Mounting structure and mounting method of suspended ceiling Download PDF

Info

Publication number
CN111663706A
CN111663706A CN202010711278.5A CN202010711278A CN111663706A CN 111663706 A CN111663706 A CN 111663706A CN 202010711278 A CN202010711278 A CN 202010711278A CN 111663706 A CN111663706 A CN 111663706A
Authority
CN
China
Prior art keywords
plate
support
keel
rectangle
cladding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202010711278.5A
Other languages
Chinese (zh)
Inventor
张尧弟
易国华
邱锦昱
万淑泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Longsheng Industry Co ltd
Original Assignee
Shanghai Longsheng Industry Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Longsheng Industry Co ltd filed Critical Shanghai Longsheng Industry Co ltd
Priority to CN202010711278.5A priority Critical patent/CN111663706A/en
Publication of CN111663706A publication Critical patent/CN111663706A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • E04B9/12Connections between non-parallel members of the supporting construction
    • E04B9/14Connections between non-parallel members of the supporting construction all the members being discontinuous and laying at least partly in the same plane
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/18Means for suspending the supporting construction
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/22Connection of slabs, panels, sheets or the like to the supporting construction
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/30Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by edge details of the ceiling; e.g. securing to an adjacent wall
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F19/00Other details of constructional parts for finishing work on buildings
    • E04F19/02Borders; Finishing strips, e.g. beadings; Light coves
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

一种吊顶的安装结构和安装方法,包括主龙骨、覆面龙骨、三个边部支撑件和一个收边条,收边条和三个边部支撑件分别设置一个矩形的四条边上,三个边部支撑件分别位于在矩形的左侧、前侧和后侧,收边条位于在矩形的右侧,矩形左侧的边部支撑件与覆面龙骨之间、相邻的覆面龙骨之间以及覆面龙骨与矩形右侧的收边条之间各自设置有吊顶板。本发明中边部支撑件中的弹片下端能防止吊顶板上移,当房间有空气压力变化时,防止吊顶板上下窜动产生异响。可以在最后一个吊顶板放置后,再将插入件从下侧插入固定件,减少了安装步骤,增加了安装效率。

Figure 202010711278

An installation structure and installation method of a suspended ceiling, comprising a main keel, a cladding keel, three side supports and a trim strip, the trim strip and the three side supports are respectively arranged on four sides of a rectangle, and three The side supports are located on the left side, the front side and the rear side of the rectangle respectively, the trim strips are located on the right side of the rectangle, between the side supports on the left side of the rectangle and the cladding keel, between adjacent cladding keels and Ceiling panels are respectively arranged between the covering keel and the trim strip on the right side of the rectangle. The lower end of the elastic sheet in the middle side support of the present invention can prevent the ceiling plate from moving, and when the air pressure in the room changes, it can prevent the ceiling plate from moving up and down to produce abnormal noise. After the last ceiling panel is placed, the insert piece can be inserted into the fixing piece from the lower side, which reduces the installation steps and increases the installation efficiency.

Figure 202010711278

Description

一种吊顶的安装结构和安装方法Ceiling installation structure and installation method

技术领域technical field

本发明涉及建筑领域,尤其涉及吊顶安装技术,具体而言是一种吊顶的安装结构和安装方法。The invention relates to the field of construction, in particular to a suspended ceiling installation technology, in particular to a suspended ceiling installation structure and an installation method.

背景技术Background technique

随着家庭装潢概念的不断改变,吊顶正逐渐被大众认可和接受,成为现代家庭装潢中的组成部分之一。现有技术中,可相互拼接的龙骨设置有专门的卡槽,需要专用的螺钉螺母组合来固定安装,螺母需要预先滑入卡槽,安装时,螺钉较难对准螺母孔,配套物料零件多,龙骨与龙骨之间的安装步骤多,安装效率低。吊顶板边部通过连接件与墙体连接不方便,当房间有空气压力变化时,吊顶板容易上下窜动,导致会产生异响,连接件与龙骨连接时,龙骨容易在水平方向窜动。安装最后一块吊顶板是业界难题,普遍方法是预先在收边条上打玻璃胶,用吸盘将大板下拉与收边条粘合,但是这种安装结构作业装备多,操作工艺复杂,不方便做二次维护。With the continuous change of the concept of home decoration, the suspended ceiling is gradually recognized and accepted by the public, and has become one of the components of modern home decoration. In the prior art, the keels that can be spliced with each other are provided with a special slot, which requires a special screw and nut combination for fixed installation. The nut needs to be slid into the slot in advance. During installation, it is difficult for the screw to align the nut hole, and there are many supporting materials and parts. , There are many installation steps between the keel and the keel, and the installation efficiency is low. It is inconvenient to connect the edge of the ceiling panel to the wall through the connector. When the air pressure in the room changes, the ceiling panel is easy to move up and down, resulting in abnormal noise. When the connector is connected to the keel, the keel is easy to move in the horizontal direction. Installing the last ceiling board is a difficult problem in the industry. The common method is to apply glass glue on the edge strips in advance, and use suction cups to pull down the large board and glue the edge strips. However, this installation structure has many operations and equipment, and the operation process is complicated and inconvenient. Do secondary maintenance.

发明内容SUMMARY OF THE INVENTION

本发明的目的在于提供一种吊顶的安装结构,所述的这种吊顶的安装结构要解决现有技术中吊顶板边部容易上下窜动、最后一块吊顶板安装复杂且容易上移的技术问题。The purpose of the present invention is to provide an installation structure of a suspended ceiling, which should solve the technical problems in the prior art that the edge of the ceiling panel is easy to move up and down, and the installation of the last ceiling panel is complicated and easy to move up. .

本发明的一种吊顶的安装结构,包括主龙骨、覆面龙骨、三个边部支撑件和一个收边条,收边条和三个边部支撑件分别设置一个矩形的四条边上,三个边部支撑件分别位于矩形的左侧、前侧和后侧,收边条设置在矩形的右侧,矩形前侧的边部支撑件与矩形后侧的边部支撑件相向设置,矩形左侧的边部支撑件与矩形右侧的收边条相向设置,覆面龙骨设置在矩形左侧的边部支撑件和矩形右侧的收边条之间,覆面龙骨的长度方向与矩形右侧的收边条的长度方向平行,主龙骨设置在覆面龙骨上方,主龙骨的长度方向与覆面龙骨的长度方向垂直,覆面龙骨通过龙骨吊件与主龙骨固定连接,边部支撑件中设置有第二支撑板,覆面龙骨的前后两端分别设置在前侧边部支撑件的第二支撑板上和后侧边部支撑件的第二支撑板上,覆面龙骨中设置有第一支撑板,收边条包括固定件和插入件,插入件插设于固定件的下侧,插入件中设置有第三支撑板,矩形左侧的边部支撑件与覆面龙骨之间、相邻的覆面龙骨之间以及覆面龙骨与矩形右侧的收边条之间各自设置有吊顶板,矩形左侧的边部支撑件与覆面龙骨之间的吊顶板的左侧和右侧分别设置在矩形左侧的边部支撑件的第二支撑板和相邻的覆面龙骨的第一支撑板上,两个相邻的覆面龙骨之间的吊顶板的左侧和右侧分别设置在两个相邻的覆面龙骨的第一支撑板上,覆面龙骨与矩形右侧的收边条之间的吊顶板的左侧和右侧分别设置在覆面龙骨的第一支撑板和收边条的第三支撑板上,任意一个吊顶板的前侧和后侧均分别设置在矩形前侧边部支撑件的第二支撑板上与矩形后侧边部支撑件的第二支撑板上。The installation structure of the suspended ceiling of the present invention includes a main keel, a cladding keel, three side supports and a trim strip. The side supports are located on the left side, the front side and the rear side of the rectangle respectively, the edge trim is arranged on the right side of the rectangle, the side supports on the front side of the rectangle are arranged opposite to the side supports on the rear side of the rectangle, and the left side of the rectangle is arranged oppositely. The side support on the right side of the rectangle is arranged opposite to the side trim on the right side of the rectangle, the cladding keel is arranged between the side support on the left side of the rectangle and the side trim on the right side of the rectangle, and the length direction of the clad keel is the same as that on the right side of the rectangle. The length direction of the side strip is parallel, the main keel is arranged above the covering keel, the length direction of the main keel is perpendicular to the length direction of the covering keel, the covering keel is fixedly connected with the main keel through the keel hanger, and the side support is provided with a second support The front and rear ends of the cladding keel are respectively arranged on the second support plate of the front side edge support and the second support plate of the rear side edge support. A first support plate is arranged in the covering keel, and the edge trim It includes a fixing piece and an inserting piece, the inserting piece is inserted into the lower side of the fixing piece, and the inserting piece is provided with a third support plate, between the side support piece on the left side of the rectangle and the cladding keel, between the adjacent cladding keels and A ceiling panel is respectively arranged between the cladding keel and the trim strip on the right side of the rectangle, and the left and right sides of the ceiling panel between the side support on the left side of the rectangle and the cladding keel are respectively arranged on the side support on the left side of the rectangle. The second support plate of the piece and the first support plate of the adjacent cladding keels, the left and right sides of the ceiling plate between the two adjacent cladding keels are respectively set on the first supporting plate of the two adjacent cladding keels. On the support plate, the left and right sides of the ceiling plate between the cladding keel and the edge trim on the right side of the rectangle are respectively set on the first support plate of the clad keel and the third support plate of the edge trim. The front side and the rear side are respectively arranged on the second support plate of the rectangular front side edge part support and the second support plate of the rectangular rear side edge part support.

优选的,所述的覆面龙骨包括一条型材,型材沿直线方向延伸,型材的上部设置有连接座,连接座的断面呈H形,所述的断面垂直于型材的延伸方向,连接座上侧面中沿型材的长度方向间隔设置有两个以上数目的第一螺纹连接部,连接座的上端在其两侧各自垂直连接有一个第一横板,任意一个第一横板的外侧各自垂直连接有一个第一竖板,任意一个第一竖板的上端各自垂直连接有一个第一卡板,第一卡板位于连接座的上方并与连接座的上侧面平行间隔,第一卡板、第一竖板与第一横板构成连接槽,连接座下侧连接有吊顶板固定结构。Preferably, the cladding keel comprises a profile, the profile extends in a straight line, the upper part of the profile is provided with a connecting seat, the cross-section of the connecting seat is H-shaped, the cross-section is perpendicular to the extending direction of the profile, and the upper side of the connecting seat is in the middle There are two or more first threaded connection parts at intervals along the length direction of the profile, the upper end of the connection seat is vertically connected with a first horizontal plate on both sides, and the outer side of any first horizontal plate is vertically connected with a The first vertical plate, the upper end of any first vertical plate is vertically connected with a first clamping plate, the first clamping plate is located above the connection seat and is spaced parallel to the upper side of the connection seat, the first clamping plate, the first vertical plate The board and the first horizontal board form a connecting groove, and the lower side of the connecting seat is connected with a ceiling board fixing structure.

优选的,所述的吊顶板固定结构包括一个第一螺钉安装座,第一螺钉安装座与连接座的下侧连接,第一螺钉安装座的两侧面中沿长度方向间隔设置有多个第二螺纹部,第一螺钉安装座下方设置有一个第一支撑板,第一支撑板通过连接板与第一螺钉安装座连接。Preferably, the ceiling plate fixing structure includes a first screw mounting seat, the first screw mounting seat is connected to the lower side of the connecting seat, and a plurality of second screw mounting seats are arranged at intervals along the length direction on both sides of the first screw mounting seat In the threaded portion, a first support plate is arranged below the first screw mounting seat, and the first support plate is connected with the first screw mounting seat through the connecting plate.

优选的,所述的吊顶板固定结构包括一个支撑座,支撑座固定设置在连接座的下侧,支撑座的两侧各自设置有一个第二螺钉安装座,两个第二螺钉安装座的侧面中沿长度方向均间隔设置有多个第二螺纹部,支撑座的底部两侧各自连接有一个第一支撑板,支撑座中设置有一个功能腔,功能腔开口向下。Preferably, the ceiling plate fixing structure includes a support seat, the support seat is fixedly arranged on the lower side of the connection seat, two sides of the support seat are respectively provided with a second screw mounting seat, and the side surfaces of the two second screw mounting seats A plurality of second threaded portions are arranged at intervals along the length direction in the middle, a first support plate is respectively connected to both sides of the bottom of the support base, a functional cavity is arranged in the support base, and the opening of the functional cavity is downward.

优选的,所述的边部支撑件包括安装板,安装板上设置有第一安装孔,安装板上端垂直连接有一个第二横板,第二横板的一侧垂直连接有一个第二卡板,第二卡板与安装板平行,安装板下端垂直连接有一个第二支撑板,第二支撑板位于第二横板的下方,第二支撑板的一侧向上方弯折。Preferably, the edge support includes a mounting plate, the mounting plate is provided with a first mounting hole, an upper end of the mounting plate is vertically connected with a second horizontal plate, and one side of the second horizontal plate is vertically connected with a second card The second clamping plate is parallel to the mounting plate, the lower end of the mounting plate is vertically connected with a second supporting plate, the second supporting plate is located below the second horizontal plate, and one side of the second supporting plate is bent upwards.

优选的,所述的安装板的一侧固定连接有一个螺丝安装座,螺丝安装座位于第二横板和第二支撑板之间,螺丝安装座与第二支撑板之间连接有第二竖板,螺丝安装座的外侧面中沿长度方向间隔设置有若干个螺丝孔,螺丝孔中设置有螺丝。Preferably, a screw mounting seat is fixedly connected to one side of the mounting plate, the screw mounting seat is located between the second horizontal plate and the second support plate, and a second vertical plate is connected between the screw mounting seat and the second support plate A number of screw holes are arranged at intervals along the length direction in the outer side surface of the screw mounting seat, and screws are arranged in the screw holes.

优选的,所述的收边条包括固定件和插入件;所述的固定件包括贴墙板,贴墙板上设置有第二安装孔,贴墙板上垂直连接有一个第三横板,第三横板的一侧垂直连接有一个第三卡板,第三卡板与贴墙板间隔平行,贴墙板的下侧垂直连接有一个第四横板,第四横板位于第三横板的下方并与第三横板平行,第四横板的一侧垂直连接有一个第三竖板,第三竖板上连接有一个挡片,第三竖板的下侧垂直连接有一个第五横板,第五横板位于第四横板的下方并与第四横板平行,Preferably, the edge trimming strip includes a fixing piece and an inserting piece; the fixing piece comprises a wall-mounted board, a second installation hole is provided on the wall-mounted board, and a third horizontal board is vertically connected on the wall-mounted board, One side of the third horizontal board is vertically connected with a third card board, the third card board is parallel to the wall-mounted board, and a fourth horizontal board is vertically connected to the lower side of the wall-mounted board, and the fourth horizontal board is located in the third horizontal board. Below the plate and parallel to the third horizontal plate, a third vertical plate is vertically connected to one side of the fourth horizontal plate, a blocking plate is connected to the third vertical plate, and a first vertical plate is vertically connected to the lower side of the third vertical plate. Five horizontal plates, the fifth horizontal plate is located below and parallel to the fourth horizontal plate,

所述的插入件包括第三支撑板,第三支撑板上从一侧到另一侧依次设置有插板和弹性卡板,弹性卡板的上侧向下弯折后再向上弯折,插板和弹性卡板之间设置有间隙,弹性卡板的最终弯折部与插板的上部相向并设置有间隙,The insert includes a third support plate, and the third support plate is provided with an insert plate and an elastic card plate in sequence from one side to the other side. A gap is set between the board and the elastic card board, and the final bending part of the elastic card board faces the upper part of the plug board and is provided with a gap,

所述的第三竖板的下端侧面中设置有第一凸起,插板朝向弹性卡板的侧面中设置有第二凸起,插入件的插板与第三竖板配合连接,第一凸起与第二凸起配合卡固,第三竖板下端的一侧设置有第二凸条,弹性卡板的上侧与第二凸条配合卡紧。The lower end side of the third vertical plate is provided with a first protrusion, and the side of the insert plate facing the elastic card plate is provided with a second protrusion. The second protruding strip is arranged on one side of the lower end of the third vertical plate, and the upper side of the elastic clamping plate cooperates and clamps with the second protruding strip.

本发明还提供了一种安装上述吊顶的方法,所述的方法包括以下步骤:The present invention also provides a method for installing the above-mentioned suspended ceiling, the method comprising the following steps:

步骤1:将三个边部支撑件分别固定在左侧、前侧和后侧的墙壁上,将收边条固定在右侧的墙壁上。Step 1: Fasten the three edge supports to the left, front and rear walls respectively, and fasten the edge trim to the right wall.

步骤2:吊装主龙骨,将主龙骨通过吊件与天花板固定连接。Step 2: Hoist the main keel, and connect the main keel to the ceiling through the hanging piece.

步骤3:从左至右依次安装吊顶板和覆面龙骨,将一个吊顶板的左侧与左侧墙壁上的边部支撑件固定连接,将一个覆面龙骨的左侧与吊顶板的右侧固定连接,将覆面龙骨的前端和后端分别与前侧墙壁上的边部支撑件和后侧墙壁上的边部支撑件固定连接,将覆面龙骨上侧通过吊件与主龙骨固定连接,再将下一个吊顶板的左侧与覆面龙骨的右侧固定连接。Step 3: Install the ceiling panel and the cladding joist in sequence from left to right, and connect the left side of one ceiling panel to the side support on the left wall, and connect the left side of one cladding joist to the right side of the ceiling panel. , fix the front and rear ends of the cladding keel with the side support on the front wall and the side support on the rear wall respectively, and connect the upper side of the cladding keel with the main keel through the hanger, and then connect the lower The left side of a ceiling panel is fixedly connected to the right side of the cladding joist.

步骤4:重复步骤安装吊顶板和覆面龙骨,直到最后一个吊顶板的左侧固定好后,将收边条的插入件从下侧插入固定件上推封边,使最后一个吊顶板的右侧固定设置在插入件的第三支撑板上。Step 4: Repeat the steps to install the ceiling panel and the cladding keel until the left side of the last ceiling panel is fixed, insert the insert of the edge trim from the lower side into the fixing part and push the edge to seal the edge, so that the right side of the last ceiling panel is fixed. It is fixedly arranged on the third support plate of the insert.

本发明与现有技术相比,其效果是积极和明显的。本发明的一种吊顶的安装结构和安装方法中两个覆面龙骨之间可以很方便地通过角码进行T型或者一字型搭接安装,安装步骤少,提高了安装效率高。第二螺纹孔中安装螺钉,螺钉的头部可以防止吊顶板上移,或者将弹片上端卡设于第二卡板与连接座之间,弹片下端也可以防止吊顶板上移,避免房间有空气压力变化时,吊顶板上下窜动,产生异响。Compared with the prior art, the effect of the present invention is positive and obvious. In the installation structure and installation method of the suspended ceiling of the present invention, T-shaped or in-line lap joint installation can be easily carried out between the two cladding keels through the corner code, the installation steps are few, and the installation efficiency is improved. A screw is installed in the second threaded hole, the head of the screw can prevent the ceiling plate from moving, or the upper end of the shrapnel can be clamped between the second card plate and the connecting seat, and the lower end of the shrapnel can also prevent the ceiling plate from moving and avoid air in the room When the pressure changes, the ceiling plate moves up and down, producing abnormal noise.

边部支撑件中的弹片下端能防止吊顶板上移,当房间有空气压力变化时,防止吊顶板上下窜动产生异响。螺丝的头部可对龙骨的水平方向进行限位,防止龙骨水平窜动。The lower end of the shrapnel in the side support can prevent the ceiling board from moving, and when the air pressure in the room changes, it can prevent the ceiling board from moving up and down to produce abnormal noise. The head of the screw can limit the horizontal direction of the keel to prevent the keel from moving horizontally.

收边条采用分离的固定件和插入件,可以在最后一个吊顶板放置后,再将插入件从下侧插入固定件,而不需要借吸盘安装,减少了安装步骤,增加了安装效率,方便做二次维护。挡片和弹片可以防止吊顶板上移。The edge trim adopts separate fixing parts and inserts. After the last ceiling panel is placed, the inserts can be inserted into the fixing parts from the lower side, without using suction cups to install, which reduces the installation steps, increases the installation efficiency, and is convenient Do secondary maintenance. Baffles and shrapnel prevent the ceiling panel from moving.

附图说明Description of drawings

图1为本发明的一种吊顶的安装结构的示意图。FIG. 1 is a schematic diagram of an installation structure of a suspended ceiling according to the present invention.

图2为图1的A局部放大结构示意图。FIG. 2 is a schematic view of the enlarged structure of part A of FIG. 1 .

图3为图1的B局部放大结构示意图。FIG. 3 is an enlarged schematic structural diagram of part B of FIG. 1 .

图4为图1的C局部放大结构示意图。FIG. 4 is a schematic diagram of an enlarged structure of part C of FIG. 1 .

图5为本发明的一种吊顶的安装结构中的覆面龙骨的第一结构示意图。FIG. 5 is a first structural schematic diagram of a cladding keel in an installation structure of a suspended ceiling of the present invention.

图6为本发明的一种吊顶的安装结构中的覆面龙骨的第二结构示意图。FIG. 6 is a second structural schematic diagram of a cladding keel in an installation structure of a suspended ceiling of the present invention.

图7为本发明的一种吊顶的安装结构中的覆面龙骨的第三结构示意图。FIG. 7 is a third structural schematic diagram of a cladding keel in an installation structure of a suspended ceiling of the present invention.

图8为本发明的一种吊顶的安装结构中的覆面龙骨的第一使用状态结构示意图。FIG. 8 is a schematic structural diagram of a first use state of a cladding keel in an installation structure of a suspended ceiling of the present invention.

图9为本发明的一种吊顶的安装结构中的覆面龙骨的第二使用状态结构示意图。FIG. 9 is a schematic structural diagram of the second use state of the cladding keel in the installation structure of the suspended ceiling of the present invention.

图10为本发明的一种吊顶的安装结构和安装方法中的覆面龙骨的第三使用状态结构示意图。FIG. 10 is a schematic structural diagram of the third use state of the cladding keel in the installation structure and installation method of the suspended ceiling of the present invention.

图11为本发明的一种吊顶的安装结构中的边部支撑件的结构示意图。FIG. 11 is a schematic structural diagram of a side support member in an installation structure of a suspended ceiling according to the present invention.

图12为本发明的一种吊顶的安装结构中的边部支撑件与吊顶板连接的结构示意图。FIG. 12 is a schematic structural diagram of the connection between the side support and the ceiling plate in the installation structure of the suspended ceiling of the present invention.

图13为本发明的一种吊顶的安装结构中的边部支撑件与龙骨连接的结构示意图。FIG. 13 is a schematic structural diagram of the connection between the side support and the keel in the installation structure of the suspended ceiling of the present invention.

图14为本发明的一种吊顶的安装结构中的收边条中的固定件结构示意图。FIG. 14 is a schematic structural diagram of the fixing member in the edge trimming strip in the installation structure of the suspended ceiling of the present invention.

图15为本发明的一种吊顶的安装结构中的收边条中的插入件结构示意图。FIG. 15 is a schematic structural diagram of an insert in a trim strip in a ceiling installation structure of the present invention.

图16为本发明的一种吊顶的安装结构中的收边条的结构示意图。FIG. 16 is a schematic structural diagram of a trim strip in an installation structure of a suspended ceiling according to the present invention.

图17为本发明的一种吊顶的安装结构中的收边条的使用状态示意图。FIG. 17 is a schematic diagram of the use state of the edge trim in the installation structure of the suspended ceiling of the present invention.

具体实施方式Detailed ways

以下结合附图和实施例对本发明作进一步描述,但本发明并不限制于本实施例,凡是采用本发明的相似结构及其相似变化,均应列入本发明的保护范围。The present invention will be further described below in conjunction with the accompanying drawings and embodiments, but the present invention is not limited to the present embodiment, and all similar structures and similar changes of the present invention should be included in the protection scope of the present invention.

本说明书中所引用的如“上”、“下”、“左”、“右”等用语,亦仅为便于叙述明了,而非用以限定本发明可实施的范围,其相对关系的改变或调整,在无实质变更技术内容下,当亦视为本发明可实施的范畴。Terms such as "up", "down", "left", "right", etc. quoted in this specification are only for the convenience of description, and are not used to limit the scope of the present invention. Changes in the relative relationship or Adjustments, if there is no substantial change in the technical content, should also be regarded as the scope of the present invention.

实施例1Example 1

如图1~图17所示,本发明的一种吊顶的安装结构,包括主龙骨1、覆面龙骨2、三个边部支撑件3和一个收边条4,收边条4和三个边部支撑件3分别设置一个矩形的四条边上,三个边部支撑件3分别位于矩形的左侧、前侧和后侧,收边条4设置在矩形的右侧,矩形前侧的边部支撑件3与矩形后侧的边部支撑件3相向设置,矩形左侧的边部支撑件3与矩形右侧的收边条4相向设置,覆面龙骨2设置在矩形左侧的边部支撑件3和矩形右侧的收边条4之间,覆面龙骨2的长度方向与矩形右侧的收边条4的长度方向平行,主龙骨1设置在覆面龙骨2上方,主龙骨1的长度方向与覆面龙骨2的长度方向垂直,覆面龙骨2通过龙骨吊件7与主龙骨1固定连接,边部支撑件3中设置有第二支撑板312,覆面龙骨2的前后两端分别设置在前侧边部支撑件3的第二支撑板312上和后侧边部支撑件3的第二支撑板312上,覆面龙骨2中设置有第一支撑板29,收边条4包括固定件和插入件,插入件插设于固定件的下侧,插入件中设置有第三支撑板412,矩形左侧的边部支撑件3与覆面龙骨2之间、相邻的覆面龙骨2之间以及覆面龙骨2与矩形右侧的收边条4之间各自设置有吊顶板5,矩形左侧的边部支撑件3与覆面龙骨2之间的吊顶板5的左侧和右侧分别设置在矩形左侧的边部支撑件3的第二支撑板312和相邻的覆面龙骨2的第一支撑板29上,两个相邻的覆面龙骨2之间的吊顶板5的左侧和右侧分别设置在两个相邻的覆面龙骨2的第一支撑板29上,覆面龙骨2与矩形右侧的收边条4之间的吊顶板5的左侧和右侧分别设置在覆面龙骨2的第一支撑板29和收边条4的第三支撑板412上,任意一个吊顶板5的前侧和后侧均分别设置在矩形前侧边部支撑件3的第二支撑板312上与矩形后侧边部支撑件3的第二支撑板312上。As shown in Figures 1 to 17, an installation structure of a suspended ceiling of the present invention includes a main keel 1, a cladding keel 2, three edge support members 3 and an edge trim 4. The edge trim 4 and three sides The part supports 3 are respectively arranged on the four sides of a rectangle, the three side supports 3 are respectively located on the left side, the front side and the back side of the rectangle, the edge trim 4 is arranged on the right side of the rectangle, The support 3 is arranged opposite to the side support 3 on the rear side of the rectangle, the side support 3 on the left side of the rectangle is arranged opposite to the edge trim 4 on the right side of the rectangle, and the cladding keel 2 is arranged on the side support on the left side of the rectangle. 3 and the edge trim 4 on the right side of the rectangle, the length direction of the covering keel 2 is parallel to the length direction of the edge trim 4 on the right side of the rectangle, the main keel 1 is arranged above the covering keel 2, and the length direction of the main keel 1 is The length direction of the cladding keel 2 is vertical, the cladding keel 2 is fixedly connected with the main keel 1 through the keel hanger 7, the side support 3 is provided with a second support plate 312, and the front and rear ends of the cladding keel 2 are respectively arranged on the front side. On the second support plate 312 of the part support 3 and the second support plate 312 of the rear side part support 3, the cladding keel 2 is provided with a first support plate 29, and the edge trim 4 includes a fixing part and an insert part, The insert is inserted into the lower side of the fixing piece, and the insert is provided with a third support plate 412, between the side support 3 on the left side of the rectangle and the covering keel 2, between adjacent covering keels 2 and the covering keel 2 A ceiling panel 5 is respectively provided between the edge strip 4 on the right side of the rectangle, and the left side and the right side of the ceiling panel 5 between the side support 3 on the left side of the rectangle and the cladding keel 2 are respectively arranged on the left side of the rectangle. On the second support plate 312 of the edge support 3 and the first support plate 29 of the adjacent cladding joists 2, the left and right sides of the ceiling panel 5 between the two adjacent cladding joists 2 are respectively arranged on the two sides. On the first support plates 29 of two adjacent cladding joists 2 , the left and right sides of the ceiling plate 5 between the cladding joists 2 and the right edge trim 4 of the rectangle are respectively arranged on the first supporting plates of the cladding joists 2 29 and the third support plate 412 of the edge trim 4, the front side and the rear side of any one of the ceiling panels 5 are respectively arranged on the second support plate 312 of the rectangular front side support member 3 and the rectangular rear side. on the second support plate 312 of the support member 3 .

优选的,所述的覆面龙骨2包括一条型材,型材沿直线方向延伸,型材的上部设置有连接座21,连接座21的断面呈H形,所述的断面垂直于型材的延伸方向,连接座21上侧面中沿型材的长度方向间隔设置有两个以上数目的第一螺纹连接部22,连接座21的上端在其两侧各自垂直连接有一个第一横板23,任意一个第一横板23的外侧各自垂直连接有一个第一竖板24,任意一个第一竖板24的上端各自垂直连接有一个第一卡板25,第一卡板25位于连接座21的上方并与连接座21的上侧面平行间隔,第一卡板25、第一竖板24与第一横板23构成连接槽26,连接座21下侧连接有吊顶板5固定结构。Preferably, the cladding keel 2 includes a profile, the profile extends in a linear direction, the upper portion of the profile is provided with a connecting seat 21, the cross-section of the connecting seat 21 is H-shaped, and the cross-section is perpendicular to the extending direction of the profile, the connecting seat In the upper side of the 21, there are two or more first threaded connection parts 22 spaced along the length direction of the profile, and the upper end of the connection seat 21 is vertically connected with a first horizontal plate 23 on both sides, and any first horizontal plate 23. The outer sides of 23 are respectively vertically connected with a first vertical plate 24, and the upper end of any first vertical plate 24 is vertically connected with a first clamping plate 25. The first clamping plate 25 is located above the connecting seat 21 and is connected with the connecting seat 21. The upper side of the connecting seat 21 is spaced in parallel, the first clamping plate 25 , the first vertical plate 24 and the first horizontal plate 23 form a connecting groove 26 , and the lower side of the connecting seat 21 is connected with a fixing structure of the ceiling plate 5 .

优选的,所述的吊顶板5固定结构包括一个第一螺钉安装座27,第一螺钉安装座27与连接座21的下侧连接,第一螺钉安装座27的两侧面中沿长度方向间隔设置有多个第二螺纹部28,第一螺钉安装座27下方设置有一个第一支撑板29,第一支撑板29通过连接板217与第一螺钉安装座27连接。Preferably, the fixing structure of the ceiling panel 5 includes a first screw mounting seat 27, the first screw mounting seat 27 is connected with the lower side of the connecting seat 21, and the two side surfaces of the first screw mounting seat 27 are arranged at intervals along the length direction There are a plurality of second threaded portions 28 , a first support plate 29 is disposed below the first screw mounting seat 27 , and the first support plate 29 is connected to the first screw mounting seat 27 through the connecting plate 217 .

优选的,所述的吊顶板5固定结构包括一个支撑座210,支撑座210固定设置在连接座21的下侧,支撑座210的两侧各自设置有一个第二螺钉安装座211,两个第二螺钉安装座211的侧面中沿长度方向均间隔设置有多个第二螺纹部28,支撑座210的底部两侧各自连接有一个第一支撑板29,支撑座210中设置有一个功能腔212,功能腔212开口向下。Preferably, the fixing structure of the ceiling panel 5 includes a support base 210 , the support base 210 is fixedly arranged on the lower side of the connection base 21 , and a second screw mounting base 211 is respectively provided on both sides of the support base 210 . The side surfaces of the two screw mounting bases 211 are provided with a plurality of second threaded portions 28 at intervals along the length direction. A first support plate 29 is respectively connected to both sides of the bottom of the support base 210 , and a functional cavity 212 is provided in the support base 210 . , the functional cavity 212 opens downward.

优选的,所述的任意一个第一横板23的外侧各自向下垂直连接一个第二卡板213,第二卡板213的下端内侧设置有第一凸条214。Preferably, the outer side of any one of the first transverse plates 23 is vertically downwardly connected to a second clamping plate 213 , and the inner side of the lower end of the second clamping plate 213 is provided with a first protruding strip 214 .

优选的,所述的龙骨连接结构的数量为两个,两个连接座21下侧各自连接有一个吊顶板5固定结构,吊顶板5固定结构包括一个支撑座210,支撑座210固定设置在连接座21的下侧,支撑座210的一侧固定设置有一个第二螺钉安装座211,第二螺钉安装座211的侧面沿长度方向设置有若干个第二螺纹部28,支撑座210的底部一侧连接有一个第一支撑板29,支撑座210中设置有一个功能腔212,功能腔212开口向下;Preferably, the number of the keel connection structures is two, and the lower sides of the two connection bases 21 are respectively connected with a fixed structure of the ceiling plate 5, and the fixed structure of the ceiling plate 5 includes a support base 210, and the support base 210 is fixedly arranged on the connection On the lower side of the seat 21, a second screw mounting seat 211 is fixedly arranged on one side of the supporting seat 210, and a plurality of second threaded portions 28 are arranged on the side surface of the second screw mounting seat 211 along the length direction. A first support plate 29 is connected to the side, a functional cavity 212 is provided in the support base 210, and the functional cavity 212 opens downward;

所述的连接座21的一侧壁中设置有一个T型槽215,连接座21的一侧设置有一个弹性卡扣216,弹性卡扣216的上端设置有两个L形卡板218,两个L形卡板218卡设于T型槽215中;One side wall of the connecting seat 21 is provided with a T-shaped groove 215, one side of the connecting seat 21 is provided with an elastic buckle 216, and the upper end of the elastic buckle 216 is provided with two L-shaped clamping plates 218. Each L-shaped card board 218 is clamped in the T-shaped slot 215;

所述的两个支撑座210之间设置有一个功能板219,功能板219的两侧各自通过一个弧形板连接有一个卡接板220,两个卡接板220上端各自卡设于弹性卡板217和支撑座210之间,功能板219的下侧平行间隔设置有若干个隔板221,任意两个相邻的隔板221之间均构成一个开口向下的功能槽222。A function board 219 is disposed between the two support bases 210, two sides of the function board 219 are connected with a clip board 220 through an arc plate, and the upper ends of the two clip boards 220 are respectively clipped on the elastic clip. Between the plate 217 and the support base 210 , a number of partitions 221 are arranged in parallel and spaced on the lower side of the functional plate 219 , and a functional slot 222 with an opening downward is formed between any two adjacent partitions 221 .

优选的,所述的边部支撑件3包括安装板31,安装板31上设置有第一安装孔314,安装板31上端垂直连接有一个第二横板32,第二横板32的一侧垂直连接有一个第二卡板33,第二卡板33与安装板31平行,安装板31下端垂直连接有一个第二支撑板312,第二支撑板312位于第二横板32的下方,第二支撑板312的一侧向上方弯折。Preferably, the edge support 3 includes a mounting plate 31, the mounting plate 31 is provided with a first mounting hole 314, the upper end of the mounting plate 31 is vertically connected with a second horizontal plate 32, one side of the second horizontal plate 32 is A second clamping plate 33 is vertically connected, the second clamping plate 33 is parallel to the mounting plate 31, a second supporting plate 312 is vertically connected to the lower end of the mounting plate 31, and the second supporting plate 312 is located below the second horizontal plate 32. One side of the two supporting plates 312 is bent upward.

优选的,所述的安装板31的一侧固定连接有一个螺丝安装座36,螺丝安装座36位于第二横板32和第二支撑板312之间,螺丝安装座36与第二支撑板312之间连接有第二竖板311,螺丝安装座36的外侧面中沿长度方向间隔设置有若干个螺丝孔37,螺丝孔37中设置有螺丝38。Preferably, a screw mounting seat 36 is fixedly connected to one side of the mounting plate 31 , the screw mounting seat 36 is located between the second horizontal plate 32 and the second supporting plate 312 , and the screw mounting seat 36 is connected to the second supporting plate 312 A second vertical plate 311 is connected therebetween, a plurality of screw holes 37 are arranged at intervals along the length direction in the outer side surface of the screw mounting seat 36 , and screws 38 are arranged in the screw holes 37 .

优选的,所述的第二卡板33下端内侧设置有第一卡条34。Preferably, a first clamping strip 34 is provided on the inner side of the lower end of the second clamping plate 33 .

优选的,所述的收边条4包括固定件和插入件;所述的固定件包括贴墙板43,贴墙板43上设置有第二安装孔,贴墙板43上垂直连接有一个第三横板41,第三横板41的一侧垂直连接有一个第三卡板42,第三卡板42与贴墙板43间隔平行,贴墙板43的下侧垂直连接有一个第四横板44,第四横板44位于第三横板41的下方并与第三横板41平行,第四横板44的一侧垂直连接有一个第三竖板45,第三竖板45上连接有一个挡片411,第三竖板45的下侧垂直连接有一个第五横板46,第五横板46位于第四横板44的下方并与第四横板44平行,Preferably, the edge trim 4 includes a fixing member and an inserting member; the fixing member includes a wall-mounted board 43, the wall-mounted board 43 is provided with a second installation hole, and the wall-mounted board 43 is vertically connected with a first Three horizontal boards 41, one side of the third horizontal board 41 is vertically connected with a third card board 42, the third card board 42 is spaced parallel to the wall-mounted board 43, and a fourth horizontal board 43 is vertically connected to the lower side of the wall-mounted board 43. Plate 44, the fourth horizontal plate 44 is located below the third horizontal plate 41 and is parallel to the third horizontal plate 41, one side of the fourth horizontal plate 44 is vertically connected with a third vertical plate 45, and the third vertical plate 45 is connected There is a blocking piece 411, and a fifth horizontal plate 46 is vertically connected to the lower side of the third vertical plate 45. The fifth horizontal plate 46 is located below the fourth horizontal plate 44 and is parallel to the fourth horizontal plate 44.

所述的插入件包括第三支撑板412,第三支撑板412上从一侧到另一侧依次设置有插板414和弹性卡板416,弹性卡板416的上侧向下弯折后再向上弯折,插板414和弹性卡板416之间设置有间隙,弹性卡板416的最终弯折部与插板414的上部相向并设置有间隙,The insert includes a third support plate 412. The third support plate 412 is provided with an insert plate 414 and an elastic card plate 416 in sequence from one side to the other side, and the upper side of the elastic card plate 416 is bent downwards. Bending upwards, a gap is set between the insertion plate 414 and the elastic card plate 416, and the final bending part of the elastic card plate 416 faces the upper part of the insertion plate 414 and is provided with a gap,

所述的第三竖板45的下端侧面中设置有第一凸起49,插板414朝向弹性卡板416的侧面中设置有第二凸起415,插入件的插板414与第三竖板45配合连接,第一凸起49与第二凸起415配合卡固,第三竖板45下端的一侧设置有第二凸条410,弹性卡板416的上侧与第二凸条410配合卡紧。A first protrusion 49 is provided on the lower end side of the third vertical plate 45, a second protrusion 415 is provided on the side of the plug board 414 facing the elastic card board 416, and the plug board 414 of the insert is connected to the third vertical board. 45 is matched and connected, the first protrusion 49 cooperates with the second protrusion 415 and is fastened, the side of the lower end of the third vertical plate 45 is provided with a second convex strip 410, and the upper side of the elastic clamping plate 416 cooperates with the second convex strip 410 jam.

优选的,所述的挡片411的宽度方向垂直于第三竖板45的宽度方向。Preferably, the width direction of the blocking piece 411 is perpendicular to the width direction of the third vertical plate 45 .

优选的,所述的第三卡板42的下端内侧设置有第二卡条421。Preferably, the inner side of the lower end of the third clamping plate 42 is provided with a second clamping strip 421 .

覆面龙骨2的工作原理为:将两条型材沿直线方向相接可延长覆面龙骨2的长度,两条型材相邻的端部通过角码227进行T型或者一字型搭接,将角码227的两端分别放置在两条覆面龙骨2的连接槽26中,角码227通过第一螺钉和第一螺纹连接部22将两个覆面龙骨2固定连接。覆面龙骨2与龙骨吊件7安装,龙骨吊件7中设置有卡槽,连接座21卡设于龙骨吊件7的卡槽中。吊顶板5的一端放置在第一支撑板29上,第二螺纹部28中安装第二螺钉228,第二螺钉228的头部可以防止吊顶板5上移,或者将第一弹片224的根部卡设于第二卡板213与连接座21之间,利用第一弹片224下端的弹性也可以防止吊顶板5上移,在房间有空气压力变化时,避免吊顶板5上下窜动,产生异响。功能腔212或者功能槽222中可放置LED发光条225等功能件进行照明。The working principle of the cladding keel 2 is as follows: the length of the cladding keel 2 can be extended by connecting the two profiles in a straight line, and the adjacent ends of the two profiles are overlapped by the corner code 227 in a T-shaped or in-line shape. The two ends of the 227 are respectively placed in the connecting grooves 26 of the two covering keels 2 , and the angle code 227 is fixedly connected to the two covering keels 2 through the first screw and the first threaded connection part 22 . The covering keel 2 is installed with the keel hanger 7 , the keel hanger 7 is provided with a slot, and the connecting seat 21 is clamped in the slot of the keel hanger 7 . One end of the ceiling plate 5 is placed on the first support plate 29 , and a second screw 228 is installed in the second threaded portion 28 . It is arranged between the second clamping plate 213 and the connecting seat 21. The elasticity of the lower end of the first elastic piece 224 can also prevent the ceiling plate 5 from moving up. When there is a change in the air pressure in the room, the ceiling plate 5 can be prevented from moving up and down, resulting in abnormal noise. . Functional components such as LED light-emitting strips 225 can be placed in the functional cavity 212 or the functional slot 222 for lighting.

边部支撑件3的工作原理为:将边部支撑件3通过第一安装孔314和第三螺钉313与墙壁固定连接,将吊顶板5的一侧放置在第二支撑板312上,将一个第二弹片35的根部卡设于第二卡板33与安装板31之间,将第二弹片35的下端偏置在吊顶板5上,能防止吊顶板5上移,当房间有空气压力变化时,可防止吊顶板5上下窜动产生异响。该边部支撑件3与龙骨39拼接时,龙骨39放置在第二支撑板312上,螺丝孔37中安装螺丝38,螺丝38的头部可对龙骨39的水平方向进行限位。The working principle of the side support 3 is as follows: the side support 3 is fixedly connected to the wall through the first mounting hole 314 and the third screw 313, one side of the ceiling board 5 is placed on the second support plate 312, and a The root of the second elastic sheet 35 is clamped between the second clamping plate 33 and the mounting plate 31, and the lower end of the second elastic sheet 35 is biased on the ceiling board 5, which can prevent the ceiling board 5 from moving up. When the air pressure in the room changes When the ceiling plate 5 moves up and down, abnormal noise can be prevented. When the side support 3 is spliced with the keel 39 , the keel 39 is placed on the second support plate 312 , the screw 38 is installed in the screw hole 37 , and the head of the screw 38 can limit the horizontal direction of the keel 39 .

收边条4的工作原理为:安装最后一个吊顶板5时,将固定件通过第二安装孔和第四螺钉417与墙壁固定,将最后一个吊顶板5放置在固定件的一侧,将插入件从下侧插入固定件,插入件与固定件的下端配合卡紧,吊顶板5放置在第三支撑板412上,手工或借用一字螺丝刀折弯挡片411,挡片411可以防止吊顶板5上移。还可以将第三弹片420的根部卡入第三卡板42与贴墙板43之间,第三弹片420依靠弹力可以卡住吊顶板5,防止吊顶板5向上窜动。The working principle of the edge trim 4 is: when installing the last ceiling panel 5, fix the fixing piece to the wall through the second mounting hole and the fourth screw 417, place the last ceiling panel 5 on one side of the fixing piece, and insert the The fixing piece is inserted into the fixing piece from the lower side, the insert piece is matched with the lower end of the fixing piece and clamped, the ceiling plate 5 is placed on the third support plate 412, and the blocking piece 411 is bent by hand or with a flat-blade screwdriver. The blocking piece 411 can prevent the ceiling board 5 Move up. The root of the third elastic piece 420 can also be clamped between the third clamping plate 42 and the wall-mounted board 43 , and the third elastic piece 420 can clamp the ceiling panel 5 by its elastic force to prevent the ceiling panel 5 from moving upward.

本实施例的安装过程按照以下步骤进行:The installation process of this embodiment is performed according to the following steps:

步骤1:将三个边部支撑件3分别固定在左侧、前侧和后侧的墙壁上,将收边条4固定在右侧的墙壁上。Step 1: Fix the three side supports 3 to the left, front and rear walls respectively, and fix the edge trim 4 to the right wall.

步骤2:吊装主龙骨1,将主龙骨1通过吊件6与天花板固定连接。Step 2: Hoist the main keel 1, and connect the main keel 1 to the ceiling through the hanging piece 6.

步骤3:从左至右依次安装吊顶板5和覆面龙骨2,将一个吊顶板5的左侧与左侧墙壁上的边部支撑件固定连接,将一个覆面龙骨2的左侧与吊顶板5的右侧固定连接,将覆面龙骨2的前端和后端分别与前侧墙壁上的边部支撑件3和后侧墙壁上的边部支撑件3固定连接,将覆面龙骨2上侧通过吊件6与主龙骨1固定连接,再将下一个吊顶板5的左侧与覆面龙骨2的右侧固定连接。Step 3: Install the ceiling panel 5 and the cladding joist 2 in sequence from left to right, connect the left side of one ceiling panel 5 to the side support on the left wall, and connect the left side of one cladding joist 2 to the ceiling panel 5 The front and rear ends of the cladding keel 2 are fixedly connected to the side support 3 on the front side wall and the side support 3 on the rear side wall respectively, and the upper side of the cladding keel 2 is passed through the hanger. 6. It is fixedly connected with the main keel 1, and then the left side of the next ceiling panel 5 is fixedly connected with the right side of the cladding keel 2.

步骤4:重复步骤3安装吊顶板5和覆面龙骨2,直到最后一个吊顶板5的左侧固定好后,将收边条4的插入件从下侧插入固定件上推封边,使最后一个吊顶板5的右侧固定设置在插入件的第三支撑板412上。Step 4: Repeat step 3 to install the ceiling panel 5 and the cladding keel 2 until the left side of the last ceiling panel 5 is fixed, insert the insert of the edge trim 4 from the lower side into the fixing part and push the edge to seal the last The right side of the ceiling panel 5 is fixedly arranged on the third support plate 412 of the insert.

Claims (8)

1.一种吊顶的安装结构,其特征在于:包括主龙骨、覆面龙骨、三个边部支撑件和一个收边条,收边条和三个边部支撑件分别设置一个矩形的四条边上,三个边部支撑件分别位于矩形的左侧、前侧和后侧,收边条设置在矩形的右侧,矩形前侧的边部支撑件与矩形后侧的边部支撑件相向设置,矩形左侧的边部支撑件与矩形右侧的收边条相向设置,覆面龙骨设置在矩形左侧的边部支撑件和矩形右侧的收边条之间,覆面龙骨的长度方向与矩形右侧的收边条的长度方向平行,主龙骨设置在覆面龙骨上方,主龙骨的长度方向与覆面龙骨的长度方向垂直,覆面龙骨通过龙骨吊件与主龙骨固定连接,边部支撑件中设置有第二支撑板,覆面龙骨的前后两端分别设置在前侧边部支撑件的第二支撑板上和后侧边部支撑件的第二支撑板上,覆面龙骨中设置有第一支撑板,收边条包括固定件和插入件,插入件插设于固定件的下侧,插入件中设置有第三支撑板,矩形左侧的边部支撑件与覆面龙骨之间、相邻的覆面龙骨之间以及覆面龙骨与矩形右侧的收边条之间各自设置有吊顶板,矩形左侧的边部支撑件与覆面龙骨之间的吊顶板的左侧和右侧分别设置在矩形左侧的边部支撑件的第二支撑板和相邻的覆面龙骨的第一支撑板上,两个相邻的覆面龙骨之间的吊顶板的左侧和右侧分别设置在两个相邻的覆面龙骨的第一支撑板上,覆面龙骨与矩形右侧的收边条之间的吊顶板的左侧和右侧分别设置在覆面龙骨的第一支撑板和收边条的第三支撑板上,任意一个吊顶板的前侧和后侧均分别设置在矩形前侧边部支撑件的第二支撑板上与矩形后侧边部支撑件的第二支撑板上。1. the installation structure of a suspended ceiling is characterized in that: comprise main keel, cladding keel, three side part supports and a trim strip, the edge strip and three edge part supports are respectively arranged on four sides of a rectangle , the three side supports are located on the left side, the front side and the back side of the rectangle respectively, the edge strip is arranged on the right side of the rectangle, the side supports on the front side of the rectangle are arranged opposite to the side supports on the rear side of the rectangle, The side support on the left side of the rectangle is arranged opposite to the edge trim on the right side of the rectangle, and the cladding keel is arranged between the side support on the left side of the rectangle and the edge trim on the right side of the rectangle. The length direction of the side trimming strips is parallel, the main keel is arranged above the covering keel, the length direction of the main keel is perpendicular to the length direction of the covering keel, the covering keel is fixedly connected with the main keel through the keel hanger, and the side support is provided with a The second support plate, the front and rear ends of the cladding keel are respectively arranged on the second support plate of the front side part support and the second support plate of the rear side part support, and the clad keel is provided with a first support plate, The edge trim includes a fixing piece and an inserting piece. The inserting piece is inserted into the lower side of the fixing piece. Ceiling panels are respectively provided between the cladding keel and the trim strip on the right side of the rectangle, and the left and right sides of the ceiling panel between the side support on the left side of the rectangle and the cladding keel are respectively set on the left side of the rectangle. The second support plate of the edge support and the first support plate of the adjacent cladding keels, the left and right sides of the suspended ceiling plate between the two adjacent cladding keels are respectively arranged on the two adjacent cladding keels. The left and right sides of the ceiling panel between the cladding keel and the edge trim strip on the right side of the rectangle are respectively set on the first support plate of the cladding keel and the third support plate of the edge trim. Both the front side and the rear side of a ceiling panel are respectively arranged on the second support plate of the rectangular front side support member and the second support plate of the rectangular rear side support member. 2.根据权利要求1所述的一种吊顶的安装结构,其特征在于:所述的覆面龙骨包括一条型材,型材沿直线方向延伸,型材的上部设置有连接座,连接座的断面呈H形,所述的断面垂直于型材的延伸方向,连接座上侧面中沿型材的长度方向间隔设置有两个以上数目的第一螺纹连接部,连接座的上端在其两侧各自垂直连接有一个第一横板,任意一个第一横板的外侧各自垂直连接有一个第一竖板,任意一个第一竖板的上端各自垂直连接有一个第一卡板,第一卡板位于连接座的上方并与连接座的上侧面平行间隔,第一卡板、第一竖板与第一横板构成连接槽,连接座下侧连接有吊顶板固定结构。2 . The installation structure of a suspended ceiling according to claim 1 , wherein the cladding keel comprises a profile, the profile extends in a linear direction, the upper portion of the profile is provided with a connecting seat, and the cross-section of the connecting seat is H-shaped. 3 . , the section is perpendicular to the extension direction of the profile, the upper side of the connection seat is provided with two or more first threaded connection parts at intervals along the length direction of the profile, and the upper end of the connection seat is vertically connected with a first threaded connection on both sides. A horizontal plate, the outer side of any first horizontal plate is vertically connected with a first vertical plate, and the upper end of any first vertical plate is vertically connected with a first clamping plate, the first clamping plate is located above the connection seat and The first clamping plate, the first vertical plate and the first horizontal plate are spaced in parallel with the upper side of the connecting seat to form a connecting groove, and the lower side of the connecting seat is connected with a ceiling plate fixing structure. 3.根据权利要求2所述的一种吊顶的安装结构,其特征在于:所述的吊顶板固定结构包括一个第一螺钉安装座,第一螺钉安装座与连接座的下侧连接,第一螺钉安装座的两侧面中沿长度方向间隔设置有多个第二螺纹部,第一螺钉安装座下方设置有一个第一支撑板,第一支撑板通过连接板与第一螺钉安装座连接。3 . The installation structure of a suspended ceiling according to claim 2 , wherein the ceiling plate fixing structure comprises a first screw mounting seat, the first screw mounting seat is connected to the lower side of the connecting seat, and the first screw mounting seat is connected to the lower side of the connecting seat. 4 . Two side surfaces of the screw mounting seat are provided with a plurality of second threaded portions at intervals along the length direction, a first support plate is arranged below the first screw mounting seat, and the first support plate is connected with the first screw mounting seat through the connecting plate. 4.根据权利要求2所述的一种吊顶的安装结构,其特征在于:所述的吊顶板固定结构包括一个支撑座,支撑座固定设置在连接座的下侧,支撑座的两侧各自设置有一个第二螺钉安装座,两个第二螺钉安装座的侧面中沿长度方向均间隔设置有多个第二螺纹部,支撑座的底部两侧各自连接有一个第一支撑板,支撑座中设置有一个功能腔,功能腔开口向下。4 . The installation structure of a suspended ceiling according to claim 2 , wherein the fixed structure of the suspended ceiling plate comprises a support seat, the support seat is fixedly arranged on the lower side of the connection seat, and the two sides of the support seat are respectively arranged There is a second screw mounting seat, the side surfaces of the two second screw mounting seats are provided with a plurality of second threaded portions at intervals along the length direction, and a first support plate is connected to each of the two sides of the bottom of the support seat. A functional cavity is provided, and the opening of the functional cavity is downward. 5.根据权利要求1所述的一种吊顶的安装结构,其特征在于:所述的边部支撑件包括安装板,安装板上设置有第一安装孔,安装板上端垂直连接有一个第二横板,第二横板的一侧垂直连接有一个第二卡板,第二卡板与安装板平行,安装板下端垂直连接有一个第二支撑板,第二支撑板位于第二横板的下方,第二支撑板的一侧向上方弯折。5 . The installation structure of a suspended ceiling according to claim 1 , wherein the side support member comprises an installation plate, the installation plate is provided with a first installation hole, and a second installation hole is vertically connected to the upper end of the installation plate. 6 . A horizontal plate, one side of the second horizontal plate is vertically connected with a second clamping plate, the second clamping plate is parallel to the mounting plate, a second supporting plate is vertically connected at the lower end of the mounting plate, and the second supporting plate is located on the side of the second horizontal plate. Below, one side of the second support plate is bent upward. 6.根据权利要求3所述的一种吊顶的安装结构,其特征在于:所述的安装板的一侧固定连接有一个螺丝安装座,螺丝安装座位于第二横板和第二支撑板之间,螺丝安装座与第二支撑板之间连接有第二竖板,螺丝安装座的外侧面中沿长度方向间隔设置有若干个螺丝孔,螺丝孔中设置有螺丝。6 . The installation structure of a suspended ceiling according to claim 3 , wherein a screw mounting seat is fixedly connected to one side of the mounting plate, and the screw mounting seat is located between the second horizontal plate and the second supporting plate. 7 . A second vertical plate is connected between the screw mounting seat and the second support plate, a plurality of screw holes are arranged at intervals along the length direction in the outer side surface of the screw mounting seat, and screws are arranged in the screw holes. 7.根据权利要求1所述的一种吊顶的安装结构,其特征在于:所述的收边条包括固定件和插入件;所述的固定件包括贴墙板,贴墙板上设置有第二安装孔,贴墙板上垂直连接有一个第三横板,第三横板的一侧垂直连接有一个第三卡板,第三卡板与贴墙板间隔平行,贴墙板的下侧垂直连接有一个第四横板,第四横板位于第三横板的下方并与第三横板平行,第四横板的一侧垂直连接有一个第三竖板,第三竖板上连接有一个挡片,第三竖板的下侧垂直连接有一个第五横板,第五横板位于第四横板的下方并与第四横板平行,7 . The installation structure of a suspended ceiling according to claim 1 , wherein the edge trimming strip comprises a fixing piece and an inserting piece; the fixing piece comprises a wall-mounted board, and the wall-mounted board is provided with a first Two installation holes, a third horizontal plate is vertically connected to the wall panel, and a third card board is vertically connected to one side of the third horizontal plate. The third card plate is parallel to the wall panel, and the lower side of the wall panel A fourth horizontal plate is vertically connected, the fourth horizontal plate is located below the third horizontal plate and is parallel to the third horizontal plate, one side of the fourth horizontal plate is vertically connected with a third vertical plate, and the third vertical plate is connected There is a blocking plate, a fifth horizontal plate is vertically connected to the lower side of the third vertical plate, and the fifth horizontal plate is located below the fourth horizontal plate and is parallel to the fourth horizontal plate, 所述的插入件包括第三支撑板,第三支撑板上从一侧到另一侧依次设置有插板和弹性卡板,弹性卡板的上侧向下弯折后再向上弯折,插板和弹性卡板之间设置有间隙,弹性卡板的最终弯折部与插板的上部相向并设置有间隙,The insert includes a third support plate, and the third support plate is provided with an insert plate and an elastic card plate in sequence from one side to the other side. A gap is set between the board and the elastic card board, and the final bending part of the elastic card board faces the upper part of the plug board and is provided with a gap, 所述的第三竖板的下端侧面中设置有第一凸起,插板朝向弹性卡板的侧面中设置有第二凸起,插入件的插板与第三竖板配合连接,第一凸起与第二凸起配合卡固,第三竖板下端的一侧设置有第二凸条,弹性卡板的上侧与第二凸条配合卡紧。The lower end side of the third vertical plate is provided with a first protrusion, and the side of the insert plate facing the elastic card plate is provided with a second protrusion. The second protruding strip is arranged on one side of the lower end of the third vertical plate, and the upper side of the elastic clamping plate cooperates and clamps with the second protruding strip. 8.一种安装权利要求1所述的吊顶的方法,其特征在于:所述的方法包括以下步骤:8. A method for installing the suspended ceiling of claim 1, wherein the method comprises the steps of: 步骤1:将三个边部支撑件分别固定在左侧、前侧和后侧的墙壁上,将收边条固定在右侧的墙壁上,Step 1: Fix the three side supports on the left, front and rear walls respectively, and fix the trim strip on the right wall, 步骤2:吊装主龙骨,将主龙骨通过吊件与天花板固定连接,Step 2: Hoist the main keel, and connect the main keel to the ceiling through the hanging piece. 步骤3:从左至右依次安装吊顶板和覆面龙骨,将一个吊顶板的左侧与左侧墙壁上的边部支撑件固定连接,将一个覆面龙骨的左侧与吊顶板的右侧固定连接,将覆面龙骨的前端和后端分别与前侧墙壁上的边部支撑件和后侧墙壁上的边部支撑件固定连接,将覆面龙骨上侧通过吊件与主龙骨固定连接,再将下一个吊顶板的左侧与覆面龙骨的右侧固定连接,Step 3: Install the ceiling panel and the cladding joist in sequence from left to right, and connect the left side of one ceiling panel to the side support on the left wall, and connect the left side of one cladding joist to the right side of the ceiling panel. , fix the front and rear ends of the cladding keel with the side support on the front wall and the side support on the rear wall respectively, and connect the upper side of the cladding keel with the main keel through the hanger, and then connect the lower The left side of a ceiling panel is fixedly connected to the right side of the cladding keel, 步骤4:重复步骤安装吊顶板和覆面龙骨,直到最后一个吊顶板的左侧固定好后,将收边条的插入件从下侧插入固定件上推封边,使最后一个吊顶板的右侧固定设置在插入件的第三支撑板上。Step 4: Repeat the steps to install the ceiling panel and the cladding keel until the left side of the last ceiling panel is fixed, insert the insert of the edge trim from the lower side into the fixing part and push the edge to seal the edge, so that the right side of the last ceiling panel is fixed. It is fixedly arranged on the third support plate of the insert.
CN202010711278.5A 2020-07-22 2020-07-22 Mounting structure and mounting method of suspended ceiling Withdrawn CN111663706A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010711278.5A CN111663706A (en) 2020-07-22 2020-07-22 Mounting structure and mounting method of suspended ceiling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010711278.5A CN111663706A (en) 2020-07-22 2020-07-22 Mounting structure and mounting method of suspended ceiling

Publications (1)

Publication Number Publication Date
CN111663706A true CN111663706A (en) 2020-09-15

Family

ID=72393088

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010711278.5A Withdrawn CN111663706A (en) 2020-07-22 2020-07-22 Mounting structure and mounting method of suspended ceiling

Country Status (1)

Country Link
CN (1) CN111663706A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112443130A (en) * 2020-11-25 2021-03-05 浙江亚厦装饰股份有限公司 Multifunctional ceiling edge folding structure and mounting method
CN112726935A (en) * 2021-02-05 2021-04-30 山东阿尔法新材料科技有限公司 Freely-adjustable type cladding keel
CN113216496A (en) * 2021-05-24 2021-08-06 浙江亚厦装饰股份有限公司 Integrated ceiling suitable for small space and installation method
CN113356451A (en) * 2021-05-24 2021-09-07 浙江亚厦装饰股份有限公司 Movable hanging piece
CN115030388A (en) * 2022-05-26 2022-09-09 中建八局建筑科技(山东)有限公司 Assembled ceiling system
CN116446586A (en) * 2023-04-12 2023-07-18 重庆集凯科技服务有限公司 Assembled bathroom ceiling system and installation method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1811098A1 (en) * 2006-01-18 2007-07-25 Chicago Metallic Continental Ceiling island system
CN102011456A (en) * 2009-09-07 2011-04-13 上海龙胜实业有限公司 Improved integrated ceiling
CN106401046A (en) * 2016-10-10 2017-02-15 浙江友邦集成吊顶股份有限公司 Modular connection structure for integrated ceiling
CN109025035A (en) * 2018-08-07 2018-12-18 广东省锦绣明天建材有限公司 Suspended ceiling margin-ending method and compound suspended ceiling margin-ending section combination body in complicated structure
CN212358807U (en) * 2020-07-22 2021-01-15 上海龙胜实业有限公司 Mounting structure of furred ceiling

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1811098A1 (en) * 2006-01-18 2007-07-25 Chicago Metallic Continental Ceiling island system
CN102011456A (en) * 2009-09-07 2011-04-13 上海龙胜实业有限公司 Improved integrated ceiling
CN106401046A (en) * 2016-10-10 2017-02-15 浙江友邦集成吊顶股份有限公司 Modular connection structure for integrated ceiling
CN109025035A (en) * 2018-08-07 2018-12-18 广东省锦绣明天建材有限公司 Suspended ceiling margin-ending method and compound suspended ceiling margin-ending section combination body in complicated structure
CN212358807U (en) * 2020-07-22 2021-01-15 上海龙胜实业有限公司 Mounting structure of furred ceiling

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112443130A (en) * 2020-11-25 2021-03-05 浙江亚厦装饰股份有限公司 Multifunctional ceiling edge folding structure and mounting method
CN112726935A (en) * 2021-02-05 2021-04-30 山东阿尔法新材料科技有限公司 Freely-adjustable type cladding keel
CN113216496A (en) * 2021-05-24 2021-08-06 浙江亚厦装饰股份有限公司 Integrated ceiling suitable for small space and installation method
CN113356451A (en) * 2021-05-24 2021-09-07 浙江亚厦装饰股份有限公司 Movable hanging piece
CN115030388A (en) * 2022-05-26 2022-09-09 中建八局建筑科技(山东)有限公司 Assembled ceiling system
CN116446586A (en) * 2023-04-12 2023-07-18 重庆集凯科技服务有限公司 Assembled bathroom ceiling system and installation method

Similar Documents

Publication Publication Date Title
CN111663706A (en) Mounting structure and mounting method of suspended ceiling
CN111663705A (en) Mounting structure and method for composite board ceiling
CN112144736A (en) Integrally-installed suspended ceiling structure and installation method
CN210216864U (en) Suspended ceiling falling-level vertical frame installation structure with lamp slot
CN116623810B (en) Independent frame type bathroom suspended ceiling lap joint structure and installation method
CN113137028A (en) Assembly type decoration universal keel system and installation method thereof
CN212358807U (en) Mounting structure of furred ceiling
CN111576698B (en) A curtain wall structure
CN219033741U (en) Prevent joint release furred ceiling minor face connection structure
WO2016172685A1 (en) Channel for interior glass panel
CN112252642A (en) An assembled metal wall panel device
CN108505664A (en) A kind of corner suspended ceiling module
CN214275627U (en) Lamp slot mounting structure
CN110295715A (en) A kind of fibre cement board mounting structure
CN220954151U (en) Hook-up type short side splicing structure
CN113006398A (en) Wall veneer connecting structure and mounting method thereof
CN219033739U (en) Assembled furred ceiling of high roughness
CN114961078B (en) Suspended ceiling lamp groove installation connecting piece
CN218149174U (en) Suspended ceiling system
CN116717043A (en) A connecting piece and installation method for hanging on the wall
CN113431251B (en) Ceiling assembly and processing method of slotted member
CN113668762A (en) Small-space ceiling structure and installation method
CN117286981B (en) Hook-up type short-side splicing structure and installation method
CN215764790U (en) Lamp slot structure
CN222541758U (en) A galvanized sheet reinforcement rib installation system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20200915