A CN 202010379435A CN 111753352 A CN111753352 A CN 111753352A
Authority
CN
China
Prior art keywords
item
preset
green building
scheme
attribute
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010379435.7A
Other languages
Chinese (zh)
Inventor
袁磊
黄冰妍
许雪松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen University
Original Assignee
Shenzhen University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen University filed Critical Shenzhen University
Priority to CN202010379435.7A priority Critical patent/CN111753352A/en
Publication of CN111753352A publication Critical patent/CN111753352A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • G06F30/27Design optimisation, verification or simulation using machine learning, e.g. artificial intelligence, neural networks, support vector machines [SVM] or training a model
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06NCOMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
    • G06N20/00Machine learning

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Physics & Mathematics (AREA)
  • Software Systems (AREA)
  • Computer Hardware Design (AREA)
  • General Engineering & Computer Science (AREA)
  • Artificial Intelligence (AREA)
  • Computer Vision & Pattern Recognition (AREA)
  • Medical Informatics (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Optimization (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Mathematical Analysis (AREA)
  • Pure & Applied Mathematics (AREA)
  • Architecture (AREA)
  • Data Mining & Analysis (AREA)
  • Computing Systems (AREA)
  • Mathematical Physics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a system construction method and a device of a green building scheme, and a generation method and a device thereof, wherein the system construction method comprises the following steps: acquiring an item scoring result of each national standard measure item, an item attribute weight result of each item attribute and an item attribute weight result of each item attribute; aiming at each preset project, calculating the feasibility value of each national standard measure item according to the project attribute corresponding to the preset project and the information; generating a corresponding preset green building scheme according to the sorting result of the feasibility values; pairing all preset items pairwise, and respectively calculating attribute similarity and scheme similarity of the two preset items; the method adopts a machine learning algorithm to train the model by taking the attribute similarity as the input scheme similarity as the output so as to generate a system learning model, and provides data support and analysis judgment basis for the automatic generation of the subsequent green building scheme by implementing the method, thereby simplifying the design flow, saving the time and improving the design efficiency.

