CN111552917A - Curtain wall construction method, device and equipment based on BIM and storage medium - Google Patents

Curtain wall construction method, device and equipment based on BIM and storage medium Download PDF

Info

Publication number
CN111552917A
CN111552917A CN202010432993.5A CN202010432993A CN111552917A CN 111552917 A CN111552917 A CN 111552917A CN 202010432993 A CN202010432993 A CN 202010432993A CN 111552917 A CN111552917 A CN 111552917A
Authority
CN
China
Prior art keywords
curtain wall
simulation
model
scheme
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010432993.5A
Other languages
Chinese (zh)
Other versions
CN111552917B (en
Inventor
吴颂荣
甄睿勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou No4 Decoration Co ltd
Original Assignee
Guangzhou No4 Decoration Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou No4 Decoration Co ltd filed Critical Guangzhou No4 Decoration Co ltd
Priority to CN202010432993.5A priority Critical patent/CN111552917B/en
Publication of CN111552917A publication Critical patent/CN111552917A/en
Application granted granted Critical
Publication of CN111552917B publication Critical patent/CN111552917B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • G06F17/10Complex mathematical operations
    • G06F17/11Complex mathematical operations for solving equations, e.g. nonlinear equations, general mathematical optimization problems
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/10Internal combustion engine [ICE] based vehicles
    • Y02T10/40Engine management systems

Abstract

The invention relates to the technical field of building construction, in particular to a curtain wall construction method, a device, equipment and a storage medium based on BIM, wherein the curtain wall construction method based on BIM comprises the following steps: s10: acquiring a main building construction scheme, and constructing a simulation main body model according to the main building construction scheme; s20: acquiring a curtain wall simulation construction scheme, and acquiring a curtain wall construction node in the simulation main body model according to the curtain wall simulation construction scheme; s30: generating a curtain wall simulation scheme according to the curtain wall construction nodes, and constructing a simulation curtain wall model according to the curtain wall simulation scheme; s40: and carrying out die assembly test on the simulation main body model and the simulation curtain wall model to obtain a corresponding test result, and adjusting and optimizing the simulation main body model and the simulation curtain wall model according to the test result to generate a curtain wall construction scheme. The invention has the effect of improving the efficiency when designing and optimizing the curtain wall construction scheme.

Description

Curtain wall construction method, device and equipment based on BIM and storage medium
Technical Field
The invention relates to the technical field of building construction, in particular to a curtain wall construction method, device, equipment and storage medium based on BIM.
Background
At present, the building curtain wall is composed of a supporting structure system and a panel, can have certain displacement capacity relative to a main body structure, and does not bear the external protective structure or the decorative structure of the building acted by the main body structure.
The existing construction of the building curtain wall is that after a building main body is built, the building curtain wall is fixed on the surface of the building main body through a supporting structure after supporting structures such as aluminum cross beam columns, steel structures and glass ribs are built on the surface of the building main body. The Chinese patent application with the publication number of CN110306804A discloses a curtain wall construction method, which comprises the steps of scanning a main body structure by using a 3D scanning technology after the main body structure is finished, reversely modeling according to scanning data to generate an actual main body model, modeling a curtain wall node member on the basis, batching the curtain wall node member and a curtain wall plate according to a curtain wall node member model and a designed curtain wall model, and finally installing the curtain wall node member and the curtain wall plate on the main body structure to finish the construction of the curtain wall; based on the BIM technology, the actual main body model consistent with the actual structure is rebuilt, and deep modeling and construction of the curtain wall are carried out on the basis, so that the construction period of the curtain wall can be shortened, the construction quality of the curtain wall is improved, and the curtain wall structure consistent with the designed curtain wall model is obtained.
The above prior art solutions have the following drawbacks: when the actual main body model is generated, the constructed main body structure needs to be scanned, modeling analysis design is carried out on installation of curtain wall node construction, however, in the analysis process, the main body structure is already constructed, so that the curtain wall node construction can only be designed, in the scheme obtained by design, in order to adapt to the main body structure, corresponding products may need to be ordered, the construction period is delayed when the curtain wall node construction is ordered, the construction progress is influenced, and therefore space is improved.
Disclosure of Invention
The invention aims to provide a BIM-based curtain wall construction method, device, equipment and storage medium for improving efficiency of designing and optimizing a curtain wall construction scheme.
The above object of the present invention is achieved by the following technical solutions:
a curtain wall construction method based on BIM comprises the following steps:
s10: acquiring a main building construction scheme, and constructing a simulation main body model according to the main building construction scheme;
s20: acquiring a curtain wall simulation construction scheme, and acquiring a curtain wall construction node in the simulation main body model according to the curtain wall simulation construction scheme;
s30: generating a curtain wall simulation scheme according to the curtain wall construction nodes, and constructing a simulation curtain wall model according to the curtain wall simulation scheme;
s40: and carrying out die assembly test on the simulation main body model and the simulation curtain wall model to obtain a corresponding test result, and adjusting and optimizing the simulation main body model and the simulation curtain wall model according to the test result to generate a curtain wall construction scheme.
By adopting the technical scheme, the model of the building main body can be checked before the main body building is constructed by constructing the simulation main body model according to the main body building construction scheme, so that the main body building construction scheme can be conveniently adjusted; the curtain wall construction node is obtained from the simulation main body model, the fitting degree of the obtained curtain wall construction node and the simulation main body model can be higher, the simulation curtain wall model is constructed according to the curtain wall construction node, and the fitting degree of the constructed simulation curtain wall model and the simulation main body model can be further improved; through carrying out the compound die test to simulation subject model and curtain simulation model, adjusting the optimum according to the test result, can in time discover and improve the emergence problem in design stage in the design stage to can reduce the time of adjustment when being under construction to building curtain according to the curtain construction scheme, thereby can promote the efficiency to the construction of building curtain.
The present invention in a preferred example may be further configured to: step S20 includes:
s21: acquiring curtain wall construction position data from the main building construction scheme;
s22: and acquiring the curtain wall construction node according to the curtain wall construction position data.
By adopting the technical scheme, the curtain wall construction node can be accurately acquired by acquiring the data of the curtain wall construction position, so that the conformity between the subsequent simulation curtain wall model and the simulation main body model is ensured.
The present invention in a preferred example may be further configured to: step S30 includes:
s31: acquiring support construction simulation scheme data from the curtain wall simulation scheme, and constructing a simulation support structure model according to the support structure simulation scheme data;
s32: and acquiring wallboard simulation scheme data from the curtain wall simulation scheme, simulating a wallboard model according to the wallboard simulation scheme data, and taking the simulation support model and the simulation wallboard model as the simulation curtain wall model.
Through adopting above-mentioned technical scheme, through constructing simulation support result model and simulation wallboard model respectively, can be convenient for optimize respectively to the bearing structure and the wallboard of curtain to can guarantee the rationality of the bearing structure of curtain and the construction scheme of wallboard.
The present invention in a preferred example may be further configured to: step S40 includes:
s41: carrying out a first mold closing test on the simulation support model and the simulation main body model, and carrying out tuning on the simulation support model and the simulation main body model according to an obtained first test result and the first test result to obtain a first tuning result, wherein the first tuning result comprises a support tuning model and a main body tuning model;
s42: carrying out a second die assembly test on the support tuning model and the simulation wallboard model, and tuning the simulation wallboard model according to an obtained second test result to obtain a wallboard tuning model;
s43: and carrying out a third combined model test on the main body tuning model, the support tuning model and the wallboard tuning model, and tuning the main body tuning model, the support tuning model and the wallboard tuning model according to an obtained third test result to obtain the curtain wall construction scheme.
Through adopting above-mentioned technical scheme, carry out compound die test and progressively accent to bearing structure and main building body, bearing structure and wallboard in proper order, can refine test and accent to obtain the accuracy of curtain construction scheme after having promoted the accent, through the accuracy that promotes curtain construction scheme, can make constructor when constructing according to this curtain construction scheme, promote the efficiency of construction.
The present invention in a preferred example may be further configured to: after step S40, the BIM-based curtain wall construction method further includes:
s50: acquiring an actual subject model through 3D scanning;
s60: and carrying out actual die assembly test on the actual main body model, the wallboard tuning model and the support tuning model, and finely adjusting the wallboard tuning model and the support tuning model according to the obtained actual test result to obtain a curtain wall tuning scheme.
Through adopting above-mentioned technical scheme, through accomplishing the back at building subject building, through producing actual main part model before actually building the curtain to carry out actual compound die test, when the simulation main part model after can adjusting the good in actual building subject and curtain construction scheme produces the error, finely tune the construction scheme of curtain according to this error, guaranteed the quality of curtain.
The second aim of the invention is realized by the following technical scheme:
the utility model provides a curtain construction equipment based on BIM, curtain construction equipment based on BIM includes:
the main body modeling module is used for acquiring a main body building construction scheme and constructing a simulation main body model according to the main body building construction scheme;
the node setting module is used for acquiring a curtain wall simulation construction scheme and acquiring a curtain wall construction node in the simulation main body model according to the curtain wall simulation construction scheme;
the curtain wall modeling module is used for generating a curtain wall simulation scheme according to the curtain wall construction node and constructing a simulated curtain wall model according to the curtain wall simulation scheme;
and the test tuning module is used for carrying out die assembly test on the simulation main body model and the simulation curtain wall model to obtain a corresponding test result, and tuning the simulation main body model and the simulation curtain wall model according to the test result to generate a curtain wall construction scheme.
By adopting the technical scheme, the model of the building main body can be checked before the main body building is constructed by constructing the simulation main body model according to the main body building construction scheme, so that the main body building construction scheme can be conveniently adjusted; the curtain wall construction node is obtained from the simulation main body model, the fitting degree of the obtained curtain wall construction node and the simulation main body model can be higher, the simulation curtain wall model is constructed according to the curtain wall construction node, and the fitting degree of the constructed simulation curtain wall model and the simulation main body model can be further improved; through carrying out the compound die test to simulation subject model and curtain simulation model, adjusting the optimum according to the test result, can in time discover and improve the emergence problem in design stage in the design stage to can reduce the time of adjustment when being under construction to building curtain according to the curtain construction scheme, thereby can promote the efficiency to the construction of building curtain.
The third object of the invention is realized by the following technical scheme:
a computer device comprises a memory, a processor and a computer program which is stored in the memory and can run on the processor, wherein the processor executes the computer program to realize the steps of the BIM-based curtain wall construction method.
The fourth object of the invention is realized by the following technical scheme:
a computer readable storage medium storing a computer program which, when executed by a processor, implements the steps of the above-described BIM-based curtain wall construction method.
In summary, the invention includes at least one of the following beneficial technical effects:
1. by carrying out the die assembly test on the simulation main body model and the curtain wall simulation model and carrying out optimization according to the test result, the problems occurring in the design stage can be found and improved in time in the design stage, so that the adjustment time can be reduced when the building curtain wall is constructed according to the curtain wall construction scheme, and the construction efficiency of the building curtain wall can be improved;
2. the supporting structure and the building main body, the supporting structure and the wallboard as well as the building main body, the supporting structure and the wallboard are subjected to die assembly testing and gradual optimization, and the testing and the optimization can be refined, so that the accuracy of a curtain wall construction scheme obtained after optimization is improved, and the construction efficiency can be improved when constructors construct according to the curtain wall construction scheme by improving the accuracy of the curtain wall construction scheme;
3. through after building the main building, through producing actual main model before actually building the curtain to carry out actual compound die test, can be in the time of the simulation main model after the accent produces the error in actual building main and curtain construction scheme, finely tune the construction scheme of curtain according to this error, guaranteed the quality of curtain.
Drawings
FIG. 1 is a flow chart of a BIM-based curtain wall construction method according to an embodiment of the present invention;
FIG. 2 is a flowchart illustrating the implementation of step S20 in the BIM-based curtain wall construction method according to an embodiment of the present invention;
FIG. 3 is a flowchart illustrating the implementation of step S30 in the BIM-based curtain wall construction method according to an embodiment of the present invention;
FIG. 4 is a flowchart illustrating the implementation of step S40 in the BIM-based curtain wall construction method according to an embodiment of the present invention;
FIG. 5 is another implementation flowchart of the BIM-based curtain wall construction method according to an embodiment of the present invention;
FIG. 6 is a schematic block diagram of a BIM-based curtain wall construction apparatus according to an embodiment of the present invention;
FIG. 7 is a schematic diagram of a computer device according to an embodiment of the invention.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
The first embodiment is as follows:
in one embodiment, as shown in fig. 1, the invention discloses a curtain wall construction method based on BIM, which specifically comprises the following steps:
s10: and acquiring a main building construction scheme, and constructing a simulation main model according to the main building construction scheme.
In the present embodiment, the main building construction plan refers to a plan of construction of a building main body of a building. The simulation subject model is a three-dimensional model obtained by modeling a building subject to be built by using a BIM (building information modeling) technology.
Specifically, after the designer designs the main building construction scheme, an OCR character recognition technology may be adopted to extract data such as requirements and dimensions for constructing the building main body from the main building construction scheme, and input the data into the BIM platform, so as to construct the simulation main body model in the BIM platform.
S20: and acquiring a curtain wall simulation construction scheme, and acquiring a curtain wall construction node in the simulation main body model according to the curtain wall simulation construction scheme.
In this embodiment, the curtain wall simulation construction scheme refers to a first draft of a scheme for designing, purchasing, and installing and constructing a building curtain wall. The curtain wall construction node refers to a position where the building curtain wall and the building main body are fixedly connected with each other.
Specifically, a scheme for constructing the building main body can be acquired according to the main body building construction scheme, data such as the installation position of the building curtain wall, the distance between adjacent support structures and the like are set according to the scheme, and the data are combined into a curtain wall simulation construction scheme.
And further, acquiring the connecting position of the supporting structure of the curtain wall and the outer surface of the building main body from the curtain wall simulation construction scheme to serve as a curtain wall construction node.
Preferably, if a building main body comprises a plurality of building constructions, the data volume of the constructed simulation main body model is large, in order to reduce the data volume in the subsequent test and improve the test efficiency, the building construction irrelevant to the curtain wall construction can be omitted, and only the part of the building main body fixed with the building curtain wall is reserved.
S30: and generating a curtain wall simulation scheme according to the curtain wall construction nodes, and constructing a simulated curtain wall model according to the curtain wall simulation scheme.
In this embodiment, the curtain wall simulation scheme refers to a scheme for simulating construction and installation of a building curtain wall in a simulation main body. The simulated curtain wall model is a three-dimensional model constructed on the building curtain wall needing building by using a BIM technology.
Specifically, according to the curtain wall construction node, that is, the position of the curtain wall fixed to the building body, the scheme of the curtain wall installed to the building body is determined, and the scheme includes the installation size, structure, material and the like of the support structure, and also includes the wallboard material, size, structure and the like of the curtain wall.
Further, the curtain wall simulation scheme is formed according to the scheme of the installed curtain wall, and the simulation curtain wall model is constructed according to the data of the curtain wall simulation scheme on the size and the structure of the supporting structure and the curtain wall of the curtain wall.
S40: and carrying out die assembly test on the simulation main body model and the simulation curtain wall model to obtain a corresponding test result, and generating a curtain wall construction scheme after optimizing the simulation main body model and the simulation curtain wall model according to the test result.
In the present embodiment, the curtain wall construction scheme refers to a scheme for constructing a portion where a building body and a building curtain wall are installed.
Specifically, the simulated curtain wall model is subjected to die assembly test in the BIM platform according to a curtain wall simulation construction scheme, namely, the simulated curtain wall model is installed according to the curtain wall construction node, and therefore the installation result is used as a test result.
Further, if a corresponding problem is fed back from the test result, the simulation main body model and/or the simulation curtain wall model can be adjusted and optimized, and the adjustment and optimization scheme can be automatic adjustment and optimization through a preset program or adjustment and optimization through a designer.
And further, taking the adjusted and optimized simulated curtain wall model and the simulated main body model as a curtain wall construction scheme.
In the implementation, by constructing the simulation main body model according to the main body building construction scheme, the model of the building main body can be checked before the main body building construction is carried out, so that the adjustment of the main body building construction scheme is facilitated; the curtain wall construction node is obtained from the simulation main body model, the fitting degree of the obtained curtain wall construction node and the simulation main body model can be higher, the simulation curtain wall model is constructed according to the curtain wall construction node, and the fitting degree of the constructed simulation curtain wall model and the simulation main body model can be further improved; through carrying out the compound die test to simulation subject model and curtain simulation model, adjusting the optimum according to the test result, can in time discover and improve the emergence problem in design stage in the design stage to can reduce the time of adjustment when being under construction to building curtain according to the curtain construction scheme, thereby can promote the efficiency to the construction of building curtain.
In an embodiment, as shown in fig. 2, in step S20, that is, obtaining a curtain wall simulation construction scheme, obtaining a curtain wall construction node in the simulation main body model according to the curtain wall simulation construction scheme specifically includes the following steps:
s21: and acquiring the data of the construction position of the curtain wall from the main building construction scheme.
In the present embodiment, the curtain wall construction position data refers to a position where the building curtain wall is mounted on the surface of the building body.
Specifically, according to the subject construction scheme, a portion for installing a curtain wall of a building, such as an outer wall, is obtained. And the part for installing the building curtain wall is used as the data of the construction position of the curtain wall.
S22: and obtaining curtain wall construction nodes according to the curtain wall construction position data.
Specifically, after the acquired data of the construction position of the curtain wall, a node for fixing with the curtain wall, namely a connection point of the support structure of the curtain wall and the outer wall of the building main body, is set in the position, and the node for fixing with the curtain wall is used as a curtain wall construction node.
In an embodiment, as shown in fig. 3, in step S30, a curtain wall simulation scheme is generated according to the curtain wall building nodes, and a simulated curtain wall model is built according to the curtain wall simulation scheme, which specifically includes the following steps:
s31: and acquiring support construction simulation scheme data from the curtain wall simulation scheme, and constructing a simulation support structure model according to the support structure simulation scheme data.
In this embodiment, the support member simulation plan data refers to a first draft of an installation plan of a structure in which the wall panel of the curtain wall and the building body are fixedly supported. The simulation support structure model refers to a three-dimensional model generated by using BIM technology to support structure correspondingly.
Specifically, in the curtain wall simulation scheme, data of a support structure that supports and fixes the curtain wall is acquired as the support member simulation scheme data. Further, in the support structure simulation scheme data, the overall shape, size, structure and the like of the support structure are input into the BIM platform, and the BIM platform is used for constructing the simulation support structure model.
S32: and acquiring wallboard simulation scheme data from the curtain wall simulation scheme, simulating a wallboard model according to the wallboard simulation scheme data, and taking the simulation support model and the simulation wallboard model as a simulation curtain wall model.
In this embodiment, the data of the wall panel simulation scheme refers to a fixed scheme initial draft of the wall panel of the building curtain wall. The simulated wallboard model is a three-dimensional model generated by using BIM technology to correspond to the wallboard.
Specifically, in the curtain wall simulation scheme, the data of the size and the structure of the wall plate of the curtain wall are acquired and used as the data of the curtain wall simulation scheme. And further, in the wallboard simulation scheme data, data such as the whole size and the structure of the wallboard are input into the BIM platform, and the BIM platform is utilized to construct the wallboard simulation model.
In an embodiment, as shown in fig. 4, in step S40, a mold assembly test is performed on the simulation main body model and the simulation curtain wall model to obtain a corresponding test result, and after the simulation main body model and the simulation curtain wall model are optimized according to the test result, a curtain wall construction scheme is generated, which specifically includes the following steps:
s41: and carrying out a first mold closing test on the simulation support model and the simulation main body model, and carrying out tuning on the simulation support model and the simulation main body model according to the obtained first test result and the first test result to obtain a first tuning result, wherein the first tuning result comprises the support tuning model and the main body tuning model.
In this embodiment, the support tuning model refers to a model for tuning and optimizing the simulation support structure model. The main body optimization model refers to a model obtained by adjusting and optimizing a simulation main body model.
Specifically, the simulation support structure model is installed on the simulation main body model according to the curtain wall building node and used as a first mold closing test, and the simulation support structure and the simulation main body model are adjusted and optimized according to the compatibility degree between the simulation support structure model and the simulation main body model in the obtained first test result, so that a first tuning result consisting of the support bar humorous model and the main body tuning model is obtained.
S42: and carrying out a second die assembly test on the support optimizing model and the simulated wallboard model, and optimizing the simulated wallboard model according to the obtained second test result to obtain the wallboard optimizing model.
In this embodiment, the wallboard tuning model refers to a model obtained by adjusting and optimizing a simulated wallboard model.
And adjusting and optimizing the simulated wallboard model according to the compatibility degree of the simulated wallboard model and the support tuning model in the obtained second test result, so that the obtained wallboard tuning model is compatible with the support tuning model.
S43: and carrying out a third combined model test on the main body tuning model, the support tuning model and the wallboard tuning model, and tuning the main body tuning model, the support tuning model and the wallboard tuning model according to the obtained third test result to obtain a curtain wall construction scheme.
Specifically, after the adjusted and optimized theme tuning model and the support tuning model are assembled, the wallboard tuning model is assembled into the support tuning model to be used as a third combined model test, the main body tuning model assembled with the wallboard tuning model is previewed according to an obtained third test result, and designers further adjust and optimize the main body tuning model, the support tuning model and the wallboard tuning model to ensure that the main body tuning model, the support tuning model and the wallboard tuning model are mutually compatible in structure and meet the requirements of relevant mechanics and regulations, and the style of the wallboard can be set and selected according to the integrally previewed model to obtain a final curtain wall construction scheme.
In an embodiment, as shown in fig. 5, after step S40, the BIM-based curtain wall construction method further includes:
s50: the actual subject model is acquired by 3D scanning.
In this embodiment, the actual main body model refers to a model constructed by scanning a building main body completed by a building by using a BIM technique.
Specifically, in an actual building, the obtained actual building main body may be finely adjusted according to actual conditions, or a certain error is generated in the building, so that after the actual building main body is built according to the main body optimization model in the curtain wall construction scheme, the actual building main body is presented in the BIM platform by using a 3D scanning technology, and the actual main body model is obtained.
S60: and carrying out actual die assembly test on the actual main body model, the wallboard tuning model and the support tuning model, and finely adjusting the wallboard tuning model and the support tuning model according to the obtained actual test result to obtain a curtain wall tuning scheme.
In this embodiment, the curtain wall tuning scheme refers to a scheme for performing actual installation and construction on a support structure and a wall panel of a curtain wall.
Specifically, the support tuning model and the wallboard tuning model are assembled with an actual main body model according to a curtain wall construction scheme and used as an actual die assembly test, and the wallboard tuning model and the support tuning model are subjected to fine tuning according to generated errors to obtain the curtain wall tuning scheme.
It should be understood that, the sequence numbers of the steps in the foregoing embodiments do not imply an execution sequence, and the execution sequence of each process should be determined by its function and inherent logic, and should not constitute any limitation to the implementation process of the embodiments of the present invention.
Example two:
in an embodiment, a curtain wall construction device based on the BIM is provided, and the curtain wall construction device based on the BIM corresponds to the curtain wall construction method based on the BIM in the above embodiment one to one. As shown in fig. 6, the BIM-based curtain wall construction apparatus includes a body modeling module 10, a node setting module 20, a curtain wall modeling module 30, and a test tuning module 40. The functional modules are explained in detail as follows:
the main body modeling module 10 is used for acquiring a main body building construction scheme and constructing a simulation main body model according to the main body building construction scheme;
the node setting module 20 is used for acquiring a curtain wall simulation construction scheme and acquiring a curtain wall construction node in the simulation main body model according to the curtain wall simulation construction scheme;
the curtain wall modeling module 30 is used for generating a curtain wall simulation scheme according to the curtain wall construction nodes and constructing a simulated curtain wall model according to the curtain wall simulation scheme;
and the test tuning module 40 is used for performing a die assembly test on the simulation main body model and the simulation curtain wall model to obtain a corresponding test result, and tuning the simulation main body model and the simulation curtain wall model according to the test result to generate a curtain wall construction scheme.
Preferably, the node setting module 20 includes:
the position acquisition submodule 21 is used for acquiring the data of the curtain wall construction position from the main building construction scheme;
and the node setting submodule 22 is used for acquiring the curtain wall construction node according to the curtain wall construction position data.
Preferably, the curtain wall modeling module 30 includes:
the supporting structure modeling submodule 31 is used for acquiring supporting construction simulation scheme data from the curtain wall simulation scheme and constructing a simulated supporting structure model according to the supporting structure simulation scheme data;
and the wallboard modeling submodule 32 is used for acquiring the wallboard simulation scheme data from the curtain wall simulation scheme, simulating a wallboard model according to the wallboard simulation scheme data, and taking the simulation support model and the simulation wallboard model as a simulation curtain wall model.
Preferably, the test tuning module 40 includes:
the first testing submodule 41 is configured to perform a first mold closing test on the simulation support model and the simulation main body model, and perform tuning on the simulation support model and the simulation main body model according to the obtained first testing result and the first testing result to obtain a first tuning result, where the first tuning result includes the support tuning model and the main body tuning model;
the second testing submodule 42 is used for carrying out a second die assembly test on the support tuning model and the simulated wallboard model, and tuning the simulated wallboard model according to an obtained second testing result to obtain a wallboard tuning model;
and the third testing submodule 43 is configured to perform a third combined testing on the main body tuning model, the support tuning model and the wallboard tuning model, and tune the main body tuning model, the support tuning model and the wallboard tuning model according to an obtained third testing result to obtain a curtain wall construction scheme.
Preferably, the BIM-based curtain wall construction apparatus further includes:
a scanning module 50 for acquiring an actual subject model by 3D scanning;
and the actual tuning module 60 is used for performing actual die assembly test on the actual main body model, the wallboard tuning model and the support tuning model, and performing fine tuning on the wallboard tuning model and the support tuning model according to the obtained actual test result to obtain a curtain wall tuning scheme.
For the concrete definition of the BIM based curtain wall construction device, reference may be made to the definition of the BIM based curtain wall construction method above, and the detailed description thereof is omitted. The modules in the BIM-based curtain wall construction device can be wholly or partially realized by software, hardware and a combination thereof. The modules can be embedded in a hardware form or independent from a processor in the computer device, and can also be stored in a memory in the computer device in a software form, so that the processor can call and execute operations corresponding to the modules.
Example three:
in one embodiment, a computer device is provided, which may be a server, the internal structure of which may be as shown in fig. 7. The computer device includes a processor, a memory, a network interface, and a database connected by a system bus. Wherein the processor of the computer device is configured to provide computing and control capabilities. The memory of the computer device comprises a nonvolatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program, and a database. The internal memory provides an environment for the operation of an operating system and computer programs in the non-volatile storage medium. The database of the computer equipment is used for storing curtain wall construction schemes. The network interface of the computer device is used for communicating with an external terminal through a network connection. The computer program is executed by a processor to realize a BIM-based curtain wall construction method.
In one embodiment, a computer device is provided, comprising a memory, a processor, and a computer program stored on the memory and executable on the processor, the processor implementing the following steps when executing the computer program:
s10: acquiring a main building construction scheme, and constructing a simulation main model according to the main building construction scheme;
s20: acquiring a curtain wall simulation construction scheme, and acquiring curtain wall construction nodes in a simulation main body model according to the curtain wall simulation construction scheme;
s30: generating a curtain wall simulation scheme according to the curtain wall construction nodes, and constructing a simulation curtain wall model according to the curtain wall simulation scheme;
s40: and carrying out die assembly test on the simulation main body model and the simulation curtain wall model to obtain a corresponding test result, and generating a curtain wall construction scheme after optimizing the simulation main body model and the simulation curtain wall model according to the test result.
Example four:
in one embodiment, a computer-readable storage medium is provided, having a computer program stored thereon, which when executed by a processor, performs the steps of:
s10: acquiring a main building construction scheme, and constructing a simulation main model according to the main building construction scheme;
s20: acquiring a curtain wall simulation construction scheme, and acquiring curtain wall construction nodes in a simulation main body model according to the curtain wall simulation construction scheme;
s30: generating a curtain wall simulation scheme according to the curtain wall construction nodes, and constructing a simulation curtain wall model according to the curtain wall simulation scheme;
s40: and carrying out die assembly test on the simulation main body model and the simulation curtain wall model to obtain a corresponding test result, and generating a curtain wall construction scheme after optimizing the simulation main body model and the simulation curtain wall model according to the test result.
It will be understood by those skilled in the art that all or part of the processes of the methods of the embodiments described above can be implemented by hardware instructions of a computer program, which can be stored in a non-volatile computer-readable storage medium, and when executed, can include the processes of the embodiments of the methods described above. Any reference to memory, storage, database, or other medium used in the embodiments provided herein may include non-volatile and/or volatile memory, among others. Non-volatile memory can include read-only memory (ROM), Programmable ROM (PROM), Electrically Programmable ROM (EPROM), Electrically Erasable Programmable ROM (EEPROM), or flash memory. Volatile memory can include Random Access Memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in a variety of forms such as Static RAM (SRAM), Dynamic RAM (DRAM), Synchronous DRAM (SDRAM), Double Data Rate SDRAM (DDRSDRAM), Enhanced SDRAM (ESDRAM), Synchronous Link DRAM (SLDRAM), Rambus Direct RAM (RDRAM), direct bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).
It will be apparent to those skilled in the art that, for convenience and brevity of description, only the above-mentioned division of the functional units and modules is illustrated, and in practical applications, the above-mentioned function distribution may be performed by different functional units and modules according to needs, that is, the internal structure of the apparatus is divided into different functional units or modules to perform all or part of the above-mentioned functions.
The above-mentioned embodiments are only used for illustrating the technical solutions of the present invention, and not for limiting the same; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; such modifications and substitutions do not substantially depart from the spirit and scope of the embodiments of the present invention, and are intended to be included within the scope of the present invention.

Claims (10)

1. A curtain wall construction method based on BIM is characterized by comprising the following steps:
s10: acquiring a main building construction scheme, and constructing a simulation main body model according to the main building construction scheme;
s20: acquiring a curtain wall simulation construction scheme, and acquiring a curtain wall construction node in the simulation main body model according to the curtain wall simulation construction scheme;
s30: generating a curtain wall simulation scheme according to the curtain wall construction nodes, and constructing a simulation curtain wall model according to the curtain wall simulation scheme;
s40: and carrying out die assembly test on the simulation main body model and the simulation curtain wall model to obtain a corresponding test result, and adjusting and optimizing the simulation main body model and the simulation curtain wall model according to the test result to generate a curtain wall construction scheme.
2. The BIM-based curtain wall construction method as claimed in claim 1, wherein the step S20 includes:
s21: acquiring curtain wall construction position data from the main building construction scheme;
s22: and acquiring the curtain wall construction node according to the curtain wall construction position data.
3. The BIM-based curtain wall construction method as claimed in claim 1, wherein the step S30 includes:
s31: acquiring support construction simulation scheme data from the curtain wall simulation scheme, and constructing a simulation support structure model according to the support structure simulation scheme data;
s32: and acquiring wallboard simulation scheme data from the curtain wall simulation scheme, simulating a wallboard model according to the wallboard simulation scheme data, and taking the simulation support model and the simulation wallboard model as the simulation curtain wall model.
4. The BIM-based curtain wall construction method according to claim 3, wherein the step S40 includes:
s41: carrying out a first mold closing test on the simulation support model and the simulation main body model, and carrying out tuning on the simulation support model and the simulation main body model according to an obtained first test result and the first test result to obtain a first tuning result, wherein the first tuning result comprises a support tuning model and a main body tuning model;
s42: carrying out a second die assembly test on the support tuning model and the simulation wallboard model, and tuning the simulation wallboard model according to an obtained second test result to obtain a wallboard tuning model;
s43: and carrying out a third combined model test on the main body tuning model, the support tuning model and the wallboard tuning model, and tuning the main body tuning model, the support tuning model and the wallboard tuning model according to an obtained third test result to obtain the curtain wall construction scheme.
5. The BIM-based curtain wall construction method as claimed in claim 1, wherein after the step S40, the BIM-based curtain wall construction method further comprises:
s50: acquiring an actual subject model through 3D scanning;
s60: and carrying out actual die assembly test on the actual main body model, the wallboard tuning model and the support tuning model, and finely adjusting the wallboard tuning model and the support tuning model according to the obtained actual test result to obtain a curtain wall tuning scheme.
6. The utility model provides a curtain construction equipment based on BIM which characterized in that, curtain construction equipment based on BIM includes:
the main body modeling module is used for acquiring a main body building construction scheme and constructing a simulation main body model according to the main body building construction scheme;
the node setting module is used for acquiring a curtain wall simulation construction scheme and acquiring a curtain wall construction node in the simulation main body model according to the curtain wall simulation construction scheme;
the curtain wall modeling module is used for generating a curtain wall simulation scheme according to the curtain wall construction node and constructing a simulated curtain wall model according to the curtain wall simulation scheme;
and the test tuning module is used for carrying out die assembly test on the simulation main body model and the simulation curtain wall model to obtain a corresponding test result, and tuning the simulation main body model and the simulation curtain wall model according to the test result to generate a curtain wall construction scheme.
7. The BIM-based curtain wall construction device according to claim 6, wherein the node setting module comprises:
the position acquisition submodule is used for acquiring curtain wall construction position data from the main building construction scheme;
and the node setting submodule is used for acquiring the curtain wall construction node according to the curtain wall construction position data.
8. The BIM-based curtain wall construction apparatus of claim 6, wherein the curtain wall modeling module comprises:
the supporting structure modeling submodule is used for acquiring supporting construction simulation scheme data from the curtain wall simulation scheme and constructing a simulation supporting structure model according to the supporting structure simulation scheme data;
and the wallboard modeling submodule is used for acquiring wallboard simulation scheme data from the curtain wall simulation scheme, simulating a wallboard model according to the wallboard simulation scheme data, and taking the simulation support model and the simulation wallboard model as the simulation curtain wall model.
9. A computer device comprising a memory, a processor and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the BIM based curtain wall construction method according to any one of claims 1 to 5 when executing the computer program.
10. A computer readable storage medium storing a computer program, wherein the computer program, when executed by a processor, implements the steps of the BIM based curtain wall construction method according to any one of claims 1 to 5.
CN202010432993.5A 2020-05-21 2020-05-21 Curtain wall construction method, device and equipment based on BIM and storage medium Active CN111552917B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010432993.5A CN111552917B (en) 2020-05-21 2020-05-21 Curtain wall construction method, device and equipment based on BIM and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010432993.5A CN111552917B (en) 2020-05-21 2020-05-21 Curtain wall construction method, device and equipment based on BIM and storage medium

Publications (2)

Publication Number Publication Date
CN111552917A true CN111552917A (en) 2020-08-18
CN111552917B CN111552917B (en) 2023-01-24

Family

ID=72003541

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010432993.5A Active CN111552917B (en) 2020-05-21 2020-05-21 Curtain wall construction method, device and equipment based on BIM and storage medium

Country Status (1)

Country Link
CN (1) CN111552917B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112632649A (en) * 2020-12-09 2021-04-09 中建三局西部投资有限公司 Automatic curtain wall laying system based on BIM technology
CN113076040A (en) * 2021-04-29 2021-07-06 久瓴(江苏)数字智能科技有限公司 Curtain wall previewing method and system and storage medium
CN113297650A (en) * 2021-07-28 2021-08-24 广东世纪达建设集团有限公司 BIM technology-based unit type glass curtain wall construction method and system
CN117421817A (en) * 2023-12-19 2024-01-19 中建六局华南建设有限公司 Intelligent management platform for glass curtain wall installation based on cloud computing and data analysis
CN117421817B (en) * 2023-12-19 2024-04-19 中建六局华南建设有限公司 Intelligent management platform for glass curtain wall installation based on cloud computing and data analysis

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104123412A (en) * 2014-07-17 2014-10-29 金刚幕墙集团有限公司 Method for detecting collision of curtain wall through BIM technology
CN108121873A (en) * 2017-12-25 2018-06-05 广州江河幕墙系统工程有限公司 A kind of application process of buildings model in curtain wall construction
CN108763685A (en) * 2018-05-17 2018-11-06 上海宝冶集团有限公司 A kind of construction method of spacial special-shaped curved surface curtain wall system
CN109914659A (en) * 2019-03-18 2019-06-21 广州市第四装修有限公司 Building glass curtain wall construction method
JP2019112904A (en) * 2017-12-26 2019-07-11 大和ハウス工業株式会社 Building construction method
CN110056106A (en) * 2019-04-17 2019-07-26 中建八局第二建设有限公司 A kind of frame curtain wall quick assembling construction method and system based on BIM
CN110110490A (en) * 2019-05-28 2019-08-09 中机中联工程有限公司 A method of curtain wall dynamic installation monitoring and collision detection based on BIM model
CN110206200A (en) * 2019-05-30 2019-09-06 中国十七冶集团有限公司 A kind of concrete heat-insulating curtain wall construction method based on BIM technology
CN110306804A (en) * 2019-08-06 2019-10-08 中建八局第四建设有限公司 A kind of curtain wall construction method
CN110335345A (en) * 2019-07-02 2019-10-15 同济大学建筑设计研究院(集团)有限公司 Curtain wall joint rendering method, device, computer equipment and storage medium
CN111005483A (en) * 2019-06-20 2020-04-14 方传斌 Curtain wall production and processing method based on BIM technology
CN111177824A (en) * 2019-12-12 2020-05-19 中国建筑第二工程局有限公司 Aluminum alloy formwork construction method based on BIM technology

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104123412A (en) * 2014-07-17 2014-10-29 金刚幕墙集团有限公司 Method for detecting collision of curtain wall through BIM technology
CN108121873A (en) * 2017-12-25 2018-06-05 广州江河幕墙系统工程有限公司 A kind of application process of buildings model in curtain wall construction
JP2019112904A (en) * 2017-12-26 2019-07-11 大和ハウス工業株式会社 Building construction method
CN108763685A (en) * 2018-05-17 2018-11-06 上海宝冶集团有限公司 A kind of construction method of spacial special-shaped curved surface curtain wall system
CN109914659A (en) * 2019-03-18 2019-06-21 广州市第四装修有限公司 Building glass curtain wall construction method
CN110056106A (en) * 2019-04-17 2019-07-26 中建八局第二建设有限公司 A kind of frame curtain wall quick assembling construction method and system based on BIM
CN110110490A (en) * 2019-05-28 2019-08-09 中机中联工程有限公司 A method of curtain wall dynamic installation monitoring and collision detection based on BIM model
CN110206200A (en) * 2019-05-30 2019-09-06 中国十七冶集团有限公司 A kind of concrete heat-insulating curtain wall construction method based on BIM technology
CN111005483A (en) * 2019-06-20 2020-04-14 方传斌 Curtain wall production and processing method based on BIM technology
CN110335345A (en) * 2019-07-02 2019-10-15 同济大学建筑设计研究院(集团)有限公司 Curtain wall joint rendering method, device, computer equipment and storage medium
CN110306804A (en) * 2019-08-06 2019-10-08 中建八局第四建设有限公司 A kind of curtain wall construction method
CN111177824A (en) * 2019-12-12 2020-05-19 中国建筑第二工程局有限公司 Aluminum alloy formwork construction method based on BIM technology

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
贾宝荣: "BIM技术在上海中心大厦工程中的探索应用", 《施工技术》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112632649A (en) * 2020-12-09 2021-04-09 中建三局西部投资有限公司 Automatic curtain wall laying system based on BIM technology
CN113076040A (en) * 2021-04-29 2021-07-06 久瓴(江苏)数字智能科技有限公司 Curtain wall previewing method and system and storage medium
CN113297650A (en) * 2021-07-28 2021-08-24 广东世纪达建设集团有限公司 BIM technology-based unit type glass curtain wall construction method and system
CN117421817A (en) * 2023-12-19 2024-01-19 中建六局华南建设有限公司 Intelligent management platform for glass curtain wall installation based on cloud computing and data analysis
CN117421817B (en) * 2023-12-19 2024-04-19 中建六局华南建设有限公司 Intelligent management platform for glass curtain wall installation based on cloud computing and data analysis

Also Published As

Publication number Publication date
CN111552917B (en) 2023-01-24

Similar Documents

Publication Publication Date Title
CN111552917B (en) Curtain wall construction method, device and equipment based on BIM and storage medium
CN101814103A (en) Multi-component layout modeling and structure optimizing design method based on super-element
CN111539066B (en) Method for parametric integrated design of automobile door cover
CN105893666A (en) CATIA-based railway vehicle parameterized model establishing method
US20050204235A1 (en) Automatic method and system for instantiating built-in-test (BIST) modules in ASIC memory designs
CN110727981B (en) Method and device for generating column splicing node of light steel structure and storage medium
CN115577449A (en) Intelligent design method for automobile panel die
CN112084572B (en) Method for optimizing vehicle body section structure in vehicle body modeling stage
CN109472084A (en) Assembled architecture design method and system, computer equipment and storage medium
CN112836271B (en) Automatic design method and device for hanging plate of high-rise residence based on Revit model
CN113918594A (en) Method and device for generating structured query statement and computer equipment
CN111159796A (en) Method and device for generating beam of building, computer equipment and storage medium
CN113779669A (en) Wall column reinforcement map automatic generation method, storage medium and terminal equipment
US11766712B2 (en) Method of manufacturing a vehicle panel to reduce deviation between pre-panels and subsequent secondary forming dies
CN112182902A (en) Product data management and three-dimensional auxiliary platform digital-analog assembly method and device
CN116595638A (en) Vehicle body structural member design optimization method, device and medium
CN112699510B (en) Simulation manufacturing method, device, equipment and storage medium for automobile door glass
CN110826118A (en) Method and device for generating column factory variable cross-section splicing node of light steel structure
CN115730373B (en) BIM-based assembly type building element design method
CN112507406B (en) Intelligent computing module in intelligent design system of steel frame structure
CN113255058B (en) Processing method, device, equipment and storage medium of finite element model of carrier rocket
CN113673025A (en) Vehicle body structure modeling method and device and storage medium
CN114117583A (en) Automatic hole opening method and system based on BIM (building information modeling)
CN114462121A (en) Assembly type engineering structure component parameterization design method based on AutoCAD dynamic block
CN112347575A (en) Method for improving simulation calculation efficiency of incremental forming

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant