CN111636558A - Assembled integral type frame structure and construction process thereof - Google Patents

Assembled integral type frame structure and construction process thereof Download PDF

Info

Publication number
CN111636558A
CN111636558A CN202010482056.0A CN202010482056A CN111636558A CN 111636558 A CN111636558 A CN 111636558A CN 202010482056 A CN202010482056 A CN 202010482056A CN 111636558 A CN111636558 A CN 111636558A
Authority
CN
China
Prior art keywords
groove
holding tank
block
clamping
frame structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010482056.0A
Other languages
Chinese (zh)
Other versions
CN111636558B (en
Inventor
叶长松
逯登平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei China Railway Cangyan Construction Technology Co ltd
Original Assignee
Hebei China Railway Cangyan Construction Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei China Railway Cangyan Construction Technology Co ltd filed Critical Hebei China Railway Cangyan Construction Technology Co ltd
Priority to CN202010482056.0A priority Critical patent/CN111636558B/en
Publication of CN111636558A publication Critical patent/CN111636558A/en
Application granted granted Critical
Publication of CN111636558B publication Critical patent/CN111636558B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • E04B1/21Connections specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/92Protection against other undesired influences or dangers
    • E04B1/98Protection against other undesired influences or dangers against vibrations or shocks; against mechanical destruction, e.g. by air-raids
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/02Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/02Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
    • E04H9/025Structures with concrete columns

Abstract

The invention relates to an assembled integral frame structure and a construction process thereof, belonging to the technical field of prefabricated concrete structure engineering and comprising a prefabricated column and a superposed beam, wherein the bottom end of the prefabricated column is fixedly connected with the ground, the superposed beam is lapped on the upper surface of the prefabricated column, the upper surface of the prefabricated column is provided with an accommodating tank, one end of the lower surface of the superposed beam, which is close to the prefabricated column, is fixedly connected with a pressing block, the lower surface of the pressing block is provided with an inserting groove, an inserting block is embedded in the accommodating tank in a sliding manner, and a transmission assembly for driving the inserting block to be inserted in the inserting groove is arranged between the accommodating tank and the inserting block.

