CN111673006A - Toothed bending components for anchor machining - Google Patents

Toothed bending components for anchor machining Download PDF

Info

Publication number
CN111673006A
CN111673006A CN202010671925.4A CN202010671925A CN111673006A CN 111673006 A CN111673006 A CN 111673006A CN 202010671925 A CN202010671925 A CN 202010671925A CN 111673006 A CN111673006 A CN 111673006A
Authority
CN
China
Prior art keywords
bending
hole
head
tooth block
roller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010671925.4A
Other languages
Chinese (zh)
Inventor
刘长润
鲍丽婷
徐文强
谢飞
姜策
张广廷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Wuhu Conch Construction and Installation Co Ltd
Original Assignee
Anhui Wuhu Conch Construction and Installation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Wuhu Conch Construction and Installation Co Ltd filed Critical Anhui Wuhu Conch Construction and Installation Co Ltd
Priority to CN202010671925.4A priority Critical patent/CN111673006A/en
Publication of CN111673006A publication Critical patent/CN111673006A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21FWORKING OR PROCESSING OF METAL WIRE
    • B21F1/00Bending wire other than coiling; Straightening wire
    • B21F1/006Bending wire other than coiling; Straightening wire in 3D with means to rotate the tools about the wire axis

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Wire Processing (AREA)

Abstract

The invention discloses a tooth-shaped bending assembly for machining an anchoring part, which comprises a chassis and a bending head; the chassis is provided with a through hole, a first mounting hole, a second mounting hole and a plurality of fixing holes; the bending head comprises a head part, a neck part and a rotating shaft which are sequentially connected, a first tooth block and a second tooth block are arranged on the head part, and a bending gap is formed between the first tooth block and the second tooth block; the head part can pass through the through hole, and the diameter of the neck part is larger than the inner diameter of the through hole; a first bending roller is arranged on the first mounting hole, and a second bending roller is arranged on the second mounting hole; the rotating shaft can drive the head to rotate in the through hole. This a profile of tooth subassembly of bending for anchor piece processing can process anchor piece high-efficiently.

Description

用于锚固件加工的齿形折弯组件Toothed bending components for anchor machining

技术领域technical field

本发明涉及锚固件,具体地,涉及一种用于锚固件加工的齿形折弯组件。The present invention relates to anchors, in particular to a tooth-shaped bending assembly used for anchor processing.

背景技术Background technique

锚固件的现有加工方法主要采用冲床冲压折弯后人工焊接进行,虽然能够完成加工,但是存在加工程序复杂等以下缺陷:一、钢筋折弯采用人工操作冲床冲压制作,工序复杂且人工成本大;二、焊接过程中烟雾较大,容易产生职业病,难以满足环保要求;三、冲击过程中耐热钢冲击点强度发生变化,容易造成断裂;四、冲压过程中尺寸与图纸实际设计要求差距较大,精度低。The existing processing method of the anchor mainly adopts the manual welding after punching and bending. Although the processing can be completed, it has the following defects such as complicated processing procedures: 1. The bending of the steel bar is produced by manual punching, the process is complicated and the labor cost is high. 2. The smoke is large during the welding process, which is easy to cause occupational diseases, and it is difficult to meet the environmental protection requirements; 3. The strength of the impact point of the heat-resistant steel changes during the impact process, which is easy to cause fracture; large, low precision.

发明内容SUMMARY OF THE INVENTION

本发明的目的是提供一种用于锚固件加工的齿形折弯组件,该用于锚固件加工的齿形折弯组件能够高效地加工锚固件。An object of the present invention is to provide a toothed bending assembly for anchor processing, which can efficiently process anchors.

为了实现上述目的,本发明提供了一种用于锚固件加工的齿形折弯组件,包括底盘和折弯头;底盘上设置有贯穿孔、第一安装孔、第二安装孔和多个固定孔;折弯头包括依次连接的头部、颈部和转动轴,头部上设置有第一齿块和第二齿块,且第一齿块和第二齿块之间形成有折弯间隙;头部能够通过贯穿孔,颈部的直径大于贯穿孔的内径;第一安装孔上安装有第一折弯滚轮,第二安装孔上安装有第二折弯滚轮;转动轴能够驱动头部于贯穿孔内转动。In order to achieve the above purpose, the present invention provides a toothed bending assembly for anchor processing, including a base plate and a bending head; the base plate is provided with a through hole, a first installation hole, a second installation hole and a plurality of fixing holes The bending head includes a head, a neck and a rotating shaft connected in sequence, a first tooth block and a second tooth block are arranged on the head, and a bending gap is formed between the first tooth block and the second tooth block The head can pass through the through hole, and the diameter of the neck is larger than the inner diameter of the through hole; the first installation hole is installed with a first bending roller, and the second installation hole is installed with a second bending roller; the rotating shaft can drive the head rotate in the through hole.

优选地,第一折弯滚轮通过第一折弯销安装于第一安装孔的上方,第二折弯滚轮通过第二折弯销安装于第二安装孔的上方。Preferably, the first bending roller is installed above the first installation hole through the first bending pin, and the second bending roller is installed above the second installation hole through the second bending pin.

优选地,第一折弯销和第二折弯销的顶部均由上而下依次设置有紧固螺母和垫片以固定第一折弯滚轮和第二折弯滚轮。Preferably, the tops of the first bending pin and the second bending pin are provided with a tightening nut and a washer in order from top to bottom to fix the first bending roller and the second bending roller.

优选地,第一折弯滚轮能够绕第一折弯销转动,第二折弯滚轮能够通过第二折弯销转动。Preferably, the first bending roller can rotate around the first bending pin, and the second bending roller can rotate through the second bending pin.

优选地,颈部为圆柱形,且圆柱形的直径大于转动轴的直径。Preferably, the neck is cylindrical, and the diameter of the cylindrical shape is larger than the diameter of the rotating shaft.

优选地,固定孔通过螺栓固接于气缸上,气缸能够驱动转动轴转动。Preferably, the fixing hole is fixed on the cylinder through bolts, and the cylinder can drive the rotating shaft to rotate.

优选地,固定孔的数量为3-4个。Preferably, the number of fixing holes is 3-4.

优选地,折弯间隙的底部为内凹的弧面。Preferably, the bottom of the bending gap is a concave arc surface.

在上述技术方案中,本发明中首先将钢筋置于第一齿块和第二齿块之间的折弯间隙中,接着使得折弯头逆时针转动使得钢筋的一端进入第一齿块的外部与第一折弯滚轮之间的间隙中被折弯,折弯到一定程度;便可操作折弯头顺时针转动使得钢筋的另一端进入第二齿块的外部与第二折弯滚轮之间的间隙中被折弯,由此完成了钢筋的两头的折弯;一个折弯完整的折弯动作完成后,便可使得钢筋在折弯间隙中向前行进,对钢筋进行下一个折弯操作,从而实现连续折弯。In the above technical solution, in the present invention, the steel bar is first placed in the bending gap between the first tooth block and the second tooth block, and then the bending head is rotated counterclockwise so that one end of the steel bar enters the outside of the first tooth block It is bent in the gap with the first bending roller to a certain extent; the bending head can be operated to rotate clockwise so that the other end of the steel bar enters between the outside of the second tooth block and the second bending roller The steel bar is bent in the gap, thus completing the bending of both ends of the steel bar; after a complete bending action is completed, the steel bar can move forward in the bending gap, and the next bending operation is performed on the steel bar. , so as to achieve continuous bending.

由此可见该折弯组件可以快速地在相对方向进行连续折弯,避免了重复折弯头缩入、转筒重新定位和折弯头伸出等操作,提高了折弯效率,减少了工件加工时间,提高了生产效率,具有结构简单、操作方便、便于安装、更换配件简单的优点,提高了加工精度和质量。It can be seen that the bending assembly can be continuously bent in opposite directions quickly, avoiding repeated operations such as retracting the bending head, repositioning the drum and extending the bending head, improving the bending efficiency and reducing workpiece processing. Time, improve production efficiency, have the advantages of simple structure, convenient operation, easy installation, simple replacement of accessories, and improve processing accuracy and quality.

本发明的其他特征和优点将在随后的具体实施方式部分予以详细说明。Other features and advantages of the present invention will be described in detail in the detailed description that follows.

附图说明Description of drawings

附图是用来提供对本发明的进一步理解,并且构成说明书的一部分,与下面的具体实施方式一起用于解释本发明,但并不构成对本发明的限制。在附图中:The accompanying drawings are used to provide a further understanding of the present invention, and constitute a part of the specification, and together with the following specific embodiments, are used to explain the present invention, but do not constitute a limitation to the present invention. In the attached image:

图1是本发明提供的用于锚固件加工的齿形折弯组件的一种优选实施方式的结构示意图;1 is a schematic structural diagram of a preferred embodiment of a toothed bending assembly for anchor processing provided by the present invention;

图2是图1组装后的结构示意图;Fig. 2 is the structural representation after the assembly of Fig. 1;

图3是图2的俯视图。FIG. 3 is a plan view of FIG. 2 .

附图标记说明Description of reference numerals

1、头部 2、底盘1. Head 2. Chassis

3、第一折弯滚轮 4、第一折弯销3. The first bending roller 4. The first bending pin

5、第二折弯滚轮 6、第二折弯销5. The second bending roller 6. The second bending pin

7、第一齿块 8、第二齿块7. The first tooth block 8. The second tooth block

9、第一安装孔 10、第二安装孔9. The first mounting hole 10. The second mounting hole

11、垫片 12、紧固螺母11. Gasket 12. Fastening nut

13、转动轴 14、颈部13. Rotating shaft 14. Neck

15、固定孔 16、贯穿孔。15. Fixed hole 16. Through hole.

具体实施方式Detailed ways

以下结合附图对本发明的具体实施方式进行详细说明。应当理解的是,此处所描述的具体实施方式仅用于说明和解释本发明,并不用于限制本发明。The specific embodiments of the present invention will be described in detail below with reference to the accompanying drawings. It should be understood that the specific embodiments described herein are only used to illustrate and explain the present invention, but not to limit the present invention.

在本发明中,在未作相反说明的情况下,“上、下、内、外、顶、底”等包含在术语中的方位词仅代表该术语在常规使用状态下的方位,或为本领域技术人员理解的俗称,而不应视为对该术语的限制。In the present invention, unless otherwise stated, the orientation words such as "upper, lower, inner, outer, top, bottom" etc. contained in a term only represent the orientation of the term under normal usage, or this It is a common name understood by those skilled in the art and should not be regarded as a limitation of the term.

本发明提供了一种用于锚固件加工的齿形折弯组件,如图1-3所示,包括底盘2和折弯头;底盘2上设置有贯穿孔16、第一安装孔9、第二安装孔10和多个固定孔15;折弯头包括依次连接的头部1、颈部14和转动轴13,头部1上设置有第一齿块7和第二齿块8,且第一齿块7和第二齿块8之间形成有折弯间隙;头部1能够通过贯穿孔16,颈部14的直径大于贯穿孔16的内径;第一安装孔9上安装有第一折弯滚轮3,第二安装孔10上安装有第二折弯滚轮5;转动轴13能够驱动头部1于贯穿孔16内转动。The present invention provides a tooth-shaped bending assembly for anchor processing, as shown in Figures 1-3, comprising a chassis 2 and a bending head; the chassis 2 is provided with a through hole 16, a first installation hole 9, a first Two mounting holes 10 and a plurality of fixing holes 15; the bending head includes a head 1, a neck 14 and a rotating shaft 13 connected in sequence, and the head 1 is provided with a first tooth block 7 and a second tooth block 8, and the first tooth block 7 and the second tooth block 8 are arranged on the head 1. A bending gap is formed between the first tooth block 7 and the second tooth block 8; the head 1 can pass through the through hole 16, and the diameter of the neck 14 is larger than the inner diameter of the through hole 16; The bending roller 3 and the second bending roller 5 are installed on the second installation hole 10 ; the rotating shaft 13 can drive the head 1 to rotate in the through hole 16 .

上述用于锚固件加工的齿形折弯组件首先将钢筋置于第一齿块7和第二齿块8之间的折弯间隙中,接着使得折弯头逆时针转动使得钢筋的一端进入第一齿块7的外部与第一折弯滚轮3之间的间隙中被折弯,折弯到一定程度;便可操作折弯头顺时针转动使得钢筋的另一端进入第二齿块8的外部与第二折弯滚轮5之间的间隙中被折弯,由此完成了钢筋的两头的折弯;一个折弯完整的折弯动作完成后,便可使得钢筋在折弯间隙中向前行进,对钢筋进行下一个折弯操作,从而实现连续折弯。在折弯角度不超过100度,转弯半径小于或等于钢筋的直径时,用于锚固件加工的齿形折弯组件在相对方向连续折弯操作时,可以重复避免折弯头的缩入、折弯头的重新定位和折弯头的伸出,大大提高了折弯效率。此外,在同一折弯动作中,折弯头可以是先逆时针转动,也可以是顺时针转动,对转动的先后顺序并没有严格的要求。The above toothed bending assembly for anchor processing first places the steel bar in the bending gap between the first tooth block 7 and the second tooth block 8, and then rotates the bending head counterclockwise so that one end of the steel bar enters the first tooth block. The outside of a tooth block 7 is bent in the gap between the first bending roller 3 and is bent to a certain extent; the bending head can be operated to rotate clockwise so that the other end of the steel bar enters the outside of the second tooth block 8 It is bent in the gap between it and the second bending roller 5, thereby completing the bending of both ends of the steel bar; after a complete bending action is completed, the steel bar can move forward in the bending gap. , perform the next bending operation on the reinforcement bar, thus achieving continuous bending. When the bending angle does not exceed 100 degrees and the turning radius is less than or equal to the diameter of the steel bar, the tooth-shaped bending components used for anchor processing can be repeatedly bent in the opposite direction to avoid the indentation and bending of the bending head. The repositioning of the elbow and the extension of the bending head greatly improve the bending efficiency. In addition, in the same bending action, the bending head can be rotated counterclockwise or clockwise, and there is no strict requirement on the order of rotation.

在上述实施方式中,为了进一步便于钢筋的折弯,优选地,第一齿块7和第二齿块8的外侧面由两个平面组成,且中部形成有尖端。由此,尖端能够增大压强,从而提高折弯效果。In the above embodiment, in order to further facilitate the bending of the steel bar, preferably, the outer sides of the first tooth block 7 and the second tooth block 8 are composed of two planes, and a pointed end is formed in the middle. Thereby, the tip can increase the pressure, thereby improving the bending effect.

在本发明中,第一折弯滚轮3和第二折弯滚轮5的固定方式可以在在宽的范围内选择,但是为了便于安装与拆卸,优选地,第一折弯滚轮3通过第一折弯销4安装于第一安装孔9的上方,第二折弯滚轮5通过第二折弯销6安装于第二安装孔10的上方。由此,便可通过第一折弯销4、第二折弯销6实现第一折弯滚轮3和第二折弯滚轮5的快速安装与拆卸。In the present invention, the fixing methods of the first bending roller 3 and the second bending roller 5 can be selected in a wide range, but in order to facilitate installation and disassembly, preferably, the first bending roller 3 is The bending pin 4 is installed above the first installation hole 9 , and the second bending roller 5 is installed above the second installation hole 10 through the second bending pin 6 . Thus, the first bending roller 3 and the second bending roller 5 can be quickly installed and removed through the first bending pin 4 and the second bending pin 6 .

在上述实施方式的基础上,为了进一步地实现第一折弯滚轮3和第二折弯滚轮5的快速固定与拆卸,优选地,第一折弯销4和第二折弯销6的顶部均由上而下依次设置有紧固螺母12和垫片11以固定第一折弯滚轮3和第二折弯滚轮5。由此,便可通过紧固螺母12和垫片11快速地实现第一折弯滚轮3和第二折弯滚轮5与第一折弯销4、第二折弯销6的安装与拆卸。On the basis of the above embodiment, in order to further realize the quick fixation and disassembly of the first bending roller 3 and the second bending roller 5, preferably, the tops of the first bending pin 4 and the second bending pin 6 are both A tightening nut 12 and a washer 11 are sequentially arranged from top to bottom to fix the first bending roller 3 and the second bending roller 5 . Therefore, the first and second bending rollers 3 and 5 and the first and second bending pins 4 and 6 can be installed and removed quickly by tightening the nut 12 and the washer 11 .

在本发明中,为了进一步便于钢筋的端部进入第一齿块7的外部与第一折弯滚轮3之间的间隙中,或者进入第二齿块8的外部与第二折弯滚轮5之间,优选地,第一折弯滚轮3能够绕第一折弯销4转动,第二折弯滚轮5能够通过第二折弯销6转动。由此,第一折弯滚轮3、第二折弯滚轮5的转动能够便于将钢筋的端部引入至间隙中。In the present invention, in order to further facilitate the end of the steel bar to enter the gap between the outside of the first tooth block 7 and the first bending roller 3, or enter the gap between the outside of the second tooth block 8 and the second bending roller 5 Meanwhile, preferably, the first bending roller 3 can rotate around the first bending pin 4 , and the second bending roller 5 can rotate through the second bending pin 6 . Therefore, the rotation of the first bending roller 3 and the second bending roller 5 can facilitate the introduction of the end of the steel bar into the gap.

在本发明中,为了便于控制头部1的安装位置,优选地,颈部14为圆柱形,且圆柱形的直径大于转动轴13的直径。由此,颈部14便可稳定头部1的安装位置。In the present invention, in order to facilitate the control of the installation position of the head 1 , preferably, the neck 14 is cylindrical, and the diameter of the cylindrical shape is larger than the diameter of the rotating shaft 13 . Thereby, the neck 14 can stabilize the installation position of the head 1 .

在本实施方式中,为了便于提高底盘2的稳定性,同时也为了便于操作转动轴13的转动,优选地,固定孔15通过螺栓固接于气缸上,气缸能够驱动转动轴13转动。In this embodiment, in order to improve the stability of the chassis 2 and also to facilitate the operation of the rotation of the rotating shaft 13, preferably, the fixing hole 15 is fixed to the cylinder through bolts, and the cylinder can drive the rotating shaft 13 to rotate.

在上述实施方式中,固定孔15的数量可以在宽的范围选择,但是为了进一步提高底盘2的稳定性,优选地,固定孔15的数量为3-4个。In the above embodiment, the number of the fixing holes 15 can be selected in a wide range, but in order to further improve the stability of the chassis 2, preferably, the number of the fixing holes 15 is 3-4.

最后,为了便于钢筋进入折弯间隙中,优选地,折弯间隙的底部为内凹的弧面。Finally, in order to facilitate the entry of the steel bar into the bending gap, preferably, the bottom of the bending gap is a concave arc surface.

以上结合附图详细描述了本发明的优选实施方式,但是,本发明并不限于上述实施方式中的具体细节,在本发明的技术构思范围内,可以对本发明的技术方案进行多种简单变型,这些简单变型均属于本发明的保护范围。The preferred embodiments of the present invention have been described in detail above with reference to the accompanying drawings. However, the present invention is not limited to the specific details of the above-mentioned embodiments. Within the scope of the technical concept of the present invention, various simple modifications can be made to the technical solutions of the present invention, These simple modifications all belong to the protection scope of the present invention.

另外需要说明的是,在上述具体实施方式中所描述的各个具体技术特征,在不矛盾的情况下,可以通过任何合适的方式进行组合,为了避免不必要的重复,本发明对各种可能的组合方式不再另行说明。In addition, it should be noted that the specific technical features described in the above-mentioned specific embodiments can be combined in any suitable manner unless they are inconsistent. In order to avoid unnecessary repetition, the present invention provides The combination method will not be specified otherwise.

此外,本发明的各种不同的实施方式之间也可以进行任意组合,只要其不违背本发明的思想,其同样应当视为本发明所公开的内容。In addition, the various embodiments of the present invention can also be combined arbitrarily, as long as they do not violate the spirit of the present invention, they should also be regarded as the contents disclosed in the present invention.

Claims (8)

1.一种用于锚固件加工的齿形折弯组件,其特征在于,包括底盘(2)和折弯头;所述底盘(2)上设置有贯穿孔(16)、第一安装孔(9)、第二安装孔(10)和多个固定孔(15);所述折弯头包括依次连接的头部(1)、颈部(14)和转动轴(13),所述头部(1)上设置有第一齿块(7)和第二齿块(8),且所述第一齿块(7)和第二齿块(8)之间形成有折弯间隙;所述头部(1)能够通过所述贯穿孔(16),所述颈部(14)的直径大于所述贯穿孔(16)的内径;所述第一安装孔(9)上安装有第一折弯滚轮(3),所述第二安装孔(10)上安装有第二折弯滚轮(5);所述转动轴(13)能够驱动所述头部(1)于所述贯穿孔(16)内转动。1. A toothed bending assembly for anchor processing, characterized in that it comprises a chassis (2) and a bending head; the chassis (2) is provided with a through hole (16), a first mounting hole ( 9), a second installation hole (10) and a plurality of fixing holes (15); the bending head includes a head (1), a neck (14) and a rotating shaft (13) connected in sequence, the head (1) A first tooth block (7) and a second tooth block (8) are provided, and a bending gap is formed between the first tooth block (7) and the second tooth block (8); the The head (1) can pass through the through hole (16), the diameter of the neck (14) is larger than the inner diameter of the through hole (16); the first installation hole (9) is mounted with a first folding A bending roller (3), a second bending roller (5) is installed on the second installation hole (10); the rotating shaft (13) can drive the head (1) to the through hole (16) ) to rotate. 2.根据权利要求1所述的用于锚固件加工的齿形折弯组件,其特征在于,所述第一折弯滚轮(3)通过第一折弯销(4)安装于所述第一安装孔(9)的上方,所述第二折弯滚轮(5)通过第二折弯销(6)安装于所述第二安装孔(10)的上方。2 . The toothed bending assembly for anchor processing according to claim 1 , wherein the first bending roller ( 3 ) is installed on the first bending pin ( 4 ) through a first bending pin ( 4 ). 3 . Above the installation hole (9), the second bending roller (5) is installed above the second installation hole (10) through the second bending pin (6). 3.根据权利要求2所述的用于锚固件加工的齿形折弯组件,其特征在于,所述第一折弯销(4)和第二折弯销(6)的顶部均由上而下依次设置有紧固螺母(12)和垫片(11)以固定所述第一折弯滚轮(3)和第二折弯滚轮(5)。3 . The toothed bending assembly for anchor processing according to claim 2 , wherein the tops of the first bending pin ( 4 ) and the second bending pin ( 6 ) are from top to bottom. 4 . A tightening nut (12) and a washer (11) are arranged in sequence at the bottom to fix the first bending roller (3) and the second bending roller (5). 4.根据权利要求2所述的用于锚固件加工的齿形折弯组件,其特征在于,所述第一折弯滚轮(3)能够绕所述第一折弯销(4)转动,所述第二折弯滚轮(5)能够通过所述第二折弯销(6)转动。4. The toothed bending assembly for anchor processing according to claim 2, wherein the first bending roller (3) can rotate around the first bending pin (4), so The second bending roller (5) can be rotated through the second bending pin (6). 5.根据权利要求1所述的用于锚固件加工的齿形折弯组件,其特征在于,所述颈部(14)为圆柱形,且所述圆柱形的直径大于所述转动轴(13)的直径。5. The toothed bending assembly for anchor processing according to claim 1, wherein the neck portion (14) is cylindrical, and the diameter of the cylindrical portion is larger than that of the rotating shaft (13). )diameter of. 6.根据权利要求1所述的用于锚固件加工的齿形折弯组件,其特征在于,所述固定孔(15)通过螺栓固接于气缸上,所述气缸能够驱动所述转动轴(13)转动。6 . The toothed bending assembly for anchor processing according to claim 1 , wherein the fixing hole ( 15 ) is fixed on a cylinder through a bolt, and the cylinder can drive the rotating shaft ( 6 . 13) Turn. 7.根据权利要求1所述的用于锚固件加工的齿形折弯组件,其特征在于,所述固定孔(15)的数量为3-4个。7 . The toothed bending assembly for anchor processing according to claim 1 , wherein the number of the fixing holes ( 15 ) is 3-4. 8 . 8.根据权利要求1所述的用于锚固件加工的齿形折弯组件,其特征在于,所述折弯间隙的底部为内凹的弧面。8 . The toothed bending assembly for anchor processing according to claim 1 , wherein the bottom of the bending gap is a concave arc surface. 9 .
CN202010671925.4A 2020-07-14 2020-07-14 Toothed bending components for anchor machining Pending CN111673006A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010671925.4A CN111673006A (en) 2020-07-14 2020-07-14 Toothed bending components for anchor machining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010671925.4A CN111673006A (en) 2020-07-14 2020-07-14 Toothed bending components for anchor machining

Publications (1)

Publication Number Publication Date
CN111673006A true CN111673006A (en) 2020-09-18

Family

ID=72438187

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010671925.4A Pending CN111673006A (en) 2020-07-14 2020-07-14 Toothed bending components for anchor machining

Country Status (1)

Country Link
CN (1) CN111673006A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200323179Y1 (en) * 2003-04-22 2003-08-14 이세원 re-bar bander
WO2012130350A1 (en) * 2011-03-30 2012-10-04 Wafios Aktiengesellschaft Bending head for bending rod- and pipe-shaped workpieces
CN205702236U (en) * 2016-06-17 2016-11-23 郑州机械研究所 Wire rod apparatus for bending and bending tool rest thereof
CN207288717U (en) * 2017-09-11 2018-05-01 天津市泽琪水泥构件有限公司 A kind of angle-bender
CN210754530U (en) * 2019-10-21 2020-06-16 杭州杰派展示用品有限公司 Manual steel pipe bending tool
CN212384464U (en) * 2020-07-14 2021-01-22 安徽芜湖海螺建筑安装工程有限责任公司 Tooth-shaped bending assembly for machining anchoring part

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200323179Y1 (en) * 2003-04-22 2003-08-14 이세원 re-bar bander
WO2012130350A1 (en) * 2011-03-30 2012-10-04 Wafios Aktiengesellschaft Bending head for bending rod- and pipe-shaped workpieces
CN103429365A (en) * 2011-03-30 2013-12-04 瓦菲欧斯公司 Bending head for bending rod- and pipe-shaped workpieces
CN205702236U (en) * 2016-06-17 2016-11-23 郑州机械研究所 Wire rod apparatus for bending and bending tool rest thereof
CN207288717U (en) * 2017-09-11 2018-05-01 天津市泽琪水泥构件有限公司 A kind of angle-bender
CN210754530U (en) * 2019-10-21 2020-06-16 杭州杰派展示用品有限公司 Manual steel pipe bending tool
CN212384464U (en) * 2020-07-14 2021-01-22 安徽芜湖海螺建筑安装工程有限责任公司 Tooth-shaped bending assembly for machining anchoring part

Similar Documents

Publication Publication Date Title
CN205571772U (en) Thin wall barrel anti -deformation device of adjustable diameter
CN107842210A (en) The construction package and its method for applying prestressing force of CFRP plate multi-point support prestressed reinforcements
CN111673006A (en) Toothed bending components for anchor machining
CN110371475A (en) A kind of pipeline transportation anti-deformation device and its application method
CN212384464U (en) Tooth-shaped bending assembly for machining anchoring part
CN220127263U (en) Device for adjusting ovality of large-caliber round steel pipe outside pipeline
CN109551165B (en) High-strength precision welded pipe welding device
CN111595244A (en) Manual welding gun laser ranging device suitable for electric arc self-oscillation
CN207749851U (en) The construction package of CFRP plate multi-point support prestressed reinforcements
CN218426545U (en) Simple steel plate positioning and assembling device with any angle
CN209416633U (en) A beam end support for beam testing
CN206346820U (en) A kind of easy-to-dismount environmental protection helps row's formula mobile muffler
CN202006351U (en) Positioning device for welding of projection welding nuts
CN109578418A (en) A kind of bolt locking structure
CN213796291U (en) Split pin splitter
CN209681055U (en) Chain link producing device
CN210508399U (en) Locking structure for upper and lower aluminum alloy templates
CN222818774U (en) U-shaped clamp for fixing H-shaped steel
CN221942956U (en) A bolt connection structure
CN218933615U (en) Pile foundation pile head steel bar positioning jig
CN205734677U (en) A kind of disassembling tool of steering wheel
CN114000703B (en) A reinforcing device for paper molds at the connection of cylindrical rectangular beams
CN220848372U (en) I-steel structure of angle-variable cantilever frame
CN212321293U (en) Reinforcing bar tensile strength testing machine
CN220761486U (en) Auxiliary fixture for welding

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20200918