CN111738512A - Short-term power load prediction method based on CNN-IPSO-GRU hybrid model - Google Patents
Short-term power load prediction method based on CNN-IPSO-GRU hybrid model Download PDFInfo
- Publication number
- CN111738512A CN111738512A CN202010573272.6A CN202010573272A CN111738512A CN 111738512 A CN111738512 A CN 111738512A CN 202010573272 A CN202010573272 A CN 202010573272A CN 111738512 A CN111738512 A CN 111738512A
- Authority
- CN
- China
- Prior art keywords
- gru
- prediction
- model
- ipso
- unit network
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 41
- 239000002245 particle Substances 0.000 claims abstract description 55
- 238000012360 testing method Methods 0.000 claims abstract description 25
- 238000013527 convolutional neural network Methods 0.000 claims abstract description 22
- 238000012549 training Methods 0.000 claims abstract description 18
- 230000008859 change Effects 0.000 claims abstract description 14
- 239000013598 vector Substances 0.000 claims abstract description 13
- 238000012545 processing Methods 0.000 claims abstract description 12
- 238000010606 normalization Methods 0.000 claims abstract description 11
- 238000005457 optimization Methods 0.000 claims description 28
- 238000011156 evaluation Methods 0.000 claims description 20
- 210000002569 neuron Anatomy 0.000 claims description 16
- 125000004122 cyclic group Chemical group 0.000 claims description 12
- 101001095088 Homo sapiens Melanoma antigen preferentially expressed in tumors Proteins 0.000 claims description 10
- 102100037020 Melanoma antigen preferentially expressed in tumors Human genes 0.000 claims description 10
- 230000008569 process Effects 0.000 claims description 8
- 230000001133 acceleration Effects 0.000 claims description 7
- 230000006870 function Effects 0.000 claims description 6
- 238000004458 analytical method Methods 0.000 claims description 5
- 238000010276 construction Methods 0.000 claims description 3
- 238000013507 mapping Methods 0.000 claims description 3
- 238000004422 calculation algorithm Methods 0.000 abstract description 7
- 230000008901 benefit Effects 0.000 description 5
- 238000010586 diagram Methods 0.000 description 5
- 230000000694 effects Effects 0.000 description 5
- 238000010801 machine learning Methods 0.000 description 3
- 230000000306 recurrent effect Effects 0.000 description 2
- 238000011160 research Methods 0.000 description 2
- 238000007619 statistical method Methods 0.000 description 2
- 238000012706 support-vector machine Methods 0.000 description 2
- 230000006978 adaptation Effects 0.000 description 1
- 238000013528 artificial neural network Methods 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 238000007405 data analysis Methods 0.000 description 1
- 238000000354 decomposition reaction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000006386 memory function Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000007781 pre-processing Methods 0.000 description 1
- 238000010200 validation analysis Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N3/00—Computing arrangements based on biological models
- G06N3/004—Artificial life, i.e. computing arrangements simulating life
- G06N3/006—Artificial life, i.e. computing arrangements simulating life based on simulated virtual individual or collective life forms, e.g. social simulations or particle swarm optimisation [PSO]
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N3/00—Computing arrangements based on biological models
- G06N3/02—Neural networks
- G06N3/04—Architecture, e.g. interconnection topology
- G06N3/045—Combinations of networks
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N3/00—Computing arrangements based on biological models
- G06N3/02—Neural networks
- G06N3/08—Learning methods
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- General Physics & Mathematics (AREA)
- General Health & Medical Sciences (AREA)
- Economics (AREA)
- Software Systems (AREA)
- Biomedical Technology (AREA)
- Data Mining & Analysis (AREA)
- Molecular Biology (AREA)
- Computing Systems (AREA)
- General Engineering & Computer Science (AREA)
- Computational Linguistics (AREA)
- Mathematical Physics (AREA)
- Biophysics (AREA)
- Strategic Management (AREA)
- Artificial Intelligence (AREA)
- Human Resources & Organizations (AREA)
- Life Sciences & Earth Sciences (AREA)
- Evolutionary Computation (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Entrepreneurship & Innovation (AREA)
- Development Economics (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a short-term power load prediction method based on a CNN-IPSO-GRU mixed model, which comprises the steps of firstly collecting data such as historical load, meteorological factors, date information and the like of a power grid, carrying out data normalization processing, dividing a training set and a test set, extracting multi-dimensional characteristic vectors representing load changes by utilizing a convolutional neural network technology, and constructing a time sequence as the input of a model; then constructing a gated circulation unit network prediction model, optimizing the gated circulation unit network prediction model by using training set data through an improved particle swarm algorithm to obtain two optimal prediction model parameters, and reestablishing the gated circulation unit network model according to the obtained optimal prediction model parameters; and finally, short-term load prediction of the power grid is realized by using the test set data. The method provided by the invention can accurately predict the short-term load change trend of the power grid, and further plays an important role in reducing the loss of the generator set and ensuring the economic and reliable operation of the power grid.
Description
Technical Field
The invention relates to a power load prediction method, in particular to a short-term load prediction method based on a CNN-IPSO-GRU mixed model.
Background
With the rapid development of the electric power market in China, efficient and accurate short-term load prediction is important content of power grid research, and the accurate short-term load prediction plays an important role in reducing the loss of a generator set and ensuring the economic and reliable operation of a power grid. Therefore, a new method for improving the load prediction precision needs to be researched to improve the economic benefit of the power grid.
A large amount of research is carried out on short-term load prediction by numerous scholars at home and abroad for many years, and the short-term load prediction can be summarized into three types: statistical methods, model combination methods and machine learning methods. The statistical method mainly comprises a time sequence model, a fuzzy prediction model and the like, and the prediction effect of the method has higher requirements on the distribution characteristics of the data set; there are two main categories of combinatorial prediction methods: firstly, different prediction models are effectively combined, and secondly, a data analysis method is used for preprocessing an original data sequence, wherein the analysis method comprises a convolutional neural network, Empirical Mode Decomposition (EMD) and the like, and then prediction is carried out by combining the models; the Machine learning method mainly includes a Recurrent Neural Network (RNN), a Support Vector Machine (SVM), a Long-short term memory Network (LSTM), a Gated Recurrent Unit (GRU), and the like.
Because the factors influencing the load fluctuation are many, the factors mainly include historical load, meteorological factors, date types and the like, and considering that the historical data set has the characteristics of complexity and time sequence, the Convolutional Neural Networks (CNNs) have the characteristic of reducing the complexity of the multi-dimensional data set, and are currently applied to the aspect of extracting feature vectors during load prediction. RNN has a memory function, and is widely applied to the aspect of predicting time series, LSTM and GRU are both special RNN, and have higher precision in the aspect of predicting time series. The GRU is improved on the basis of an LSTM structure, compared with the LSTM, the GRU has the advantages that the structure is simpler, the convergence rate is higher, and the prediction accuracy is higher. The Particle Swarm Optimization (PSO) has the advantages of few adjusting parameters, concise iterative optimization thought, high convergence speed and the like, and is widely applied to the aspect of determining model parameters, but the PSO is easy to fall into local optimization in the optimization process, so that the error result is large and the like, and therefore an Improved Particle Swarm Optimization (IPSO) is provided to enhance the optimization capability of the model parameters.
Disclosure of Invention
The invention aims to solve the technical problem of providing a short-term power load prediction method for optimizing a gate control cycle unit network (CNN-IPSO-GRU) mixed model based on a convolutional neural network and an improved particle swarm algorithm.
In order to solve the technical problem, the invention provides a short-term load prediction method based on a CNN-IPSO-GRU mixed model, which comprises the following steps:
A. collecting historical load, meteorological factors and date information data of a power grid as characteristic parameters;
B. acquiring sample data of the characteristic parameters in the step A in the historical time dimension power grid load, carrying out normalization processing on the sample data, extracting a multi-dimensional characteristic vector representing load change by using a Convolutional Neural Network (CNN), constructing the multi-dimensional characteristic vector into a time sequence, and dividing training set data and test set data according to the time sequence;
C. constructing a gate control cycle unit network prediction model GRU comprising an input layer, a hidden layer and an output layer;
D. performing improved particle swarm optimization IPSO on the gated circulation unit network prediction model GRU constructed in the step C by using the training set data obtained in the step B, determining the optimal parameters of the gated circulation unit network prediction model GRU on the basis of meeting the optimal evaluation index of the prediction model, and reestablishing the optimized gated circulation unit network prediction model IPSO-GRU on the basis of the optimal parameters;
E. and D, using the test set data obtained in the step B as input variables of the optimized gated loop unit network prediction model IPSO-GRU in the step D, and further performing power grid short-term load prediction to obtain a prediction result.
The step B of normalizing the sample data means that the sample data is mapped between [0 and 1], and the normalized formula is expressed by formula (1):
in the formula (1), x*The normalized data is obtained; x is the number ofmin、xmaxThe minimum value and the maximum value of the sample data set are respectively, and x is the original sample data.
The concrete construction process of the gate control cycle unit network prediction model GRU in the step C is as follows:
c1, collecting power grid historical load, meteorological factor and date information data as characteristic parameters, extracting multi-dimensional characteristic vectors representing load changes by using a Convolutional Neural Network (CNN), and constructing a time sequence as sample data of a gate control cycle unit network prediction model GRU input layer;
c2, carrying out normalization processing on the sample data of each characteristic parameter in the step C1, mapping the sample data to the position between [0 and 1], and dividing the training set data and the test set data according to the time sequence;
c3, the hidden layer trains the gated loop unit network prediction model GRU by adopting the training set data obtained in the step C2, and determines the optimal parameters of the gated loop unit network prediction model GRU under the condition that the evaluation standard error of the prediction result is smaller;
c4, adopting the gate control cycle unit network prediction model GRU obtained in the step C3 to predict the data of the test set, and obtaining a prediction result P1、P2、…Pn;
And C5, calculating n prediction results obtained in the step C4 by an average absolute percentage error mode through an output layer, performing inverse normalization processing to obtain a final prediction result, and finally performing evaluation analysis on the prediction result by combining with an experimental evaluation index.
The process of optimizing the gated cyclic unit network prediction model GRU by using the improved particle swarm optimization IPSO in the step D is as follows:
d1, initializing GRU parameters of the gate control cycle unit network prediction model constructed in the step C, setting the value ranges and the search ranges of the number m of the neurons and the learning rate, and determining the maximum iteration times TmaxWith the population size ps and the maximum value omega of the inertial weight omegamaxWith a minimum value ωminAcceleration factor c1、c2Maximum and minimum values of;
d2, performing model prediction on the test set data by using the gated cyclic unit network prediction model GRU constructed in the step C according to the number m of the neurons initialized in the step D1 and the value of the learning rate, and taking the average absolute percentage error of the obtained prediction result as the fitness value of the particles, wherein the fitness function f is a function of the fitnessitiAs defined in formula (2):
wherein n represents the sample volume of the test set data; xact(i) And Xpred(i) Respectively a real value and a predicted value of the load at the moment i;
d3, taking two parameters of the number m of the neurons and the learning rate as particles, taking the average absolute percentage error of the prediction result obtained in the step D2 as a particle fitness value, and iteratively updating the speeds and the positions of the two particles by adopting formulas (3) to (7), namely updating the values of two key parameters of the gated loop unit network prediction model GRU; after the optimal values of the two parameters are obtained by improving particle swarm optimization IPSO, an optimized gated cyclic unit network prediction model IPSO-GRU is reestablished on the basis of the optimal values;
in the above formula, k represents the current iteration number; t ismaxRepresenting the maximum iteration number;respectively representing the speed, the position, the individual local optimal solution and the global optimal solution of the particle; r is1And r2Is [0, 1]]A random number in between; omega (k), c1(k) And c2(k) Respectively representing the values of inertia weight and acceleration factor in the k iteration; omegamax=0.9,ωmin=0.4;TmaxIs the maximum iteration number; c. C1And c2∈[0.5,2.5];a=b=1, c=d=1.5;
D4, iteratively updating the speed and the position of the particles according to formulas (3) - (7) of the improved particle swarm optimization, calculating the corresponding particle fitness value, comparing the local optimal solution with the global optimal solution, meeting a termination condition when the particle fitness value tends to be stable or the iteration frequency reaches the maximum, obtaining the optimal neuron number m and a learning rate parameter, obtaining a gated cycle unit network prediction model IPSO-GRU optimized by the improved particle swarm optimization, and otherwise, returning to the step D3 to continuously perform iterative updating.
The prediction result obtained in the step E uses the average relative percentage error MAPE, the root mean square error RMSE, the prediction precision FA and the decision coefficient R2Model evaluation was performed for four evaluation indexes, which are shown in equations (8) to (11):
in the above formula: n represents the sample capacity of the test data set; xact(i) And Xpred(i) (i is 1,2, … n) is the real value and predicted value of the load at the ith moment respectively;an average value representing the true value of the prediction sample; wherein the smaller the MAPE and RMSE values are, the larger the FA value is, and R is2The closer to 1 the value of (a) indicates the greater the goodness of fit, the more accurate the model prediction result.
The method comprises the steps of firstly, collecting data such as historical load, meteorological factors and date information of a power grid, carrying out data normalization processing, dividing training set data and test set data, extracting multi-dimensional characteristic vectors representing load changes by using a convolutional neural network, and constructing a time sequence as input data of a model; then constructing a gated circulation unit network prediction model, optimizing the gated circulation unit network prediction model by using training set data through an improved particle swarm algorithm to obtain two optimal prediction model parameters, and reestablishing the gated circulation unit network model according to the obtained optimal prediction model parameters; and finally, short-term load prediction of the power grid is realized by using the test set data. The method provided by the invention can accurately predict the short-term load change trend of the power grid, and further plays an important role in reducing the loss of the generator set and ensuring the economic and reliable operation of the power grid.
Drawings
FIG. 1 is a diagram illustrating the variation of particle fitness with the number of iterations in an embodiment of the present invention;
FIG. 2 is a diagram illustrating the variation of the number of neurons with the variation of the number of iterations according to an embodiment of the present invention;
FIG. 3 is a diagram illustrating the variation of the learning rate with the variation of the number of iterations according to an embodiment of the present invention;
FIG. 4 is a schematic diagram showing comparison between a prediction curve and an actual curve of a power grid load respectively performed by using a CNN-IPSO-GRU model, a CNN-PSO-GRU model, a CNN-GRU model, an LSTM model, an RNN model and a GRU model in the embodiment of the present invention;
FIG. 5 is a diagram illustrating relative error comparisons of predictions of grid loads by using a CNN-IPSO-GRU model, a CNN-PSO-GRU model, a CNN-GRU model, an LSTM model, an RNN model, and a GRU model, respectively, in an embodiment of the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some embodiments, but not all embodiments, of the present invention; all other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The invention provides a short-term load prediction method based on a CNN-IPSO-GRU mixed model, which comprises the following steps:
A. collecting historical load, meteorological factors and date information data of a power grid as characteristic parameters;
B. acquiring sample data of the characteristic parameters in the step A in the historical time dimension power grid load, carrying out normalization processing on the sample data, extracting a multi-dimensional characteristic vector representing load change by using a Convolutional Neural Network (CNN), constructing the multi-dimensional characteristic vector into a time sequence, and dividing training set data and test set data according to the time sequence;
C. constructing a gate control cycle unit network prediction model GRU comprising an input layer, a hidden layer and an output layer;
D. performing improved particle swarm optimization IPSO on the gated circulation unit network prediction model GRU constructed in the step C by using the training set data obtained in the step B, determining the optimal parameters of the gated circulation unit network prediction model GRU on the basis of meeting the optimal evaluation index of the prediction model, and reestablishing the optimized gated circulation unit network prediction model IPSO-GRU on the basis of the optimal parameters;
E. and D, using the test set data obtained in the step B as input variables of the optimized gated loop unit network prediction model IPSO-GRU in the step D, and further performing power grid short-term load prediction to obtain a prediction result.
The step B of normalizing the sample data means that the sample data is mapped between [0 and 1], and the normalized formula is expressed by formula (1):
in the formula (1), x*The normalized data is obtained; x is the number ofmin、xmaxThe minimum value and the maximum value of the sample data set are respectively, and x is the original sample data.
The concrete construction process of the gate control cycle unit network prediction model GRU in the step C is as follows:
c1, collecting power grid historical load, meteorological factor and date information data as characteristic parameters, extracting multi-dimensional characteristic vectors representing load changes by using a Convolutional Neural Network (CNN), and constructing a time sequence as sample data of a gate control cycle unit network prediction model GRU input layer;
c2, carrying out normalization processing on the sample data of each characteristic parameter in the step C1, mapping the sample data to the position between [0 and 1], and dividing the training set data and the test set data according to the time sequence;
c3, the hidden layer trains the gated loop unit network prediction model GRU by adopting the training set data obtained in the step C2, and determines the optimal parameters of the gated loop unit network prediction model GRU under the condition that the evaluation standard error of the prediction result is smaller;
c4, adopting the gate control cycle unit network prediction model GRU obtained in the step C3 to predict the data of the test set, and obtaining a prediction result P1、P2、…Pn;
And C5, calculating n prediction results obtained in the step C4 by an average absolute percentage error mode through an output layer, performing inverse normalization processing to obtain a final prediction result, and finally performing evaluation analysis on the prediction result by combining with an experimental evaluation index.
The process of optimizing the gated cyclic unit network prediction model GRU by using the improved particle swarm optimization IPSO in the step D is as follows:
d1, initializing GRU parameters of the gate control cycle unit network prediction model constructed in the step C, setting the value ranges and the search ranges of the number m of the neurons and the learning rate, and determining the maximum iteration times TmaxWith the population size ps and the maximum value omega of the inertial weight omegamaxWith a minimum value ωminAcceleration factor c1、c2Maximum and minimum values of;
d2, performing model prediction on the test set data by using the gated cyclic unit network prediction model GRU constructed in the step C according to the number m of the neurons initialized in the step D1 and the value of the learning rate, and taking the average absolute percentage error of the obtained prediction result as the fitness value of the particles, wherein the fitness function f is a function of the fitnessitiAs defined in formula (2):
wherein n represents the sample volume of the test set data; xact(i) And Xpred(i) Respectively a real value and a predicted value of the load at the moment i;
d3, taking two parameters of the number m of the neurons and the learning rate as particles, taking the average absolute percentage error of the prediction result obtained in the step D2 as a particle fitness value, and iteratively updating the speeds and the positions of the two particles by adopting formulas (3) to (7), namely updating the values of two key parameters of the gated loop unit network prediction model GRU; after the optimal values of the two parameters are obtained by improving particle swarm optimization IPSO, an optimized gated cyclic unit network prediction model IPSO-GRU is reestablished on the basis of the optimal values;
in the above formula, k represents the current iteration number; t ismaxRepresenting the maximum iteration number;respectively representing the speed, the position, the individual local optimal solution and the global optimal solution of the particle; r is1And r2Is [0, 1]]A random number in between; omega (k), c1(k) And c2(k) Respectively representing the values of inertia weight and acceleration factor in the k iteration; omegamax=0.9,ωmin=0.4;TmaxIs the maximum iteration number; c. C1And c2∈[0.5,2.5];a=b=1, c=d=1.5;
D4, iteratively updating the speed and the position of the particles according to formulas (3) - (7) of the improved particle swarm optimization, calculating the corresponding particle fitness value, comparing the local optimal solution with the global optimal solution, meeting a termination condition when the particle fitness value tends to be stable or the iteration frequency reaches the maximum, obtaining the optimal neuron number m and a learning rate parameter, obtaining a gated cycle unit network prediction model IPSO-GRU optimized by the improved particle swarm optimization, and otherwise, returning to the step D3 to continuously perform iterative updating.
The prediction result obtained in the step E uses the average relative percentage error MAPE, the root mean square error RMSE, the prediction precision FA and the decision coefficient R2Model evaluation was performed for four evaluation indexes, which are shown in equations (8) to (11):
in the above formula: n represents the sample capacity of the test data set; xact(i) And Xpred(i) (i is 1,2, … n) is the real value and predicted value of the load at the ith moment respectively;an average value representing the true value of the prediction sample; wherein the smaller the MAPE and RMSE values are, the larger the FA value is, and R is2The closer to 1 the value of (a) indicates the greater the goodness of fit, the more accurate the model prediction result.
Examples
The embodiment provides a short-term load prediction method for optimizing a gated circulation unit based on a convolutional neural network and an improved particle swarm optimization, aiming at the defects that factors influencing the load change of a power grid have the characteristics of complexity and time sequence and key parameters are selected according to experience in the conventional machine learning prediction method, and the method comprises the steps of firstly extracting multi-dimensional characteristic vectors representing the load change by using the convolutional neural network, and constructing a time sequence to be input into a gated circulation unit network model; and then, carrying out iterative optimization on the hyper-parameters (the number of neurons in a hidden layer and the learning rate) in the gating cycle unit model by using an improved particle swarm algorithm, obtaining optimal parameters on the premise of highest prediction precision, and finally completing the short-term load prediction of the power grid.
The sample data set uses power grid load and meteorological data of 2 years in total from 1 month and 1 day of 2013 to 12 months and 31 days of 2014 in a certain area in China, the data acquisition period is 15min, 96 points are acquired in one day, the power grid load and the meteorological data of 1 month to 6 months of 2013 to 2014 are used as a training data set, and the sample data is used for prediction under different models in 12 months of 2014 to verify the short-term power load prediction method based on the convolutional neural network and the improved particle swarm optimization gated cycle unit network model.
In the process of optimizing the gated loop unit network model by using the improved particle swarm optimization, the settings of model parameters are shown in table 1.
TABLE 1 optimization of parameters of gated cyclic unit network model by improved particle swarm optimization
Parameter(s) | Value taking | Parameter(s) | Value taking |
Number of |
100 | Maximum value of inertial weight ωmax | 0.9 |
|
50 | Minimum value of inertial weight ωmin | 0.4 |
Value range of m | [1,32] | Acceleration factor c1Initial value | 0.5 |
m search ranges | [-4,4] | Acceleration factor c1Final value of | 2.5 |
ε range of values | [0.0001,0.01] | Acceleration factor c2Initial value | 0.5 |
ε search scope | [-0.001,0.001] | Acceleration factor c2Final value of | 2.5 |
FIGS. 1, (2) and (3) show the rule that the particle fitness, the number of hidden layer neurons and the learning rate change with the change of the iteration number respectively, and it can be seen that the fitness values of PSO-GRU and IPSO-GRU particles are finally stabilized at 2.236 and 1.513 with the change of the iteration number; the number of neurons in the 2-layer hidden layer, m1 and m2, is finally stabilized at 8 and 16 respectively; the learning rate is finally stabilized at 0.0022 along with the change of the iteration times.
Load prediction is carried out on the CNN-IPSO-GRU model provided by the invention and the CNN-PSO-GRU, CNN-GRU, LSTM and RNN models by combining evaluation indexes, and the evaluation indexes of the load prediction in continuous half-year are shown in table 2. The analysis shows that: compared with CNN-GRU, LSTM and RNN prediction models, the proposed CNN-IPSO-GRU method reduces MAPE indexes by 3.80%, 12.79%, 31.84% and 37.94% respectively, reduces RMSE indexes by 8.47%, 16.61%, 40.65% and 43.24% respectively, and improves FA indexes by 0.09%, 0.33%, 1.06% and 1.39% respectively, thereby showing that the GRU model has better prediction effect in processing time sequence problems and reflecting the necessity of optimizing hyper-parameters by using a particle swarm algorithm; the CNN-IPSO-GRU model provided by the invention is further compared with the CNN-PSO-GRU prediction effect, wherein MAPE and RMSE are respectively reduced by 40.84 percent and 24.06 percent, and FA is improved by 0.92 percent, which shows that the prediction precision can be further improved by optimizing the hyper-parameters by using the improved particle swarm optimization, and the reliability is higher; finally, the effects of the 5 prediction models are quantitatively analyzed, and the calculation result of the decision coefficient R2 shows that: the R2 value of the CNN-IPSO-GRU prediction model provided by the invention is 1.007 which is closest to 1, namely the model prediction effect is best.
TABLE 2 comparison of different prediction models
Model (model) | MAPE/% | RMSE/% | FA/% | R2 |
CNN-IPSO-GRU | 1.318 | 106.021 | 98.682 | 1.007 |
CNN-PSO-GRU | 2.228 | 139.610 | 97.772 | 0.989 |
CNN-GRU | 2.316 | 152.532 | 97.684 | 1.012 |
GRU | 2.555 | 167.413 | 97.445 | 1.014 |
LSTM | 3.269 | 235.222 | 96.731 | 0.973 |
RNN | 3.590 | 245.977 | 96.410 | 1.034 |
The size change curve of the load actual value and other model predicted values in a certain day 12 months 2014 is shown in fig. 4, the absolute percentage error change line graph of the corresponding predicted point is shown in fig. 5, and it can be seen from the graph that 5 prediction models have good prediction performance, but the CNN-IPSO-GRU model provided by the invention has the advantages of minimum prediction error, highest accuracy, better fitting capability for actual load data and basically consistent with the actual load change trend.
Table 3 is a summary table of the actual and predicted load values and absolute percentage errors monitored during the first 15min of each hour of the day for different algorithm model validation. It can be seen that the average absolute percentage error of the prediction result of the method provided by the invention at 24 monitoring points is 1.205%, the maximum absolute percentage error is 3.038%, and compared with CNN-PSO-GRU, CNN-GRU, LSTM and RNN models, the MAPE index is respectively reduced by 45.00%, 49.45%, 52.60%, 60.54% and 62.43%, which proves that the average error and the maximum error of the provided CNN-IPSO-GRU prediction method are superior to those of other models, and the prediction precision is higher.
TABLE 3 actual and predicted values and absolute percent error
The short-term power load prediction method for optimizing the gated cyclic unit network (CNN-IPSO-GRU) hybrid model based on the convolutional neural network and the improved particle swarm algorithm can quickly search and determine the optimal parameters of the gated cyclic unit network model, is high in training efficiency, solves the problems of insufficient model fitting capability and low prediction precision caused by parameter selection according to experience, further improves the load prediction precision, and plays an important role in reducing the loss of a generator set and ensuring the economic and reliable operation of a power grid.
The above description is only of the preferred embodiments of the present invention, and it should be noted that: it will be apparent to those skilled in the art that various modifications and adaptations can be made without departing from the principles of the invention and these are intended to be within the scope of the invention.
Claims (5)
1. A short-term load prediction method based on a CNN-IPSO-GRU mixed model is characterized by comprising the following steps:
A. collecting historical load, meteorological factors and date information data of a power grid as characteristic parameters;
B. acquiring sample data of the characteristic parameters in the step A in the historical time dimension power grid load, carrying out normalization processing on the sample data, extracting a multi-dimensional characteristic vector representing load change by using a Convolutional Neural Network (CNN), constructing the multi-dimensional characteristic vector into a time sequence, and dividing training set data and test set data according to the time sequence;
C. constructing a gate control cycle unit network prediction model GRU comprising an input layer, a hidden layer and an output layer;
D. performing improved particle swarm optimization IPSO on the gated circulation unit network prediction model GRU constructed in the step C by using the training set data obtained in the step B, determining the optimal parameters of the gated circulation unit network prediction model GRU on the basis of meeting the optimal evaluation index of the prediction model, and reestablishing the optimized gated circulation unit network prediction model IPSO-GRU on the basis of the optimal parameters;
E. and D, using the test set data obtained in the step B as input variables of the optimized gated loop unit network prediction model IPSO-GRU in the step D, and further performing power grid short-term load prediction to obtain a prediction result.
2. The method of claim 1, wherein the method for short-term load prediction based on a CNN-IPSO-GRU hybrid model comprises: the step B of normalizing the sample data means that the sample data is mapped between [0 and 1], and the normalized formula is expressed by formula (1):
in the formula (1), x*The normalized data is obtained; x is the number ofmin、xmaxThe minimum value and the maximum value of the sample data set are respectively, and x is the original sample data.
3. The method of claim 1, wherein the method for short-term load prediction based on a CNN-IPSO-GRU hybrid model comprises: the concrete construction process of the gate control cycle unit network prediction model GRU in the step C is as follows:
c1, collecting power grid historical load, meteorological factor and date information data as characteristic parameters, extracting multi-dimensional characteristic vectors representing load changes by using a Convolutional Neural Network (CNN), and constructing a time sequence as sample data of a gate control cycle unit network prediction model GRU input layer;
c2, carrying out normalization processing on the sample data of each characteristic parameter in the step C1, mapping the sample data to the position between [0 and 1], and dividing the training set data and the test set data according to the time sequence;
c3, the hidden layer trains the gated loop unit network prediction model GRU by adopting the training set data obtained in the step C2, and determines the optimal parameters of the gated loop unit network prediction model GRU under the condition that the evaluation standard error of the prediction result is smaller;
c4, adopting the gate control cycle unit network prediction model GRU obtained in the step C3 to predict the data of the test set, and obtaining a prediction result P1、P2、…Pn;
And C5, calculating n prediction results obtained in the step C4 by an average absolute percentage error mode through an output layer, performing inverse normalization processing to obtain a final prediction result, and finally performing evaluation analysis on the prediction result by combining with an experimental evaluation index.
4. The method of claim 1, wherein the method for short-term load prediction based on a CNN-IPSO-GRU hybrid model comprises: the process of optimizing the gated cyclic unit network prediction model GRU by using the improved particle swarm optimization IPSO in the step D is as follows:
d1, initializing GRU parameters of the gate control cycle unit network prediction model constructed in the step C, setting the value ranges and the search ranges of the number m of the neurons and the learning rate, and determining the maximum iteration times TmaxWith the population size ps and the maximum value omega of the inertial weight omegamaxWith a minimum value ωminAcceleration factor c1、c2Maximum and minimum values of;
d2, performing model prediction on the test set data by using the gated cyclic unit network prediction model GRU constructed in the step C according to the number m of the neurons initialized in the step D1 and the value of the learning rate, and taking the average absolute percentage error of the obtained prediction result as the fitness value of the particles, wherein the fitness function f is a function of the fitnessitiAs defined in formula (2):
wherein n represents the sample volume of the test set data; xact(i) And Xpred(i) Respectively a real value and a predicted value of the load at the moment i;
d3, taking two parameters of the number m of the neurons and the learning rate as particles, taking the average absolute percentage error of the prediction result obtained in the step D2 as a particle fitness value, and iteratively updating the speeds and the positions of the two particles by adopting formulas (3) to (7), namely updating the values of two key parameters of the gated loop unit network prediction model GRU; after the optimal values of the two parameters are obtained by improving particle swarm optimization IPSO, an optimized gated cyclic unit network prediction model IPSO-GRU is reestablished on the basis of the optimal values;
in the above formula, k represents the current iteration number; t ismaxRepresenting the maximum iteration number;respectively representing the speed, the position, the individual local optimal solution and the global optimal solution of the particle; r is1And r2Is [0, 1]]A random number in between; omega (k), c1(k) And c2(k) Respectively representing inertia weight and acceleration at the k-th iterationTaking the value of the factor; omegamax=0.9,ωmin=0.4;TmaxIs the maximum iteration number; c. C1And c2∈[0.5,2.5];a=b=1,c=d=1.5;
D4, iteratively updating the speed and the position of the particles according to formulas (3) - (7) of the improved particle swarm optimization, calculating the corresponding particle fitness value, comparing the local optimal solution with the global optimal solution, meeting a termination condition when the particle fitness value tends to be stable or the iteration frequency reaches the maximum, obtaining the optimal neuron number m and a learning rate parameter, obtaining a gated cycle unit network prediction model IPSO-GRU optimized by the improved particle swarm optimization, and otherwise, returning to the step D3 to continuously perform iterative updating.
5. The method of claim 1, wherein the method for short-term load prediction based on a CNN-IPSO-GRU hybrid model comprises: the prediction result obtained in the step E uses the average relative percentage error MAPE, the root mean square error RMSE, the prediction precision FA and the decision coefficient R2Model evaluation was performed for four evaluation indexes, which are shown in equations (8) to (11):
in the above formula: n represents the sample capacity of the test data set; xact(i) And Xpred(i) (i is 1,2, … n) is the real value and predicted value of the load at the ith moment respectively;an average value representing the true value of the prediction sample; wherein the smaller the MAPE and RMSE values are, the larger the FA value is, and R is2The closer to 1 the value of (a) indicates the greater the goodness of fit, the more accurate the model prediction result.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010573272.6A CN111738512B (en) | 2020-06-22 | 2020-06-22 | Short-term power load prediction method based on CNN-IPSO-GRU hybrid model |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010573272.6A CN111738512B (en) | 2020-06-22 | 2020-06-22 | Short-term power load prediction method based on CNN-IPSO-GRU hybrid model |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111738512A true CN111738512A (en) | 2020-10-02 |
CN111738512B CN111738512B (en) | 2022-05-24 |
Family
ID=72650305
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010573272.6A Active CN111738512B (en) | 2020-06-22 | 2020-06-22 | Short-term power load prediction method based on CNN-IPSO-GRU hybrid model |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111738512B (en) |
Cited By (33)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112232577A (en) * | 2020-10-23 | 2021-01-15 | 浙江八达电子仪表有限公司 | Power load probability prediction system and method for multi-core intelligent meter |
CN112241811A (en) * | 2020-10-20 | 2021-01-19 | 浙江大学 | Method for predicting hierarchical mixed performance of customized product in 'Internet +' environment |
CN112348271A (en) * | 2020-11-12 | 2021-02-09 | 华北电力大学 | Short-term photovoltaic power prediction method based on VMD-IPSO-GRU |
CN112396152A (en) * | 2020-11-17 | 2021-02-23 | 郑州大学 | Flood forecasting method based on CS-LSTM |
CN112737109A (en) * | 2020-12-18 | 2021-04-30 | 北京国电通网络技术有限公司 | Real-time safety early warning system of smart power grids |
CN112819224A (en) * | 2021-01-29 | 2021-05-18 | 南京工程学院 | Unit output prediction and confidence evaluation method based on deep learning fusion model |
CN112819221A (en) * | 2021-01-29 | 2021-05-18 | 江苏大学 | Grain condition prediction method based on IPSO-GRU network |
CN112836431A (en) * | 2021-02-05 | 2021-05-25 | 河北工业大学 | Penicillin fermentation process fault prediction method based on PSO-LSTM |
CN112990554A (en) * | 2021-02-23 | 2021-06-18 | 中国大唐集团科学技术研究院有限公司华中电力试验研究院 | Method for predicting short-term voltage trend of generator outlet PT fuse in slow melting |
CN113191544A (en) * | 2021-04-28 | 2021-07-30 | 河海大学 | Short-term power load prediction method based on multilayer neural network |
CN113222281A (en) * | 2021-05-31 | 2021-08-06 | 国网山东省电力公司潍坊供电公司 | Power distribution network short-term load prediction method and device based on improved AlexNet-GRU model |
CN113469412A (en) * | 2021-06-02 | 2021-10-01 | 国核电力规划设计研究院有限公司 | Real-time operation strategy optimization method and system for comprehensive energy system |
CN113516316A (en) * | 2021-07-29 | 2021-10-19 | 昆明理工大学 | Attention-GRU short-term load prediction method based on sparrow search optimization |
CN113554466A (en) * | 2021-07-26 | 2021-10-26 | 国网四川省电力公司电力科学研究院 | Short-term power consumption prediction model construction method, prediction method and device |
CN113610328A (en) * | 2021-08-25 | 2021-11-05 | 浙江浙能台州第二发电有限责任公司 | Power generation load prediction method |
CN113688770A (en) * | 2021-09-02 | 2021-11-23 | 重庆大学 | Long-term wind pressure missing data completion method and device for high-rise building |
CN113705094A (en) * | 2021-08-27 | 2021-11-26 | 江苏杰瑞信息科技有限公司 | Ship fuel oil pipeline fault prediction method based on PSO-GRU |
CN113762486A (en) * | 2021-11-11 | 2021-12-07 | 中国南方电网有限责任公司超高压输电公司广州局 | Method and device for constructing fault diagnosis model of converter valve and computer equipment |
CN113837894A (en) * | 2021-08-06 | 2021-12-24 | 国网江苏省电力有限公司南京供电分公司 | Non-invasive resident user load decomposition method based on residual convolution module |
CN113837480A (en) * | 2021-09-29 | 2021-12-24 | 河北工业大学 | Impact load prediction method based on improved GRU and differential error compensation |
CN113920408A (en) * | 2021-09-10 | 2022-01-11 | 天津理工大学 | Photonic crystal transmission spectrum sequence feature extraction method based on CNN-RNN parallel fusion |
CN114021847A (en) * | 2021-11-19 | 2022-02-08 | 福州大学 | Short-term power load prediction method and system based on ISGU (inverse transformation and aggregation) hybrid model |
CN114037145A (en) * | 2021-11-05 | 2022-02-11 | 河北师范大学 | Network security situation prediction method and system |
CN114282614A (en) * | 2021-12-27 | 2022-04-05 | 淮阴工学院 | Medium-and-long-term runoff prediction method for optimizing CNN-GRU (CNN-GRU) based on random forest and IFDA (IFDA) |
CN114707772A (en) * | 2022-06-06 | 2022-07-05 | 山东大学 | Power load prediction method and system based on multi-feature decomposition and fusion |
CN115049038A (en) * | 2022-07-01 | 2022-09-13 | 科大智能电气技术有限公司 | Optimization method, system, equipment and readable storage medium for park load prediction model |
CN115271463A (en) * | 2022-07-29 | 2022-11-01 | 昂顿科技(上海)有限公司 | Intelligent energy management system |
CN115270921A (en) * | 2022-06-22 | 2022-11-01 | 天纳能源科技(上海)有限公司 | Power load prediction method, system and storage medium based on combined prediction model |
CN115440317A (en) * | 2022-07-20 | 2022-12-06 | 中南大学 | Prediction method and device for leached uranium concentration, electronic equipment and storage medium |
CN115511191A (en) * | 2022-09-30 | 2022-12-23 | 固远晨通科技发展有限公司 | High and steep slope displacement point prediction method |
CN115967077A (en) * | 2022-08-30 | 2023-04-14 | 湖南农业大学 | Short-term prediction power load prediction method and system |
CN117391260A (en) * | 2023-12-11 | 2024-01-12 | 山东科技大学 | Dissolved oxygen prediction method for optimizing convolutional neural network parameters by Kelvin optimization algorithm |
CN117540265A (en) * | 2023-10-09 | 2024-02-09 | 国网浙江省电力有限公司紧水滩水力发电厂 | Concrete dam deformation prediction method based on IPSO-transducer model |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107578124A (en) * | 2017-08-28 | 2018-01-12 | 国网山东省电力公司电力科学研究院 | The Short-Term Load Forecasting Method of GRU neutral nets is improved based on multilayer |
CN108288115A (en) * | 2018-03-15 | 2018-07-17 | 安徽大学 | Logistics enterprise daily short-term express business volume prediction method |
CN109345019A (en) * | 2018-10-10 | 2019-02-15 | 南京邮电大学 | A kind of micro-capacitance sensor economic load dispatching optimisation strategy based on improvement particle swarm algorithm |
US20190319868A1 (en) * | 2019-06-25 | 2019-10-17 | Intel Corporation | Link performance prediction technologies |
CN110596492A (en) * | 2019-09-17 | 2019-12-20 | 昆明理工大学 | Transformer fault diagnosis method based on particle swarm optimization random forest model |
CN110751318A (en) * | 2019-09-26 | 2020-02-04 | 上海电力大学 | IPSO-LSTM-based ultra-short-term power load prediction method |
US20200160176A1 (en) * | 2018-11-16 | 2020-05-21 | Royal Bank Of Canada | System and method for generative model for stochastic point processes |
CN111191841A (en) * | 2019-12-30 | 2020-05-22 | 润联软件系统(深圳)有限公司 | Power load prediction method and device, computer equipment and storage medium |
-
2020
- 2020-06-22 CN CN202010573272.6A patent/CN111738512B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107578124A (en) * | 2017-08-28 | 2018-01-12 | 国网山东省电力公司电力科学研究院 | The Short-Term Load Forecasting Method of GRU neutral nets is improved based on multilayer |
CN108288115A (en) * | 2018-03-15 | 2018-07-17 | 安徽大学 | Logistics enterprise daily short-term express business volume prediction method |
CN109345019A (en) * | 2018-10-10 | 2019-02-15 | 南京邮电大学 | A kind of micro-capacitance sensor economic load dispatching optimisation strategy based on improvement particle swarm algorithm |
US20200160176A1 (en) * | 2018-11-16 | 2020-05-21 | Royal Bank Of Canada | System and method for generative model for stochastic point processes |
US20190319868A1 (en) * | 2019-06-25 | 2019-10-17 | Intel Corporation | Link performance prediction technologies |
CN110596492A (en) * | 2019-09-17 | 2019-12-20 | 昆明理工大学 | Transformer fault diagnosis method based on particle swarm optimization random forest model |
CN110751318A (en) * | 2019-09-26 | 2020-02-04 | 上海电力大学 | IPSO-LSTM-based ultra-short-term power load prediction method |
CN111191841A (en) * | 2019-12-30 | 2020-05-22 | 润联软件系统(深圳)有限公司 | Power load prediction method and device, computer equipment and storage medium |
Non-Patent Citations (6)
Title |
---|
DITSUHI ISKANDARYAN 等: "Air Quality Prediction in Smart Cities Using Machine Learning Technologies Based on Sensor Data: A Review", 《APPLIED SCIENCES》 * |
刘可真 等: "基于粒子群优化-长短期记忆网络模型的变压器油中溶解气体浓度预测方法", 《电网技术》 * |
姜建国 等: "融合快速信息交流和局部搜索的粒子群算法", 《哈尔滨工程大学学报》 * |
王康 等: "基于PSO算法优化GRU神经网络的短期负荷预测", 《广东电力》 * |
秦光宇 等: "短期电力负荷预测模型及其应用研究", 《价格理论与实践》 * |
赵兵 等: "基于注意力机制的CNN-GRU短期电力负荷预测方法", 《电网技术》 * |
Cited By (51)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112241811A (en) * | 2020-10-20 | 2021-01-19 | 浙江大学 | Method for predicting hierarchical mixed performance of customized product in 'Internet +' environment |
CN112241811B (en) * | 2020-10-20 | 2024-04-16 | 浙江大学 | Layered hybrid performance prediction method for customized product in Internet +' environment |
CN112232577B (en) * | 2020-10-23 | 2024-04-16 | 浙江八达电子仪表有限公司 | Power load probability prediction system and method for multi-core smart meter |
CN112232577A (en) * | 2020-10-23 | 2021-01-15 | 浙江八达电子仪表有限公司 | Power load probability prediction system and method for multi-core intelligent meter |
CN112348271B (en) * | 2020-11-12 | 2024-01-30 | 华北电力大学 | Short-term photovoltaic power prediction method based on VMD-IPSO-GRU |
CN112348271A (en) * | 2020-11-12 | 2021-02-09 | 华北电力大学 | Short-term photovoltaic power prediction method based on VMD-IPSO-GRU |
CN112396152A (en) * | 2020-11-17 | 2021-02-23 | 郑州大学 | Flood forecasting method based on CS-LSTM |
CN112737109B (en) * | 2020-12-18 | 2022-05-31 | 北京国电通网络技术有限公司 | Real-time safety early warning system of smart power grids |
CN112737109A (en) * | 2020-12-18 | 2021-04-30 | 北京国电通网络技术有限公司 | Real-time safety early warning system of smart power grids |
CN112819221A (en) * | 2021-01-29 | 2021-05-18 | 江苏大学 | Grain condition prediction method based on IPSO-GRU network |
CN112819224A (en) * | 2021-01-29 | 2021-05-18 | 南京工程学院 | Unit output prediction and confidence evaluation method based on deep learning fusion model |
CN112819224B (en) * | 2021-01-29 | 2021-10-08 | 南京工程学院 | Unit output prediction and confidence evaluation method based on deep learning fusion model |
CN112836431A (en) * | 2021-02-05 | 2021-05-25 | 河北工业大学 | Penicillin fermentation process fault prediction method based on PSO-LSTM |
CN112990554A (en) * | 2021-02-23 | 2021-06-18 | 中国大唐集团科学技术研究院有限公司华中电力试验研究院 | Method for predicting short-term voltage trend of generator outlet PT fuse in slow melting |
CN113191544B (en) * | 2021-04-28 | 2022-08-12 | 河海大学 | Short-term power load prediction method based on multilayer neural network |
CN113191544A (en) * | 2021-04-28 | 2021-07-30 | 河海大学 | Short-term power load prediction method based on multilayer neural network |
CN113222281A (en) * | 2021-05-31 | 2021-08-06 | 国网山东省电力公司潍坊供电公司 | Power distribution network short-term load prediction method and device based on improved AlexNet-GRU model |
CN113469412B (en) * | 2021-06-02 | 2024-04-09 | 国核电力规划设计研究院有限公司 | Real-time operation strategy optimization method and system for comprehensive energy system |
CN113469412A (en) * | 2021-06-02 | 2021-10-01 | 国核电力规划设计研究院有限公司 | Real-time operation strategy optimization method and system for comprehensive energy system |
CN113554466B (en) * | 2021-07-26 | 2023-04-28 | 国网四川省电力公司电力科学研究院 | Short-term electricity consumption prediction model construction method, prediction method and device |
CN113554466A (en) * | 2021-07-26 | 2021-10-26 | 国网四川省电力公司电力科学研究院 | Short-term power consumption prediction model construction method, prediction method and device |
CN113516316A (en) * | 2021-07-29 | 2021-10-19 | 昆明理工大学 | Attention-GRU short-term load prediction method based on sparrow search optimization |
CN113837894A (en) * | 2021-08-06 | 2021-12-24 | 国网江苏省电力有限公司南京供电分公司 | Non-invasive resident user load decomposition method based on residual convolution module |
CN113837894B (en) * | 2021-08-06 | 2023-12-19 | 国网江苏省电力有限公司南京供电分公司 | Non-invasive resident user load decomposition method based on residual convolution module |
CN113610328A (en) * | 2021-08-25 | 2021-11-05 | 浙江浙能台州第二发电有限责任公司 | Power generation load prediction method |
CN113705094A (en) * | 2021-08-27 | 2021-11-26 | 江苏杰瑞信息科技有限公司 | Ship fuel oil pipeline fault prediction method based on PSO-GRU |
CN113705094B (en) * | 2021-08-27 | 2024-01-23 | 江苏杰瑞信息科技有限公司 | PSO-GRU-based ship fuel pipeline fault prediction method |
CN113688770A (en) * | 2021-09-02 | 2021-11-23 | 重庆大学 | Long-term wind pressure missing data completion method and device for high-rise building |
CN113688770B (en) * | 2021-09-02 | 2024-02-06 | 重庆大学 | Method and device for supplementing long-term wind pressure missing data of high-rise building |
CN113920408A (en) * | 2021-09-10 | 2022-01-11 | 天津理工大学 | Photonic crystal transmission spectrum sequence feature extraction method based on CNN-RNN parallel fusion |
CN113920408B (en) * | 2021-09-10 | 2024-07-09 | 天津理工大学 | Photon crystal transmission spectrum sequence feature extraction method based on CNN-RNN parallel fusion |
CN113837480A (en) * | 2021-09-29 | 2021-12-24 | 河北工业大学 | Impact load prediction method based on improved GRU and differential error compensation |
CN113837480B (en) * | 2021-09-29 | 2023-11-07 | 河北工业大学 | Impact load prediction method based on improved GRU and differential error compensation |
CN114037145A (en) * | 2021-11-05 | 2022-02-11 | 河北师范大学 | Network security situation prediction method and system |
CN113762486B (en) * | 2021-11-11 | 2022-04-08 | 中国南方电网有限责任公司超高压输电公司广州局 | Method and device for constructing fault diagnosis model of converter valve and computer equipment |
CN113762486A (en) * | 2021-11-11 | 2021-12-07 | 中国南方电网有限责任公司超高压输电公司广州局 | Method and device for constructing fault diagnosis model of converter valve and computer equipment |
CN114021847A (en) * | 2021-11-19 | 2022-02-08 | 福州大学 | Short-term power load prediction method and system based on ISGU (inverse transformation and aggregation) hybrid model |
CN114282614B (en) * | 2021-12-27 | 2023-09-26 | 淮阴工学院 | Medium-long runoff prediction method for optimizing CNN-GRU based on random forest and IFDA |
CN114282614A (en) * | 2021-12-27 | 2022-04-05 | 淮阴工学院 | Medium-and-long-term runoff prediction method for optimizing CNN-GRU (CNN-GRU) based on random forest and IFDA (IFDA) |
CN114707772A (en) * | 2022-06-06 | 2022-07-05 | 山东大学 | Power load prediction method and system based on multi-feature decomposition and fusion |
CN114707772B (en) * | 2022-06-06 | 2022-08-23 | 山东大学 | Power load prediction method and system based on multi-feature decomposition and fusion |
CN115270921A (en) * | 2022-06-22 | 2022-11-01 | 天纳能源科技(上海)有限公司 | Power load prediction method, system and storage medium based on combined prediction model |
CN115270921B (en) * | 2022-06-22 | 2023-05-02 | 天纳能源科技(上海)有限公司 | Power load prediction method, system and storage medium based on combined prediction model |
CN115049038A (en) * | 2022-07-01 | 2022-09-13 | 科大智能电气技术有限公司 | Optimization method, system, equipment and readable storage medium for park load prediction model |
CN115440317A (en) * | 2022-07-20 | 2022-12-06 | 中南大学 | Prediction method and device for leached uranium concentration, electronic equipment and storage medium |
CN115271463A (en) * | 2022-07-29 | 2022-11-01 | 昂顿科技(上海)有限公司 | Intelligent energy management system |
CN115271463B (en) * | 2022-07-29 | 2023-06-02 | 昂顿科技(上海)有限公司 | Intelligent energy management system |
CN115967077A (en) * | 2022-08-30 | 2023-04-14 | 湖南农业大学 | Short-term prediction power load prediction method and system |
CN115511191A (en) * | 2022-09-30 | 2022-12-23 | 固远晨通科技发展有限公司 | High and steep slope displacement point prediction method |
CN117540265A (en) * | 2023-10-09 | 2024-02-09 | 国网浙江省电力有限公司紧水滩水力发电厂 | Concrete dam deformation prediction method based on IPSO-transducer model |
CN117391260A (en) * | 2023-12-11 | 2024-01-12 | 山东科技大学 | Dissolved oxygen prediction method for optimizing convolutional neural network parameters by Kelvin optimization algorithm |
Also Published As
Publication number | Publication date |
---|---|
CN111738512B (en) | 2022-05-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111738512B (en) | Short-term power load prediction method based on CNN-IPSO-GRU hybrid model | |
CN110751318B (en) | Ultra-short-term power load prediction method based on IPSO-LSTM | |
CN103324980B (en) | A kind of method for forecasting | |
CN112488395A (en) | Power distribution network line loss prediction method and system | |
CN112348271A (en) | Short-term photovoltaic power prediction method based on VMD-IPSO-GRU | |
CN112990556A (en) | User power consumption prediction method based on Prophet-LSTM model | |
CN108564192A (en) | A kind of short-term photovoltaic power prediction technique based on meteorological factor weight similar day | |
CN112232561B (en) | Power load probability prediction method based on constrained parallel LSTM fractional regression | |
CN111525587A (en) | Reactive load situation-based power grid reactive voltage control method and system | |
CN113361785A (en) | Power distribution network short-term load prediction method and device, terminal and storage medium | |
CN113139596A (en) | Optimization algorithm of low-voltage transformer area line loss neural network | |
CN111832839B (en) | Energy consumption prediction method based on sufficient incremental learning | |
CN118484666B (en) | Energy storage power station evaluation method and system for source network load multi-element application | |
CN115358437A (en) | Power supply load prediction method based on convolutional neural network | |
CN113762591B (en) | Short-term electric quantity prediction method and system based on GRU and multi-core SVM countermeasure learning | |
CN111738483A (en) | Power grid loss reduction optimization method and system based on clustering and deep belief network | |
CN111461565A (en) | Power supply side power generation performance evaluation method under power regulation | |
CN118428754A (en) | New energy power generation input power prediction method and system | |
CN113033898A (en) | Electrical load prediction method and system based on K-means clustering and BI-LSTM neural network | |
CN117498347A (en) | WOA-LSTM-based power grid line loss calculation method, system, equipment and storage medium | |
CN116865255A (en) | Short-term wind power prediction method based on improved entropy weight method and SECEEMD | |
CN116722541A (en) | Power system load prediction method and device based on convolutional neural network | |
CN115759343A (en) | E-LSTM-based user electric quantity prediction method and device | |
Li et al. | EMLP: short-term gas load forecasting based on ensemble multilayer perceptron with adaptive weight correction | |
Haiyan et al. | Short-term load forecasting of power grid based on improved WOA optimized LSTM |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |