CN111489037A - 一种基于需求预测的新能源风机备件储备策略优化方法 - Google Patents
一种基于需求预测的新能源风机备件储备策略优化方法 Download PDFInfo
- Publication number
- CN111489037A CN111489037A CN202010290948.0A CN202010290948A CN111489037A CN 111489037 A CN111489037 A CN 111489037A CN 202010290948 A CN202010290948 A CN 202010290948A CN 111489037 A CN111489037 A CN 111489037A
- Authority
- CN
- China
- Prior art keywords
- spare part
- fan spare
- part storage
- fan
- new energy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q10/087—Inventory or stock management, e.g. order filling, procurement or balancing against orders
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/20—Administration of product repair or maintenance
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Development Economics (AREA)
- Health & Medical Sciences (AREA)
- Game Theory and Decision Science (AREA)
- Primary Health Care (AREA)
- General Health & Medical Sciences (AREA)
- Water Supply & Treatment (AREA)
- Public Health (AREA)
- Accounting & Taxation (AREA)
- Finance (AREA)
- Educational Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010290948.0A CN111489037B (zh) | 2020-04-14 | 2020-04-14 | 一种基于需求预测的新能源风机备件储备策略优化方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010290948.0A CN111489037B (zh) | 2020-04-14 | 2020-04-14 | 一种基于需求预测的新能源风机备件储备策略优化方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111489037A true CN111489037A (zh) | 2020-08-04 |
CN111489037B CN111489037B (zh) | 2023-04-18 |
Family
ID=71794909
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010290948.0A Active CN111489037B (zh) | 2020-04-14 | 2020-04-14 | 一种基于需求预测的新能源风机备件储备策略优化方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111489037B (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112561089A (zh) * | 2020-11-27 | 2021-03-26 | 成都飞机工业(集团)有限责任公司 | 一种易损备件关联分析预测方法 |
CN112906992A (zh) * | 2021-04-12 | 2021-06-04 | 福州大学 | 基于集成学习的电子产品停产后的备件预测方法 |
CN113127537A (zh) * | 2021-04-16 | 2021-07-16 | 北京交通大学 | 融合时序预测模型和机器学习模型的备件需求预测方法 |
CN113127538A (zh) * | 2021-04-16 | 2021-07-16 | 北京交通大学 | 一种高精度的备件需求预测方法 |
CN116542500A (zh) * | 2023-07-06 | 2023-08-04 | 北方联创通信有限公司 | 无人机备件采购方法、系统、存储介质及设备 |
Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TW578071B (en) * | 2001-01-29 | 2004-03-01 | Manugistics Inc | System and method for allocating the supply of critical material components and manufacturing capacity |
JP2009098788A (ja) * | 2007-10-15 | 2009-05-07 | Nagaoka Univ Of Technology | 需要量予測装置,需要量予測方法,及びコンピュータプログラム |
US20120144828A1 (en) * | 2012-02-16 | 2012-06-14 | Lazaris Spyros J | Multi-resource renewable energy installation and method of maximizing operational capacity of same |
JP2014176174A (ja) * | 2013-03-08 | 2014-09-22 | Hitachi Ltd | 電力需要調整システム及び需要調整実行システム |
US20140316838A1 (en) * | 2011-12-08 | 2014-10-23 | Vestas Wind Systems A/S | Decision support system (dss) for maintenance of a plurality of renewable energy generators in a renewable power plant |
CN105894133A (zh) * | 2016-05-12 | 2016-08-24 | 华中科技大学 | 一种风电机组部件维修及备品备件需求预测方法 |
US20170185904A1 (en) * | 2015-12-29 | 2017-06-29 | 24/7 Customer, Inc. | Method and apparatus for facilitating on-demand building of predictive models |
US20170352010A1 (en) * | 2016-06-02 | 2017-12-07 | Doosan Heavy Industries & Construction Co., Ltd. | Wind farm supervision monitoring system |
CN107784374A (zh) * | 2016-08-25 | 2018-03-09 | 新疆金风科技股份有限公司 | 风电机组备件需求的预测方法、装置及设备 |
CN108846608A (zh) * | 2018-06-15 | 2018-11-20 | 上海探能实业有限公司 | 一种大型风电机组备品备件库存管理及优化调度方法 |
CN109146114A (zh) * | 2017-06-26 | 2019-01-04 | 株式会社日立大厦系统 | 部件更换预测装置、部件更换预测系统以及部件更换预测方法 |
US20190122132A1 (en) * | 2016-04-19 | 2019-04-25 | Grid4C | Method and system for energy consumption prediction |
US20190147350A1 (en) * | 2016-04-27 | 2019-05-16 | The Fourth Paradigm (Beijing) Tech Co Ltd | Method and device for presenting prediction model, and method and device for adjusting prediction model |
US20190318202A1 (en) * | 2016-10-31 | 2019-10-17 | Tencent Technology (Shenzhen) Company Limited | Machine learning model training method and apparatus, server, and storage medium |
US20190325293A1 (en) * | 2018-04-19 | 2019-10-24 | National University Of Singapore | Tree enhanced embedding model predictive analysis methods and systems |
WO2019211034A1 (de) * | 2018-05-03 | 2019-11-07 | Innofas Gmbh | Verfahren zur echtzeitregelung eines energieversorgungs- und verteilersystems |
US20200005908A1 (en) * | 2018-07-02 | 2020-01-02 | Accenture Global Solutions Limited | Determining rate of recruitment information concerning a clinical trial |
US20200090063A1 (en) * | 2016-12-16 | 2020-03-19 | Factor Financial Analytics Pty Ltd | A method and system for generating a decision-making algorithm for an entity to achieve an objective |
-
2020
- 2020-04-14 CN CN202010290948.0A patent/CN111489037B/zh active Active
Patent Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TW578071B (en) * | 2001-01-29 | 2004-03-01 | Manugistics Inc | System and method for allocating the supply of critical material components and manufacturing capacity |
JP2009098788A (ja) * | 2007-10-15 | 2009-05-07 | Nagaoka Univ Of Technology | 需要量予測装置,需要量予測方法,及びコンピュータプログラム |
US20140316838A1 (en) * | 2011-12-08 | 2014-10-23 | Vestas Wind Systems A/S | Decision support system (dss) for maintenance of a plurality of renewable energy generators in a renewable power plant |
US20120144828A1 (en) * | 2012-02-16 | 2012-06-14 | Lazaris Spyros J | Multi-resource renewable energy installation and method of maximizing operational capacity of same |
JP2014176174A (ja) * | 2013-03-08 | 2014-09-22 | Hitachi Ltd | 電力需要調整システム及び需要調整実行システム |
US20170185904A1 (en) * | 2015-12-29 | 2017-06-29 | 24/7 Customer, Inc. | Method and apparatus for facilitating on-demand building of predictive models |
US20190122132A1 (en) * | 2016-04-19 | 2019-04-25 | Grid4C | Method and system for energy consumption prediction |
US20190147350A1 (en) * | 2016-04-27 | 2019-05-16 | The Fourth Paradigm (Beijing) Tech Co Ltd | Method and device for presenting prediction model, and method and device for adjusting prediction model |
CN105894133A (zh) * | 2016-05-12 | 2016-08-24 | 华中科技大学 | 一种风电机组部件维修及备品备件需求预测方法 |
US20170352010A1 (en) * | 2016-06-02 | 2017-12-07 | Doosan Heavy Industries & Construction Co., Ltd. | Wind farm supervision monitoring system |
CN107784374A (zh) * | 2016-08-25 | 2018-03-09 | 新疆金风科技股份有限公司 | 风电机组备件需求的预测方法、装置及设备 |
US20190318202A1 (en) * | 2016-10-31 | 2019-10-17 | Tencent Technology (Shenzhen) Company Limited | Machine learning model training method and apparatus, server, and storage medium |
US20200090063A1 (en) * | 2016-12-16 | 2020-03-19 | Factor Financial Analytics Pty Ltd | A method and system for generating a decision-making algorithm for an entity to achieve an objective |
CN109146114A (zh) * | 2017-06-26 | 2019-01-04 | 株式会社日立大厦系统 | 部件更换预测装置、部件更换预测系统以及部件更换预测方法 |
US20190325293A1 (en) * | 2018-04-19 | 2019-10-24 | National University Of Singapore | Tree enhanced embedding model predictive analysis methods and systems |
WO2019211034A1 (de) * | 2018-05-03 | 2019-11-07 | Innofas Gmbh | Verfahren zur echtzeitregelung eines energieversorgungs- und verteilersystems |
CN108846608A (zh) * | 2018-06-15 | 2018-11-20 | 上海探能实业有限公司 | 一种大型风电机组备品备件库存管理及优化调度方法 |
US20200005908A1 (en) * | 2018-07-02 | 2020-01-02 | Accenture Global Solutions Limited | Determining rate of recruitment information concerning a clinical trial |
Non-Patent Citations (3)
Title |
---|
刘元浩;闫云龙;张长弓;赵光;索海龙;: "风机行业备件零库存存储策略及预测模型研究" * |
杨济海等: "基于并行的F-LSTM模型及其在电力通信设备故障预测中的应用" * |
粟杰;: "大数据融合应用探讨" * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112561089A (zh) * | 2020-11-27 | 2021-03-26 | 成都飞机工业(集团)有限责任公司 | 一种易损备件关联分析预测方法 |
CN112906992A (zh) * | 2021-04-12 | 2021-06-04 | 福州大学 | 基于集成学习的电子产品停产后的备件预测方法 |
CN113127537A (zh) * | 2021-04-16 | 2021-07-16 | 北京交通大学 | 融合时序预测模型和机器学习模型的备件需求预测方法 |
CN113127538A (zh) * | 2021-04-16 | 2021-07-16 | 北京交通大学 | 一种高精度的备件需求预测方法 |
CN113127537B (zh) * | 2021-04-16 | 2023-11-24 | 北京交通大学 | 融合时序预测模型和机器学习模型的备件需求预测方法 |
CN113127538B (zh) * | 2021-04-16 | 2024-02-09 | 北京交通大学 | 一种高精度的备件需求预测方法 |
CN116542500A (zh) * | 2023-07-06 | 2023-08-04 | 北方联创通信有限公司 | 无人机备件采购方法、系统、存储介质及设备 |
CN116542500B (zh) * | 2023-07-06 | 2023-12-08 | 北方联创通信有限公司 | 无人机备件采购方法、系统、存储介质及设备 |
Also Published As
Publication number | Publication date |
---|---|
CN111489037B (zh) | 2023-04-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111489037B (zh) | 一种基于需求预测的新能源风机备件储备策略优化方法 | |
CN111950854B (zh) | 一种基于多层神经网络的焦炭质量指标预测方法 | |
CN107967542B (zh) | 一种基于长短期记忆网络的售电量预测方法 | |
CN111340273A (zh) | 一种基于GEP参数优化XGBoost的电力系统短期负荷预测方法 | |
Şahman | A discrete spotted hyena optimizer for solving distributed job shop scheduling problems | |
CN110969290B (zh) | 一种基于深度学习的径流概率预测方法及系统 | |
CN111353656A (zh) | 一种基于生产计划的钢铁企业氧气负荷预测方法 | |
CN103745273A (zh) | 一种半导体制造过程的多性能预测方法 | |
CN109772893B (zh) | 最大化轧辊利用的多热轧单元批量计划优化方法及控制系统 | |
CN110689190A (zh) | 一种电网负荷预测方法、装置及相关设备 | |
CN109165809B (zh) | 一种新电改环境下电网规划项目投资排序评估方法 | |
CN111738477A (zh) | 基于深层特征组合的电网新能源消纳能力预测方法 | |
Chakrabarty | A regression approach to distribution and trend analysis of quarterly foreign tourist arrivals in India | |
CN109861211A (zh) | 一种基于数据驱动的配电网动态重构方法 | |
CN112308298A (zh) | 一种面向半导体生产线的多场景性能指标预测方法及系统 | |
CN110110447B (zh) | 一种混合蛙跳反馈极限学习机带钢厚度预测方法 | |
CN112085256A (zh) | 考虑负荷跃变的全周期负荷预测方法 | |
CN111563615A (zh) | 一种基于特征分析与组合学习的负荷预测方法 | |
CN114580762A (zh) | 一种基于XGBoost的水文预报误差校正方法 | |
CN114548350A (zh) | 一种基于樽海鞘群和bp神经网络的电力负荷预测方法 | |
CN111222669A (zh) | 一种架空线路造价预测方法及装置 | |
CN115688613B (zh) | 基于多目标蜉蝣算法优化的碳酸盐岩储层渗透率预测方法 | |
CN107808245A (zh) | 基于改进决策树方法的管网调度系统 | |
CN111652459A (zh) | 一种计及新能源消纳多指标内涵的电网评价方法 | |
CN112749211B (zh) | 一种基于电力大数据的茶叶产量预测新方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20211124 Address after: 810000 80 Wusi West Road, Chengxi District, Xining City, Qinghai Province Applicant after: Qinghai green energy data Co.,Ltd. Applicant after: BEIJING JOIN BRIGHT DIGITAL POWER TECHNOLOGY Co.,Ltd. Applicant after: STATE GRID QINGHAI ELECTRIC POWER Co. Applicant after: ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID QINGHAI ELECTRIC POWER Co. Address before: 810000 80 Wusi West Road, Chengxi District, Xining City, Qinghai Province Applicant before: Qinghai green energy data Co.,Ltd. Applicant before: BEIJING JOIN BRIGHT DIGITAL POWER TECHNOLOGY Co.,Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |