CN111582914A - Data acquisition system based on engineering budget and settlement - Google Patents

Data acquisition system based on engineering budget and settlement Download PDF

Info

Publication number
CN111582914A
CN111582914A CN202010318616.9A CN202010318616A CN111582914A CN 111582914 A CN111582914 A CN 111582914A CN 202010318616 A CN202010318616 A CN 202010318616A CN 111582914 A CN111582914 A CN 111582914A
Authority
CN
China
Prior art keywords
module
data
budget
settlement
backup
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202010318616.9A
Other languages
Chinese (zh)
Inventor
厉文飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Runde Engineering Management Co ltd
Original Assignee
Henan Runde Engineering Management Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Runde Engineering Management Co ltd filed Critical Henan Runde Engineering Management Co ltd
Priority to CN202010318616.9A priority Critical patent/CN111582914A/en
Publication of CN111582914A publication Critical patent/CN111582914A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0283Price estimation or determination
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Responding to the occurrence of a fault, e.g. fault tolerance
    • G06F11/14Error detection or correction of the data by redundancy in operation
    • G06F11/1402Saving, restoring, recovering or retrying
    • G06F11/1446Point-in-time backing up or restoration of persistent data
    • G06F11/1448Management of the data involved in backup or backup restore
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/25Integrating or interfacing systems involving database management systems
    • G06F16/252Integrating or interfacing systems involving database management systems between a Database Management System and a front-end application
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Strategic Management (AREA)
  • Databases & Information Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Finance (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Accounting & Taxation (AREA)
  • Economics (AREA)
  • Quality & Reliability (AREA)
  • Primary Health Care (AREA)
  • General Health & Medical Sciences (AREA)
  • Data Mining & Analysis (AREA)
  • Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Game Theory and Decision Science (AREA)
  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)

Abstract

The invention relates to the technical field of project budget and settlement systems, and discloses a data acquisition system based on project budget and settlement, which comprises a budget input module, a settlement processing module, a comparison analysis module and a storage module, wherein the budget input module comprises a classification module, a calculation module and a first backup module, and the settlement processing module comprises a recording module, an integration processing module and a second backup module. The invention has the advantages that: the budget data and the settlement data input by technicians can be classified and temporarily stored through the used classification module and the used recording module, the calculation module and the integration processing module can calculate and arrange the input data and respectively store the data in the first backup module and the second backup module, and meanwhile, the two backup modules are connected with the storage module through a local area network, so that the technicians can conveniently search data files in the later period, and the problems that the existing system cannot temporarily store the data and does not backup are solved.

Description

Data acquisition system based on engineering budget and settlement
Technical Field
The invention relates to the technical field of project budget and settlement systems, in particular to a data acquisition system based on project budget and settlement.
Background
Before a project is carried out, project budget is required to be carried out on the project according to the market quotation at that time, the project budget is a plan for the income and expenditure conditions of the project in a certain period in the future, and constructors can conveniently know the economic benefit condition of the project.
After a project is finished, the related technical personnel can make a project settlement to the project, the project settlement is an economic document for clearing project price of a construction enterprise to a construction unit according to a contract and a finished project amount, generally, the related technical personnel can analyze market quotations according to a project budget and a project settlement comparison result, and general differences exist in construction material cost, installation project cost, equipment purchase cost and other cost so as to provide a reliable market quotation data source for the next project budget, however, the project service system used at present has the following problems in the actual use process:
the existing system can not temporarily store data in the using process, and meanwhile, a specific data repository is not arranged, so that technicians can not conveniently use current data and the like.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides a data acquisition system based on engineering budget and settlement, which has the advantages of temporary storage of input data, storage and backup of comparison files and the like, and solves the problems that the data cannot be temporarily stored and the files in the past period cannot be called.
(II) technical scheme
In order to achieve the purpose of temporarily storing input data and storing and backing up comparison files, the invention provides the following technical scheme: the data acquisition system based on the project budget and settlement comprises a budget input module, a settlement processing module, a comparison analysis module and a storage module, wherein the budget input module comprises a classification module, a calculation module and a first backup module, and the settlement processing module comprises a recording module, an integration processing module and a second backup module.
The data acquisition system based on engineering budget and settlement comprises the following steps: 1) the technical personnel inputs the prophase budget data into a budget input module;
2) the classification module classifies the budget data and temporarily stores the budget data in real time, the calculation module calculates the budget data sorted by the classification module, and the processed budget data is stored in the first backup module;
3) the technical personnel input the later settlement data into the recording module;
4) the recording module temporarily stores the input settlement data, the integration processing module arranges, combines and processes the temporarily stored settlement data, and the processed settlement data is stored in the second backup module;
5) the comparison analysis module compares and arranges budget data and settlement data of the same project in the first backup module and the second backup module and outputs results;
6) and the comparison analysis module transmits the processing result to a manager, transmits the processing result to the storage module and forms a result database.
Preferably, the first backup module and the second backup module are connected with the comparison and analysis module in a local area network manner, and both the first backup module and the second backup module exist independently.
Preferably, the input ends of the budget input module and the settlement processing module are respectively and electrically connected with a display screen and an operation board, and the budget input module and the settlement processing module are independent.
Preferably, the output end of the contrastive analysis module is electrically connected with a display screen, and the contrastive analysis module is connected with the printer in a WIFI (wireless fidelity) mode.
Preferably, the inside of storage module is provided with the database, storage module's output electric connection has display screen and operation panel.
(III) advantageous effects
Compared with the prior art, the invention provides a data acquisition system based on engineering budget and settlement, which has the following beneficial effects:
1. the data acquisition system based on the project budget and settlement is characterized in that a classification module and a recording module are respectively arranged in a budget input module and a settlement processing module, wherein the classification module can classify and temporarily store budget data input by a technician in an early stage, when the technician inputs the budget to be made, the input data is uniformly calculated and sorted by a calculation module and is finally stored in a first backup module, meanwhile, the recording module is convenient for the technician to record the data when the technician settles the whole project in a later stage, the recording module can temporarily store the input data, the input data is processed by an integration processing module after the input is finished and is finally stored in a second backup module, the classification module and the recording module can temporarily store the input data, the technician can conveniently perform other operations and the like, therefore, the problems that the existing system cannot temporarily store data and does not make backup are solved.
2. This data acquisition system based on engineering budget and settlement, through using the contrastive analysis module, can carry out contrastive analysis to the engineering budget data and the engineering settlement data in first backup module and the second backup module, arrange out the difference in engineering budget data and the engineering settlement data, the technical staff of being convenient for observes and analyzes, the data file after simultaneously handling through contrastive analysis module can transmit the storage module, the technical staff of being convenient for later transfer the use, and because first backup module and the second backup module that exist, can effectively avoid the storage module to take place the condition of data loss, make things convenient for the technical staff to carry out secondary analysis processing and storage, thereby the problem that the technical staff can not take the data file before has been solved.
Drawings
Fig. 1 is a schematic view of the working process of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The first embodiment is as follows:
the data acquisition system based on the project budget and settlement comprises a budget input module, a settlement processing module, a comparison analysis module and a storage module, wherein the budget input module comprises a classification module, a calculation module and a first backup module, and the settlement processing module comprises a recording module, an integration processing module and a second backup module.
The data acquisition system based on engineering budget and settlement comprises the following steps:
1) the technical personnel inputs the prophase budget data into a budget input module;
2) the classification module classifies the budget data and temporarily stores the budget data in real time, the calculation module calculates the budget data sorted by the classification module, and the processed budget data is stored in the first backup module;
3) the technical personnel input the later settlement data into the recording module;
4) the recording module temporarily stores the input settlement data, the integration processing module arranges, combines and processes the temporarily stored settlement data, and the processed settlement data is stored in the second backup module;
5) the comparison analysis module compares and arranges budget data and settlement data of the same project in the first backup module and the second backup module and outputs results;
6) and the comparison analysis module transmits the processing result to a manager, transmits the processing result to the storage module and forms a result database.
The classification module and the recording module can temporarily store data input by technicians, so that the technicians can conveniently perform other operations in the data input process, the data information input by the technicians cannot be lost when the technicians perform other operations, the system can be conveniently used by the technicians, and the use experience of the technicians is improved; when the first backup module and the second backup module respectively store budget data and settlement data, the budget data and the settlement data can be separately stored according to names input by technicians, so that the technicians can conveniently search and operate, the situations of file information confusion and slow searching speed can be avoided when the data of a certain project is searched in the later period, and meanwhile, when the first backup module and the second backup module perform file backup storage, the technicians can be reminded of whether the same names exist or not, so that the file names in the first backup module and the second backup module can be ensured to exist singly; the purpose of facilitating the operation control of an operator on the module can be achieved through the display screen and the operation panel which are electrically connected with the output end or the input end of each module; after the comparison and analysis module is used for sorting and analyzing the budget data and the settlement data, the difference between the two files can be found, the reason caused by the difference is analyzed according to the existing difference, and the reason result is output, so that technicians can analyze and count the current market quotation conveniently, and can perform accurate budget next time; the database arranged by the storage module stores budget data and settlement data of the project analyzed and processed by the system in the past, so that a professional can predict and evaluate certain information of the industry according to the content of the database, a technician can conveniently perform project budget on the next project, the whole system is clear in operation and use order, and file information required by the technician can be rapidly processed.
The first backup module and the second backup module are connected with the contrastive analysis module in a local area network mode, the first backup module and the second backup module are independent, the output ends of the first backup module and the second backup module are electrically connected with the display screen and the operation board, the first backup module and the second backup module are connected by using the local area network, the use range of the whole system is limited, leakage of file information of an enterprise can be effectively prevented, safety of budget data and settlement data is improved, meanwhile, the first backup module and the second backup module which are independent can respectively store the budget data and the settlement data, and the situations of information confusion and inconvenience in later extraction can be prevented.
The budget input module and the settlement processing module are electrically connected with a display screen and an operation board respectively, the budget input module and the settlement processing module are independent, the electrically connected display screen and the operation board can be used for facilitating technical personnel to input budget data and settlement data, the budget input module and the settlement processing module which are independent can facilitate the operator to input the budget data and the settlement data simultaneously, the working efficiency of the operator is improved, the time required by processing is saved, and the budget input module and the settlement processing module which are independent can not be damaged together.
The output electric connection of contrastive analysis module has the display screen, contrastive analysis module and printer adopt WIFI's mode to be connected, the existence of display screen can show contrastive analysis module's processing result, convenient to use person uses, the printer that is connected with contrastive analysis module simultaneously can print the analysis result at the paper, convenient to use person carries out information remark and file mark, WIFI's transmission speed is very fast simultaneously, user of service's latency has been saved, the regional restriction of two equipment has been removed.
Storage module's inside is provided with the database, storage module's output electric connection has display screen and operation panel, wherein the existence of display screen and operation panel can reach the demand that the person of facilitating the use carries out the later stage file and seeks, to a certain extent, the person of facilitating the use uses, the database of coexistence, can preserve the data information of handling in the past, the managers of being convenient for seeks the budget and settlement information of a certain engineering, so that it carries out comparatively accurate aassessment and prediction to next engineering, in order to guarantee that the enterprise can be with the profit maximize.
Example two:
the data acquisition system based on the project budget and settlement comprises a budget input module, a settlement processing module, a comparison analysis module and a storage module, wherein the budget input module comprises a classification module, a calculation module and a first backup module, and the settlement processing module comprises a recording module, an integration processing module and a second backup module.
The data acquisition system based on engineering budget and settlement comprises the following steps:
1) the technical personnel inputs the prophase budget data into a budget input module;
2) the classification module classifies the budget data and temporarily stores the budget data in real time, the calculation module calculates the budget data sorted by the classification module, and the processed budget data is stored in the first backup module;
3) the technical personnel input the later settlement data into the recording module;
4) the recording module temporarily stores the input settlement data, the integration processing module arranges, combines and processes the temporarily stored settlement data, and the processed settlement data is stored in the second backup module;
5) the comparison analysis module compares and arranges budget data and settlement data of the same project in the first backup module and the second backup module and outputs results;
6) and the comparison analysis module transmits the processing result to a manager, transmits the processing result to the storage module and forms a result database.
The classification module and the recording module can temporarily store data input by technicians, so that the technicians can conveniently perform other operations in the data input process, the data information input by the technicians cannot be lost when the technicians perform other operations, the system can be conveniently used by the technicians, and the use experience of the technicians is improved; when the first backup module and the second backup module respectively store budget data and settlement data, the budget data and the settlement data can be separately stored according to names input by technicians, so that the technicians can conveniently search and operate, the situations of file information confusion and slow searching speed can be avoided when the data of a certain project is searched in the later period, and meanwhile, when the first backup module and the second backup module perform file backup storage, the technicians can be reminded of whether the same names exist or not, so that the file names in the first backup module and the second backup module can be ensured to exist singly; the purpose of facilitating the operation control of an operator on the module can be achieved through the display screen and the operation panel which are electrically connected with the output end or the input end of each module; after the comparison and analysis module is used for sorting and analyzing the budget data and the settlement data, the difference between the two files can be found, the reason caused by the difference is analyzed according to the existing difference, and the reason result is output, so that technicians can analyze and count the current market quotation conveniently, and can perform accurate budget next time; the database arranged by the storage module stores budget data and settlement data of the project analyzed and processed by the system in the past, so that a professional can predict and evaluate certain information of the industry according to the content of the database, a technician can conveniently perform project budget on the next project, the whole system is clear in operation and use order, and file information required by the technician can be rapidly processed.
The first backup module and the second backup module are connected with the contrastive analysis module through the Internet, the first backup module and the second backup module are a whole, the output ends of the first backup module and the second backup module are electrically connected with the display screen and the operation board, the purpose of quickly transmitting information can be achieved by connecting through the Internet, meanwhile, the first backup module and the second backup module are arranged on one device, the occupied area of the first backup module and the second backup module can be reduced, the expenditure of an enterprise to the two modules is reduced, the operation board can be used for operating the first backup module and the second backup module respectively, and technicians can search corresponding budget data and settlement data conveniently.
Budget input module and settlement processing module's input is equallyd divide and is do not electric connection have display screen and operation panel, budget input module and settlement processing module set up on same bearing equipment, the display screen and the operation panel that set up can reach the user of being convenient for carry out information input's purpose, set up budget input module and settlement processing module on same equipment simultaneously, can reduce occupation of land space and the cost expenditure of entire system equipment, make technical staff just can accomplish the input to budget data and settlement data on an equipment, to a certain extent, user's use experience has been promoted, make the user change the operating position not often.
The output electric connection of contrastive analysis module has the display screen, and the output electric connection of contrastive analysis module has the printer, electric connection's printer, and its file transmission speed is very fast, is difficult to appear the condition that file transmission interrupted, and the existence of printer and display screen can print the analysis result respectively and show simultaneously, and convenient to use person carries out analysis, mark and use.
Storage module's inside is provided with the database, storage module's output electric connection has display screen and operation panel, wherein the existence of display screen and operation panel can reach the demand that the person of facilitating the use carries out the later stage file and seeks, to a certain extent, the person of facilitating the use uses, the database of coexistence, can preserve the data information of handling in the past, the managers of being convenient for seeks the budget and settlement information of a certain engineering, so that it carries out comparatively accurate aassessment and prediction to next engineering, in order to guarantee that the enterprise can be with the profit maximize.
The invention has the beneficial effects that: the classification module and the recording module are respectively arranged in the budget input module and the settlement processing module, wherein the classification module can classify and temporarily store budget data input by a technician in an earlier period, when the technician finishes inputting the budget to be made, the calculation module performs unified calculation and arrangement on the input data, and finally the data is stored in the first backup module, meanwhile, the recording module is convenient for the technician to record the data when settling the whole project in a later period, the recording module can temporarily store the input data, the integration processing module processes the input data after the input is finished, and finally the data is stored in the second backup module, the classification module and the recording module can temporarily store the input data, the technician can conveniently perform other operations, and the like, thereby solving the problems that the prior system can not temporarily store the data and cannot perform backup, through using the contrastive analysis module, can carry out contrastive analysis to the project budget data and the project settlement data in first backup module and the second backup module, arrange out the difference in project budget data and the project settlement data, the technical staff of being convenient for observes and analyzes, the data file after the contrastive analysis module processing simultaneously can be transmitted to the storage module, the technical staff of being convenient for later on transfers the use, and because first backup module and the second backup module that exist, can effectively avoid the storage module to take place the condition that data lost, make things convenient for the technical staff to carry out secondary analysis processing and storage, thereby the problem that the technical staff can not take the previous data file is solved
Typical cases are as follows:
the data acquisition system based on the project budget and settlement comprises a budget input module, a settlement processing module, a comparison analysis module and a storage module, wherein the budget input module comprises a classification module, a calculation module and a first backup module, and the settlement processing module comprises a recording module, an integration processing module and a second backup module.
The data acquisition system based on engineering budget and settlement comprises the following steps:
1) the technical personnel inputs the prophase budget data into a budget input module;
2) the classification module classifies the budget data and temporarily stores the budget data in real time, the calculation module calculates the budget data sorted by the classification module, and the processed budget data is stored in the first backup module;
3) the technical personnel input the later settlement data into the recording module;
4) the recording module temporarily stores the input settlement data, the integration processing module arranges, combines and processes the temporarily stored settlement data, and the processed settlement data is stored in the second backup module;
5) the comparison analysis module compares and arranges budget data and settlement data of the same project in the first backup module and the second backup module and outputs results;
6) and the comparison analysis module transmits the processing result to a manager, transmits the processing result to the storage module and forms a result database.
The classification module and the recording module can temporarily store data input by technicians, so that the technicians can conveniently perform other operations in the data input process, the data information input by the technicians cannot be lost when the technicians perform other operations, the system can be conveniently used by the technicians, and the use experience of the technicians is improved; when the first backup module and the second backup module respectively store budget data and settlement data, the budget data and the settlement data can be separately stored according to names input by technicians, so that the technicians can conveniently search and operate, the situations of file information confusion and slow searching speed can be avoided when the data of a certain project is searched in the later period, and meanwhile, when the first backup module and the second backup module perform file backup storage, the technicians can be reminded of whether the same names exist or not, so that the file names in the first backup module and the second backup module can be ensured to exist singly; the purpose of facilitating the operation control of an operator on the module can be achieved through the display screen and the operation panel which are electrically connected with the output end or the input end of each module; after the comparison and analysis module is used for sorting and analyzing the budget data and the settlement data, the difference between the two files can be found, the reason caused by the difference is analyzed according to the existing difference, and the reason result is output, so that technicians can analyze and count the current market quotation conveniently, and can perform accurate budget next time; the database arranged by the storage module stores budget data and settlement data of the project analyzed and processed by the system in the past, so that a professional can predict and evaluate certain information of the industry according to the content of the database, a technician can conveniently perform project budget on the next project, the whole system is clear in operation and use order, and file information required by the technician can be rapidly processed.
The first backup module and the second backup module are connected with the contrastive analysis module in a local area network mode, the first backup module and the second backup module are independent, the output ends of the first backup module and the second backup module are electrically connected with the display screen and the operation board, the first backup module and the second backup module are connected by using the local area network, the use range of the whole system is limited, leakage of file information of an enterprise can be effectively prevented, safety of budget data and settlement data is improved, meanwhile, the first backup module and the second backup module which are independent can respectively store the budget data and the settlement data, and the situations of information confusion and inconvenience in later extraction can be prevented.
The budget input module and the settlement processing module are electrically connected with a display screen and an operation board respectively, the budget input module and the settlement processing module are independent, the electrically connected display screen and the operation board can be used for facilitating technical personnel to input budget data and settlement data, the budget input module and the settlement processing module which are independent can facilitate the operator to input the budget data and the settlement data simultaneously, the working efficiency of the operator is improved, the time required by processing is saved, and the budget input module and the settlement processing module which are independent can not be damaged together.
The output electric connection of contrastive analysis module has the display screen, contrastive analysis module and printer adopt WIFI's mode to be connected, the existence of display screen can show contrastive analysis module's processing result, convenient to use person uses, the printer that is connected with contrastive analysis module simultaneously can print the analysis result at the paper, convenient to use person carries out information remark and file mark, WIFI's transmission speed is very fast simultaneously, user of service's latency has been saved, the regional restriction of two equipment has been removed.
Storage module's inside is provided with the database, storage module's output electric connection has display screen and operation panel, wherein the existence of display screen and operation panel can reach the demand that the person of facilitating the use carries out the later stage file and seeks, to a certain extent, the person of facilitating the use uses, the database of coexistence, can preserve the data information of handling in the past, the managers of being convenient for seeks the budget and settlement information of a certain engineering, so that it carries out comparatively accurate aassessment and prediction to next engineering, in order to guarantee that the enterprise can be with the profit maximize.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The data acquisition system based on engineering budget and settlement is characterized by comprising a budget input module, a settlement processing module, a comparison analysis module and a storage module, wherein the budget input module comprises a classification module, a calculation module and a first backup module, and the settlement processing module comprises a recording module, an integration processing module and a second backup module.
2. The data acquisition system based on engineering budget and settlement is characterized by comprising the following steps:
1) the technical personnel inputs the prophase budget data into a budget input module;
2) the classification module classifies the budget data and temporarily stores the budget data in real time, the calculation module calculates the budget data sorted by the classification module, and the processed budget data is stored in the first backup module;
3) the technical personnel input the later settlement data into the recording module;
4) the recording module temporarily stores the input settlement data, the integration processing module arranges, combines and processes the temporarily stored settlement data, and the processed settlement data is stored in the second backup module;
5) the comparison analysis module compares and arranges budget data and settlement data of the same project in the first backup module and the second backup module and outputs results;
6) and the comparison analysis module transmits the processing result to a manager, transmits the processing result to the storage module and forms a result database.
3. The data acquisition system based on engineering budget and settlement as claimed in claim 1, wherein the first backup module and the second backup module are connected with the comparative analysis module by means of a local area network, the first backup module and the second backup module are independent, and output ends of the first backup module and the second backup module are electrically connected with a display screen and an operation panel.
4. The data acquisition system based on project budget and settlement as claimed in claim 1, wherein the input ends of the budget input module and the settlement processing module are respectively and electrically connected with a display screen and an operation panel, and the budget input module and the settlement processing module are independent.
5. The data acquisition system based on engineering budget and settlement according to claim 1, wherein an output end of the comparative analysis module is electrically connected with a display screen, and the comparative analysis module is connected with a printer in a WIFI manner.
6. The data acquisition system based on engineering budget and settlement according to claim 1, wherein a database is arranged inside the storage module, and an output end of the storage module is electrically connected with a display screen and an operation panel.
CN202010318616.9A 2020-04-21 2020-04-21 Data acquisition system based on engineering budget and settlement Withdrawn CN111582914A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010318616.9A CN111582914A (en) 2020-04-21 2020-04-21 Data acquisition system based on engineering budget and settlement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010318616.9A CN111582914A (en) 2020-04-21 2020-04-21 Data acquisition system based on engineering budget and settlement

Publications (1)

Publication Number Publication Date
CN111582914A true CN111582914A (en) 2020-08-25

Family

ID=72111634

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010318616.9A Withdrawn CN111582914A (en) 2020-04-21 2020-04-21 Data acquisition system based on engineering budget and settlement

Country Status (1)

Country Link
CN (1) CN111582914A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112395135A (en) * 2020-11-30 2021-02-23 福建安正智能科技有限公司 Data backup method and device for computer room server
CN112988459A (en) * 2021-02-03 2021-06-18 湖北瑞致和科技有限公司 Special effect picture making plug-in for network video making

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112395135A (en) * 2020-11-30 2021-02-23 福建安正智能科技有限公司 Data backup method and device for computer room server
CN112988459A (en) * 2021-02-03 2021-06-18 湖北瑞致和科技有限公司 Special effect picture making plug-in for network video making
CN112988459B (en) * 2021-02-03 2024-03-08 湖北瑞致和科技有限公司 Special effect picture making system for network video making

Similar Documents

Publication Publication Date Title
CN111582914A (en) Data acquisition system based on engineering budget and settlement
CN111612646A (en) Networked intelligent secondary operation and maintenance system
CN112085710A (en) Protection constant value and pressure plate inspection system and method
CN112052005A (en) Interface processing method, device, equipment and storage medium
CN110929032B (en) User demand processing system and method for software system
CN101957748A (en) Method, device and system for logic analysis of data
CN103605659B (en) The file declustering correlating method of quality control system based on flow engine
CN104391986A (en) Business reclassification device and business reclassification method
CN116127105B (en) Data collection method and device for big data platform
CN115062876B (en) OCR-based process rapid modeling method, system, equipment and storage medium
CN111311450B (en) Big data management platform and method for legal consultation service
CN110909112B (en) Data extraction method, device, terminal equipment and medium
CN112800219A (en) Method and system for feeding back customer service log to return database
CN105243479A (en) Risk judgment method and data processing system
CN117078213B (en) Building engineering management platform based on big data integration analysis
CN110889090B (en) Financial balance assessment system
CN112766817A (en) Enterprise and policy intelligent matching system
CN116205614B (en) Business reconciliation management system and method for distributed scene
CN112968941B (en) Data acquisition and man-machine collaborative annotation method based on edge calculation
CN110019164A (en) A kind of calculation method and system of heterogeneous structure data fusion probability
CN114626348A (en) Intelligent short message automatic generation method, system and equipment
CN114371953A (en) Knowledge management system based on knowledge graph technology of ITSM system
CN116823161A (en) Law enforcement investigation backstage management system
KR101617651B1 (en) Data transffer system and method between heterogeneous systems using transaction editor
Harper et al. The Use of Fully Integrated Reliability Databases On-Line for Customer Service

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20200825

WW01 Invention patent application withdrawn after publication