Description

System construction method and device of green building scheme and generation method and device thereof
Technical Field
The invention relates to the technical field of building design, in particular to a system construction method and device of a green building scheme and a generation method and device thereof.
Background
With the development of the construction field in recent years, the ecological impact of the construction and use of the built environment including buildings is increasing. The green building can achieve the aims of saving resources and protecting the environment to the greatest extent possible in the service cycle of the building, and provides healthy and comfortable use space for people, and the advantages play an important role in promoting the development of the green building. As the design of green buildings is more and more emphasized, the regulations that the building design and construction meet the relevant technical requirements of the green building evaluation standard are also put forward in more and more areas of China.
The green building scheme of each green building project needs to select a plurality of national standard measure items from all national standard measure items specified in green building evaluation standard GB/T50378-2014 according to specific project information to be combined as green building technical measures. However, most of the existing green building schemes are generated by means of manual combination and selection of national standard measure items by building designers and project decision makers, and high requirements are provided for green building technical knowledge and comprehensive decision making experience or capability of the designers. Therefore, a method which is easy and convenient to operate and can automatically generate a green building scheme is urgently needed, scheme reference is provided for building designers, and further building design efficiency is improved.
Disclosure of Invention
In view of this, embodiments of the present invention provide a method and an apparatus for building a system of a green building scheme, and a method and an apparatus for generating the green building scheme, so as to overcome the problems in the prior art that a design operation process of manually generating a green building scheme is complicated, time-consuming, and affects building design efficiency.
The embodiment of the invention provides a system construction method of a green building scheme, which comprises the following steps: acquiring an item scoring result of each national standard measure item performing utility scoring according to item attributes, an item attribute weight result of each item attribute performing weight assignment, and an item attribute weight result of each item attribute performing weight assignment according to the item attributes, wherein the item attributes comprise: quality, ecology, technical difficulty and cost, the project attributes include: authentication level, land price, owner type, building type, and item type; aiming at each preset project, calculating the feasibility value of each national standard measure item of the preset project according to the project attribute, the item scoring result, the item attribute weighting result and the project attribute weighting result corresponding to the preset project; generating a preset green building scheme corresponding to the preset project according to the sorting result of the feasibility values; pairing all preset items pairwise, and respectively calculating attribute similarity and scheme similarity of the two preset items; and performing model training by using the attribute similarity as input scheme similarity as output by adopting a machine learning algorithm to generate a system learning model.
Optionally, the generating a preset green building scheme corresponding to the preset project according to the ranking result of the feasibility values includes: sequencing the feasibility values of all national standard measure items according to the national standard large categories, and selecting the national standard measure items in each national standard large category according to the sequence of the feasibility values from high to low until the sum of scores of the selected national standard measure items reaches a first preset standard value; secondly sorting the unselected national standard measure items according to the feasibility value, and selecting the national standard measure items again according to the high-to-low sequence of the feasibility value until the sum of scores of the selected national standard measure items reaches a second preset standard value, wherein the second preset standard value is larger than the first preset standard value; and generating the preset green building scheme according to all the selected national standard measure items.
Optionally, the feasibility value of the national standard measure entry of the preset project is calculated according to the following formula:
Figure BDA0002480663950000021
wherein,
Figure BDA0002480663950000022
country showing item jFeasibility value of standard measure item i, Ci1、Di1、Qi1、Ei1Item scoring results respectively representing national standard measure items i, Ci2、Di2、Qi2、Ei2Respectively representing item attribute weight results of national standard measure items i, Ci3、Qi3、Qi3、Ei3Respectively representing the item attribute weight result of a national standard measure item i, wherein i is a positive integer from 1 to 212, j represents the number of a preset item, and j is a positive integer.
Optionally, the calculating of the similarity of the attributes of the two preset items includes: converting the project attributes corresponding to the two preset projects into numerical values according to preset rules; and respectively carrying out difference on the numerical values corresponding to the attributes of each item in the two preset items to obtain the attribute similarity of the two preset items.
Optionally, the calculating the scheme similarity of the two preset items comprises: converting the preset green building schemes corresponding to the two preset projects into item selection vectors; calculating the schema similarity according to the entry selection vector by the following formula:
Figure BDA0002480663950000031
wherein S isdist(m,n)Indicating the similarity of the preset green building plan corresponding to the item m and the preset green building plan corresponding to the item n,
Figure BDA0002480663950000032
an item selection vector indicating a preset green building scheme corresponding to the item m,
Figure BDA0002480663950000033
and expressing an item selection vector of the preset green building scheme corresponding to the item n, wherein T represents the total number of all the preset green building schemes, and m, n and T are positive integers.
The embodiment of the invention also provides a method for generating the green building scheme, which comprises the following steps: acquiring item attributes of a target item, wherein the item attributes comprise: authentication level, land price, owner type, building type, and item type; inputting the project attributes into a system learning model constructed by the system construction method of the green building schemes provided by the embodiment of the invention, and selecting a preset number of preset green building schemes from the database according to the sequence of scheme similarity from high to low; and generating a target green building scheme corresponding to the target project according to each preset green building scheme.
The embodiment of the invention also provides a system construction device of the green building scheme, which comprises the following steps: the first data input module is used for acquiring an item scoring result of each national standard measure item performing utility scoring according to an item attribute, an item attribute weight result of each item attribute performing weight assignment, and an item attribute weight result of each item attribute performing weight assignment according to the item attribute, wherein the item attribute comprises: quality, ecology, technical difficulty and cost, the project attributes include: authentication level, land price, owner type, building type, and item type; the first calculation module is used for calculating the feasibility value of each national standard measure item of each preset item according to the item attribute, the item scoring result, the item attribute weighting result and the item attribute weighting result corresponding to each preset item; the first scheme generation module is used for generating a preset green building scheme corresponding to the preset project according to the sorting result of the feasibility values; the data processing module is used for pairing all the preset items pairwise and respectively calculating the attribute similarity and scheme similarity of the two preset items; and the model construction module is used for performing model training by using the attribute similarity as an input scheme similarity as an output by adopting a machine learning algorithm to generate a system learning model.
