CN111427092A CN202010403348.0A CN202010403348A CN111427092A CN 111427092 A CN111427092 A CN 111427092A CN 202010403348 A CN202010403348 A CN 202010403348A CN 111427092 A CN111427092 A CN 111427092A
Authority
CN
China
Prior art keywords
distance
power supply
electrode
polar
measurement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010403348.0A
Other languages
Chinese (zh)
Other versions
CN111427092B (en
Inventor
赵振华
刘建权
刘钧沅
蔡运胜
刘仕刚
王建青
曲为贵
孔祥栋
袁霆
于达
包久荣
徐如磊
杨远东
党伟民
邢印锁
刘战鹏
王飞
李松彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin North China Geological Exploration Institute Co ltd
Original Assignee
Tianjin North China Geological Exploration General Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin North China Geological Exploration General Institute filed Critical Tianjin North China Geological Exploration General Institute
Priority to CN202010403348.0A priority Critical patent/CN111427092B/en
Publication of CN111427092A publication Critical patent/CN111427092A/en
Application granted granted Critical
Publication of CN111427092B publication Critical patent/CN111427092B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V3/00Electric or magnetic prospecting or detecting; Measuring magnetic field characteristics of the earth, e.g. declination, deviation
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V3/00Electric or magnetic prospecting or detecting; Measuring magnetic field characteristics of the earth, e.g. declination, deviation
    • G01V3/02Electric or magnetic prospecting or detecting; Measuring magnetic field characteristics of the earth, e.g. declination, deviation operating with propagation of electric current

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Geophysics (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

The invention provides a method for improving the efficiency of geophysical prospecting deep field construction, which comprises the following steps: laying depth measuring points and making a polar distance table; and respectively arranging power supply electrodes and receiving electrode distances at two sides of the measuring points along the section direction according to the values of the power supply electrode distance AB/2 and the receiving electrode distance MN/2 in the electrode distance table until the measurement work of all the measuring points is completed. The invention only needs to complete one-time arrangement of large polar distance, namely the power supply and receiving polar distance with the power supply polar distance AB/2 more than 65 meters, and circularly and roll measurement is carried out on the section according to the designed polar distance table, thus reducing the moving distance of the electrode arrangement compared with the original method for completing all measuring points, reducing the moving distance of the electrode arrangement personnel in the arrangement process of the power supply electrode AB, shortening the electrode arrangement time, greatly lightening the working strength of the electrode arrangement personnel, obviously improving the working efficiency, ensuring the field construction progress, and further being beneficial to the smooth completion of the expected task.

Description

Method for improving geophysical prospecting electrical deep field construction efficiency
Technical Field
The invention relates to the technical field of geological exploration, in particular to a method for improving geophysical prospecting deep field construction efficiency.
Background
The electrical sounding comprises resistivity sounding, induced polarization sounding and the like, and is widely applied to the fields of geological exploration, engineering exploration and the like as a geophysical prospecting method capable of displaying the two-dimensional earth electrical structural form in the depth direction on a section. The field measurement is carried out on the symmetrical quadrupole device in a depth measuring mode by using a plurality of sets of combined power supply electrode distances and receiving electrode distances point by point (see table 1 in detail, the electrode distance table can be changed according to actual conditions, and the maximum AB/2 power supply electrode distance can also be increased), and the detection depth of the depth measuring method is deeper along with the increase of the power supply electrode distances.
TABLE 1 electric deep power supply and receiving polar distance arrangement change table
AB/2 6.0 9.0 15 25 40 40 65 65 100 150 220 220 340
MN/2 3.0 3.0 3.0 3.0 3.0 12 3.0 12 12 12 12 40 12
AB/2 340 500 750 1000 1500
MN/2 40 40 40 40 40
The original field working method for depth measurement of the symmetrical quadrupole device comprises the following steps of;
1. connecting a power supply electrode AB and a measuring station and paying off to the measuring point, respectively arranging the power supply electrode and a receiving electrode on two sides of the measuring point along the section direction according to AB/2 and MN/2 values in the table 1, starting power supply and measurement by the measuring station after the arrangement is finished, and gradually changing AB/2 and MN/2 according to the table 1 to measure after the measurement is finished until the maximum AB/2 in a polar distance table is measured to be 1500 m polar distance, and finishing the measurement of the measuring point.
2. And moving the measuring point distance along the section direction AB and MN simultaneously to reach a new measuring point, wherein AB/2 and MN/2 are respectively 1500 m and 40 m in the table 1, starting measurement after arrangement, gradually changing AB/2 and MN/2 according to the table 1 for measurement, and completing the measuring point measurement until the minimum AB/2 in the polar distance table is measured to be 6 m.
3. And moving AB and MN again according to the point distance of the measuring point to reach a new measuring point, and measuring the measuring point according to the step 1.
4. Moving AB and MN according to the measuring point distance to reach a new measuring point, and measuring the measuring point according to the step 2.
5. And repeating the steps until all the measuring points are measured.
The method needs to perform the conversion of all the power supply polar distances and the receiving polar distances in the polar distance table by subtracting the number of the measuring points, the working efficiency is low, meanwhile, the working intensity of pole arrangement personnel is greatly increased, the field construction progress cannot be guaranteed, and the smooth completion of the expected task is influenced.
Disclosure of Invention
The invention aims to overcome the defects of the prior art and provides a method for improving the efficiency of geophysical prospecting deep field construction.
In order to achieve the purpose, the invention adopts the following technical scheme:
a method for improving the efficiency of geophysical prospecting deep field construction is characterized by comprising the following steps:
(1) laying depth measuring points according to the actual situation of the field for depth measurement, and formulating a polar distance table comprising a plurality of groups of power supply polar distances AB/2 and receiving polar distances MN/2;
(2) when the power supply polar distance AB/2 is more than 65 meters, connecting a power supply electrode AB of the symmetrical quadrupole device with a measuring station and paying off to the measuring point, respectively arranging power supply electrode and receiving polar distance on two sides of the measuring point along the cross section direction according to the values of the power supply polar distance AB/2 and the receiving polar distance MN/2 in the polar distance table in the step (1), starting power supply and measurement by the measuring station after arrangement, and gradually changing the power supply polar distance AB/2 and the receiving polar distance MN/2 according to the polar distance table in the step (1) to measure until the maximum power supply polar distance AB/2 in the polar distance table is measured, so that the measuring point measurement is completed;
(3) the power supply electrode AB and the receiving electrode MN move the measuring point distance simultaneously along the positive direction of the section to reach a new measuring point, at the moment, the power supply electrode AB/2 and the receiving electrode MN/2 are respectively the maximum power supply electrode distance AB/2 and the receiving electrode distance MN/2 corresponding to the maximum power supply electrode distance in the pole distance table, measurement is started after arrangement is finished, the measuring point distance measurement is finished, the power supply electrode AB and the receiving electrode MN move the measuring point distance simultaneously to reach the new measuring point, the pole distance measurement of the new measuring point, which is the same as the maximum power supply electrode distance AB/2 and the receiving electrode distance MN/2 corresponding to the maximum power supply electrode distance AB/2, is finished, and the measurement of all measuring points, the maximum power supply electrode distance AB/2 and the receiving electrode distance MN/2 corresponding to the maximum power supply electrode distance AB/2 is finished according to the method;
(4) converting the power supply polar distance AB/2 into a second large power supply polar distance AB/2 in the polar distance table, and converting the receiving polar distance MN/2 into a receiving polar distance MN/2 corresponding to the second large power supply polar distance AB/2 in the polar distance table to finish the measurement of the measuring point; moving the measuring point distances along the opposite directions AB and MN of the section to a new measuring point, and completing the measurement of the pole distance between the new measuring point and the second-largest power supply pole distance AB/2 and the pole distance measurement which is the same as the receiving pole distance MN/2 corresponding to the second-largest power supply pole distance AB/2, and completing the measurement of the pole distances between all the measuring points and the largest power supply pole distance AB/2 and the receiving pole distance MN/2 corresponding to the second-largest power supply pole distance AB/2 by the method, gradually reducing the power supply pole distances AB/2 and completing the corresponding pole distance measurement according to the method until completing the pole distance measurement of the receiving pole distance MN/2 corresponding to the power supply pole distance AB/2 which is more than the middle pole distance in the pole distance table;
(5) and when the power supply electrode distance AB/2 is less than 65 meters, completing the electrode distance measurement work of the power supply electrode distance AB/2 point by point according to the original observation method until finishing the measurement work of all measuring points.
Preferably, the power supply electrode AB is connected to an external power supply system.
Preferably, the receiving electrode MN is connected to an external receiving system.
Preferably, the distance moved by the power supply electrode AB is the product of the difference between the power supply electrode distance AB/2 equal to or greater than the middle pole distance and the point distance of the measuring point subtracted by 1.
The invention has the beneficial effects that: the invention provides a method for improving the efficiency of geophysical prospecting deep field construction, which only needs to complete one-time arrangement of a large polar distance, namely a power supply polar distance AB/2 which is more than 65 meters, and performs circular rolling measurement according to a designed polar distance table on a section, thereby reducing the moving distance of an electrode arrangement compared with the original method for completing all measuring points, reducing the moving distance of electrode arrangement personnel in the process of arranging the power supply electrode AB, shortening the electrode arrangement time, greatly lightening the working strength of the electrode arrangement personnel, obviously improving the working efficiency, ensuring the field construction progress, and further being beneficial to the smooth completion of the expected task.
Drawings
FIG. 1 is a field construction flow chart of depth measurement of an original single-point symmetric quadrupole device;
FIG. 2 is a flow chart of field construction for depth measurement of an original symmetric quadrupole device;
FIG. 3 is a field depth measurement flow chart of the symmetric quadrupole device of the present invention;
the following detailed description will be made in conjunction with embodiments of the present invention with reference to the accompanying drawings.
Detailed Description
The invention is further illustrated by the following examples:
a method for improving the efficiency of geophysical prospecting deep field construction is characterized by comprising the following steps:
(1) laying depth measuring points according to the actual situation of the field for depth measurement, and formulating a polar distance table comprising a plurality of groups of power supply polar distances AB/2 and receiving polar distances MN/2;
(2) when the power supply polar distance AB/2 is more than 65 meters, connecting a power supply electrode AB of the symmetrical quadrupole device with a measuring station and paying off to the measuring point, respectively arranging power supply electrode and receiving polar distance on two sides of the measuring point along the cross section direction according to the values of the power supply polar distance AB/2 and the receiving polar distance MN/2 in the polar distance table in the step (1), starting power supply and measurement by the measuring station after arrangement, and gradually changing the power supply polar distance AB/2 and the receiving polar distance MN/2 according to the polar distance table in the step (1) to measure until the maximum power supply polar distance AB/2 in the polar distance table is measured, so that the measuring point measurement is completed;
(3) the power supply electrode AB and the receiving electrode MN move the measuring point distance simultaneously along the positive direction of the section to reach a new measuring point, at the moment, the power supply electrode AB/2 and the receiving electrode MN/2 are respectively the maximum power supply electrode distance AB/2 and the receiving electrode distance MN/2 corresponding to the maximum power supply electrode distance in the pole distance table, after the arrangement is finished, the measurement is started to finish the measurement of the pole distance of the measuring point, the power supply electrode AB and the receiving electrode MN move the measuring point distance simultaneously to reach the new measuring point, the measurement of the new measuring point and the maximum power supply electrode distance AB/2 and the receiving electrode distance MN/2 corresponding to the maximum power supply electrode distance AB/2 is finished, and the measurement of the pole distances of all measuring points and the maximum power supply electrode distance AB/2 and the receiving electrode distance MN/2 corresponding to the maximum power supply electrode distance AB/2 is finished by the method;
(4) converting the power supply polar distance AB/2 into a second large power supply polar distance AB/2 in the polar distance table, and converting the receiving polar distance MN/2 into a receiving polar distance MN/2 corresponding to the second large power supply polar distance AB/2 in the polar distance table to finish the measurement of the measuring point; moving the measuring point distances along the opposite directions AB and MN of the section to a new measuring point, and completing the measurement of the pole distance between the new measuring point and the second-largest power supply pole distance AB/2 and the pole distance measurement which is the same as the receiving pole distance MN/2 corresponding to the second-largest power supply pole distance AB/2, and completing the measurement of the pole distances between all the measuring points and the largest power supply pole distance AB/2 and the receiving pole distance MN/2 corresponding to the second-largest power supply pole distance AB/2 by the method, gradually reducing the power supply pole distances AB/2 and completing the corresponding pole distance measurement according to the method until completing the pole distance measurement of the receiving pole distance MN/2 corresponding to the power supply pole distance AB/2 which is more than the middle pole distance in the pole distance table;
(5) and when the power supply electrode distance AB/2 is less than 65 meters, completing the electrode distance measurement work of the power supply electrode distance AB/2 point by point according to the original observation method until finishing the measurement work of all measuring points.
Preferably, the power supply electrode AB is connected to an external power supply system.
Preferably, the receiving electrode MN is connected to an external receiving system.
Preferably, the distance moved by the power supply electrode AB is the product of the difference between the power supply electrode distance AB/2 equal to or greater than the middle pole distance and the point distance of the measuring point subtracted by 1.
Examples
A method for improving the efficiency of geophysical prospecting deep field construction comprises the following steps:
(1) laying depth measuring points according to the actual situation of the field for depth measurement, and making a polar distance table comprising a plurality of groups of power supply polar distances AB/2 and receiving polar distances MN/2, as shown in table 1;
(2) when the power supply polar distance AB/2 is more than 65 meters, connecting a power supply electrode AB of the symmetrical quadrupole device with a measuring station and paying off to a measuring point, respectively arranging the power supply electrode and a receiving electrode on two sides of the measuring point along the section direction according to the values of AB/2 and MN/2 in the table 1, starting power supply and measurement of the measuring station after the arrangement is finished, and gradually changing AB/2 and MN/2 according to the table 1 for measurement after the measurement is finished until the maximum AB/2 in the polar distance table is measured to be 1500 meters of polar distance, and finishing the measurement of the measuring point;
(3) moving the measuring point distance along the positive direction AB and MN of the section simultaneously to reach a new measuring point, wherein AB/2 and MN/2 are respectively 1500 m and 40 m in the table 1, starting measurement after arrangement is finished, completing the measurement of the polar distance of the measuring point, moving the measuring point distance along the direction AB and MN of the section simultaneously to reach the new measuring point, completing the measurement of AB/2 of the new measuring point which is 1500 m and MN/2 which is 40 m, and completing the measurement of all the measuring points AB/2 which is 1500 m and MN/2 which is 40 m;
(4) the distance between the power supply electrode and the receiving electrode is changed into AB/2 which is 1000 meters, MN/2 which is 40 meters, the measurement of the measuring point is completed, the distance between the measuring point and the MN is moved along the opposite direction of the section, the new measuring point is reached, the measurement of the distance between the AB/2 which is 1000 meters and the MN/2 which is 40 meters of the new measuring point is completed, and the measurement of the distance between the AB/2 which is 1000 meters and the MN/2 which is 40 meters of all the measuring points is completed by analogy; gradually reducing the power supply polar distance according to the method and completing the corresponding polar distance measurement until AB/2 is completed as 100 meters of polar distance measurement;
(5) according to the original observation method, the polar distance measurement work of AB/2-65 m and MN/2-3 m is finished point by point until all the measurement points are finished.
And the power supply electrode AB is connected with an external power supply system.
And the receiving electrode MN is connected with an external receiving system.
The moving distance of the power supply electrode AB is the product of the difference value of the power supply electrode distance AB/2 above the middle pole distance and the difference of the point distance of the measuring point subtracted by 1 from the number of the point of the measuring point.
The invention has been described in an illustrative manner, and it is to be understood that the invention is not limited to the specific embodiments described above, but is intended to cover various modifications, which may be made by the methods and technical solutions of the invention, or may be applied to other applications without modification.

Claims (4)

1. A method for improving the efficiency of geophysical prospecting deep field construction is characterized by comprising the following steps:
(1) laying depth measuring points according to the actual situation of the field for depth measurement, and formulating a polar distance table comprising a plurality of groups of power supply polar distances AB/2 and receiving polar distances MN/2;
(2) when the power supply polar distance AB/2 is more than 65 meters, connecting a power supply electrode AB of the symmetrical quadrupole device with a measuring station and paying off to the measuring point, respectively arranging power supply electrode and receiving polar distance on two sides of the measuring point along the cross section direction according to the values of the power supply polar distance AB/2 and the receiving polar distance MN/2 in the polar distance table in the step (1), starting power supply and measurement by the measuring station after arrangement, and gradually changing the power supply polar distance AB/2 and the receiving polar distance MN/2 according to the polar distance table in the step (1) to measure until the maximum power supply polar distance AB/2 in the polar distance table is measured, so that the measuring point measurement is completed;
(3) the power supply electrode AB and the receiving electrode MN move the measuring point distance simultaneously along the positive direction of the section to reach a new measuring point, at the moment, the power supply electrode AB/2 and the receiving electrode MN/2 are respectively the maximum power supply electrode distance AB/2 and the receiving electrode distance MN/2 corresponding to the maximum power supply electrode distance in the pole distance table, after the arrangement is finished, the measurement is started to finish the measurement of the pole distance of the measuring point, the power supply electrode AB and the receiving electrode MN move the measuring point distance simultaneously to reach the new measuring point, the measurement of the new measuring point and the maximum power supply electrode distance AB/2 and the receiving electrode distance MN/2 corresponding to the maximum power supply electrode distance AB/2 is finished, and the measurement of the pole distances of all measuring points and the maximum power supply electrode distance AB/2 and the receiving electrode distance MN/2 corresponding to the maximum power supply electrode distance AB/2 is finished by the method;
(4) converting the power supply polar distance AB/2 into a second large power supply polar distance AB/2 in the polar distance table, and converting the receiving polar distance MN/2 into a receiving polar distance MN/2 corresponding to the second large power supply polar distance AB/2 in the polar distance table to finish the measurement of the measuring point; moving the measuring point distances along the opposite directions AB and MN of the section to a new measuring point, and completing the measurement of the pole distance between the new measuring point and the second-largest power supply pole distance AB/2 and the pole distance measurement which is the same as the receiving pole distance MN/2 corresponding to the second-largest power supply pole distance AB/2, and completing the measurement of the pole distances between all the measuring points and the largest power supply pole distance AB/2 and the receiving pole distance MN/2 corresponding to the second-largest power supply pole distance AB/2 by the method, gradually reducing the power supply pole distances AB/2 and completing the corresponding pole distance measurement according to the method until completing the pole distance measurement of the receiving pole distance MN/2 corresponding to the power supply pole distance AB/2 which is more than the middle pole distance in the pole distance table;
(5) and when the power supply electrode distance AB/2 is less than 65 meters, completing the electrode distance measurement work of the power supply electrode distance AB/2 point by point according to the original observation method until finishing the measurement work of all measuring points.
2. The method for improving the efficiency of geophysical prospecting deep field construction according to claim 1, wherein the power supply electrode AB is connected with an external power supply system.
3. The method for improving the efficiency of geophysical prospecting deep field construction according to claim 1, wherein the receiving electrode MN is connected with an external receiving system.
4. The method for improving the outdoor construction efficiency of geophysical prospecting depth according to claim 1, wherein the moving distance of the power supply electrode AB is the product of the difference of the power supply electrode distance AB/2 above the middle pole distance and the point distance of the measuring point subtracted by 1.
CN202010403348.0A 2020-05-13 2020-05-13 Method for improving geophysical prospecting electrical sounding deep field construction efficiency Active CN111427092B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010403348.0A CN111427092B (en) 2020-05-13 2020-05-13 Method for improving geophysical prospecting electrical sounding deep field construction efficiency

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010403348.0A CN111427092B (en) 2020-05-13 2020-05-13 Method for improving geophysical prospecting electrical sounding deep field construction efficiency

Publications (2)

Publication Number Publication Date
CN111427092A true CN111427092A (en) 2020-07-17
CN111427092B CN111427092B (en) 2022-12-27

Family

ID=71558827

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010403348.0A Active CN111427092B (en) 2020-05-13 2020-05-13 Method for improving geophysical prospecting electrical sounding deep field construction efficiency

Country Status (1)

Country Link
CN (1) CN111427092B (en)

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10260264A (en) * 1997-03-17 1998-09-29 Nippon Chika Tansa:Kk Specific resistance electric searching method
US20050218914A1 (en) * 2004-03-31 2005-10-06 Peteralv Brabers Electrode configuration for resistivity sounding
CN101603419A (en) * 2009-07-09 2009-12-16 煤炭科学研究总院西安研究院 A kind of detection method of mine direct current method of coal face coal seam perspecitivity
CN101762825A (en) * 2009-12-30 2010-06-30 昆明理工大学 Data collecting way by high density electrical method
CN103809202A (en) * 2012-11-09 2014-05-21 徐世铭 Induced polarization sounding multichannel observation method
CN103955000A (en) * 2014-04-02 2014-07-30 中国冶金地质总局山东正元地质勘查院 Three-dimensional electrical sounding method
CN104049279A (en) * 2014-06-28 2014-09-17 桂林理工大学 Method for positioning artificial wetland clogging area through resistivity curve
CN104502986A (en) * 2014-12-09 2015-04-08 天津华勘集团有限公司 Chromatography processing method for geophysical prospecting induced-polarization sounding data
CN104678447A (en) * 2015-03-27 2015-06-03 中国矿业大学 High-efficiency data acquisition system adopting mine direct-current electrical method and method of high-efficiency data acquisition system
CN105301661A (en) * 2015-11-30 2016-02-03 中国电建集团贵阳勘测设计研究院有限公司 Random measurement method for water electrical prospecting
US20170052271A1 (en) * 2015-08-17 2017-02-23 Vladimir Kiasper Method for marine electric survey of oil-gas deposits and apparatus for carrying out thereof
CN106646624A (en) * 2016-12-25 2017-05-10 中南大学 Asymmetric electrical method-based sounding method
RU2015151145A (en) * 2015-11-27 2017-06-01 Владимир Петрович Колесников Method of geoelectrical exploration
CN110471122A (en) * 2019-08-23 2019-11-19 李忠平 A kind of 3 D resistivity depth measurement application method based on high-density electric urethane acrylate anionomer
CN210442516U (en) * 2019-08-23 2020-05-01 李忠平 Hybrid electric sounding device

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10260264A (en) * 1997-03-17 1998-09-29 Nippon Chika Tansa:Kk Specific resistance electric searching method
US20050218914A1 (en) * 2004-03-31 2005-10-06 Peteralv Brabers Electrode configuration for resistivity sounding
CN101603419A (en) * 2009-07-09 2009-12-16 煤炭科学研究总院西安研究院 A kind of detection method of mine direct current method of coal face coal seam perspecitivity
CN101762825A (en) * 2009-12-30 2010-06-30 昆明理工大学 Data collecting way by high density electrical method
CN103809202A (en) * 2012-11-09 2014-05-21 徐世铭 Induced polarization sounding multichannel observation method
CN103955000A (en) * 2014-04-02 2014-07-30 中国冶金地质总局山东正元地质勘查院 Three-dimensional electrical sounding method
CN104049279A (en) * 2014-06-28 2014-09-17 桂林理工大学 Method for positioning artificial wetland clogging area through resistivity curve
CN104502986A (en) * 2014-12-09 2015-04-08 天津华勘集团有限公司 Chromatography processing method for geophysical prospecting induced-polarization sounding data
CN104678447A (en) * 2015-03-27 2015-06-03 中国矿业大学 High-efficiency data acquisition system adopting mine direct-current electrical method and method of high-efficiency data acquisition system
US20170052271A1 (en) * 2015-08-17 2017-02-23 Vladimir Kiasper Method for marine electric survey of oil-gas deposits and apparatus for carrying out thereof
RU2015151145A (en) * 2015-11-27 2017-06-01 Владимир Петрович Колесников Method of geoelectrical exploration
CN105301661A (en) * 2015-11-30 2016-02-03 中国电建集团贵阳勘测设计研究院有限公司 Random measurement method for water electrical prospecting
CN106646624A (en) * 2016-12-25 2017-05-10 中南大学 Asymmetric electrical method-based sounding method
CN110471122A (en) * 2019-08-23 2019-11-19 李忠平 A kind of 3 D resistivity depth measurement application method based on high-density electric urethane acrylate anionomer
CN210442516U (en) * 2019-08-23 2020-05-01 李忠平 Hybrid electric sounding device

Non-Patent Citations (7)

* Cited by examiner, † Cited by third party
Title
NAVEEN KUMARTAMANAM等: "Identification of Sub-Surface Formations in Different Geological Environs Using ERI (Multi Electrodes) at Kadalangudi and Kottuchurry, Cavery Plain Area", 《PROCEDIA EARTH AND PLANETARY SCIENCE》 *
于纪玉等: "综合物探法在鲁东变质岩找水中的应用", 《安徽农业科学》 *
冉军林等: "组合激电测深装置的应用与研究", 《物探与化探》 *
方仁培等: "浅析金属矿电法勘探技术的应用与发展", 《中国城市经济》 *
易波: "电阻率层析成像技术在阳安铁路翻浆冒泥探测中的应用", 《路基工程》 *
蔡运胜等: "激发极化法工作原理方法及应用效果探讨", 《矿产勘查》 *
邱光辉等: "四极梯度测深在智利某铜矿区的应用", 《物探与化探》 *

Also Published As

Publication number Publication date
CN111427092B (en) 2022-12-27

Similar Documents

Publication Publication Date Title
CN102520071A (en) Transmission tower modal parameter identification method based on improved subspace algorithm
CN100480734C (en) High resolution static frequency domain removed magnetotelluric method
CN101419294B (en) Multichannel measuring electrode converter and measurement method thereof
CN110632131B (en) Method for monitoring leakage of channel embankment project
CN106093534A (en) A kind of method testing earth mat step voltage and contact voltage
CN110879418B (en) Frequency domain electric source electromagnetic field apparent conductivity calculation method
CN106570227B (en) A kind of electrode arrangement optimization method and device of ultra high density electrical method
CN102879828A (en) Audio magnetotelluric optimized collection method
CN115795994B (en) Method for inverting logging data of azimuth electromagnetic wave while drilling based on Unet convolutional neural network
CN103235344B (en) Two lanes multi-electrode electricity perspective detection system
CN102590686B (en) A kind of method for determining radio interference of bipolar direct current transmission line
CN111427092B (en) Method for improving geophysical prospecting electrical sounding deep field construction efficiency
CN204945397U (en) The high-density electric instrument of magnetoelectricity signal can be received
CN108197393B (en) Design method of spiral grounding electrode with resistance reduction function
CN203658601U (en) A tunnel model test device achieving multiple geophysical field advanced detection
CN202256507U (en) Grounding resistance monitoring device
CN107015285A (en) A kind of bearing calibration for observing apparent resistivity and system
CN201716425U (en) High-density natural electric field frequency selection and geophysical prospecting measuring apparatus
CN104793065A (en) Method of determining radio interference in AC transmission line crossed erection region
CN103560281B (en) A kind of solar energy lead acid accumulator fast charge method
Karnas et al. Influence of different multilayer soil models on grounding system resistance
CN104502986B (en) Physical prospecting induced electrical sounding data chromatography processing method
CN110596762A (en) Control method of distributed parallel direct current electrical method device
CN104656146A (en) Intelligent cable for high density electrical measurement system and measurement method
CN103809202A (en) Induced polarization sounding multichannel observation method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240220

Address after: 300170 room 313, office building, No. 67, Guangrui West Road, Hedong District, Tianjin

Patentee after: Tianjin North China Geological Exploration Institute Co.,Ltd.

Country or region after: China

Address before: NO.67, Guangrui West Road, Hedong District, Tianjin

Patentee before: TIANJIN NORTH CHINA GEOLOGICAL EXPLORATION GENERAL INSTITUTE

Country or region before: China

TR01 Transfer of patent right