CN111501858A - Construction method for detecting leakage by using foundation pit bottom plate dewatering well plugging device - Google Patents

Construction method for detecting leakage by using foundation pit bottom plate dewatering well plugging device Download PDF

Info

Publication number
CN111501858A
CN111501858A CN202010295597.2A CN202010295597A CN111501858A CN 111501858 A CN111501858 A CN 111501858A CN 202010295597 A CN202010295597 A CN 202010295597A CN 111501858 A CN111501858 A CN 111501858A
Authority
CN
China
Prior art keywords
plugging
steel pipe
leakage
water
plugging device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010295597.2A
Other languages
Chinese (zh)
Inventor
董雅廷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN202010295597.2A priority Critical patent/CN111501858A/en
Publication of CN111501858A publication Critical patent/CN111501858A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Examining Or Testing Airtightness (AREA)

Abstract

A construction method for detecting leakage by using a foundation pit bottom plate dewatering well plugging device is characterized by comprising the following steps: a. installing a steel pipe plugging device, b, using the steel pipe plugging device, c, leakage inspection, d, water seepage treatment, ensuring that no leakage phenomenon exists to plug concrete inside the steel pipe, and completing leakage detection of the foundation pit bottom plate dewatering well plugging device. The construction method for detecting leakage by using the foundation pit bottom plate dewatering well plugging device has the advantages of simple structure, convenience in manufacturing, reasonable detection process design, convenience in operation, safe and reliable engineering quality, capability of conveniently checking whether leakage occurs in underground structures, construction joints, dewatering well plugging positions and the like in advance, capability of finding out that all the water leaking positions can continue dewatering and pressure reduction by using the dewatering well in advance to perform leakage position plugging treatment, capability of ensuring the structure plugging quality, capability of meeting the requirements of building use functions and design waterproof grades, great construction cost saving and engineering cost reduction.

Description

Construction method for detecting leakage by using foundation pit bottom plate dewatering well plugging device
Technical Field
The invention relates to a method for detecting leakage by plugging a precipitation well, in particular to a construction method for detecting leakage by using a foundation pit bottom plate precipitation well plugging device.
Background
With the vigorous development of construction projects in China, the number of corresponding foundation pit projects is continuously increased, the scale is increased, the depth of the foundation pit is deepened, and the foundation pit precipitation faces a new test under complex hydrogeological conditions. At present, foundation pits with large scale and deep depth are more in China, when a bottom plate is positioned in other strong permeable layers with pebbles and the like, pit-in-pit (water collecting pit, elevator shaft and the like) are influenced by underground water, construction difficulty is large, and secondary precipitation of a hole is reserved on a local bottom plate during foundation construction to ensure smooth construction of the pit-in-pit.
After foundation pit engineering foundation slab structure is accomplished, shutoff precipitation well is a difficult problem. However, in the traditional construction method, the dewatering well is firstly plugged, then the leakage position occurs when the water level rises, and then plugging treatment is carried out, so that comprehensive leakage inspection cannot be carried out on the underground structure in advance after the underground water level rises, and particularly, the leakage position is very easy to occur in engineering, and comprises the construction joint of the outer wall of a basement, the position of a wall-penetrating sleeve, a tie bolt rod, the plugging position of the dewatering well, the concrete leakage vibration defect and the like. In case leakage appears at above-mentioned position after traditional shutoff method accomplishes the precipitation well shutoff, receives groundwater to press the influence, and the secondary shutoff seepage department degree of difficulty increases at double, and the treatment cost overhead is very big to the seepage hidden danger can appear repeatedly in the later stage of water-carrying shutoff seepage point majority.
The known way of leak-off inspection therefore suffers from the inconveniences and problems described above.
Disclosure of Invention
The invention aims to provide a safe and reliable construction method for detecting leakage by using a foundation pit bottom plate dewatering well plugging device.
In order to achieve the purpose, the technical solution of the invention is as follows:
a construction method for detecting leakage by using a foundation pit bottom plate dewatering well plugging device is characterized by comprising the following steps:
a. installation steel pipe plugging device
Selecting the diameter of a steel pipe of the plugging device according to the thickness of a foundation pit bottom plate and the diameter of a concrete well pipe of a dewatering well at the lower part of the bottom plate, wherein the diameter of the steel pipe is larger than or equal to 600mm, the thickness of the steel pipe is larger than or equal to 10mm, and the length of the steel pipe is 500mm, and two steel water stop wing rings are arranged on the outer side of the steel; welding reinforcing steel bar heads at equal intervals from the bottom of the inner side of the steel pipe to serve as a bottom support of a plugging steel plate, arranging the plugging steel plate with the same inner diameter as the steel pipe at the bottom of the steel pipe, welding a water pump water pumping pipe and a wire sleeve at the middle part of the plugging steel plate, arranging a gate valve at the top of the steel pipe, and connecting the bottom of the steel pipe with a water pump by adopting a soft water hose; the whole steel pipe plugging device can be pre-buried when a bottom plate is poured or pre-buried in the later stage of a remaining construction joint;
b. plugging device using steel pipe
After the plugging condition is met, the water pump steel pipe and the plugging steel plate are placed into the steel pipe together, the plugging steel plate is guaranteed to be stably placed on the bottom support, and the water pump is used for continuously reducing the water; the water level in the precipitation well is always kept at a certain position below the plugging steel plate, and normal welding of the plugging steel plate is not influenced; performing full-length welding on the steel pipe and the blocking steel plate after wiping the welding position by using a dry towel, wherein the height of a fillet weld leg meets the standard requirement, and the quality defects of meat biting and slag inclusion cannot occur;
c. leak inspection
Stopping precipitation after the welding is finished, closing the gate valve and installing a finished wire sleeve plug; at the moment, the underground water level will be continuously raised, the water pressure is continuously increased, and the interior of the basement is immediately subjected to comprehensive leakage inspection, particularly the parts where leakage points are easy to appear in engineering, including the construction joints of the external wall of the basement, the positions of the wall-penetrating sleeves, the positions of the tie bolt rods, the plugging positions of dewatering wells and the concrete leakage vibration defect parts;
d. water seepage treatment
If the water seepage of the welding seam and the construction seam is found in the inspection process, marking the seepage position, well recording, analyzing the reason caused by the seepage and determining a leaking stoppage treatment scheme; and then opening the gate valve to continue precipitation, reducing the water level and water pressure of the basement, reducing the influence of the basement on plugging operation, then treating the water seepage part according to the concrete seepage severity by selecting a rapid-setting type plugging king or a grouting type high-permeability modified epoxy resin plugging agent plugging measure, closing the gate valve again to check after all the steps are finished, and ensuring that no seepage phenomenon exists so as to plug the concrete in the steel pipe and complete the seepage detection of the foundation pit bottom plate precipitation well plugging device.
The construction method for detecting leakage by using the foundation pit bottom plate dewatering well plugging device can be further realized by adopting the following technical measures.
The method of the preceding, wherein the steel pipe is a seamless steel pipe.
In the method, the specification of the pumping steel pipe is not less than DN32 steel pipe.
In the method, the water-stopping wing ring is a steel plate with the width of more than or equal to 100 mm.
In the method, the water stop wing ring is a steel plate with the thickness of more than or equal to 8 mm.
In the above method, each of the two water stop wing ring steel plates is perpendicular to the steel pipe axis.
In the method, the bottom support is a support seat for plugging the lower surface of the steel plate by the steel bar heads arranged at equal intervals.
The method can also be effectively applied to leakage inspection which is carried out in advance on underground structures of subway projects, comprehensive pipe galleries and industrial water pools with waterproof requirements.
After the technical scheme is adopted, the construction method for detecting the leakage by using the foundation pit bottom plate dewatering well plugging device has the following advantages:
1. the device has simple structure, convenient manufacture, reasonable design of detection process and convenient operation;
2. the construction quality is safe and reliable, whether the underground structure, the construction joint, the plugging position of the precipitation well and the like have leakage can be conveniently checked in advance, and the leakage position plugging treatment can be carried out on all the water leakage positions by using the precipitation well to continuously reduce the precipitation and pressure in advance, so that the structure plugging quality is ensured;
3. the requirements of building use functions and design of waterproof grade are met, construction cost is greatly saved, and engineering cost is reduced.
Drawings
Fig. 1 is a schematic view of a plugging structure of a foundation pit floor dewatering well according to an embodiment of the invention.
In the figure: 1 water pump drinking-water pipe, 2 shutoff steel sheets, 3 steel pipes, 4 stagnant water wing rings, 5 electric wire sleeve pipes, 6 end caps, 7 gate valves, 8 steel pipes that draw water, 9 collet, 10 foundation ditch bottom plates, 11 sealed oleamen, 12 immersible pumps, 13 drain pipes, 14 basements, 15 wall bushing, 16 basement bottom plates, 17 basement outer walls, 18 basement wall construction joints.
Detailed Description
The present invention will be further described with reference to the following examples and the accompanying drawings.
Example 1
The invention discloses a construction method for detecting leakage by using a foundation pit bottom plate dewatering well plugging device, which comprises the following steps of:
1. and (5) installing a steel pipe plugging device.
Referring to fig. 1, fig. 1 is a schematic view of a plugging structure of a foundation pit floor dewatering well according to an embodiment of the present invention. As shown in the figure, the diameter of the steel pipe of the plugging device is selected according to the thickness of a foundation pit bottom plate, the diameter of a concrete well pipe of a dewatering well on the lower portion of the bottom plate, 600mm and the like through the steel pipe 3, the seamless steel pipe with the diameter of 600mm, the thickness of 10mm and the length of 500mm is selected for the steel pipe, two steel water stop wing rings 4 are arranged on the outer side of the steel pipe, and steel bar heads are welded on the inner side of the steel pipe at equal intervals from the. The bottom of the steel pipe is provided with a 10 mm-thick sealing steel plate 2 equal to the inner diameter of the steel pipe, the middle part of the steel plate is welded with a DN75 water pump pumping pipe 1 and a DN25 wire casing pipe 5, the top of the steel pipe is provided with a gate valve 7, and the bottom of the steel pipe is connected with a soft water belt and a submersible pump 12. The whole plugging device can be pre-buried when the bottom plate is poured or pre-buried in the later stage of a remaining construction joint. The specification of the water pumping steel pipe is DN32 steel pipe. The water-stopping wing ring is a steel plate with the width of 100 mm. The water-stopping wing ring is a steel plate with the thickness of 8 mm. The two water stop wing ring steel plates are respectively vertical to the axis of the steel pipe. The bottom support is a supporting seat used for plugging the lower surface of the steel plate by reinforcing steel bar heads arranged at equal intervals.
2. Satisfy the shutoff condition after, put into steel pipe 3 with the water pump together with water pump drinking-water pipe 1, shutoff steel sheet 2 to guarantee that the shutoff steel sheet steadily lays on the collet, use the immersible pump to last precipitation, make water discharge through drain pipe 13, guarantee that the water level remains a definite position under the shutoff steel sheet in the precipitation well all the time, do not influence its normal welding. And (3) performing full-length welding on the steel pipe and the blocking steel plate after the welding position is wiped by using a dry towel, wherein the leg height of a fillet weld meets the standard requirement, and quality defects such as meat biting, slag inclusion and the like cannot occur.
3. Stopping precipitation after the welding is finished, closing the gate valve 7 and installing the finished wire sleeve plug 6; at the moment, the underground water level will rise continuously, the water pressure is increased continuously, and the inside of the basement 14 is subjected to comprehensive leakage inspection immediately, particularly the parts of the construction joints of the basement outer wall 18, the positions of the wall bushing 15, the basement bottom plate 16, the basement outer wall 17, the tie bolt rod, the plugging position of the dewatering well, the concrete leakage defect and the like which are easy to occur leakage points in the engineering.
4. If water seepage occurs in the welding seam, the construction seam and the like in the inspection process, the leakage position can be marked and recorded, the reason caused by leakage is analyzed, and the leakage stoppage treatment scheme is determined. And then opening the gate valve to continuously reduce the water level and the water pressure of the basement, reducing the influence of the basement on the plugging operation, then treating the water seepage part according to the concrete seepage severity by selecting a rapid-hardening type plugging king or a grouting type high-permeability modified epoxy resin plugging agent plugging measure, closing the gate valve again for inspection after all the water seepage parts are finished, and ensuring that the concrete inside the steel pipe can be plugged without any seepage phenomenon, wherein the observation time is not less than 7 days.
The construction method for detecting leakage by using the foundation pit bottom plate dewatering well plugging device is not limited to building basements, and can be effectively applied to underground structures with waterproof requirements such as subway engineering, comprehensive pipe galleries, industrial pools and the like to check leakage in advance and eliminate hidden water leakage hazards, so that the underground structures can meet the requirements of building use functions and design waterproof grades.
The construction method for detecting leakage by using the foundation pit floor dewatering well plugging device has the advantages that whether the leakage phenomenon exists in the underground structure, the construction joint, the dewatering well plugging part and the like can be known more conveniently in advance, the leakage position plugging treatment can be carried out on all the water leakage parts by using the dewatering well to continuously reduce the water and pressure in advance, the structure plugging quality is ensured, the requirements of building use functions and design water-proof grades are met, the process is convenient, the one-time plugging qualified rate effect is guaranteed to be excellent, and the cost is greatly saved.
The above embodiments are provided only for illustrating the present invention and not for limiting the present invention, and those skilled in the art can make various changes or modifications without departing from the spirit and scope of the present invention. Accordingly, all equivalents are intended to fall within the scope of the invention, which is defined in the claims.

Claims (8)

1. A construction method for detecting leakage by using a foundation pit bottom plate dewatering well plugging device is characterized by comprising the following steps:
a. installation steel pipe plugging device
Selecting the diameter of a steel pipe of the plugging device according to the thickness of a foundation pit bottom plate and the diameter of a concrete well pipe of a dewatering well at the lower part of the bottom plate, wherein the diameter of the steel pipe is larger than or equal to 600mm, the thickness of the steel pipe is larger than or equal to 10mm, and the length of the steel pipe is 500mm, and two steel water stop wing rings are arranged on the outer side of the steel; welding reinforcing steel bar heads at equal intervals from the bottom of the inner side of the steel pipe to serve as a bottom support of a plugging steel plate, arranging the plugging steel plate with the same inner diameter as the steel pipe at the bottom of the steel pipe, welding a water pump water pumping pipe and a wire sleeve at the middle part of the plugging steel plate, arranging a gate valve at the top of the steel pipe, and connecting the bottom of the steel pipe with a water pump by adopting a soft water hose; the whole steel pipe plugging device can be pre-buried when a bottom plate is poured or pre-buried in the later stage of a remaining construction joint;
b. plugging device using steel pipe
After the plugging condition is met, the water pump steel pipe and the plugging steel plate are placed into the steel pipe together, the plugging steel plate is guaranteed to be stably placed on the bottom support, and the water pump is used for continuously reducing the water; the water level in the precipitation well is always kept at a certain position below the plugging steel plate, and normal welding of the plugging steel plate is not influenced; performing full-length welding on the steel pipe and the blocking steel plate after wiping the welding position by using a dry towel, wherein the height of a fillet weld leg meets the standard requirement, and the quality defects of meat biting and slag inclusion cannot occur;
c. leak inspection
Stopping precipitation after the welding is finished, closing the gate valve and installing a finished wire sleeve plug; at the moment, the underground water level will be continuously raised, the water pressure is continuously increased, and the interior of the basement is immediately subjected to comprehensive leakage inspection, particularly the parts where leakage points are easy to appear in engineering, including the construction joints of the external wall of the basement, the positions of the wall-penetrating sleeves, the positions of the tie bolt rods, the plugging positions of dewatering wells and the concrete leakage vibration defect parts;
d. water seepage treatment
If the water seepage of the welding seam and the construction seam is found in the inspection process, marking the seepage position, well recording, analyzing the reason caused by the seepage and determining a leaking stoppage treatment scheme; and then opening the gate valve to continue precipitation, reducing the water level and water pressure of the basement, reducing the influence of the basement on plugging operation, then treating the water seepage part according to the concrete seepage severity by selecting a rapid-setting type plugging king or a grouting type high-permeability modified epoxy resin plugging agent plugging measure, closing the gate valve again to check after all the steps are finished, and ensuring that no seepage phenomenon exists so as to plug the concrete in the steel pipe and complete the seepage detection of the foundation pit bottom plate precipitation well plugging device.
2. The construction method for detecting the leakage by using the foundation pit floor dewatering well plugging device according to claim 1, wherein the steel pipe is a seamless steel pipe.
3. The construction method for detecting the leakage by using the foundation pit floor dewatering well plugging device according to claim 1, wherein the specification of the pumping steel pipe is equal to or larger than DN32 steel pipe.
4. The construction method for detecting the leakage by using the foundation pit floor dewatering well plugging device according to claim 1, wherein the water stopping wing ring is a steel plate with the width of more than or equal to 100 mm.
5. The construction method for detecting the leakage by using the foundation pit floor dewatering well plugging device according to claim 1, wherein the water stopping wing ring is a steel plate with the thickness of more than or equal to 8 mm.
6. The construction method for detecting the leakage by using the foundation pit floor dewatering well plugging device according to claim 1, wherein the two water stop wing ring steel plates are perpendicular to the steel pipe axis.
7. The construction method for detecting the leakage by using the plugging device for the dewatering well of the foundation pit floor as claimed in claim 1, wherein the bottom support is provided with equally spaced reinforcing heads as a support seat for plugging the lower surface of the steel plate.
8. The construction method for detecting the leakage by using the foundation pit floor dewatering well plugging device according to claim 1, is further effectively applied to leakage inspection performed in advance on underground structures of subway projects, comprehensive pipe galleries and industrial pools with waterproof requirements.
CN202010295597.2A 2020-04-15 2020-04-15 Construction method for detecting leakage by using foundation pit bottom plate dewatering well plugging device Pending CN111501858A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010295597.2A CN111501858A (en) 2020-04-15 2020-04-15 Construction method for detecting leakage by using foundation pit bottom plate dewatering well plugging device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010295597.2A CN111501858A (en) 2020-04-15 2020-04-15 Construction method for detecting leakage by using foundation pit bottom plate dewatering well plugging device

Publications (1)

Publication Number Publication Date
CN111501858A true CN111501858A (en) 2020-08-07

Family

ID=71866559

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010295597.2A Pending CN111501858A (en) 2020-04-15 2020-04-15 Construction method for detecting leakage by using foundation pit bottom plate dewatering well plugging device

Country Status (1)

Country Link
CN (1) CN111501858A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112411588A (en) * 2020-11-10 2021-02-26 上海建工七建集团有限公司 Water seepage prevention device for dewatering well and construction method
CN114457831A (en) * 2022-01-19 2022-05-10 中天建设集团有限公司 Integral steel formwork leakage blocking device in foundation pit and construction method
CN114703878A (en) * 2022-05-07 2022-07-05 中建八局第二建设有限公司 Plugging and draining device for dewatering well and construction method
CN114718099A (en) * 2022-03-21 2022-07-08 中国五冶集团有限公司 Well plugging device for dewatering well

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4298294A (en) * 1979-03-26 1981-11-03 Zimmerman C Lyle Basement dewatering system
JP2006328894A (en) * 2005-05-30 2006-12-07 Nakamura Doboku Kk Construction method of underground structure
CN102345301A (en) * 2011-07-08 2012-02-08 天津二十冶建设有限公司 New method for plugging dewatering well in basement
CN104711994A (en) * 2015-01-27 2015-06-17 江苏省华建建设股份有限公司 Foundation pit deep well rainfall and plugging construction method
CN205296346U (en) * 2016-01-11 2016-06-08 许昌水利建筑工程有限公司 Sewer line air supply precipitation structure
CN207193996U (en) * 2017-08-31 2018-04-06 中国一冶集团有限公司 A kind of precipitation pipe well well-sealing device
CN110725341A (en) * 2019-10-25 2020-01-24 浙江绿城房屋服务系统有限公司 Basement outer wall embedded sleeve and pipeline gap leakage treatment method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4298294A (en) * 1979-03-26 1981-11-03 Zimmerman C Lyle Basement dewatering system
JP2006328894A (en) * 2005-05-30 2006-12-07 Nakamura Doboku Kk Construction method of underground structure
CN102345301A (en) * 2011-07-08 2012-02-08 天津二十冶建设有限公司 New method for plugging dewatering well in basement
CN104711994A (en) * 2015-01-27 2015-06-17 江苏省华建建设股份有限公司 Foundation pit deep well rainfall and plugging construction method
CN205296346U (en) * 2016-01-11 2016-06-08 许昌水利建筑工程有限公司 Sewer line air supply precipitation structure
CN207193996U (en) * 2017-08-31 2018-04-06 中国一冶集团有限公司 A kind of precipitation pipe well well-sealing device
CN110725341A (en) * 2019-10-25 2020-01-24 浙江绿城房屋服务系统有限公司 Basement outer wall embedded sleeve and pipeline gap leakage treatment method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王明艳等: "深基坑大水量降水井封堵施工技术", 《科技视界》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112411588A (en) * 2020-11-10 2021-02-26 上海建工七建集团有限公司 Water seepage prevention device for dewatering well and construction method
CN114457831A (en) * 2022-01-19 2022-05-10 中天建设集团有限公司 Integral steel formwork leakage blocking device in foundation pit and construction method
CN114457831B (en) * 2022-01-19 2024-03-12 中天建设集团有限公司 Integral steel template plugging device in foundation pit and construction method
CN114718099A (en) * 2022-03-21 2022-07-08 中国五冶集团有限公司 Well plugging device for dewatering well
CN114703878A (en) * 2022-05-07 2022-07-05 中建八局第二建设有限公司 Plugging and draining device for dewatering well and construction method

Similar Documents

Publication Publication Date Title
CN111501858A (en) Construction method for detecting leakage by using foundation pit bottom plate dewatering well plugging device
WO2014012305A1 (en) Method for repairing large diameter concrete water-supply pipe
CN111156032B (en) Grouting pipe inserted section steel grouting reinforcement existing subway tunnel structure and method
CN103556644A (en) Basement bottom plate dewatering well mouth plugging casing and construction method
CN111501805A (en) Foundation pit bottom plate reserved precipitation plugging device and application method thereof
CN109736340B (en) Dewatering device and method for guaranteeing integrity of cushion layer by reserving dewatering well on foundation slab
CN203939060U (en) Slight seepage block structure of underground continuous wall
CN203514333U (en) Basement soleplate precipitation well mouth blocking sleeve
CN105780792B (en) A kind of foundation pit high water head Dewatering by pressure reduction well shut-in well method and structure of shunting in a well
CN113756278B (en) Construction method of prestressed pipe pile
CN212052921U (en) Foundation pit enclosure leakage repairing structure
CN107975127A (en) The outer antipriming of vertical jacking
CN112145792A (en) PCCP pipeline construction method
CN111778987A (en) Underground diaphragm wall door type emergency plugging device and method
CN212801603U (en) Foundation pit bottom plate reserved precipitation plugging device
CN114542799B (en) Underground limited space vertical jacking construction method
CN204456228U (en) A kind of diaphragm wall fast plugging device
CN214940041U (en) Water leakage prevention structure of diaphragm wall
CN112179569B (en) Water supply steel pipe hydrostatic test inner plugging head and plugging method thereof
CN114645691A (en) Ground straight-through type through-lane drilling and well cementation downhole device and well cementation construction method
CN212200511U (en) Deep foundation pit plugging device
CN204551551U (en) A kind of ground-connecting-wall seam leak detection and grouting for water plugging device
CN113175058A (en) Existing underground jacking pipe access construction method
CN212801604U (en) Filling-free rapid plugging device for reserved dewatering well opening of foundation pit bottom plate
CN112982462B (en) Construction method for large-aperture pressurized water blocking of concrete member

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200807