CN111641220A - 一种基于改进模拟退火算法的电网侧储能系统容量配置方法 - Google Patents

一种基于改进模拟退火算法的电网侧储能系统容量配置方法 Download PDF

Info

Publication number
CN111641220A
CN111641220A CN202010446239.7A CN202010446239A CN111641220A CN 111641220 A CN111641220 A CN 111641220A CN 202010446239 A CN202010446239 A CN 202010446239A CN 111641220 A CN111641220 A CN 111641220A
Authority
CN
China
Prior art keywords
energy storage
storage system
power
longicorn
constraint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010446239.7A
Other languages
English (en)
Inventor
周喜超
王楠
赵鹏翔
李振
丛琳
王冰
李建林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Comprehensive Energy Service Group Co ltd
State Grid Corp of China SGCC
North China University of Technology
Original Assignee
State Grid Comprehensive Energy Service Group Co ltd
State Grid Corp of China SGCC
North China University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Comprehensive Energy Service Group Co ltd, State Grid Corp of China SGCC, North China University of Technology filed Critical State Grid Comprehensive Energy Service Group Co ltd
Priority to CN202010446239.7A priority Critical patent/CN111641220A/zh
Publication of CN111641220A publication Critical patent/CN111641220A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • H02J3/48Controlling the sharing of the in-phase component
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2203/00Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
    • H02J2203/20Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/76Power conversion electric or electronic aspects

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明属于电网规划技术领域,具体涉及一种基于改进模拟退火算法的电网侧储能系统容量配置方法。方法包括如下过程:测度储能系统延缓输电网升级改造的收益y1,测度提升风电消纳收益y2,测度储能系统调峰减少的环境成本y3,测度储能系统全寿命周期每年成本yin,以如下目标函数来确定电网侧储能系统,选址配置的最优结果max f=y1+y2+y3‑yin;本发明提出一种基于改进模拟退火算法的电网侧储能系统容量配置方法,本专利所述方法既降低了陷入局部最优的可能性,又加快了收敛速度。本发明设计合理,结合了天牛须算法和模拟退火算法的优点,解决了电网中储能系统规划问题,提高了储能系统运行的经济性。

Description

一种基于改进模拟退火算法的电网侧储能系统容量配置方法
技术领域:
本发明属于电网规划技术领域,具体涉及一种基于改进模拟退火算法的电网侧储能系统容量配置方法。
背景技术:
近年来,可再生能源发展迅速,但是以风电光伏为主的清洁能源出力具有波动性、间歇性、随机性等特点;再加上经济高速发展导致用电负荷急剧增加,且负荷与风电出力形成反调峰特点,这两个特点使得电网产生诸多隐患,比如弃风严重、线路阻塞、电压波动等。而大规模储能系统技术可以双向快速吞吐电能,因此合理配置储能系统可以提高系统安全经济运行。
发明内容:
本发明在于提供一种将模拟退火算法的全局寻优能力和天牛须算法的快速收敛能力结合起来,使得储能系统配置问题得以更好解决。具体技术方案如下:
一种基于改进模拟退火算法的电网侧储能系统容量配置方法,包括如下过程:
(一)测度如下数据:现有电网的总线路数Nl,现有线路的最大负荷Pl max,输电线路单位扩建成本λg,火电机组的总个数Ng,现有电网时刻t火电机组i的有功出力Pt,i,g,火电机组i的SO2排放系数di,火电机组i的SO2排污成本ki
(二)测度储能系统延缓输电网升级改造的收益y1
Figure BDA0002505924760000011
式中:
Figure BDA0002505924760000012
为增加储能系统时线路的峰值负荷,i0为预期收益率,Δn为储能系统用于延缓输电网升级改造年限,
其中,储能系统用于延缓输电网升级改造的年限Δn为
Figure BDA0002505924760000013
式中:γ为储能系统的削峰率,λ为负荷年增长率;
(三)测度提升风电消纳收益y2
Figure BDA0002505924760000014
式中:T为典型日内的采样点数,ft,w为增加储能系统后时刻t使电网多接纳的风电功率,Δt为采样时间间隔,CW为风电电价;
(四)测度储能系统调峰减少的环境成本y3
Figure BDA0002505924760000021
式中:
Figure BDA0002505924760000022
为增加储能系统后时刻t火电机组i的有功出力;
(五)测度储能系统全寿命周期每年成本yin
Figure BDA0002505924760000023
式中:CP为储能系统单位功率成本,Pes为储能系统额定功率,CE为储能系统单位容量成本,Ees为储能系统额定容量,n为储能系统寿命年限,M为单位放电电量的运行维护成本,Nes为储能系统的总个数,Pt,k,e为时刻t储能系统k的放电功率;
(六)以如下目标函数来确定电网侧储能系统选址配置的最优结果
maxf=y1+y2+y3-yin
式中:f为储能系统年净收益,具体包括:y1为延缓线路升级收益、y2为提升风电消纳收益、y3为储能系统调峰减少的环境成本;yin为储能系统的全寿命周期平均到每年的成本;
约束条件考虑潮流约束、节点电压约束、发电机组出力约束、线路传输容量约束以及储能系统功率和能量约束;具体为:
(a)潮流约束:
Figure BDA0002505924760000024
Figure BDA0002505924760000025
(b)节点电压约束:
Figure BDA0002505924760000026
(c)火电机组出力约束
Figure BDA0002505924760000031
(d)风电出力约束
Figure BDA0002505924760000032
(e)线路容量约束
Figure BDA0002505924760000033
(f)储能系统功率约束
Figure BDA0002505924760000034
(g)储能系统容量约束
Figure BDA0002505924760000035
上面各式中,
Figure BDA0002505924760000036
为t时刻节点i的无功功率,
Figure BDA0002505924760000037
为t时刻节点i的无功功率,
Figure BDA0002505924760000038
为i节点在t时刻下的电压,Gij,Bij为节点i,j之间的电导和电纳,下标g为发电机,w为风电场,上标min和max为上下限;PES,s为在节点s布局的储能系统功率;
Figure BDA0002505924760000039
为节点s布局储能系统功率的上下限约束;EES,s为在节点s布局的储能系统容量;
Figure BDA00025059247600000310
为节点s布局储能系统容量的上下限约束;
基于改进模拟退火算法的求解步骤如下:
步骤1:初始化,天牛须算法中:天牛的位置X,步长因子β,步长为B;退火算法中:温度T,迭代次数N,退火循环次数M等,天牛个体的位置矩阵为:X=(x1,x2,…,xs)T,天牛的步长B=T;在储能系统问题中,天牛位置坐标代表储能系统待求的安装位置和功率以及容量大小,即s=3;
步骤2:计算天牛的下一步位置,生成天牛左右两须的坐标:
Figure BDA00025059247600000311
式中,X代表天牛坐标,t代表时刻,r代表右须,l代表左须,d代表左右两须的距离,
Figure BDA00025059247600000312
为单位向量,代表天牛的朝向;在满足约束条件的基础上计算目标函数值并更新天牛的下一步位置,公式为
Figure BDA00025059247600000313
式中f(Xl)为左须坐标对应的适应度函数值,B为天牛步长,且Bt=β·Bt-1,这里的步长和温度T是同一个值,为随着温度的降低,天牛的步长也随之减小,更有利于搜索到最优解;
步骤3:根据M准则更新天牛的下一步位置,准则如下:计算增量ΔT=f(Xt+1)-f(Xt),若ΔT为正值则接受t+1时刻的解为新解,否则计算p=e-ΔT/T,以概率p接受新解,随着T随迭代次数的递增而减小,p也随之减小,这样处理既有利于迭代前期避免陷入局部最优,又有利于迭代后期加快收敛速度;
步骤4:更新步长B;
步骤5:判断是否达到退火循环次数M,若是,执行步骤6,若否,返回步骤2;
步骤6:退温操作;更新自适应因子λ,
Figure BDA0002505924760000041
其中fi为当前适应度,fmax为历史最优适应度,i为当前迭代次数;式中表明,若当前适应度更优,则步长不变,若当前适应度较差,则步长减小;根据自适应因子降低温度,即T=λT;
步骤7:判断是否达到迭代次数N,若达到则输出最优解,否则返回步骤2;最后得到电网侧储能系统选址配置的最优结果,即:储能系统的安装位置、功率以及容量大小。
本发明提出一种基于改进模拟退火算法的电网侧储能系统容量配置方法,相对一般算法而言,本专利所述方法既降低了陷入局部最优的可能性,又加快了收敛速度。本发明设计合理,结合了天牛须算法和模拟退火算法的优点,解决了电网中储能系统规划问题,提高了储能系统运行的经济性。
附图说明:
图1是基于改进模拟退火算法的电网侧储能系统容量配置方法流程图。
图2是实施例中IEEE24节点算例图。
图3是典型日负荷曲线图。
图4是典型日风电曲线图。
具体实施方式:
实施例:
以下结合附图对本发明实施例做进一步详述。
本发明解决其技术问题是采取以下技术方案实现的:
一种基于改进模拟退火算法的电网侧储能系统容量配置方法,以IEEE24节点典型算例为例对储能系统在电网侧的选址配置进行实验,如图2所示:
算例共有24个节点,34条线路。节点6,17为风电接入节点,节点1,2,7,15,16,18,21,22为火电机组节点,只有节点11,12,17,21,22,23,24没有负荷,其余节点均接有负荷。基准容量100MVA,负荷功率需求标幺值为28.5+j5.8,负荷有功功率如图3所示,常规机组装机容量标幺值为29.99。在原标准算例的基础上,在6节点、17节点分别接入风电场,装机规模分别为400MW、200MW,风电出力如图4所示。由风电负荷出力曲线对比可以看出,风电大发时,负荷较小,风电出力较小时,负荷需求较大,即明显的反调峰特点,因此可以通过在节点上安装储能系统来解决这一问题。
一种基于改进模拟退火算法的电网侧储能系统容量配置方法,包括如下过程:
(一)测度如下数据:现有电网的总线路数Nl,现有线路的最大负荷Pl max,输电线路单位扩建成本λg,火电机组的总个数Ng,现有电网时刻t火电机组i的有功出力Pt,i,g,火电机组i的SO2排放系数di,火电机组i的SO2排污成本ki
(二)测度储能系统延缓输电网升级改造的收益y1
Figure BDA0002505924760000052
式中:
Figure BDA0002505924760000053
为增加储能系统时线路的峰值负荷,i0为预期收益率,Δn为储能系统用于延缓输电网升级改造年限,
其中,储能系统用于延缓输电网升级改造的年限Δn为
Figure BDA0002505924760000054
式中:γ为储能系统的削峰率,λ为负荷年增长率;
(三)测度提升风电消纳收益y2
Figure BDA0002505924760000055
式中:T为典型日内的采样点数,ft,w为增加储能系统后时刻t使电网多接纳的风电功率,Δt为采样时间间隔,CW为风电电价;
(四)测度储能系统调峰减少的环境成本y3
Figure BDA0002505924760000061
式中:
Figure BDA0002505924760000062
为增加储能系统后时刻t火电机组i的有功出力;
(五)测度储能系统全寿命周期每年成本yin
Figure BDA0002505924760000063
式中:CP为储能系统单位功率成本,Pes为储能系统额定功率,CE为储能系统单位容量成本,Ees为储能系统额定容量,n为储能系统寿命年限,M为单位放电电量的运行维护成本,Nes为储能系统的总个数,Pt,k,e为时刻t储能系统k的放电功率;
(六)以如下目标函数来确定电网侧储能系统选址配置的最优结果
maxf=y1+y2+y3-yin
式中:f为储能系统年净收益,具体包括:y1为延缓线路升级收益、y2为提升风电消纳收益、y3为储能系统调峰减少的环境成本;yin为储能系统的全寿命周期平均到每年的成本;
约束条件考虑潮流约束、节点电压约束、发电机组出力约束、线路传输容量约束以及储能系统功率和能量约束;具体为:
(a)潮流约束:
Figure BDA0002505924760000064
Figure BDA0002505924760000065
(b)节点电压约束:
Figure BDA0002505924760000066
(c)火电机组出力约束
Figure BDA0002505924760000067
(d)风电出力约束
Figure BDA0002505924760000068
(e)线路容量约束
Figure BDA0002505924760000071
(f)储能系统功率约束
Figure BDA0002505924760000072
(g)储能系统容量约束
Figure BDA0002505924760000073
上面各式中,
Figure BDA0002505924760000074
为t时刻节点i的无功功率,
Figure BDA0002505924760000075
为t时刻节点i的无功功率,
Figure BDA0002505924760000076
为i节点在t时刻下的电压,Gij,Bij为节点i,j之间的电导和电纳,下标g为发电机,w为风电场,上标min和max为上下限;PES,s为在节点s布局的储能系统功率;
Figure BDA0002505924760000077
为节点s布局储能系统功率的上下限约束;EES,s为在节点s布局的储能系统容量;
Figure BDA0002505924760000078
为节点s布局储能系统容量的上下限约束;
基于改进模拟退火算法的求解步骤如下:
步骤1:初始化,天牛须算法中:天牛的位置X,步长因子β,步长为B;退火算法中:温度T,迭代次数N,退火循环次数M等,天牛个体的位置矩阵为:X=(x1,x2,…,xs)T,天牛的步长B=T;在储能系统问题中,天牛位置坐标代表储能系统待求的安装位置和功率以及容量大小,即s=3;
步骤2:计算天牛的下一步位置,生成天牛左右两须的坐标:
Figure BDA0002505924760000079
式中,X代表天牛坐标,t代表时刻,r代表右须,l代表左须,d代表左右两须的距离,
Figure BDA00025059247600000710
为单位向量,代表天牛的朝向;在满足约束条件的基础上计算目标函数值并更新天牛的下一步位置,公式为
Figure BDA00025059247600000711
式中f(Xl)为左须坐标对应的适应度函数值,B为天牛步长,且Bt=β·Bt-1,这里的步长和温度T是同一个值,为随着温度的降低,天牛的步长也随之减小,更有利于搜索到最优解;
步骤3:根据M准则更新天牛的下一步位置,准则如下:计算增量ΔT=f(Xt+1)-f(Xt),若ΔT为正值则接受t+1时刻的解为新解,否则计算p=e-ΔT/T,以概率p接受新解,随着T随迭代次数的递增而减小,p也随之减小,这样处理既有利于迭代前期避免陷入局部最优,又有利于迭代后期加快收敛速度;
步骤4:更新步长B;
步骤5:判断是否达到退火循环次数M,若是,执行步骤6,若否,返回步骤2;
步骤6:退温操作;更新自适应因子λ,
Figure BDA0002505924760000081
其中fi为当前适应度,fmax为历史最优适应度,i为当前迭代次数;式中表明,若当前适应度更优,则步长不变,若当前适应度较差,则步长减小;根据自适应因子降低温度,即T=λT;
步骤7:判断是否达到迭代次数N,若达到则输出最优解,否则返回步骤2;最后得到电网侧储能系统选址配置的最优结果,即:储能系统的安装位置、功率以及容量大小。

Claims (1)

1.一种基于改进模拟退火算法的电网侧储能系统容量配置方法,其特征在于,包括如下过程:
(一)测度如下数据:现有电网的总线路数Nl,现有线路的最大负荷Pl max,输电线路单位扩建成本λg,火电机组的总个数Ng,现有电网时刻t火电机组i的有功出力Pt,i,g,火电机组i的SO2排放系数di,火电机组i的SO2排污成本ki
(二)测度储能系统延缓输电网升级改造的收益y1
Figure FDA0002505924750000011
式中:
Figure FDA0002505924750000012
为增加储能系统时线路的峰值负荷,i0为预期收益率,Δn为储能系统用于延缓输电网升级改造年限,
其中,储能系统用于延缓输电网升级改造的年限Δn为
Figure FDA0002505924750000013
式中:γ为储能系统的削峰率,λ为负荷年增长率;
(三)测度提升风电消纳收益y2
Figure FDA0002505924750000014
式中:T为典型日内的采样点数,ft,w为增加储能系统后时刻t使电网多接纳的风电功率,Δt为采样时间间隔,CW为风电电价;
(四)测度储能系统调峰减少的环境成本y3
Figure FDA0002505924750000015
式中:
Figure FDA0002505924750000016
为增加储能系统后时刻t火电机组i的有功出力;
(五)测度储能系统全寿命周期每年成本yin
Figure FDA0002505924750000017
式中:CP为储能系统单位功率成本,Pes为储能系统额定功率,CE为储能系统单位容量成本,Ees为储能系统额定容量,n为储能系统寿命年限,M为单位放电电量的运行维护成本,Nes为储能系统的总个数,Pt,k,e为时刻t储能系统k的放电功率;
(六)以如下目标函数来确定电网侧储能系统选址配置的最优结果
maxf=y1+y2+y3-yin
式中:f为储能系统年净收益,具体包括:y1为延缓线路升级收益、y2为提升风电消纳收益、y3为储能系统调峰减少的环境成本;yin为储能系统的全寿命周期平均到每年的成本;
约束条件考虑潮流约束、节点电压约束、发电机组出力约束、线路传输容量约束以及储能系统功率和能量约束;具体为:
(a)潮流约束:
Figure FDA0002505924750000021
Figure FDA0002505924750000022
(b)节点电压约束:
Figure FDA0002505924750000023
(c)火电机组出力约束
Figure FDA0002505924750000024
(d)风电出力约束
Figure FDA0002505924750000025
(e)线路容量约束
Figure FDA0002505924750000026
(f)储能系统功率约束
Figure FDA0002505924750000027
(g)储能系统容量约束
Figure FDA0002505924750000028
上面各式中,
Figure FDA0002505924750000029
为t时刻节点i的无功功率,
Figure FDA00025059247500000210
为t时刻节点i的无功功率,
Figure FDA00025059247500000211
为i节点在t时刻下的电压,Gij,Bij为节点i,j之间的电导和电纳,下标g为发电机,w为风电场,上标min和max为上下限;PES,s为在节点s布局的储能系统功率;Ps max、Ps min为节点s布局储能系统功率的上下限约束;EES,s为在节点s布局的储能系统容量;
Figure FDA0002505924750000031
为节点s布局储能系统容量的上下限约束;
基于改进模拟退火算法的求解步骤如下:
步骤1:初始化,天牛须算法中:天牛的位置X,步长因子β,步长为B;退火算法中:温度T,迭代次数N,退火循环次数M等,天牛个体的位置矩阵为:X=(x1,x2,…,xs)T,天牛的步长B=T;在储能系统问题中,天牛位置坐标代表储能系统待求的安装位置和功率以及容量大小,即s=3;
步骤2:计算天牛的下一步位置,生成天牛左右两须的坐标:
Figure FDA0002505924750000032
式中,X代表天牛坐标,t代表时刻,r代表右须,l代表左须,d代表左右两须的距离,
Figure FDA0002505924750000033
为单位向量,代表天牛的朝向;在满足约束条件的基础上计算目标函数值并更新天牛的下一步位置,公式为
Figure FDA0002505924750000034
式中f(Xl)为左须坐标对应的适应度函数值,B为天牛步长,且Bt=β·Bt-1,这里的步长和温度T是同一个值,为随着温度的降低,天牛的步长也随之减小,更有利于搜索到最优解;
步骤3:根据M准则更新天牛的下一步位置,准则如下:计算增量ΔT=f(Xt+1)-f(Xt),若ΔT为正值则接受t+1时刻的解为新解,否则计算p=e-ΔT/T,以概率p接受新解,随着T随迭代次数的递增而减小,p也随之减小,这样处理既有利于迭代前期避免陷入局部最优,又有利于迭代后期加快收敛速度;
步骤4:更新步长B;
步骤5:判断是否达到退火循环次数M,若是,执行步骤6,若否,返回步骤2;
步骤6:退温操作;更新自适应因子λ,
Figure FDA0002505924750000035
其中fi为当前适应度,fmax为历史最优适应度,i为当前迭代次数;式中表明,若当前适应度更优,则步长不变,若当前适应度较差,则步长减小;根据自适应因子降低温度,即T=λT;
步骤7:判断是否达到迭代次数N,若达到则输出最优解,否则返回步骤2;最后得到电网侧储能系统选址配置的最优结果,即:储能系统的安装位置、功率以及容量大小。
CN202010446239.7A 2020-05-25 2020-05-25 一种基于改进模拟退火算法的电网侧储能系统容量配置方法 Pending CN111641220A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010446239.7A CN111641220A (zh) 2020-05-25 2020-05-25 一种基于改进模拟退火算法的电网侧储能系统容量配置方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010446239.7A CN111641220A (zh) 2020-05-25 2020-05-25 一种基于改进模拟退火算法的电网侧储能系统容量配置方法

Publications (1)

Publication Number Publication Date
CN111641220A true CN111641220A (zh) 2020-09-08

Family

ID=72332787

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010446239.7A Pending CN111641220A (zh) 2020-05-25 2020-05-25 一种基于改进模拟退火算法的电网侧储能系统容量配置方法

Country Status (1)

Country Link
CN (1) CN111641220A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115580184A (zh) * 2022-12-08 2023-01-06 谱为科技(常州)有限公司 驱控一体式步进电机的控制方法、点胶设备

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014201849A1 (zh) * 2013-06-18 2014-12-24 国网辽宁省电力有限公司电力科学研究院 配有储能电站的分散式风电场有功优化调控方法
CN106096757A (zh) * 2016-05-31 2016-11-09 天津天大求实电力新技术股份有限公司 基于改进量子遗传算法的微网储能选址定容优化方法
CN109861256A (zh) * 2019-01-20 2019-06-07 天津大学 一种计及全寿命周期成本的配电网储能优化配置方法
CN110071505A (zh) * 2019-06-04 2019-07-30 清华大学 含大规模风电接入的输电网扩建与储能配置联合规划方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014201849A1 (zh) * 2013-06-18 2014-12-24 国网辽宁省电力有限公司电力科学研究院 配有储能电站的分散式风电场有功优化调控方法
CN106096757A (zh) * 2016-05-31 2016-11-09 天津天大求实电力新技术股份有限公司 基于改进量子遗传算法的微网储能选址定容优化方法
CN109861256A (zh) * 2019-01-20 2019-06-07 天津大学 一种计及全寿命周期成本的配电网储能优化配置方法
CN110071505A (zh) * 2019-06-04 2019-07-30 清华大学 含大规模风电接入的输电网扩建与储能配置联合规划方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
周田江 等: "融合模拟退火和自适应的天牛须搜索算法", 《通信技术》 *
李一辰: "储能系统在受端电网中的多点布局技术研究", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》 *
郭威 等: "计及多属性综合指标与经济性的电网侧储能系统选址配置方法", 《电力建设》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115580184A (zh) * 2022-12-08 2023-01-06 谱为科技(常州)有限公司 驱控一体式步进电机的控制方法、点胶设备

Similar Documents

Publication Publication Date Title
CN111146821A (zh) 一种计及光伏不确定性的dstatcom优化配置方法
CN107681655B (zh) 一种潮汐流能发电场协调规划方法
CN110620397B (zh) 一种高比例可再生能源电力系统的调峰平衡评估方法
CN110570015B (zh) 一种配电网多目标规划方法
CN112736926A (zh) 一种分布式新能源接入配电网区间仿射潮流动态优化方法
CN111525552B (zh) 一种基于特征信息的三阶段短期风电场群功率预测方法
CN112016747A (zh) 一种适用于源荷储灵活资源统筹规划与运行的优化方法
CN111082466B (zh) 考虑风电不确定性的新能源接入与网架扩建优化方法
CN111404204A (zh) 一种利用改进狼群算法的含风电场电力系统优化调度方法
CN112241923B (zh) 一种基于综合能源系统源荷等效外特性的配网电力平衡方法
CN111355250A (zh) 一种电网侧储能优化方法及系统
CN111144655A (zh) 一种分布式电源选址定容与配电网网架联合优化方法
CN116402210A (zh) 一种综合能源系统多目标优化方法、系统、设备和介质
CN111641220A (zh) 一种基于改进模拟退火算法的电网侧储能系统容量配置方法
CN112418732B (zh) 一种含多能量枢纽综合能源系统规划方法及系统
CN114629160A (zh) 风电场有功无功协同调度方法
CN111340315A (zh) 一种电网侧储能优化方法及系统
CN111697607B (zh) 一种多端柔性直流输电受端电网接入方法及系统
Tómasson et al. Multi-area generation adequacy and capacity credit in power system analysis
CN116306181A (zh) 低碳经济下源荷储主动配电网协调规划方法
CN114240203A (zh) 一种包含热泵的配电网与分布式风电协同规划方法和装置
CN115411719A (zh) 一种基于源荷不确定性和电压稳定性的分布式电源规划方法
Ćetković et al. Analysis of justification for using capacitor banks in distribution networks with low power demand
Zhang et al. Optimal PV system capacity ratio and power limit value selection based on a novel fast calculation method of IGBT junction temperature and IGBT annual damage analysis
Chen et al. Peak Load Shifting Benefit Evaluation of Distribution Network With Distributed Photovoltaic Considering Uncertainty

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination