CN111625757A - 一种数字化油田预测单井产量的算法 - Google Patents
一种数字化油田预测单井产量的算法 Download PDFInfo
- Publication number
- CN111625757A CN111625757A CN202010526450.XA CN202010526450A CN111625757A CN 111625757 A CN111625757 A CN 111625757A CN 202010526450 A CN202010526450 A CN 202010526450A CN 111625757 A CN111625757 A CN 111625757A
- Authority
- CN
- China
- Prior art keywords
- algorithm
- data
- pump
- oil
- yield
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000005086 pumping Methods 0.000 claims abstract description 15
- 238000004364 calculation method Methods 0.000 claims abstract description 13
- 239000003129 oil well Substances 0.000 claims abstract description 11
- 238000005457 optimization Methods 0.000 claims abstract description 5
- 238000004519 manufacturing process Methods 0.000 claims description 15
- 238000006073 displacement reaction Methods 0.000 claims description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 4
- 230000015572 biosynthetic process Effects 0.000 claims description 3
- 238000000034 method Methods 0.000 abstract description 4
- 238000010586 diagram Methods 0.000 abstract description 3
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000007726 management method Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000000704 physical effect Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/10—Complex mathematical operations
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Life Sciences & Earth Sciences (AREA)
- Theoretical Computer Science (AREA)
- Data Mining & Analysis (AREA)
- General Physics & Mathematics (AREA)
- Mining & Mineral Resources (AREA)
- Geology (AREA)
- Mathematical Physics (AREA)
- Algebra (AREA)
- Pure & Applied Mathematics (AREA)
- Software Systems (AREA)
- General Engineering & Computer Science (AREA)
- Computational Mathematics (AREA)
- Geophysics (AREA)
- Databases & Information Systems (AREA)
- Environmental & Geological Engineering (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010526450.XA CN111625757B (zh) | 2020-06-09 | 2020-06-09 | 一种数字化油田预测单井产量的算法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010526450.XA CN111625757B (zh) | 2020-06-09 | 2020-06-09 | 一种数字化油田预测单井产量的算法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111625757A true CN111625757A (zh) | 2020-09-04 |
CN111625757B CN111625757B (zh) | 2024-03-01 |
Family
ID=72259421
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010526450.XA Active CN111625757B (zh) | 2020-06-09 | 2020-06-09 | 一种数字化油田预测单井产量的算法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111625757B (zh) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101145235A (zh) * | 2007-06-29 | 2008-03-19 | 中国石化集团胜利石油管理局 | 一种油田开发决策系统 |
CN101906966A (zh) * | 2010-07-16 | 2010-12-08 | 中国石油天然气股份有限公司 | 储层产能的预测方法及装置 |
WO2015143626A1 (zh) * | 2014-03-25 | 2015-10-01 | 中国石油天然气股份有限公司 | 一种基于示功图的二流量试井分析的方法及系统 |
CN105868508A (zh) * | 2016-04-28 | 2016-08-17 | 西南石油大学 | 一种基于气测录井信息的产能定量预测方法 |
CN206377019U (zh) * | 2016-12-20 | 2017-08-04 | 中国石油天然气股份有限公司 | 一种无游动阀低漏失、防垢、砂卡抽油泵柱塞 |
US20180148999A1 (en) * | 2016-11-29 | 2018-05-31 | Conocophillips Company | Methods for shut-in pressure escalation analysis |
CN110008494A (zh) * | 2018-12-13 | 2019-07-12 | 胜利油田森诺胜利工程有限公司 | 一种油田机械采油系统能耗在线优化方法 |
CN111222261A (zh) * | 2020-04-22 | 2020-06-02 | 西南石油大学 | 动静参数结合的产量劈分方法 |
-
2020
- 2020-06-09 CN CN202010526450.XA patent/CN111625757B/zh active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101145235A (zh) * | 2007-06-29 | 2008-03-19 | 中国石化集团胜利石油管理局 | 一种油田开发决策系统 |
CN101906966A (zh) * | 2010-07-16 | 2010-12-08 | 中国石油天然气股份有限公司 | 储层产能的预测方法及装置 |
WO2015143626A1 (zh) * | 2014-03-25 | 2015-10-01 | 中国石油天然气股份有限公司 | 一种基于示功图的二流量试井分析的方法及系统 |
CN105868508A (zh) * | 2016-04-28 | 2016-08-17 | 西南石油大学 | 一种基于气测录井信息的产能定量预测方法 |
US20180148999A1 (en) * | 2016-11-29 | 2018-05-31 | Conocophillips Company | Methods for shut-in pressure escalation analysis |
CN206377019U (zh) * | 2016-12-20 | 2017-08-04 | 中国石油天然气股份有限公司 | 一种无游动阀低漏失、防垢、砂卡抽油泵柱塞 |
CN110008494A (zh) * | 2018-12-13 | 2019-07-12 | 胜利油田森诺胜利工程有限公司 | 一种油田机械采油系统能耗在线优化方法 |
CN111222261A (zh) * | 2020-04-22 | 2020-06-02 | 西南石油大学 | 动静参数结合的产量劈分方法 |
Non-Patent Citations (4)
Title |
---|
MAHNAZ.等: "A new fast approach for well producting prediction in gascondensate reservoirs", 《ELSEVIER》, pages 47 - 59 * |
贺清松: "抽油机井调参措施优化方法探讨", 《内蒙古石油化工》, no. 6, pages 72 - 73 * |
邓睿: "基于机器学习的SD气田储量和产量预测算法研究", 《中国优秀硕士学位论文全文数据库 工程科技辑》, pages 019 - 76 * |
韩光明等: "聚合物驱油井产能规律研究", 《石油钻采工艺》, vol. 37, no. 3, pages 93 - 97 * |
Also Published As
Publication number | Publication date |
---|---|
CN111625757B (zh) | 2024-03-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Narasingam et al. | Temporal clustering for order reduction of nonlinear parabolic PDE systems with time‐dependent spatial domains: Application to a hydraulic fracturing process | |
Fang et al. | A generalized well-management scheme for reservoir simulation | |
Karakas et al. | Semianalytical productivity models for perforated completions | |
CA2814370C (en) | Lift-gas optimization with choke control | |
CA2825189C (en) | System and method for using an artificial neural network to simulate pipe hydraulics in a reservoir simulator | |
Roustaei et al. | Non-Darcy effects in fracture flows of a yield stress fluid | |
CN111219175B (zh) | 考虑应力敏感的裂缝性碳酸盐岩酸压裂缝匹配性优化方法 | |
CN104346511B (zh) | 一种油藏动态监测方法及装置 | |
CN113836695A (zh) | 一种基于无网格连接元的油藏数值模拟方法 | |
CN113486538A (zh) | 一种非常规油气井产量预测及压裂效果评价方法 | |
CN107545102B (zh) | 一种预测新开发区蒸汽辅助重力泄油开发指标的方法 | |
CN111625757A (zh) | 一种数字化油田预测单井产量的算法 | |
CN106929615A (zh) | 一种高炉炉缸数值模拟与解析系统及其控制方法 | |
Nakashima et al. | Near-well upscaling for three-phase flows | |
CN114239419A (zh) | 一种基于深度学习的井筒积液预测方法 | |
CN110486008B (zh) | 一种径向复合油藏的参数解释方法及系统 | |
Sagen et al. | A coupled dynamic reservoir and pipeline model–development and initial experience | |
Gao et al. | A novel optimization approach for oil and gas production process considering model parameters uncertainties | |
Liu et al. | Study on a gas plunger lift model for shale gas wells and its effective application | |
Clemens | Sucker rod pumping system optimisation based on a novel finite elements analysis | |
WO2009084973A1 (en) | Methods of forecasting and analysing gas-condensate flows into a well | |
Zhou et al. | Nodal Analysis for a Transient Production System—Principles and Application | |
CN111210522A (zh) | 利用fem在三维非结构网格流场内追踪流线分布的方法 | |
CN106780105A (zh) | 一种确定举升方式的方法及装置 | |
Chandra et al. | Integrated Production Optimization of Mature Field Y Under Network Constraints |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20240716 Address after: Room 219, Building D, High tech Zone Energy Information Port, No. 233 Nan'er Road, Dongying District, Dongying City, Shandong Province, China 257000 Patentee after: Dongying Dixin Intelligent Technology Co.,Ltd. Country or region after: China Address before: 067000 No. 2 College Road, Chengde High-tech Industrial Development Zone, Hebei Province Patentee before: Hebei Petroleum University of Technology Country or region before: China |
|
TR01 | Transfer of patent right |