The embodiment of the invention also provides a device for generating the green building scheme, which comprises the following components: a second data input module, configured to obtain item attributes of the target item, where the item attributes include: authentication level, land price, owner type, building type, and item type; a plan selection module, configured to input the project attributes into a system learning model constructed by the system construction apparatus for green building plans according to another embodiment of the present invention, and select a preset number of preset green building plans from the database in order of plan similarity from high to low; and the second scheme generating module is used for generating a target green building scheme corresponding to the target project according to each preset green building scheme.
An embodiment of the present invention further provides an electronic device, including: the green building scheme generation system comprises a memory and a processor, wherein the memory and the processor are mutually connected in a communication mode, computer instructions are stored in the memory, and the processor executes the computer instructions so as to execute the system construction method of the green building scheme provided by the embodiment of the invention or execute the green building scheme generation method provided by the embodiment of the invention.
The embodiment of the present invention further provides a computer-readable storage medium, where the computer-readable storage medium stores computer instructions, and the computer instructions are used to enable the computer to execute the system construction method of the green building scheme provided by the embodiment of the present invention, or execute the green building scheme generation method provided by the embodiment of the present invention.
The technical scheme of the invention has the following advantages:
the embodiment of the invention provides a method and a device for constructing a green building scheme, wherein an item scoring result of each national standard measure item for performing utility scoring according to an item attribute, an item attribute weight result of each item attribute for performing weight assignment and a item attribute weight result of each item attribute for performing weight assignment according to the item attribute are obtained, then for each preset item, the feasibility value of each national standard measure item of the preset item is calculated according to the item attribute, the item scoring result, the item attribute weight result and the item attribute weight result corresponding to the preset item, and the preset green building scheme corresponding to the preset item is generated according to the sequencing result of the feasibility values, so that a database of the whole system is formed, and data support is provided for automatic generation of subsequent green building schemes, pairing all preset items in the database pairwise, and respectively calculating attribute similarity and scheme similarity of the two preset items; the system of the green building scheme constructed by the embodiment of the invention is convenient for a user to directly obtain the existing preset green building scheme in the database as a design reference by using the system learning model, thereby greatly simplifying the design flow, saving the time and improving the design efficiency.
The embodiment of the invention also provides a green building scheme generation method and a green building scheme generation device, wherein the project attributes of the target project are acquired and input into a system learning model constructed by the green building scheme system construction method provided by another embodiment of the invention, and a preset number of preset green building schemes are selected from the database according to the sequence of scheme similarity from high to low; and generating a target green building scheme corresponding to the target project according to each preset green building scheme. Therefore, through the system utilizing the green building scheme, a user can conveniently and directly obtain the existing preset green building scheme in the database by utilizing the system learning model as a design reference, the design process is greatly simplified, the time is saved, the design efficiency is improved, the target green building scheme corresponding to the target project can be automatically generated according to the existing preset green building scheme, the automatic generation of the green building scheme is realized, the problem of wrong decision of the green building scheme caused by the lack of experience of a new practitioner in the green building industry is avoided, and the decision accuracy is improved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and other drawings can be obtained by those skilled in the art without creative efforts.
FIG. 1 is a flow chart of a system construction method of a green building project in an embodiment of the present invention;
FIG. 2 is a flow chart of a green building plan generation method in an embodiment of the present invention;
FIG. 3 is a schematic view of a system construction apparatus for a green building solution in an embodiment of the present invention;
FIG. 4 is a schematic diagram of a green building plan generating apparatus according to an embodiment of the present invention;
fig. 5 is a schematic structural diagram of an electronic device in an embodiment of the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The technical features mentioned in the different embodiments of the invention described below can be combined with each other as long as they do not conflict with each other.
The grade evaluation mode of the existing green building takes the national standard 'green building evaluation standard' as the evaluation standard, the design evaluation index of the 'green building evaluation standard' is composed of six national standard large-class indexes of 'land and outdoor environment saving', 'energy saving and energy utilization', 'water saving and water resource utilization', 'material and material resource utilization', 'indoor environment quality' and 'improvement and innovation', and the total number of the national standard measures is 212. The design scheme of the building project participating in the green building certification needs to meet the technical measure combination corresponding to a plurality of 212 national standard measure items, the overall design scheme meets the standard of the corresponding certification level of the green building, the level division is divided into a three-star level, a two-star level, a one-star level and a basic level from high to low, wherein the basic level requirement is that the national standard score of each type is more than or equal to 40 points, and the total national standard scores of the one-star level, the two-star level and the three-star level need to reach 50 points, 60 points and 80 points respectively on the basis of meeting the basic level requirement.
In order to overcome the problem that in the prior art, a designer needs to manually select technical measures from 212 national standard measure items to combine according to design experience so that the designed green building scheme meets the evaluation standard of the corresponding national standard grade, the actual design operation process is complex, the time consumption is long, and the building design efficiency is influenced, the embodiment of the invention provides a system construction method of the green building scheme, and as shown in fig. 1, the system construction method of the green building scheme specifically comprises the following steps:
step S1: acquiring an item scoring result of each national standard measure item performing utility scoring according to item attributes, an item attribute weight result of each item attribute performing weight assignment and an item attribute weight result of each item attribute performing weight assignment according to item attributes, wherein the item attributes comprise: quality, ecology, technical difficulty and cost, and the project attributes include: authentication level, land price, owner type, building type, and item type.
Specifically, when a building item is being subjected to green building authentication, the building item needs to be authenticated according to the item attribute-related information of the building item, for example: the certification level declared by the construction project is one star, two stars or three stars, and the national standard total score required to be met is correspondingly different. In the embodiment of the present invention, the meaning of the item attribute of the building item and the attribute value corresponding thereto are detailed in table 1. In the embodiment of the present invention, a building design scheme with an authentication level of at least star level is taken as an example for description, in practical applications, a basic level green building design scheme may also be implemented by corresponding adjustment with reference to the embodiment of the present invention, and the present invention is not limited thereto.
TABLE 1
Figure BDA0002480663950000081
In the embodiment of the invention, the item scoring result, the item attribute weight result and the item attribute weight result are obtained by adopting a questionnaire survey and expert opinion collection mode of quantitative measure evaluation of a Likter scale, 0-6 parts of utility assignment is respectively carried out on all national standard measure items in four dimensions according to the expert opinion, the performance of the national standard measure items on quality, ecology, technical difficulty and cost is evaluated, and the item scoring result is obtained, wherein the item scoring result is shown in a table 2; weighting the four item attributes by using an analytic hierarchy process according to the expert opinions to obtain the item attribute weighting result, which is shown in a table 3; according to the expert opinion, the item attributes under different item attributes (authentication level, land price, owner type, building type and item type) are subjected to weight assignment to obtain the item attribute weight results, wherein the weight assignment under each item condition is obtained according to different item conditions, and the item attribute weight results under partial item conditions are shown in a table 4. It should be noted that, in the embodiment of the present invention, the item scoring result, the item attribute weighting result, and the item attribute weighting result are obtained in a manner of collecting expert opinions, in practical applications, other existing models or algorithms may also be used to calculate the item scoring result, the item attribute weighting result, and the item attribute weighting result, which only can implement the functions provided by the embodiment of the present invention, and the present invention is not limited thereto.
TABLE 2
Figure BDA0002480663950000082
Figure BDA0002480663950000091
TABLE 3
Item attributes Quality (Q) Ecological (E) Cost (C) Technical difficulty (D)
Weighted value 0.33 0.31 0.20 0.16
TABLE 4
Figure BDA0002480663950000092
Step S2: and aiming at each preset project, calculating the feasibility value of each national standard measure item of the preset project according to the project attribute, the item scoring result, the item attribute weighting result and the project attribute weighting result corresponding to the preset project. In practical applications, the practical feasibility of each national standard measure item is different for different preset projects, for example: some reconstruction and extension projects are limited by the influence of the original building design, and when the projects are designed, technical measures corresponding to some national standard measure items can not be actually constructed, so that the feasibility of each national standard measure item needs to be comprehensively evaluated by combining the characteristics of the project, so that the relatively optimal national standard measure item can be conveniently selected for scheme design.
Specifically, in one embodiment, in the step S2, the feasibility value of the national standard measure entry of the preset item is calculated according to the following formula (1):
Figure BDA0002480663950000101
wherein,
Figure BDA0002480663950000102
the feasibility value, C, of the national Standard measure item i representing the project ji1、Di1、Qi1、Ei1Item scoring results respectively representing national standard measure items i, Ci2、Di2、Qi2、Ei2Respectively representing item attribute weight results of national standard measure items i, Ci3、Di3、Qi3、Ei3Respectively representing the item attribute weight result of a national standard measure item i, wherein i is a positive integer from 1 to 212, j represents the number of a preset item, and j is a positive integer. In the embodiment of the present invention, the feasibility values of the national standard measure entries under different project conditions are calculated based on the multi-attribute effect theory, for example, the feasibility value of the national standard measure entry 1 in table 2 corresponding to the project condition 1 in table 4 is:
Figure BDA0002480663950000103
i.e. the feasibility value of national standard measure item 1 under project case 1 is 4.68.
Step S3: and generating a preset green building scheme corresponding to the preset project according to the sorting result of the feasibility values. In practical application, the feasibility values are respectively calculated for all national standard measure items of the preset project according to the formula (1) so as to conveniently select proper national standard measure items subsequently to form a green building scheme.
Specifically, in an embodiment, in the step S3, the step of generating the preset green building plan corresponding to the preset item according to the sorting result of the feasibility values specifically includes the following steps:
step S31: and sequencing the feasibility values of all the national standard measure items according to the national standard large categories, and selecting the national standard measure items in each national standard large category according to the sequence of the feasibility values from high to low until the sum of the scores of the selected national standard measure items reaches a first preset standard value. In practical applications, the first predetermined standard value corresponds to the score standard of the base level in the green building rating scale, and in the embodiment of the present invention, the first predetermined standard value is 40, specifically, taking the item 1 in the above table 4 as an example, the international entries and related information thereof are shown in table 5.
TABLE 5
Figure BDA0002480663950000111
Figure BDA0002480663950000121
Step S32: and further carrying out secondary sequencing on the unselected national standard measure items according to the feasibility value, and selecting the national standard measure items again according to the sequence of the feasibility value from high to low until the sum of scores of the selected national standard measure items reaches a second preset standard value, wherein the second preset standard value is larger than the first preset standard value. In practical application, because the embodiment of the present invention mainly aims at the green construction scheme with the star-level standard, the total score of the green construction design scheme needs to be greater than the corresponding score of the corresponding star-level standard under the condition that the score standard of the basic level is met, and the second preset standard value is 50 when the predetermined item needs to be evaluated as a star item; when the preset item needs to be evaluated as a two-star item, the second preset standard value is 60; when the predetermined item needs to be rated as a samsung item, the second predetermined criterion value is 80. Specifically, taking item 1 in table 4 above as an example, the international entries and related information thereof are shown in table 6.
TABLE 6
Figure BDA0002480663950000122
Figure BDA0002480663950000131
Step S33: and generating a preset green building scheme according to all the selected national standard measure items. Specifically, as can be seen from table 6, if the authentication type of the preset item is one star, the total score of the first selected item is 41.42 points and exceeds the first preset standard value by 40 points, the score of the second selected item is 8.78 points, the total score of all the items selected twice is 50.2 points, and the result meets the authentication standard of a star-green building, so that the green building scheme generated by combining the technical measures corresponding to the corresponding national standard items in table 6 meets the star-level identification standard of the preset item.
In practical application, by repeatedly executing the steps S31 to S33, the preset green building plan under all the preset project conditions can be obtained, all the preset project information and the preset building plan integrally form the database of the green building plan system, and a data basis is provided for the subsequent generation of the green building plan according to the project conditions.
Step S4: pairing all the preset items pairwise, and respectively calculating the attribute similarity and scheme similarity of the two preset items. Specifically, in the embodiment of the present invention, the database established in step S3 is used to obtain the relevant rule of the green building scheme by comparing the similarity of the preset items in the database with the similarity of the preset green building scheme, so as to facilitate the generation of the subsequent green building scheme.
Specifically, in an embodiment, in the step S4, the calculating the attribute similarity of the two preset items specifically includes the following steps:
step S41: and converting the item attributes corresponding to the two preset items into numerical values according to preset rules. Specifically, in the embodiment of the present invention, an assignment manner is adopted to convert the item attribute into corresponding numerical information, for example, see table 7 in detail, it should be noted that, in practical application, the item attribute may also be subjected to numerical conversion by using other preset rules, and the present invention is not limited thereto.
TABLE 7
Figure BDA0002480663950000141
Step S42: and respectively carrying out difference on the numerical values corresponding to the attributes of each item in the two preset items to obtain the attribute similarity of the two preset items. Specifically, taking item 1 and item 2 in table 4 as an example, assuming that the actual difference between the prices of the two is 45 ten thousand, the similarity of the attributes is as follows: the S certification rating is 0, the S place price is 45, the S owner is 0, the S building type is 1, and the S item type is 0.
Specifically, in an embodiment, in the step S4, the step of calculating the similarity between the schemes of the two preset items includes the following steps:
step S43: and converting the preset green building schemes corresponding to the two preset projects into item selection vectors. Specifically, in the embodiment of the present invention, taking the preset green building scheme of item case 1 shown in table 6 as an example, all the international entries to be selected are converted into a form of 01 vector, where one entry selection vector has 212 bits in total, and represents 212 international measure entries, where 1 represents an entry to be selected, and 0 represents a drop entry, and then the entry selection vector of item 1 is:
[1 1 1 1 1 1 1 1 0 1 0 1 1 0 0 0 0 0 0 0 0 0 1 1 1 1 0 0 0 0 0 1 1 00 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 00 0 0 0 0 1 0 1 1 1 1 1 1 1 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 1 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 01 0 1 1 0 0 0 1 0 0 1 1 1 0 0 0 0 0 0 0 1 1 0 0 1 0 0 0 0 0 0 0 0 0 1 0 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0]。
step S44: the scheme similarity is calculated from the item selection vector by the following formula (2):
Figure BDA0002480663950000151
wherein S isdist(m,n)Indicating the similarity of the preset green building plan corresponding to the item m and the preset green building plan corresponding to the item n,
Figure BDA0002480663950000152
an item selection vector indicating a preset green building scheme corresponding to the item m,
Figure BDA0002480663950000153
and expressing an item selection vector of the preset green building scheme corresponding to the item n, wherein T represents the total number of all the preset green building schemes, and m, n and T are positive integers.
Specifically, also taking the item 1 and the item 2 in the above table 4 as examples, the similarity of the schemes is: sdist(m,n)=1/212。
Step S5: and performing model training by using the machine learning algorithm and taking the attribute similarity as the input scheme similarity as the output to generate a system learning model. In practical application, MATLAB can be adopted as a learning platform, attribute similarity is used as an input vector, the similarity of a solution is used as an output vector, and a machine learning algorithm is utilized to train a system learning model.
In practical application, the database formed by the preset items and the corresponding preset green building schemes can be supplemented by using the existing real items and the corresponding green building schemes, so that the data volume is continuously improved, the accuracy of a system learning model is continuously optimized, and the comprehensive performance of the whole system is continuously improved.
Through the steps S1 to S5, the method for building a green building plan system according to the embodiment of the present invention constructs a database of the entire system through each preset project and the corresponding preset green building plan, provides data support for automatic generation of the subsequent green building plan, and provides an analysis and judgment basis for plan design of the subsequent green building plan through the trained system learning model, so as to obtain the preset green building plan most similar to the green building plan as a design reference.
The embodiment of the invention also provides a green building scheme generation method, as shown in fig. 2, the green building scheme generation method specifically comprises the following steps:
step S6: acquiring the item attributes of the target item, wherein the item attributes comprise: authentication level, land price, owner type, building type, and item type.
Step S7: the project attributes are input into a system learning model constructed by the system construction method of the green building schemes provided by another embodiment of the invention, and a preset number of preset green building schemes are selected from the database according to the sequence of scheme similarity from high to low. In practical application, a user inputs project attributes of a target project into the system of the green building schemes, the system automatically calls the system learning model to automatically search past projects which are most similar to the project attributes in the database, and selects a preset number of preset green building schemes set by the user according to the similarity of the projects, for example, when the preset number is 5, the system selects 5 preset green building schemes which are closest to the target project for the user to refer to.
Step S8: and generating a target green building scheme corresponding to the target project according to each preset green building scheme. In practical application, because the international items selected in different preset green building schemes are different, if the number of times that a certain international item is selected is more, the comprehensive feasibility of the international item is higher or more suitable in practical application, so that the international items can be selected according to the probability of the occurrence of the international items selected in each preset green building scheme, and the optimal international item selected by the finally generated target green building scheme is ensured.
Through the steps S6 to S8, the method for generating a green building plan according to the embodiment of the present invention facilitates a user to directly obtain an existing preset green building plan in a database as a design reference by using a system of the green building plan through a system learning model, greatly simplifies a design process, saves time, improves design efficiency, and can automatically generate a target green building plan corresponding to a target project according to the existing preset green building plan, thereby achieving automatic generation of the green building plan, and further avoiding a problem of wrong decision of the green building plan due to inexperience of a new practitioner in the green building industry, and improving decision accuracy.
An embodiment of the present invention further provides a system construction apparatus for a green building scheme, as shown in fig. 3, the system construction apparatus for a green building scheme includes:
the first data input module 1 is configured to obtain an item scoring result of each international measure item performing utility scoring according to an item attribute, an item attribute weight result of each item attribute performing weight assignment, and an item attribute weight result of each item attribute performing weight assignment according to an item attribute, where the item attributes include: quality, ecology, technical difficulty and cost, and the project attributes include: authentication level, land price, owner type, building type, and item type. For details, reference is made to the description relating to step S1 in the above method embodiment.
And the first calculating module 2 is used for calculating the feasibility value of each national standard measure item of each preset item according to the item attribute, the item scoring result, the item attribute weighting result and the item attribute weighting result corresponding to the preset item for each preset item. For details, reference is made to the description relating to step S2 in the above method embodiment.
And the first scheme generation module 3 is used for generating a preset green building scheme corresponding to the preset project according to the sorting result of the feasibility values. For details, reference is made to the description relating to step S3 in the above method embodiment.
And the data processing module 4 is used for pairing all the preset items pairwise and respectively calculating the attribute similarity and the scheme similarity of the two preset items. For details, reference is made to the description relating to step S4 in the above method embodiment.
And the model construction module 5 is used for performing model training by using the attribute similarity as an input scheme similarity as an output by adopting a machine learning algorithm to generate a system learning model. For details, reference is made to the description relating to step S5 in the above method embodiment.
Through the cooperative cooperation of the components, the system construction device of the green building scheme provided by the embodiment of the invention constructs a database of the whole system through each preset project and the corresponding preset green building scheme, provides data support for the automatic generation of the subsequent green building scheme, and provides an analysis and judgment basis for the scheme design of the subsequent green building project through the trained system learning model, so that the preset green building scheme most similar to the green building project is obtained as a design reference.
An embodiment of the present invention further provides a green building plan generating device, as shown in fig. 4, the green building plan generating device includes:
a second data input module 6, configured to obtain item attributes of the target item, where the item attributes include: authentication level, land price, owner type, building type, and item type. See the description relating to step 6 in the above method embodiment for details.
And the scheme selection module 7 is used for inputting the project attributes into the system learning model constructed by the system construction device of the green building scheme provided by another embodiment of the invention, and selecting a preset number of preset green building schemes from the database according to the sequence of scheme similarity from high to low. See the description relating to step 7 in the above method embodiment for details.
And the second scheme generating module 8 is configured to generate a target green building scheme corresponding to the target project according to each preset green building scheme. See the description relating to step 8 in the above method embodiment for details.
Through the cooperative cooperation of the above components, the green building scheme generation device provided by the embodiment of the invention facilitates the user to directly obtain the existing preset green building scheme in the database as the design reference by using the system of the green building scheme through the system learning model, greatly simplifies the design process, saves time, improves the design efficiency, can automatically generate the target green building scheme corresponding to the target project according to the existing preset green building scheme, realizes the automatic generation of the green building scheme, thereby also avoiding the problem of wrong decision of the green building scheme caused by the lack of experience of new practitioners in the green building industry, and improving the decision accuracy.
There is also provided an electronic device according to an embodiment of the present invention, as shown in fig. 5, the electronic device may include a processor 901 and a memory 902, where the processor 901 and the memory 902 may be connected by a bus or in another manner, and fig. 5 takes the example of being connected by a bus as an example.
Processor 901 may be a Central Processing Unit (CPU). The Processor 901 may also be other general purpose processors, Digital Signal Processors (DSPs), Application Specific Integrated Circuits (ASICs), Field Programmable Gate Arrays (FPGAs) or other Programmable logic devices, discrete Gate or transistor logic devices, discrete hardware components, or combinations thereof.
The memory 902, which is a non-transitory computer readable storage medium, may be used for storing non-transitory software programs, non-transitory computer executable programs, and modules, such as program instructions/modules corresponding to the methods in the method embodiments of the present invention. The processor 901 executes various functional applications and data processing of the processor by executing non-transitory software programs, instructions and modules stored in the memory 902, that is, implements the methods in the above-described method embodiments.
The memory 902 may include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application program required for at least one function; the storage data area may store data created by the processor 901, and the like. Further, the memory 902 may include high speed random access memory, and may also include non-transitory memory, such as at least one magnetic disk storage device, flash memory device, or other non-transitory solid state storage device. In some embodiments, the memory 902 may optionally include memory located remotely from the processor 901, which may be connected to the processor 901 via a network. Examples of such networks include, but are not limited to, the internet, intranets, local area networks, mobile communication networks, and combinations thereof.
One or more modules are stored in the memory 902, which when executed by the processor 901 performs the methods in the above-described method embodiments.
The specific details of the electronic device may be understood by referring to the corresponding related descriptions and effects in the above method embodiments, and are not described herein again.
It will be understood by those skilled in the art that all or part of the processes of the methods of the embodiments described above can be implemented by hardware related to instructions of a computer program, and the program can be stored in a computer readable storage medium, and when executed, can include the processes of the embodiments of the methods described above. The storage medium may be a magnetic Disk, an optical Disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a Flash Memory (Flash Memory), a Hard Disk (Hard Disk Drive, abbreviated as HDD), a Solid State Drive (SSD), or the like; the storage medium may also comprise a combination of memories of the kind described above.
Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the invention, and such modifications and variations fall within the scope defined by the appended claims.

Claims (10)

1. A system construction method of a green building scheme is characterized by comprising the following steps:
acquiring an item scoring result of each national standard measure item performing utility scoring according to item attributes, an item attribute weight result of each item attribute performing weight assignment, and an item attribute weight result of each item attribute performing weight assignment according to the item attributes, wherein the item attributes comprise: quality, ecology, technical difficulty and cost, the project attributes include: authentication level, land price, owner type, building type, and item type;
aiming at each preset project, calculating the feasibility value of each national standard measure item of the preset project according to the project attribute, the item scoring result, the item attribute weighting result and the project attribute weighting result corresponding to the preset project;
generating a preset green building scheme corresponding to the preset project according to the sorting result of the feasibility values;
pairing all preset items pairwise, and respectively calculating attribute similarity and scheme similarity of the two preset items;
and performing model training by using the attribute similarity as input scheme similarity as output by adopting a machine learning algorithm to generate a system learning model.
2. The method for constructing a green building scheme according to claim 1, wherein the generating a preset green building scheme corresponding to the preset project according to the ranking result of the feasibility values comprises:
sequencing the feasibility values of all national standard measure items according to the national standard large categories, and selecting the national standard measure items in each national standard large category according to the sequence of the feasibility values from high to low until the sum of scores of the selected national standard measure items reaches a first preset standard value;
secondly sorting the unselected national standard measure items according to the feasibility value, and selecting the national standard measure items again according to the high-to-low sequence of the feasibility value until the sum of scores of the selected national standard measure items reaches a second preset standard value, wherein the second preset standard value is larger than the first preset standard value;
and generating the preset green building scheme according to all the selected national standard measure items.
3. The system construction method of a green building scheme according to claim 1, wherein the feasibility value of the national standard measure entry of the preset project is calculated according to the following formula:
Figure FDA0002480663940000021
wherein, Pi jThe feasibility value, C, of the national Standard measure item i representing the project ji1、Di1、Qi1、Ei1Item scoring results respectively representing national standard measure items i, Ci2、Di2、Qi2、Ei2Respectively representing item attribute weight results of national standard measure items i, Ci3、Di3、Qi3、Ei3Respectively representing the item attribute weight result of a national standard measure item i, wherein i is a positive integer from 1 to 212, j represents the number of a preset item, and j is a positive integer.
4. The method of claim 1, wherein the calculating of the similarity of the attributes of the two preset items comprises:
converting the project attributes corresponding to the two preset projects into numerical values according to preset rules;
and respectively carrying out difference on the numerical values corresponding to the attributes of each item in the two preset items to obtain the attribute similarity of the two preset items.
5. The method of claim 1, wherein the calculating of the project similarity of the two preset projects comprises:
converting the preset green building schemes corresponding to the two preset projects into item selection vectors;
calculating the schema similarity according to the entry selection vector by the following formula:
Figure FDA0002480663940000022
wherein S isdist(m,n)Representing the preset green building scheme corresponding to the item m and the preset green building corresponding to the item nThe similarity of the scheme of the construction scheme,
Figure FDA0002480663940000031
an item selection vector indicating a preset green building scheme corresponding to the item m,
Figure FDA0002480663940000032
and expressing an item selection vector of the preset green building scheme corresponding to the item n, wherein T represents the total number of all the preset green building schemes, and m, n and T are positive integers.
6. A green building plan generation method is characterized by comprising the following steps:
acquiring item attributes of a target item, wherein the item attributes comprise: authentication level, land price, owner type, building type, and item type;
inputting the project attributes into a system learning model constructed by the system construction method of green building schemes according to any one of claims 1 to 5, and selecting a preset number of preset green building schemes from the database in the order of scheme similarity from high to low;
and generating a target green building scheme corresponding to the target project according to each preset green building scheme.
7. A system construction apparatus for green building solutions, comprising:
the first data input module is used for acquiring an item scoring result of each national standard measure item performing utility scoring according to an item attribute, an item attribute weight result of each item attribute performing weight assignment, and an item attribute weight result of each item attribute performing weight assignment according to the item attribute, wherein the item attribute comprises: quality, ecology, technical difficulty and cost, the project attributes include: authentication level, land price, owner type, building type, and item type;
the first calculation module is used for calculating the feasibility value of each national standard measure item of each preset item according to the item attribute, the item scoring result, the item attribute weighting result and the item attribute weighting result corresponding to each preset item;
the first scheme generation module is used for generating a preset green building scheme corresponding to the preset project according to the sorting result of the feasibility values;
the data processing module is used for pairing all the preset items pairwise and respectively calculating the attribute similarity and scheme similarity of the two preset items;
and the model construction module is used for performing model training by using the attribute similarity as an input scheme similarity as an output by adopting a machine learning algorithm to generate a system learning model.
8. A green building plan generating apparatus, comprising:
a second data input module, configured to obtain item attributes of the target item, where the item attributes include: authentication level, land price, owner type, building type, and item type;
a plan selection module, configured to input the project attributes into a system learning model constructed by the system construction apparatus for green building plans in claim 7, and select a preset number of preset green building plans from the database in order of plan similarity from high to low;
and the second scheme generating module is used for generating a target green building scheme corresponding to the target project according to each preset green building scheme.
9. An electronic device, comprising:
a memory and a processor, the memory and the processor being communicatively connected to each other, the memory having stored therein computer instructions, the processor executing the computer instructions to perform the system construction method of the green building scheme according to any one of claims 1 to 5 or to perform the green building scheme generation method according to claim 6.
10. A computer-readable storage medium, characterized in that the computer-readable storage medium stores computer instructions for causing the computer to thereby execute the system construction method of green building scheme of any one of claims 1 to 5 or execute the green building scheme generation method of claim 6.
CN202010379435.7A 2020-05-07 2020-05-07 System construction method and device of green building scheme and generation method and device thereof Pending CN111753352A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010379435.7A CN111753352A (en) 2020-05-07 2020-05-07 System construction method and device of green building scheme and generation method and device thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010379435.7A CN111753352A (en) 2020-05-07 2020-05-07 System construction method and device of green building scheme and generation method and device thereof

Publications (1)

Publication Number Publication Date
CN111753352A true CN111753352A (en) 2020-10-09

Family

ID=72673264

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010379435.7A Pending CN111753352A (en) 2020-05-07 2020-05-07 System construction method and device of green building scheme and generation method and device thereof

Country Status (1)

Country Link
CN (1) CN111753352A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102324075A (en) * 2011-10-29 2012-01-18 大连理工大学 Green building intelligent energy-saving assessment management system based on Web geographic information system (GIS)
CN105760633A (en) * 2016-03-30 2016-07-13 班淇超 Green architectural design method applicable to information assistance
CN106203760A (en) * 2015-05-08 2016-12-07 中国人民解放军理工大学 A kind of urban underground space Plan mode method
US20180322516A1 (en) * 2017-05-08 2018-11-08 Beijing Baidu Netcom Science And Technology Co., Ltd. Quality evaluation method, apparatus and device, and computer readable storage medium
CN109241580A (en) * 2018-08-15 2019-01-18 深圳大学 A kind of plot design method, device, computer equipment and storage medium
CN109961178A (en) * 2019-03-12 2019-07-02 中国电子工程设计院有限公司 The acquisition methods and device of house type transformation information

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102324075A (en) * 2011-10-29 2012-01-18 大连理工大学 Green building intelligent energy-saving assessment management system based on Web geographic information system (GIS)
CN106203760A (en) * 2015-05-08 2016-12-07 中国人民解放军理工大学 A kind of urban underground space Plan mode method
CN105760633A (en) * 2016-03-30 2016-07-13 班淇超 Green architectural design method applicable to information assistance
US20180322516A1 (en) * 2017-05-08 2018-11-08 Beijing Baidu Netcom Science And Technology Co., Ltd. Quality evaluation method, apparatus and device, and computer readable storage medium
CN109241580A (en) * 2018-08-15 2019-01-18 深圳大学 A kind of plot design method, device, computer equipment and storage medium
CN109961178A (en) * 2019-03-12 2019-07-02 中国电子工程设计院有限公司 The acquisition methods and device of house type transformation information

Similar Documents

Publication Publication Date Title
CN105975632B (en) A kind of searching method, relation establishing method and relevant device
CN103473175A (en) Extraction method for software testing case set
CN110020128A (en) A kind of search result ordering method and device
CN104536881A (en) Public testing error report priority sorting method based on natural language analysis
CN105913323A (en) PullRequest reviewer recommend method of GitHub open source community
CN106845777A (en) Case workload evaluation method, judge's performance evaluation techniques, modeling method, computing device and computer-readable recording medium
WO2020007177A1 (en) Quotation method executed by computer, quotation device, electronic device and storage medium
JP2019537079A (en) How to build stochastic models for large-scale renewable energy data
WO2021017293A1 (en) Rule training method, apparatus, device, and storage medium
CN110751355A (en) Scientific and technological achievement assessment method and device
CN109193748A (en) A kind of evaluation method and calculating equipment of photovoltaic digestion capability
Huang et al. Examining the multidimensional energy poverty trap and its determinants: An empirical analysis at household and community levels in six provinces of China
CN111537884A (en) Method and device for acquiring service life data of power battery, computer equipment and medium
CN109639469A (en) A kind of sparse net with attributes characterizing method of combination learning and system
CN109146553A (en) Spot Price forecasting system and its method based on multi-density cluster and multicore SVM
CN105740434A (en) Network information scoring method and device
CN110263973B (en) Method and device for predicting user behavior
CN115081515A (en) Energy efficiency evaluation model construction method and device, terminal and storage medium
Wang et al. Product design evaluation based on improved CRITIC and Comprehensive Cloud-TOPSIS–Applied to automotive styling design evaluation
Jiang et al. Toward perception-based shape decomposition
CN111753352A (en) System construction method and device of green building scheme and generation method and device thereof
CN117272130A (en) Recommendation system click prediction method based on feature selection depolarization
KR102353806B1 (en) Support decision system and method based on graph database
CN109889981A (en) A kind of localization method and system based on two sorting techniques
CN110598930B (en) Bus route optimization adjustment method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination