CN111585348A - 智能变电站监控信息无线辅助对点验收系统 - Google Patents

智能变电站监控信息无线辅助对点验收系统 Download PDF

Info

Publication number
CN111585348A
CN111585348A CN202010496716.0A CN202010496716A CN111585348A CN 111585348 A CN111585348 A CN 111585348A CN 202010496716 A CN202010496716 A CN 202010496716A CN 111585348 A CN111585348 A CN 111585348A
Authority
CN
China
Prior art keywords
message
module
telemechanical
automatic
wireless
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010496716.0A
Other languages
English (en)
Inventor
张桂芹
柴颖
申庆刚
吴秋丽
王振华
陈喆
吴翠娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
TaiAn Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
Shandong Anxinyuan Information Technology Co ltd
State Grid Corp of China SGCC
TaiAn Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Anxinyuan Information Technology Co ltd, State Grid Corp of China SGCC, TaiAn Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical Shandong Anxinyuan Information Technology Co ltd
Priority to CN202010496716.0A priority Critical patent/CN111585348A/zh
Publication of CN111585348A publication Critical patent/CN111585348A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00022Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using wireless data transmission
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L69/00Network arrangements, protocols or services independent of the application payload and not provided for in the other groups of this subclass
    • H04L69/04Protocols for data compression, e.g. ROHC
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/124Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wired telecommunication networks or data transmission busses
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/126Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wireless data transmission
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
    • Y04S40/12Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
    • Y04S40/128Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment involving the use of Internet protocol

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Power Engineering (AREA)
  • Computer Security & Cryptography (AREA)
  • Signal Processing (AREA)
  • Telephonic Communication Services (AREA)
  • Selective Calling Equipment (AREA)

Abstract

本发明的智能变电站监控信息无线辅助对点验收系统,主站侧自动验收模块、主站侧远动报文无线接收模块、主站侧远动报文自动解压模块安装在接收客户端上;变电站侧远动报文采集模块、变电站侧远动报文自动压缩模块、变电站侧远动报文无线发送模块安装于发送客户端上。相比较传统验收方式,站内信号只需要操作一遍,节约了时间,不用等待光纤贯通后再与主站进行信号传动验收。节约了工作人员。解放了主站监控人员,因为是自动验收,使其不用一直与站内通电话进行验收工作。

Description

智能变电站监控信息无线辅助对点验收系统
技术领域
本发明涉及智能变电站监控信息验收技术领域,具体为一种智能变电站监控信息无线辅助对点验收系统。
背景技术
新建变电站投运前,站内监控后台需要进行验收。目前,新建变电站监控信息进行验收时,先由变电站现场实际操作设备完成站内信息验收,待主子站链路联通后,变电站现场再次实操设备进行主子站监控信息联调;联调过程使用人工以打电话的方式双方同时在线进行调试、验收,整个验收过程受制于通讯链路及电话,带来诸多不便及隐患。
发明内容
本发明为了弥补现有技术的不足,提供了一种结构简单、使用方便的智能变电站监控信息无线辅助对点验收系统。
本发明是通过如下技术方案实现的:
一种智能变电站监控信息无线辅助对点验收系统,其特征在于:包括如下模块:
(1)主站侧自动验收模块:通过与主站系统通讯将所需前置点表自动下载至指定目录,使用前置点表与标准点表进行对比,保证两方的信息一致;在通过前置点表生成顺序化验收卡,每隔5分钟将自动解压完的报文导入模块内,读取报文实现验收工作;
(2)主站侧远动报文无线接收模块:接收变电站侧远动报文无线发送模块的报文压缩包;
(3)主站侧远动报文自动解压模块:将无线接收模块接收到的报文压缩包自动解压,存放至指定目录;
(4)变电站侧远动报文采集模块:通过网线与远动建立连接,将远动出口侧104报文收集;
(5)变电站侧远动报文自动压缩模块:将变电站侧远动报文采集模块收集的报文每隔5分钟自动压缩;
(6)变电站侧远动报文无线发送模块:将报文压缩包发送至主站侧远动报文无线接收模块。
该智能变电站监控信息无线辅助对点验收系统,主站侧自动验收模块、主站侧远动报文无线接收模块、主站侧远动报文自动解压模块安装在接收客户端上;变电站侧远动报文采集模块、变电站侧远动报文自动压缩模块、变电站侧远动报文无线发送模块安装于发送客户端上;接收客户端采用台式机、笔记本或pad(平板电脑),发送客户端采用笔记本或pad(平板电脑)。
本发明的智能变电站监控信息无线辅助对点验收系统的验收方法,其特征在于:包括以下步骤:
(1)将装有变电站侧远动报文采集模块、变电站侧远动报文自动压缩模块、变电站侧远动报文无线发送模块的发送客户端(笔记本或pad)通过网线接在远动出口侧与远动进行通讯,再将笔记连接无线网络开始工作;报文采集模块开始工作,将远动产生的报文收集起来发送到报文自动压缩模块,报文自动压缩模块每隔5分钟压缩一次,将压缩包发送至报文无线发送模块,报文无线发送模块将收到报文通过发送客户端使用无线网络发送至主站无线接收模块。
(2)主站将装有主站侧自动验收模块、主站侧远动报文无线接收模块、主站侧远动报文自动解压模块的接收客户端(台式机、笔记本或pad)连接到互联网,再通过另外一个网络端口与主站侧建立连接通讯,获取前置点表,将前置点表导入至自动验收模块,再将标准点表手动导入至自动验收模块,进行标准点表与前置点表对比,核对是否存在问题,保证两方的信息一致;若存在问题更改前置点表后,再使用自动验收模块获取前置点表形成标准化验收序列(即顺序化验收卡);报文无线接收模块通过接收客户端接收来自变电站侧发送的报文压缩包,收到报文压缩包后主站自动解压模块将收到的报文压缩包自动解压至指定目录,自动验收模块将解压完的报文录入至自动验收模块解析报文,读取报文进行验收工作,使报文与前置点表对应。
本发明的有益效果是:相比较传统验收方式,站内信号只需要操作一遍,节约了时间,不用等待光纤贯通后再与主站进行信号传动验收。节约了工作人员。解放了主站监控人员,因为是自动验收,使其不用一直与站内通电话进行验收工作。
附图说明
图1为本发明的示意图。图2为工作流程示意图。
具体实施方式
附图为本发明的一种具体实施例。
一种智能变电站监控信息无线辅助对点验收系统,包括如下模块:
(1)主站侧自动验收模块:通过与主站系统通讯将所需前置点表自动下载至指定目录,使用前置点表与标准点表进行对比,
(2)主站侧远动报文无线接收模块:接收变电站侧远动报文无线发送模块的报文压缩包。
(3)主站侧远动报文自动解压模块:将无线接收模块接收到的报文压缩包自动解压,存放至指定目录。
(4)通过网线与远动建立连接,将远动出口侧104报文收集。
(5)将变电站侧远动报文采集模块收集的报文每隔5分钟自动压缩。
(6)变电站侧远动报文无线发送模块:将报文压缩包发送至主站侧远动报文无线接收模块。
该智能变电站监控信息无线辅助对点验收系统,主站侧自动验收模块、主站侧远动报文无线接收模块、主站侧远动报文自动解压模块安装在接收客户端上;变电站侧远动报文采集模块、变电站侧远动报文自动压缩模块、变电站侧远动报文无线发送模块安装于发送客户端上;接收客户端采用台式机、笔记本或pad(平板电脑),发送客户端采用笔记本或pad(平板电脑)。
顺序化验收卡是排列多个前置点表的顺序。前置点表是主站前置库点表(点号、描述)。
本发明的智能变电站监控信息无线辅助对点验收系统的验收方法,包括以下步骤:
步骤1、将装有变电站侧远动报文采集模块、变电站侧远动报文自动压缩模块、变电站侧远动报文无线发送模块的笔记本或pad接到变电站远动出口侧,将104报文采集、打包、每隔5分钟发送至主站侧。
步骤2、将装有主站侧自动验收模块、主站侧远动报文无线接收模块、主站侧远动报文自动解压模块的台式机与主站侧系统建立通讯,获取前置点表,手动导入标准点表,进行对比保证两方的信息一致。再通过前置点表生成顺序化验收卡,每隔5分钟将接收、自动解压完的报文导入模块内,读取报文进行验收工作。
验收方法的详细步骤如下:
(1)将装有变电站侧远动报文采集模块、变电站侧远动报文自动压缩模块、变电站侧远动报文无线发送模块的发送客户端(笔记本或pad)通过网线接在远动出口侧与远动进行通讯,再将笔记连接无线网络开始工作;报文采集模块开始工作,将远动产生的报文收集起来发送到报文自动压缩模块,报文自动压缩模块每隔5分钟压缩一次,将压缩包发送至报文无线发送模块,报文无线发送模块将收到报文通过发送客户端使用无线网络发送至主站无线接收模块。
(2)主站将装有主站侧自动验收模块、主站侧远动报文无线接收模块、主站侧远动报文自动解压模块的接收客户端(台式机、笔记本或pad)连接到互联网,再通过另外一个网络端口与主站侧建立连接通讯,获取前置点表,将前置点表导入至自动验收模块,再将标准点表手动导入至自动验收模块,进行标准点表与前置点表对比,核对是否存在问题,保证两方的信息一致;若存在问题更改前置点表后,再使用自动验收模块获取前置点表形成标准化验收序列(即顺序化验收卡);报文无线接收模块通过接收客户端接收来自变电站侧发送的报文压缩包,收到报文压缩包后主站自动解压模块将收到的报文压缩包自动解压至指定目录,自动验收模块将解压完的报文录入至自动验收模块解析报文,读取报文进行验收工作,使报文与前置点表对应。

Claims (3)

1.一种智能变电站监控信息无线辅助对点验收系统,其特征在于:包括如下模块:
(1)主站侧自动验收模块:通过与主站系统通讯将所需前置点表自动下载至指定目录,使用前置点表与标准点表进行对比,保证两方的信息一致;在通过前置点表生成顺序化验收卡,每隔5分钟将自动解压完的报文导入模块内,读取报文实现验收工作;
(2)主站侧远动报文无线接收模块:接收变电站侧远动报文无线发送模块的报文压缩包;
(3)主站侧远动报文自动解压模块:将无线接收模块接收到的报文压缩包自动解压,存放至指定目录;
(4)变电站侧远动报文采集模块:通过网线与远动建立连接,将远动出口侧104报文收集;
(5)变电站侧远动报文自动压缩模块:将变电站侧远动报文采集模块收集的报文每隔5分钟自动压缩;
(6)变电站侧远动报文无线发送模块:将报文压缩包发送至主站侧远动报文无线接收模块。
2.根据权利要求1所述的智能变电站监控信息无线辅助对点验收系统,其特征在于:主站侧自动验收模块、主站侧远动报文无线接收模块、主站侧远动报文自动解压模块安装在接收客户端上;变电站侧远动报文采集模块、变电站侧远动报文自动压缩模块、变电站侧远动报文无线发送模块安装于发送客户端上;接收客户端采用台式机、笔记本或pad(平板电脑),发送客户端采用笔记本或pad(平板电脑)。
3.一种权利要求1所述的智能变电站监控信息无线辅助对点验收系统的验收方法,其特征在于:包括以下步骤:
(1)将装有变电站侧远动报文采集模块、变电站侧远动报文自动压缩模块、变电站侧远动报文无线发送模块的发送客户端通过网线接在远动出口侧与远动进行通讯,再将笔记连接无线网络开始工作;报文采集模块开始工作,将远动产生的报文收集起来发送到报文自动压缩模块,报文自动压缩模块每隔5分钟压缩一次,将压缩包发送至报文无线发送模块,报文无线发送模块将收到报文通过发送客户端使用无线网络发送至主站无线接收模块;
(2)主站将装有主站侧自动验收模块、主站侧远动报文无线接收模块、主站侧远动报文自动解压模块的接收客户端连接到互联网,再通过另外一个网络端口与主站侧建立连接通讯,获取前置点表,将前置点表导入至自动验收模块,再将标准点表手动导入至自动验收模块,进行标准点表与前置点表对比,核对是否存在问题,保证两方的信息一致;若存在问题更改前置点表后,再使用自动验收模块获取前置点表形成标准化验收序列;报文无线接收模块通过接收客户端接收来自变电站侧发送的报文压缩包,收到报文压缩包后主站自动解压模块将收到的报文压缩包自动解压至指定目录,自动验收模块将解压完的报文录入至自动验收模块解析报文,读取报文进行验收工作,使报文与前置点表对应。
CN202010496716.0A 2020-06-03 2020-06-03 智能变电站监控信息无线辅助对点验收系统 Pending CN111585348A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010496716.0A CN111585348A (zh) 2020-06-03 2020-06-03 智能变电站监控信息无线辅助对点验收系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010496716.0A CN111585348A (zh) 2020-06-03 2020-06-03 智能变电站监控信息无线辅助对点验收系统

Publications (1)

Publication Number Publication Date
CN111585348A true CN111585348A (zh) 2020-08-25

Family

ID=72125854

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010496716.0A Pending CN111585348A (zh) 2020-06-03 2020-06-03 智能变电站监控信息无线辅助对点验收系统

Country Status (1)

Country Link
CN (1) CN111585348A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112668516A (zh) * 2020-12-31 2021-04-16 南京太司德智能电气有限公司 一种电力调度系统告警窗自动对点验收方法
CN112769238A (zh) * 2020-12-31 2021-05-07 南京太司德智能电气有限公司 一种电力调度系统前置多通道界面自动对点验收方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017194269A (ja) * 2017-07-13 2017-10-26 三菱電機株式会社 遠隔操作表示装置
CN109217470A (zh) * 2018-09-07 2019-01-15 国网江苏省电力有限公司连云港供电分公司 基于验收卡的主子站监控信息自动验收与校核方法及系统
CN110071577A (zh) * 2019-05-10 2019-07-30 国家电网有限公司 变电站监控信息验收方法及系统
CN110112831A (zh) * 2019-06-03 2019-08-09 国网四川省电力公司电力科学研究院 一种变电站监控信息自动化验收装置及其验收方法
CN110689238A (zh) * 2019-09-11 2020-01-14 深圳供电局有限公司 智能变电站mms信息模拟及对点的实现方法及系统
CN210327638U (zh) * 2019-08-31 2020-04-14 南京悠阔电气科技有限公司 一种变电站远动信息验收装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017194269A (ja) * 2017-07-13 2017-10-26 三菱電機株式会社 遠隔操作表示装置
CN109217470A (zh) * 2018-09-07 2019-01-15 国网江苏省电力有限公司连云港供电分公司 基于验收卡的主子站监控信息自动验收与校核方法及系统
CN110071577A (zh) * 2019-05-10 2019-07-30 国家电网有限公司 变电站监控信息验收方法及系统
CN110112831A (zh) * 2019-06-03 2019-08-09 国网四川省电力公司电力科学研究院 一种变电站监控信息自动化验收装置及其验收方法
CN210327638U (zh) * 2019-08-31 2020-04-14 南京悠阔电气科技有限公司 一种变电站远动信息验收装置
CN110689238A (zh) * 2019-09-11 2020-01-14 深圳供电局有限公司 智能变电站mms信息模拟及对点的实现方法及系统

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112668516A (zh) * 2020-12-31 2021-04-16 南京太司德智能电气有限公司 一种电力调度系统告警窗自动对点验收方法
CN112769238A (zh) * 2020-12-31 2021-05-07 南京太司德智能电气有限公司 一种电力调度系统前置多通道界面自动对点验收方法
CN112668516B (zh) * 2020-12-31 2024-06-04 南京太司德智能电气有限公司 一种电力调度系统告警窗自动对点验收方法

Similar Documents

Publication Publication Date Title
CN111585348A (zh) 智能变电站监控信息无线辅助对点验收系统
CN108767818B (zh) 一种基于虚拟保信主站的继电保护调试系统及调试方法
CN100450249C (zh) 一种近端维护射频拉远单元的方法
CN101272583A (zh) 一种近端维护射频拉远模块的方法
CN104391244A (zh) 继电保护设备闭环检验方法和系统
CN112165444A (zh) 智能变电站远动机遥信、遥测量自动比对校验系统及方法
CN210327638U (zh) 一种变电站远动信息验收装置
CN102802170A (zh) 获取以太网数据帧的方法、装置及基站
CN114264898B (zh) 一种兼容性性能测试方法及系统
CN111443258A (zh) 一种电网故障录波图转换方法及装置
CN112946394A (zh) 变电检测试验数据统一通讯规范接口转化方法
CN110297796B (zh) 蓄能机组多串口通讯协议实时解析系统及其解析方法
CN112738443A (zh) 一种基于ar眼镜的智能化现场记录用交互系统
CN111384779B (zh) 一种电网故障录波图的提取装置及方法
CN214626507U (zh) 一种输变电检测试验数据现场交互与集中管控装置
CN114820868A (zh) 一种配网线路智能成图的方法、装置和系统
CN111934431A (zh) 一种发电车智能低压配电柜及其数据监测方法
CN111526157A (zh) 一种物联网数据采集系统及方法
CN201234166Y (zh) 一种基于线缆复用的远程供电和监控系统
CN213244254U (zh) 一种pon网络资源核查电路及其设备
CN216599656U (zh) 一种小电流接地选线装置通信网关机
CN211426666U (zh) 一种用于继电保护装置的测试装置
CN211825757U (zh) 接收装置和检测系统
CN115586364A (zh) 一种配电网自动化设备智能测试系统及方法
CN214069665U (zh) 一种配网终端智能运维系统

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20210223

Address after: No. 201, Dongyue street, Taishan District, Taian City, Shandong Province 271000

Applicant after: TAIAN POWER SUPPLY COMPANY OF STATE GRID SHANDONG ELECTRIC POWER Co.

Applicant after: STATE GRID CORPORATION OF CHINA

Address before: 271000 No.8 Dongyue street, Taishan District, Taian City, Shandong Province

Applicant before: TAIAN POWER SUPPLY COMPANY OF STATE GRID SHANDONG ELECTRIC POWER Co.

Applicant before: SHANDONG ANXINYUAN INFORMATION TECHNOLOGY Co.,Ltd.

Applicant before: STATE GRID CORPORATION OF CHINA

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20200825