Description

Assembled integral type frame structure and construction process thereof
Technical Field
The invention relates to the technical field of prefabricated concrete structural engineering, in particular to an assembled integral frame structure and a construction process thereof.
Background
The assembled integral frame structure is characterized in that columns and beams used for buildings are prefabricated by a factory and then connected on a construction site, and the assembled integral frame structure can improve the construction environment of the construction site and shorten the construction time.
Referring to fig. 1, including prefabricated post 1 and superposed beam 2 among the prior art, prefabricated post 1 is provided with many and the vertical setting of prefabricated post 1, prefabricated post 1 bottom and ground fixed connection, superposed beam 2 overlap joint is on prefabricated post 1 upper surface, fixedly connected with reinforcing bar between superposed beam 2 and the prefabricated post 1, after the assembly is accomplished, pour the concrete in the space between prefabricated post 1 and superposed beam 2, guarantee that the concrete of pouring and superposed beam 2 upper surface parallel and level, accomplish the connection of prefabricated post 1 and superposed beam 2, accomplish the assembly.
The above prior art solutions have the following drawbacks: among the above-mentioned technical scheme, prefabricated post and superposed beam use the reinforcing bar to connect, use the concrete to pour again, and building connection stability, shock resistance and anti-cracking ability after the assembly is accomplished are relatively poor.
Disclosure of Invention
The invention aims to provide an assembled integral type frame structure, which achieves the effects of improving the connection stability, the shock resistance and the crack resistance of the assembled integral type frame structure.
One of the above objects of the present invention is achieved by the following technical solutions: the utility model provides an assemble integral frame construction, includes prefabricated post and coincide roof beam, prefabricated post bottom and ground fixed connection, coincide roof beam overlap joint at prefabricated post upper surface, and the holding tank has been seted up to prefabricated post upper surface, and the one end fixedly connected with briquetting that coincide roof beam lower surface is close to prefabricated post, and the slot has been seted up to the briquetting lower surface, and sliding fit is equipped with the inserted block in the holding tank, is provided with the drive assembly who drives the inserted block and peg graft in the slot between holding tank and the inserted block.
Through adopting above-mentioned technical scheme, aim at the holding tank with the briquetting during use, when the briquetting is pegged graft in the holding tank, the briquetting drives transmission assembly and removes under the effect of self gravity, the conveying subassembly drives the inserted block and pegs graft in the slot this moment, as long as the composite beam is placed on prefabricated post and the briquetting is pegged graft in the holding tank, the inserted block just pegs graft in the slot always, realize the connection of prefabricated post and composite beam, the inserted block is pegged graft in the slot all the time, the effect of improving assembly integral frame structural connection stability, shock resistance and anti-cracking ability has been reached.
The invention is further configured to: the transmission assembly comprises a pressing plate, a connecting rod, a supporting rod and a slide, the insert block penetrates through the pressing plate and is in sliding connection with the pressing plate, the connecting rod is provided with a plurality of support rods and the slide, the quantity of the support rods and the slide is equal to that of the connecting rod, the pressing plate is slidably embedded in the accommodating groove and is abutted to the inner wall of the accommodating groove, the supporting rod is hinged to the bottom end of the insert block, one end of the connecting rod is hinged to the lower surface of the pressing plate, the rest end of the connecting rod is hinged to one end, far away from.
Through adopting above-mentioned technical scheme, when briquetting and clamp plate butt, the clamp plate drives connecting rod and bracing piece and slides in the slide, the length of connecting rod and bracing piece is unchangeable, clamp plate restriction inserted block can only slide from top to bottom in vertical direction, the angle between connecting rod and the bracing piece changes this moment, the bracing piece drives the inserted block rebound and pegs graft in the slot, the direction of sliding of connecting rod and bracing piece has been guaranteed in the setting of slide, transmission just can realize the transmission under the effect of superposed beams own gravity during the use, thereby realize pegging graft the inserted block in the slot, the effect of improving the integral frame construction stability of assembly has been reached, shock resistance and anti-crack ability.
The invention is further configured to: briquetting circumference lateral wall and the inner wall butt of holding tank and briquetting lower surface fixedly connected with clamping ring, the through-hole has been seted up to the clamp plate upper surface.
Through adopting above-mentioned technical scheme, briquetting circumference outer wall and the inner wall butt of holding tank, when the briquetting is pegged graft in the holding tank, zheng increased the stability that briquetting and holding tank are connected, reduce the influence of vibrations to prefabricated post and composite beam.
The invention is further configured to: be provided with coupling assembling between clamp plate and the holding tank lateral wall, coupling assembling includes slider and spout, and slider fixed connection is at the clamp plate lateral wall, and slider sliding connection is in the spout, and along the vertical slip of the degree of depth direction of holding tank in the spout.
Through adopting above-mentioned technical scheme, at the in-process that the clamp plate slided to the accommodation tank bottom, the slider slides in the spout, and coupling assembling's setting can guarantee that the clamp plate only slides from top to bottom vertically in the holding tank, can guarantee the stability of being connected at the in-process drive assembly of prefabricated post transportation and holding tank simultaneously.
The invention is further configured to: the prefabricated column lateral wall has been seted up and has been pour the hole, pours hole and holding tank intercommunication.
Through adopting above-mentioned technical scheme, the inserted block is pegged graft in the slot back through pouring the hole with concrete placement in the remaining space of holding tank, and the fixed position of drive assembly and inserted block is unchangeable after the concreting, has guaranteed that the inserted block can be stable peg graft in the slot, has improved the shock resistance of assembling integral frame construction.
The invention is further configured to: fixed surface is connected with the stopper under the holding tank, and the stopper is located under the inserted block, and is located between the connecting rod.
Through adopting above-mentioned technical scheme, when the bracing piece was in vertical state, connecting rod and bracing piece articulated one end and stopper butt, connecting rod and bracing piece articulated one end can not slide in the spout this moment, and the bracing piece is in vertical state all the time, and the bearing capacity of the bracing piece of vertical state is strongest, has reached the stability of guaranteeing to assemble integral frame construction.
The invention is further configured to: the caulking groove has been seted up to the inserted block lateral wall symmetry, is provided with the chucking subassembly in the caulking groove, and the draw-in groove inner wall symmetry has been seted up the draw-in groove.
Through adopting above-mentioned technical scheme, when the inserted block is pegged graft in the slot, chucking subassembly joint has increased inserted block and slot connection's stability in the draw-in groove, and the chucking subassembly is located the caulking groove simultaneously, guarantees that the inserted block runs through the clamp plate and with clamp plate sliding connection, nevertheless can not produce relative rocking, has reached the effect of guaranteeing the shock resistance of assembling integral frame construction.
The invention is further configured to: the clamping assembly comprises a clamping plate and a pressure spring, the top end of the clamping plate is hinged to the inner wall of the caulking groove, the pressure spring is located between the clamping plate and the caulking groove, and the clamping groove is matched with the clamping plate.
Through adopting above-mentioned technical scheme, when the inserted block is pegged graft in the slot completely, under the elastic effect of pressure spring, the cardboard is not pegged graft in the draw-in groove with caulking groove inner wall articulated one end, has increased the stability of inserted block when pegging graft in the slot, has improved the connection stability of assembling integral frame construction.
The second purpose of the invention is to provide a construction process for assembling an integral frame structure, which achieves the effects of improving the connection stability, the shock resistance and the crack resistance of a building, simultaneously having convenient installation and improving the working efficiency.
The second purpose of the invention is realized by the following technical scheme: a construction process for assembling an integral frame structure comprises the following steps:
s1, the whole frame construction of assembled includes prefabricated post and coincide roof beam, and the holding tank has been seted up to prefabricated post upper surface, and coincide roof beam lower surface fixedly connected with briquetting will prefabricate the post bottom and ground fixed connection, pegs graft the briquetting in the holding tank.
S2, a transmission assembly and an insertion block are arranged in the containing groove, a slot is formed in the lower surface of the pressing block, the pressing block drives the transmission assembly to slide towards the bottom end of the containing groove in the process of being inserted into the containing groove, and the transmission assembly drives the insertion block to be inserted into the slot.
S3, the side wall of the insert is provided with a clamping assembly, the clamping assembly comprises a clamping plate and a pressure spring, the slot is communicated with a clamping groove, and when the insert is inserted into the slot, and the clamping plate is clamped in the clamping groove.
S4, the prefabricated column lateral wall has been seted up and has been pour the hole, pours hole and holding tank intercommunication, pours the hole and pours the concrete into the holding tank in.
Through adopting above-mentioned technical scheme, with prefabricated post fixed connection only need aim at the holding tank with the briquetting of coincide roof beam lower surface fixed connection after subaerial, peg graft at the in-process of holding tank at the briquetting, the inserted block is automatic to be pegged graft in the slot, when the inserted block is pegged graft completely in the slot, the cardboard joint is in the draw-in groove, the rethread is pour the hole and is injected into the concrete into the remaining cavity of holding tank, the whole assembly process of assembling integral frame construction only need peg graft the briquetting in the holding tank simultaneously by pouring downthehole injection concrete, reached simple installation, the effect that provides work efficiency.
In summary, the invention includes at least one of the following beneficial technical effects:
1. when the prefabricated column is abutted to the superposed beam, the inserting block is inserted into the inserting groove, and the pressing block is inserted into the accommodating groove, so that the connecting stability, the shock resistance and the crack resistance of the assembled integral frame structure are improved due to the arrangement of the inserting block and the pressing block;
2. the arrangement of the transmission assembly can ensure that the insert block is automatically inserted into the slot when the press block is inserted into the accommodating groove, the manual processing by workers is not needed, and the arrangement of the connecting assembly can ensure that the press block slides in the accommodating groove along the depth direction of the accommodating groove;
3. the setting of chucking subassembly can guarantee that the inserted block is pegged graft in the slot after the inserted block is connected stability of being connected of inserted block and slot, pour setting up of hole and make things convenient for the staff to pour into the concrete in the cavity of holding tank, reached the effect that improves the stability of assembling integral frame construction and shock resistance.
Drawings
FIG. 1 is an assembled schematic view of a prior art assembled monolithic structural frame;
FIG. 2 is a schematic view of the entire structure of the present embodiment;
FIG. 3 is an exploded cross-sectional view showing a portion of the components of the transmission assembly;
fig. 4 is a partially enlarged schematic view of a portion a in fig. 3.
In the figure, 1, a column is prefabricated; 11. accommodating grooves; 12. pouring holes; 13. a limiting block; 2. a composite beam; 21. briquetting; 211. pressing a ring; 22. a slot; 221. a card slot; 3. inserting a block; 31. caulking grooves; 4. a transmission assembly; 41. pressing a plate; 411. a through hole; 42. a connecting rod; 43. a support bar; 44. a slideway; 5. a connecting assembly; 51. a slider; 52. a chute; 6. a clamping assembly; 61. clamping a plate; 62. and (5) pressing a spring.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Example 1
Referring to fig. 2 and 3, an assembled integral frame structure disclosed by the invention comprises a plurality of prefabricated columns 1, the prefabricated columns 1 are vertically arranged, the bottom ends of the prefabricated columns 1 are fixedly connected with the ground, superposed beams 2 are arranged between the prefabricated columns 1, the superposed beams 2 are lapped on the upper surfaces of the prefabricated columns 1, accommodating grooves 11 are formed in the upper surfaces of the prefabricated columns 1, pressing blocks 21 are fixedly connected to the lower surfaces of the superposed beams 2 abutted to the prefabricated columns 1, slots 22 are formed in the lower surfaces of the pressing blocks 21, the slots 22 penetrate through the pressing blocks 21 and extend into the superposed beams 2, inserting blocks 3 are embedded in the accommodating grooves 11 in a sliding manner, transmission assemblies 4 used for inserting the inserting blocks 3 into the slots 22 are arranged between the inserting blocks 3 and the accommodating grooves 11, when the assembled integral frame structure is used, the pressing blocks 21 are inserted in the accommodating grooves 11 in a sliding manner, the outer walls of the pressing blocks 21 are abutted to the inner walls of the, the transmission component 4 drives the insertion block 3 to be inserted into the slot 22, the arrangement of the insertion block 3 and the slot 22 enhances the connection stability of the prefabricated column 1 and the superposed beam 2, and meanwhile, the shock resistance and the crack resistance of the assembled integral frame structure are improved.
Referring to fig. 3, the transmission assembly 4 includes a pressing plate 41, a connecting rod 42, a plurality of supporting rods 43 and a slide way 44, the pressing plate 41 is inserted in the receiving groove 11 in a sliding manner, a circumferential side wall of the pressing plate 41 abuts against an inner wall of the receiving groove 11, the insert block 3 penetrates through the pressing plate 41 and is connected with the pressing plate 41 in a sliding manner, the plurality of connecting rods 42 are provided, one end of each connecting rod 42 is hinged to a lower surface of the pressing plate 41, the number of the supporting rods 43 and the number of the slide way 44 are the same as the number of the connecting rods 42, one end of each supporting rod 43 is hinged to a lower surface of the insert block 3, one end of each connecting rod 42 far away from the pressing plate 41 is hinged to one end of each supporting rod 43 far away from the insert block 3, and the connecting rods 43 are inserted in the slide way 44 in a sliding manner, when in use, the pressing block 21 abuts against the, at this moment, the inserting block 3 moves upwards and is inserted into the inserting groove 22, manual operation of workers is not needed in the using process, the using effect of the workers is achieved, meanwhile, the inserting block 3 can be inserted into the inserting groove 22 as long as the superposed beam 2 is located above the prefabricated column 1, and the effect of guaranteeing the stability and the shock resistance of the assembled integral frame structure is achieved.
Referring to fig. 3, holding tank 11 lower surface fixed connection has stopper 13, and stopper 13 is located between the bracing piece 43 and is located the inserted block 3 under, and the setting of stopper 13 can guarantee that when briquetting 21 is pegged graft in holding tank 11 completely, bracing piece 43 uses and is in vertical state, and the bearing capacity of bracing piece 43 under vertical state is strongest, and the stability of assembling integral frame construction is strongest simultaneously.
Referring to fig. 3, be provided with coupling assembling 5 between clamp plate 41 and the holding tank 11, coupling assembling 5 includes slider 51 and spout 52, slider 51 is T type plate structure, slider 51 fixed connection is at clamp plate 41 circumference outer wall, spout 52 sets up at the 11 inner walls of holding tank, slider 51 sliding connection is in spout 52, and guarantee that clamp plate 41 slides along the depth direction of holding tank 11 in holding tank 11, the effect of the interactive stability of clamp plate 41 in holding tank 11 has been reached, thereby the effect of assembling integral frame construction stability has been guaranteed.
Referring to fig. 2 and 3, prefabricated post 1 circumference outer wall has been seted up and has been pour hole 12, pour hole 12 and holding tank 11 intercommunication, briquetting 21 lower surface fixedly connected with clamping ring 211, clamping ring 211 circumference outer wall and briquetting 21 circumference lateral wall parallel and level, through-hole 411 has been seted up to clamping plate 41 upper surface, through-hole 411 runs through clamping plate 41, when the inserted block 3 is pegged graft completely in slot 22, pour the concrete into in the cavity of holding tank 11 through pouring hole 12, the concrete fills up the space between clamping plate 21 and the holding tank 11 and is full of after, the space between clamping plate 21 and the clamping plate 41 is filled to the rethread through-hole, pour hole 12, the setting of through-hole 411 and clamping ring 211 can improve the stability of inserted block 3 in holding tank 11, thereby guarantee the connection stability of assembling integral.
Referring to fig. 4, caulking groove 31 has been seted up to inserted block 3 lateral wall symmetry, be provided with chucking subassembly 6 in the caulking groove 31, chucking subassembly 6 includes cardboard 61 and pressure spring 62, it is articulated with the 31 inner walls of caulking groove that the clamp plate 41 top is held, pressure spring 62 fixed connection is between clamp plate 41 and caulking groove 31, draw-in groove 221 has been seted up to slot 22 lateral wall, draw-in groove 221 and cardboard 61 looks adaptation, when briquetting 21 drives transmission assembly 4 and removes, the fixture block is accomodate in caulking groove 31 with pressure spring 62, inserted block 3 rebound, when inserted block 3 pegs graft in slot 22 completely, cardboard 61 joint is in draw-in groove 221, chucking subassembly 6 sets up the stability of being connected that has improved inserted block 3 and slot 22, the effect that has improved the integral frame construction stability of assembly and shock resistance has been reached.
The implementation principle of the embodiment is as follows: during the use with prefabricated post 1 and ground fixed connection, peg graft briquetting 21 in holding tank 11, clamp plate 41 drives connecting rod 42 and slides in spout 52 this moment, connecting rod 42 drives bracing piece 43 and rotates, the angle between bracing piece 43 and the connecting rod 42 changes, bracing piece 43 is in vertical state this moment, bracing piece 43 drives inserted block 3 and pegs graft in slot 22, cardboard 61 joint is in draw-in groove 221 when inserted block 3 pegs graft in slot 22 completely, realize assembling integral frame construction's installation, the shock resistance and the crack resistance have been improved when having reached the stability that improves assembling integral frame construction.
Example 2
The invention is further configured to: a construction process for assembling an integral frame structure comprises the following steps:
s1, the whole frame construction of assembled includes prefabricated post 1 and coincide roof beam 2, and holding tank 11 has been seted up to prefabricated post 1 upper surface, and the fixed surface of coincide roof beam 2 lower surface is connected with briquetting 21, with prefabricated post 1 bottom and ground fixed connection, pegs graft briquetting 21 in holding tank 11.
S2, the containing groove 11 is internally provided with a transmission assembly 4 and an insert 3, the lower surface of the pressing block 21 is provided with a slot 22, the pressing block 21 is inserted in the containing groove 11, the pressing block 21 drives the transmission assembly 4 to slide towards the bottom end of the containing groove 11, and the transmission assembly 4 drives the insert 3 to be inserted in the slot 22.
S3, the side wall of the insert block 3 is provided with a clamping assembly 6, the clamping assembly 6 comprises a clamping plate 61 and a pressure spring 62, the slot 22 is communicated with a clamping groove 221, and when the insert block 3 is inserted into the slot 22 and the insert block 3 is inserted into the slot 22, the clamping plate 61 is clamped in the clamping groove 221.
S4, the side wall of the prefabricated column 1 is provided with a pouring hole 12, the pouring hole 12 is communicated with the accommodating groove 11, and concrete is injected into the accommodating groove 11 through the pouring hole 12.
The implementation principle of the embodiment is as follows: after briquetting 21 is pegged graft in holding tank 11, briquetting 21 can drive transmission assembly 4 and remove, connecting rod 42 drives bracing piece 43 and removes this moment, inserted block 3 rebound under the restriction of clamp plate 41, inserted block 3 pegs graft in slot 22, when inserted block 3 pegs graft in slot 22 completely, cardboard 61 joint is in draw-in groove 221, when cardboard 61 joint is in draw-in groove 221, pour hole 12 into the concrete in the space of holding tank 11, the whole installation process of assembling integral frame construction only need fix precast column 1, peg graft briquetting 21 in holding tank 11 again, when cardboard 61 joint is in draw-in groove 221, pour hole 12 into the concrete in the space of holding tank 11, the effect that has improved the connecting stability of assembling integral frame construction, shock resistance and anti-cracking ability has been reached.
The embodiments of the present invention are preferred embodiments of the present invention, and the scope of the present invention is not limited by these embodiments, so: all equivalent changes made according to the structure, shape and principle of the invention are covered by the protection scope of the invention.

Claims (9)

1. The utility model provides an assemble integral frame construction, includes prefabricated post (1) and composite beam (2), prefabricated post (1) bottom and ground fixed connection, composite beam (2) overlap joint is at prefabricated post (1) upper surface, its characterized in that: holding tank (11) have been seted up to prefabricated post (1) upper surface, and the one end fixedly connected with briquetting (21) that superimposed beam (2) lower surface is close to prefabricated post (1), and slot (22) have been seted up to briquetting (21) lower surface, and sliding fit is equipped with inserted block (3) in holding tank (11), is provided with between holding tank (11) and inserted block (3) to drive transmission assembly (4) of inserted block (3) grafting in slot (22).
2. An assembled unitary frame structure according to claim 1 wherein: drive assembly (4) are including clamp plate (41), connecting rod (42), bracing piece (43) and slide (44), inserted block (3) run through clamp plate (41) and with clamp plate (41) sliding connection, connecting rod (42) are provided with a plurality ofly, the quantity of bracing piece (43) and slide (44) all is the same with the quantity of connecting rod (42), clamp plate (41) slip inlays to be established in holding tank (11), and with holding tank (11) inner wall butt, bracing piece (43) articulate in inserted block (3) bottom, the articulated surplus one end of connecting rod (42) one end and clamp plate (41) lower surface is articulated with the one end that bracing piece (43) kept away from inserted block (3), and bracing piece (43) and the articulated one end of connecting rod (42) slide and peg graft in slide (44).
3. An assembled unitary frame structure according to claim 1 wherein: briquetting (21) circumference lateral wall and the inner wall butt of holding tank (11), and briquetting (21) lower surface fixedly connected with clamping ring (211), through-hole (411) have been seted up to clamp plate (41) upper surface.
4. An assembled unitary frame structure according to claim 2 wherein: be provided with coupling assembling (5) between clamp plate (41) and holding tank (11) lateral wall, coupling assembling (5) include slider (51) and spout (52), slider (51) fixed connection is in clamp plate (41) lateral wall, slider (51) sliding connection in spout (52), and the vertical slip of the direction of depth along holding tank (11) in spout (52).
5. An assembled unitary frame structure according to claim 1 wherein: the side wall of the prefabricated column (1) is provided with a pouring hole (12), and the pouring hole (12) is communicated with the accommodating groove (11).
6. An assembled unitary frame structure according to claim 1 wherein: holding tank (11) lower surface fixed connection has stopper (13), stopper (13) are located under inserted block (3), and are located between a plurality of connecting rods (42).
7. An assembled unitary frame structure according to claim 1 wherein: the side wall of the inserting block (3) is symmetrically provided with an embedding groove (31), a clamping assembly (6) is arranged in the embedding groove (31), and the inner wall of the inserting groove (22) is symmetrically provided with clamping grooves (221).
8. An assembled unitary frame structure according to claim 7 wherein: the clamping assembly (6) comprises a clamping plate (61) and a pressure spring (62), the top end of the clamping plate (61) is hinged to the inner wall of the caulking groove (31), the pressure spring (62) is located between the clamping plate (61) and the caulking groove (31), and the clamping groove (221) is matched with the clamping plate (61).
9. The construction process for assembling the integral frame structure is characterized by comprising the following steps of: the method comprises the following steps:
s1, the assembly type integral frame structure comprises a prefabricated column (1) and an overlapped beam (2), wherein an accommodating groove (11) is formed in the upper surface of the prefabricated column (1), a pressing block (21) is fixedly connected to the lower surface of the overlapped beam (2), the bottom end of the prefabricated column (1) is fixedly connected with the ground, and the pressing block (21) is inserted into the accommodating groove (11);
s2, a transmission assembly (4) and an insert block (3) are arranged in the accommodating groove (11), an inserting groove (22) is formed in the lower surface of the pressing block (21), the pressing block (21) drives the transmission assembly (4) to slide towards the bottom end of the accommodating groove (11) in the process that the pressing block (21) is inserted in the accommodating groove (11), and the transmission assembly (4) drives the insert block (3) to be inserted in the inserting groove (22);
s3, a clamping assembly (6) is arranged on the side wall of the insert block (3), the clamping assembly (6) comprises a clamping plate (61) and a pressure spring (62), the slot (22) is communicated with a clamping groove (221), and when the insert block (3) is inserted into the slot (22), the clamping plate (61) is clamped in the clamping groove (221);
s4, a pouring hole (12) is formed in the side wall of the prefabricated column (1), the pouring hole (12) is communicated with the accommodating groove (11), and concrete is injected into the accommodating groove (11) through the pouring hole (12).
CN202010482056.0A 2020-05-30 2020-05-30 Assembled integral type frame structure and construction process thereof Active CN111636558B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010482056.0A CN111636558B (en) 2020-05-30 2020-05-30 Assembled integral type frame structure and construction process thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010482056.0A CN111636558B (en) 2020-05-30 2020-05-30 Assembled integral type frame structure and construction process thereof

Publications (2)

Publication Number Publication Date
CN111636558A true CN111636558A (en) 2020-09-08
CN111636558B CN111636558B (en) 2021-07-16

Family

ID=72326828

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010482056.0A Active CN111636558B (en) 2020-05-30 2020-05-30 Assembled integral type frame structure and construction process thereof

Country Status (1)

Country Link
CN (1) CN111636558B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4453488A (en) * 1982-02-08 1984-06-12 E. W. Watchorn & Associates, Inc. Connector for joining structural components
KR100855547B1 (en) * 2007-05-25 2008-09-01 동서 피, 씨, 씨 주식회사 Structure for jointing framework of clean room construction
CN106012960A (en) * 2016-07-14 2016-10-12 中交第三航务工程勘察设计院有限公司 Assembly type long piled wharf upper structure system and construction method thereof
CN206189975U (en) * 2016-11-01 2017-05-24 湖南城建职业技术学院 A buffering of taking precautions against earthquakes steel casting for building engineering
CN207794302U (en) * 2017-12-29 2018-08-31 东华理工大学 A kind of slag transfer structure for SRC beams
CN208056316U (en) * 2018-03-09 2018-11-06 江苏省建筑园林设计院有限公司 The dry type connecting structure of full precast floor slab
CN209066597U (en) * 2018-11-16 2019-07-05 王晓辉 A kind of prefabrication and assembly construction concrete frame beam-column connection construction
CN110644617A (en) * 2019-10-25 2020-01-03 南京工业大学 Beam column node structure of assembled single-storey factory building

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4453488A (en) * 1982-02-08 1984-06-12 E. W. Watchorn & Associates, Inc. Connector for joining structural components
KR100855547B1 (en) * 2007-05-25 2008-09-01 동서 피, 씨, 씨 주식회사 Structure for jointing framework of clean room construction
CN106012960A (en) * 2016-07-14 2016-10-12 中交第三航务工程勘察设计院有限公司 Assembly type long piled wharf upper structure system and construction method thereof
CN206189975U (en) * 2016-11-01 2017-05-24 湖南城建职业技术学院 A buffering of taking precautions against earthquakes steel casting for building engineering
CN207794302U (en) * 2017-12-29 2018-08-31 东华理工大学 A kind of slag transfer structure for SRC beams
CN208056316U (en) * 2018-03-09 2018-11-06 江苏省建筑园林设计院有限公司 The dry type connecting structure of full precast floor slab
CN209066597U (en) * 2018-11-16 2019-07-05 王晓辉 A kind of prefabrication and assembly construction concrete frame beam-column connection construction
CN110644617A (en) * 2019-10-25 2020-01-03 南京工业大学 Beam column node structure of assembled single-storey factory building

Also Published As

Publication number Publication date
CN111636558B (en) 2021-07-16

Similar Documents

Publication Publication Date Title
CN211037541U (en) Assembled wallboard
CN111636558B (en) Assembled integral type frame structure and construction process thereof
CN114775891A (en) Prefabricated wall of prefabricated building
CN114991303B (en) Grouting-free sleeve assembly integral beam column structure UHPC connection construction method
CN212743138U (en) Building structure constructional column based on BIM
CN214784975U (en) Assembled wall structure of building engineering
CN218521939U (en) Supporting wall for building structure
CN217630625U (en) Assembled shear force wall connection structure
CN211200439U (en) Long service life's pile foundation
CN218881238U (en) Assembled antidetonation wall body
CN215594545U (en) Full precast floor slab dry-type connection structure
CN215630659U (en) Super high-rise SRC frame section of thick bamboo building structure that excels in
CN218933520U (en) Inserted connection structure of steel frame column and prefabricated cover frame partition wall
CN217630936U (en) Anti-seismic buffer composition structure of prefabricated staircase
CN113622451B (en) Assembled pile foundation structure
CN219081097U (en) Plug-in type ancient building timber post mound connects structure
CN215106526U (en) Novel aerated concrete block
CN216689740U (en) Double-deck coincide prefabricated outer wall structure of basement
CN220769871U (en) Wooden plate connecting mechanism
CN212271399U (en) Steel form shell concrete combination T shape post standard festival
CN216195485U (en) A superposed beam connection structure for precast concrete externally-hung wallboard
CN217517949U (en) Concrete prefabricated part connecting structure
CN219491382U (en) Wallboard connection structure with antidetonation effect
CN213772889U (en) Environment-friendly steel structure bridge
CN218714080U (en) Prefabricated shear force wall of interior inclined that muscle is connected

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant