CN111737307A - Automatic checking method based on distribution network dictionary setting boundary condition full elements - Google Patents

Automatic checking method based on distribution network dictionary setting boundary condition full elements Download PDF

Info

Publication number
CN111737307A
CN111737307A CN202010281109.2A CN202010281109A CN111737307A CN 111737307 A CN111737307 A CN 111737307A CN 202010281109 A CN202010281109 A CN 202010281109A CN 111737307 A CN111737307 A CN 111737307A
Authority
CN
China
Prior art keywords
conditions
typical
meteorological
checking
tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010281109.2A
Other languages
Chinese (zh)
Other versions
CN111737307B (en
Inventor
程正逢
姚远
徐辉
王林
陈功
周冰
王雪浩
张奇
付江缺
张健
欧阳亚
李立瑞
王海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Power Engineering Consultant Group Central Southern China Electric Power Design Institute Corp
Original Assignee
China Power Engineering Consultant Group Central Southern China Electric Power Design Institute Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Power Engineering Consultant Group Central Southern China Electric Power Design Institute Corp filed Critical China Power Engineering Consultant Group Central Southern China Electric Power Design Institute Corp
Priority to CN202010281109.2A priority Critical patent/CN111737307B/en
Publication of CN111737307A publication Critical patent/CN111737307A/en
Application granted granted Critical
Publication of CN111737307B publication Critical patent/CN111737307B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • G06F16/2458Special types of queries, e.g. statistical queries, fuzzy queries or distributed queries
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/29Geographical information databases
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Databases & Information Systems (AREA)
  • General Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Economics (AREA)
  • Data Mining & Analysis (AREA)
  • General Engineering & Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Water Supply & Treatment (AREA)
  • Strategic Management (AREA)
  • Remote Sensing (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Public Health (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Fuzzy Systems (AREA)
  • Mathematical Physics (AREA)
  • Probability & Statistics with Applications (AREA)
  • Software Systems (AREA)
  • Computational Linguistics (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses an automatic checking method for a power distribution network typical boundary condition full element, which mainly comprises the following steps: the first step is as follows: establishing a unified geographic information benchmark; the second step is that: setting boundary conditions for classification and parameterization; the third step: checking the boundary conditions of the typical components one by one; the fourth step: and matching typical components, wherein the verification is passed, the failure to provide the failure details and the positioning information is not satisfied, and the modification is returned.

Description

Automatic checking method based on distribution network dictionary setting boundary condition full elements
Technical Field
The invention relates to the technical field of information technology systematicness, in particular to an automatic checking method based on power distribution network dictionary boundary condition full elements.
Background
At present, in the design of a power distribution network, components are selected from national grid dictionary libraries, and boundary conditions of the components are manually checked one by one, so that the components meeting the conditions are found. Low efficiency and poor fault-tolerant capability. Especially, the calculation is complicated for a new member which is not available in a typical library.
Disclosure of Invention
The invention aims to provide an automatic checking method based on the full elements of typical boundary conditions of a power distribution network, which is used for parameterizing components in a typical library and checking and calculating one by one through typical boundary conditions.
The technical scheme adopted by the invention is as follows: an automatic checking method based on distribution network dictionary boundary condition full elements is characterized by comprising the following steps: a, establishing a unified geographic information reference; extracting geographic information data related to the typical member according to the unified geographic information reference; b, classifying boundary conditions of typical members and parameterizing the boundary conditions; c, selecting a typical component to be checked; d, checking the boundary conditions of the typical components to be checked one by one to match the typical components, satisfying the check, failing to provide the detail and the positioning information, and re-executing the step c; e. outputting the typical construction details and the positioning information which meet the verification in the step d.
In the above technical solution, the step a includes the following steps: establishing a unified geographic information reference, and converting all data into wgs84 coordinate systems; and extracting geographic information data related to typical conditions, including the plane position and the elevation of the tower, and the starting point and the ending point of the wire.
In the technical scheme, the step b comprises the following steps of checking and calculating the model of the tower, the conducting wire, the cross arm load, the safe distance and the external condition.
In the above technical solution, the step b includes the following steps: associating lead usage conditions with meteorological areas; carrying out parametric modeling aiming at meteorological areas and using conditions of leads; grouping and establishing tables according to meteorological areas, namely a meteorological area-meteorological condition table, a meteorological area-lead stress sag table and a meteorological area-specific load table; the attributes typically provided by the tower include the use conditions of the tower, the meteorological conditions, the use limits of the wires, the use limits of the span, the contents of the components, and the number and description information of the components.
In the above technical solution, the verification of the boundary condition in step d is divided into attribute verification and geographical verification;
the attribute verification means that whether the model selected by the current tower or wire meets the requirement is judged according to the parameterized typical attribute information;
and the geographic checking means that related spatial information is calculated according to the geographic position in the checking, and whether the parameter meets the parameterized lead typical attribute in the step b is checked according to the spatial information.
In the above technical scheme, the method for automatically checking the model of the tower in the step d comprises the following steps:
setting SBXH to represent the model of tower material, SBBH code tower material number, GTMC to represent the type of tower, and ZJDS to represent the degree of corner;
searching the electric pole with code SBXH in all the electric pole type selection data tables, prompting that the electric pole type selection cannot be found in the type selection data tables, and finding the electric pole type selection in the type selection data tables, judging whether the SBBH is equal to the 'type' of the found record, and prompting that the electric pole type code is set wrongly if the SBBH is not equal to the 'type';
searching electric poles with codes of SBXH and models of SBBH in all electric pole type selection data tables, judging whether GTMC contains J, if yes, the electric poles are straight poles, and judging whether typical electric pole type selection is found;
judging whether the ZJDS is between the minimum degree and the maximum degree for finding the typical pole model selection; and c, if the conditions are met, verifying that the conditions are not met, prompting that the contents are not met, and returning to the step c for modification.
In the technical scheme, the wire span verification is adopted in the step d for the geographical verification; the automatic checking method for the wire span comprises the following steps:
acquiring horizontal position and elevation information corresponding to the towers according to the spatial position information acquired in the step a, and acquiring horizontal distance and height difference between the towers according to the height information of the towers;
acquiring a current specific load value according to a meteorological area-specific load table and a meteorological area-meteorological condition table in combination with the meteorological conditions of the project;
acquiring a stress value under the current meteorological condition according to a meteorological area-wire stress sag table and a meteorological area-meteorological condition table;
calculating the current horizontal span and the current vertical span according to the meteorological conditions;
comparing the selected span range adapted to the ceremony, and judging whether the span is in the corresponding range; and c, if the conditions are met, verifying that the conditions are not met, prompting that the contents are not met, and returning to the step c for modification.
In the above technical solution, step e includes the following steps:
and (c) iteratively modifying through the step c and the step b until all the typical selection types meet the conditions, and finally generating a checking report to list the use conditions of each typical selection and the values of the actual values in the conditions.
According to the invention, the typical design library is utilized on the three-dimensional platform of the power distribution network, and the boundary conditions are automatically checked through what you see is what you get, so that the design efficiency is improved, and the error rate is reduced.
Drawings
FIG. 1 is a schematic flow diagram of the present invention;
FIG. 2 is a schematic diagram of a unified geographic information reference establishment;
FIG. 3 is a schematic diagram illustrating exemplary parameterization of boundary conditions;
FIG. 4 is a schematic diagram of a typical model selection of a tower;
FIG. 5 is a schematic diagram showing the verification result
Detailed Description
The invention will be further described in detail with reference to the following drawings and specific examples, which are not intended to limit the invention, but are for clear understanding.
As shown in fig. 1, the present invention provides an automatic checking method based on a distribution network dictionary to set a full factor of boundary conditions, which is characterized by comprising the following steps:
the first step is as follows: establishing a unified geographic information reference, and in a specific implementation, confirming the geographic information reference by selecting a project site in a newly-built project, wherein the specific content is shown in fig. 2 below.
Secondly, classifying and setting boundary conditions, and parameterizing the boundary conditions; the parameterization is implemented by taking the parameter of the tower as an example, and parameterizing the use condition, the meteorological condition and the use condition of the wire, as shown in fig. 3. Checking and calculating the loads, such as the model of the tower, the conducting wire, the cross arm and the like, the safe distance, the external conditions and the like; the boundary conditions comprise electrical conditions, terrain conditions, ground feature conditions and geological conditions; in addition, the using conditions of the wires need to be related to meteorological areas, parametric modeling needs to be carried out on the meteorological areas and the using conditions of the wires, and tables are built in groups according to the meteorological areas and named as meteorological area-meteorological condition tables, meteorological area-wire stress sag and meteorological area-specific load. In the process of automatically checking the wires, the weather conditions, the stress sag and the specific load information corresponding to the weather area can be searched according to the weather type of the area. The typical attributes of the tower include the using conditions of the tower, meteorological conditions, the using limits of the wires, the using limits of the span, the contents of the components, the number of the components and description information.
The third step: typically setting type selection; the typical model selection is also described by taking the tower model selection as an example, as shown in fig. 4. And performing typical design and selection of the tower and the lead according to the actual situation and the parameterized typical design model in the second step.
The fourth step: checking the boundary conditions of the typical components one by one; if the verification is passed, if the verification is not passed, the failure details and the positioning information are not provided, and the step three is returned for modification; the specific operation only needs to click a check button, and as a result, as shown in fig. 5, the interface can be positioned to a specific position which does not conform to the standard, the modification and editing are performed, and the fourth step is continued to be executed after the modification and editing are completed.
The check of the boundary condition is divided into an attribute check and a geographic check.
The attribute verification means that whether the model selected by the current tower or wire meets the requirement is judged according to the parameterized typical attribute information. Taking the automatic checking of the tower model as an example, the algorithm is as follows:
SBXH represents the tower material model, SBBH code tower material number, GTMC represents the tower type, and ZJDS represents the degree of the corner.
2. And searching the electric pole with the code being SBXH in all the electric pole type selection data tables, prompting that the electric pole type selection cannot be found in the type selection data tables, and being capable of finding in the type selection data tables, judging whether the SBBH is equal to the found recorded model, and prompting the electric pole model if the SBBH is not equal to the found recorded model. The code is set incorrectly.
3. And searching electric poles with codes of SBXH and models of SBBH in all electric pole type selection data tables, judging whether GTMC contains J, if yes, judging that the electric poles are straight poles, and judging whether the found typical electric pole type selection is straight poles. It is determined whether ZJDS is between [ min-degree ] and [ max-degree ] to find a typical pole profile. And if the condition is met, verifying that the condition is not met, prompting that the content is not met, and returning to the third step for modification.
And the geographic checking means that related spatial information needs to be calculated according to the geographic position in the checking, and whether the parameter meets the parameter typical attribute of the wire parameterized in the step two is checked according to the spatial information. The geographic verification is used for wire span verification, and the algorithm is as follows:
1. and C, acquiring horizontal position and elevation information corresponding to the towers according to the spatial position information acquired in the step I, and acquiring horizontal distance and height difference between the towers according to the tower elevation information.
2. And according to the weather area specific load information table, combining the weather conditions of the project to obtain the specific load value used currently.
3. And acquiring a stress value under the current meteorological condition according to a parameterization mode of the second step.
4. The current horizontal and vertical span is calculated based on meteorological conditions.
5. And comparing the selected span range adapted to the ceremony, and judging whether the span is in the corresponding range. And if the condition is met, verifying that the condition is not met, prompting that the content is not met, and returning to the third step for modification.
The fifth step: and automatically generating a check report.
And (4) through iterative modification of the third step and the fourth step until all the typical design types meet the conditions, finally generating a checking report, and listing the use conditions of all the typical designs and the values of the actual values in the conditions. After all verification modifications are completed, a final result report is generated, the format is customized according to different regions, and the final result report is not specifically shown again.
Details not described in this specification are within the skill of the art that are well known to those skilled in the art.

Claims (8)

1. An automatic checking method based on distribution network dictionary boundary condition full elements is characterized by comprising the following steps:
a. establishing a unified geographic information benchmark; extracting geographic information data related to the typical member according to the unified geographic information reference;
b. classifying boundary conditions of the typical member and parameterizing the boundary conditions;
c. selecting a typical component to be checked;
d. checking the boundary conditions of the typical components to be checked one by one to match the typical components, satisfying the check, failing to provide the failure details and the positioning information, and executing the step c again;
e. outputting the typical construction details and the positioning information which meet the verification in the step d.
2. The method for automatically checking the full elements of the boundary conditions of the distribution network typically according to claim 1, wherein the step a comprises the following steps: establishing a unified geographic information reference, and converting all data into wgs84 coordinate systems; and extracting geographic information data related to typical conditions, including the plane position and the elevation of the tower, and the starting point and the ending point of the wire.
3. The method for automatically checking the full elements of the typical boundary conditions of the power distribution network according to claim 2, wherein the step b comprises the step of checking and calculating the model of a tower, a wire, the load of a cross arm, a safe distance and external conditions.
4. The method for automatically checking the distribution network typically includes the steps of: associating lead usage conditions with meteorological areas; carrying out parametric modeling aiming at meteorological areas and using conditions of leads; grouping and establishing tables according to meteorological areas, namely a meteorological area-meteorological condition table, a meteorological area-lead stress sag table and a meteorological area-specific load table; the attributes typically provided by the tower include the use conditions of the tower, the meteorological conditions, the use limits of the wires, the use limits of the span, the contents of the components, and the number and description information of the components.
5. The method for automatically checking the full elements of the typical boundary conditions of the power distribution network according to claim 4, wherein the checking of the boundary conditions in the step d is divided into attribute checking and geographic checking;
the attribute verification means that whether the model selected by the current tower or wire meets the requirement is judged according to the parameterized typical attribute information;
and the geographic checking means that related spatial information is calculated according to the geographic position in the checking, and whether the parameter meets the parameterized lead typical attribute in the step b is checked according to the spatial information.
6. The method for automatically checking the full elements of the typical boundary conditions of the power distribution network according to claim 5, wherein the method for automatically checking the model of the tower in the step d comprises the following steps:
setting SBXH to represent the model of tower material, SBBH code tower material number, GTMC to represent the type of tower, and ZJDS to represent the degree of corner;
searching the electric pole with code SBXH in all the electric pole type selection data tables, prompting that the electric pole type selection cannot be found in the type selection data tables, and finding the electric pole type selection in the type selection data tables, judging whether the SBBH is equal to the 'type' of the found record, and prompting that the electric pole type code is set wrongly if the SBBH is not equal to the 'type';
searching electric poles with codes of SBXH and models of SBBH in all electric pole type selection data tables, judging whether GTMC contains J, if yes, the electric poles are straight poles, and judging whether typical electric pole type selection is found;
judging whether the ZJDS is between the minimum degree and the maximum degree for finding the typical pole model selection; and c, if the conditions are met, verifying that the conditions are not met, prompting that the contents are not met, and returning to the step c for modification.
7. The method according to claim 5, wherein the step d of checking the geography is performed by using a wire span check; the automatic checking method for the wire span comprises the following steps:
acquiring horizontal position and elevation information corresponding to the towers according to the spatial position information acquired in the step a, and acquiring horizontal distance and height difference between the towers according to the height information of the towers;
acquiring a current specific load value according to a meteorological area-specific load table and a meteorological area-meteorological condition table in combination with the meteorological conditions of the project;
acquiring a stress value under the current meteorological condition according to a meteorological area-wire stress sag table and a meteorological area-meteorological condition table;
calculating the current horizontal span and the current vertical span according to the meteorological conditions;
comparing the selected span range adapted to the ceremony, and judging whether the span is in the corresponding range; and c, if the conditions are met, verifying that the conditions are not met, prompting that the contents are not met, and returning to the step c for modification.
8. The method for automatically checking the full elements of the boundary conditions of the distribution network dictionary as claimed in claim 5, wherein the step e comprises the following steps:
and (c) iteratively modifying through the step c and the step b until all the typical selection types meet the conditions, and finally generating a checking report to list the use conditions of each typical selection and the values of the actual values in the conditions.
CN202010281109.2A 2020-04-10 2020-04-10 Automatic checking method based on full elements of typical boundary conditions of power distribution network Active CN111737307B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010281109.2A CN111737307B (en) 2020-04-10 2020-04-10 Automatic checking method based on full elements of typical boundary conditions of power distribution network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010281109.2A CN111737307B (en) 2020-04-10 2020-04-10 Automatic checking method based on full elements of typical boundary conditions of power distribution network

Publications (2)

Publication Number Publication Date
CN111737307A true CN111737307A (en) 2020-10-02
CN111737307B CN111737307B (en) 2024-04-09

Family

ID=72647759

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010281109.2A Active CN111737307B (en) 2020-04-10 2020-04-10 Automatic checking method based on full elements of typical boundary conditions of power distribution network

Country Status (1)

Country Link
CN (1) CN111737307B (en)

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1128961A1 (en) * 1998-11-09 2001-09-05 Silverbrook Research Pty. Limited Printer and methods of operation
CN103077483A (en) * 2013-02-07 2013-05-01 重庆市电力公司綦南供电局 Power grid planning method based on comprehensive boundary conditions
CN103279656A (en) * 2013-05-20 2013-09-04 天津大学 Method for calculating maximum power supply capacity of power distribution network based on load flow calculation
CN104199743A (en) * 2014-08-22 2014-12-10 国家电网公司 Power distribution network historical data service interface consistency verifying method
CN105824982A (en) * 2015-08-18 2016-08-03 上海电力设计院有限公司 Three-dimensional electrical distance checking method for approach span of very high voltage transmission line
CN106026092A (en) * 2016-07-22 2016-10-12 南京工程学院 Island dividing method for power distribution network comprising distributed power supply
CN106327025A (en) * 2016-09-30 2017-01-11 山东国研电力股份有限公司 Planning method for interactive high voltage distribution network based on local optimization goal
CN107959308A (en) * 2018-01-10 2018-04-24 云南电网有限责任公司电力科学研究院 Power distribution network distributed energy accesses adaptability teaching method and device
US20180216623A1 (en) * 2015-08-14 2018-08-02 Siemens Aktiengesellschaft Method for the prediction of surge in a gas compressor
CN108717473A (en) * 2018-04-08 2018-10-30 中国电建集团河北省电力勘测设计研究院有限公司 A kind of UHV transmission line digitlization electrical design method
CN109214055A (en) * 2018-08-06 2019-01-15 中国南方电网有限责任公司 A kind of PSD-BPA card parameter check method based on formula driving
CN109992870A (en) * 2019-03-26 2019-07-09 中国电力工程顾问集团中南电力设计院有限公司 Power distribution network shaft tower automatized three-dimensional modeling method
CN110287092A (en) * 2019-05-10 2019-09-27 广东电力交易中心有限责任公司 A kind of electricity transaction system and its automatic test approach based on graphical interfaces

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1128961A1 (en) * 1998-11-09 2001-09-05 Silverbrook Research Pty. Limited Printer and methods of operation
CN103077483A (en) * 2013-02-07 2013-05-01 重庆市电力公司綦南供电局 Power grid planning method based on comprehensive boundary conditions
CN103279656A (en) * 2013-05-20 2013-09-04 天津大学 Method for calculating maximum power supply capacity of power distribution network based on load flow calculation
CN104199743A (en) * 2014-08-22 2014-12-10 国家电网公司 Power distribution network historical data service interface consistency verifying method
US20180216623A1 (en) * 2015-08-14 2018-08-02 Siemens Aktiengesellschaft Method for the prediction of surge in a gas compressor
CN105824982A (en) * 2015-08-18 2016-08-03 上海电力设计院有限公司 Three-dimensional electrical distance checking method for approach span of very high voltage transmission line
CN106026092A (en) * 2016-07-22 2016-10-12 南京工程学院 Island dividing method for power distribution network comprising distributed power supply
CN106327025A (en) * 2016-09-30 2017-01-11 山东国研电力股份有限公司 Planning method for interactive high voltage distribution network based on local optimization goal
CN107959308A (en) * 2018-01-10 2018-04-24 云南电网有限责任公司电力科学研究院 Power distribution network distributed energy accesses adaptability teaching method and device
CN108717473A (en) * 2018-04-08 2018-10-30 中国电建集团河北省电力勘测设计研究院有限公司 A kind of UHV transmission line digitlization electrical design method
CN109214055A (en) * 2018-08-06 2019-01-15 中国南方电网有限责任公司 A kind of PSD-BPA card parameter check method based on formula driving
CN109992870A (en) * 2019-03-26 2019-07-09 中国电力工程顾问集团中南电力设计院有限公司 Power distribution network shaft tower automatized three-dimensional modeling method
CN110287092A (en) * 2019-05-10 2019-09-27 广东电力交易中心有限责任公司 A kind of electricity transaction system and its automatic test approach based on graphical interfaces

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘奕君等: "以保障边界区域供电质量为目标的配电网标准化管理", 《国家电网开封供电公司》, pages 158 - 160 *

Also Published As

Publication number Publication date
CN111737307B (en) 2024-04-09

Similar Documents

Publication Publication Date Title
KR102123450B1 (en) Simulation method for building construction using building information modeling, computer readable medium and system for performing the method
US20080091507A1 (en) Methods, systems, and products for surveying facilities
CN110188150A (en) The modeling method and computer readable storage medium of distribution network line figure
CN113779670B (en) Method and system for realizing dual-control modeling of Revit pile foundation based on Dynamo
CN110069279B (en) Method, device and storage medium for checking direct current control protection program
CN115186936B (en) Optimal well pattern construction method for oil field based on GNN model
CN109271697B (en) System and method for processing interrupt data in AutoCAD based on VBA, and computer program
CN112269850B (en) Geographic data processing method and device, electronic equipment and storage medium
CN115510842A (en) Transformer substation model full-data verification method based on new-generation secondary system
CN113626455A (en) Method and device for updating picture library in linkage manner, electronic equipment and storage medium
CN112580175B (en) Method and system for establishing BIM (building information modeling) for current pipe network
CN111737307A (en) Automatic checking method based on distribution network dictionary setting boundary condition full elements
CN117150595A (en) Automatic modeling method and system for BIM software interoperation based on artificial intelligence
CN115907723A (en) Test template creating method and terminal for electrical equipment
CN113919427A (en) Electric power equipment archive data management method and system
CN116757647B (en) Intelligent verification method and device for exploration data
CN110909964A (en) Active power distribution network planning state model building method
CN116628275B (en) Method for realizing bidirectional conversion between graph database and standardized topology
CN117113011B (en) Coal mine power setting data splicing method and device based on XML technology
CN109885936B (en) Tracking and identifying method and system for geological boundary in two-dimensional geological section diagram
Wu et al. 3D high-efficiency and high-precision model-driven modelling for power transmission tower
CN110334024A (en) A kind of testing case management based on tree, device and terminal
CN116090692B (en) Engineering cost management system and method based on BIM technology
US11709049B2 (en) Bending estimation device, bending estimation method, and program
CN113434584B (en) Data processing method and device for power equipment and electronic equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant