CN111400800B - Building construction quality control system and method based on BIM and VR technology - Google Patents

Building construction quality control system and method based on BIM and VR technology Download PDF

Info

Publication number
CN111400800B
CN111400800B CN202010174228.8A CN202010174228A CN111400800B CN 111400800 B CN111400800 B CN 111400800B CN 202010174228 A CN202010174228 A CN 202010174228A CN 111400800 B CN111400800 B CN 111400800B
Authority
CN
China
Prior art keywords
module
decoration
construction
design
total
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010174228.8A
Other languages
Chinese (zh)
Other versions
CN111400800A (en
Inventor
陈宏伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Shenbai Digital Image Design Co.,Ltd.
Original Assignee
Shenzhen Shenbai Digital Image Design Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Shenbai Digital Image Design Co ltd filed Critical Shenzhen Shenbai Digital Image Design Co ltd
Priority to CN202010174228.8A priority Critical patent/CN111400800B/en
Publication of CN111400800A publication Critical patent/CN111400800A/en
Application granted granted Critical
Publication of CN111400800B publication Critical patent/CN111400800B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F3/00Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
    • G06F3/01Input arrangements or combined input and output arrangements for interaction between user and computer
    • G06F3/011Arrangements for interaction with the human body, e.g. for user immersion in virtual reality
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06395Quality analysis or management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T7/00Image analysis
    • G06T7/0002Inspection of images, e.g. flaw detection
    • G06T7/0004Industrial image inspection
    • G06T7/001Industrial image inspection using an image reference approach
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T2207/00Indexing scheme for image analysis or image enhancement
    • G06T2207/10Image acquisition modality
    • G06T2207/10004Still image; Photographic image
    • G06T2207/10012Stereo images
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T2207/00Indexing scheme for image analysis or image enhancement
    • G06T2207/30Subject of image; Context of image processing
    • G06T2207/30108Industrial image inspection
    • G06T2207/30132Masonry; Concrete

Abstract

The invention discloses a building construction quality control system and method based on BIM and VR technology, the system comprises an initial VR projection module, a construction material suggestion pre-selection module, a real-time construction monitoring module, a BIM difference comparison module and a main structure detail presentation module, wherein the initial VR projection module is used for VR imaging of a selected design drawing, the construction material suggestion pre-selection module is used for providing suggestions of construction materials but selecting decoration materials according to the requirements of customers, the real-time construction monitoring module is used for carrying out real-time measurement, acceptance and monitoring on a construction site, the BIM difference comparison module is used for comparing the selected design drawing with actual site decoration, and the main structure detail presentation module is used for carrying out quality evaluation on a main structure after finishing decoration, and the system has the advantages that: the invention can actually check the construction quality of the house and avoid the difference between the actual house and the template house.

Description

Building construction quality control system and method based on BIM and VR technology
Technical Field
The invention relates to the field of buildings, in particular to a building construction quality control system and method based on BIM and VR technology.
Background
The BIM is a new tool for architecture, engineering and civil engineering, and its core is to provide a complete building engineering information base consistent with the actual situation for the model by establishing a virtual building engineering three-dimensional model and using digital technology. The information base not only contains geometrical information, professional attributes and state information describing building components, but also contains state information of non-component objects (such as space and motion behaviors). By means of the three-dimensional model containing the construction engineering information, the information integration degree of the construction engineering is greatly improved, and therefore a platform for engineering information exchange and sharing is provided for related interest parties of the construction engineering project.
VR is a virtual reality technology that encompasses a computer, electronic information, and simulation technologies, and is basically implemented in such a way that the computer simulates a virtual environment to give people a sense of environmental immersion. With the continuous development of social productivity and scientific technology, VR technology is increasingly in great demand in various industries. The VR technology has made great progress and gradually becomes a new virtual reality technology in the scientific and technical field, that is, the virtual reality technology utilizes data in real life and combines electronic signals generated by computer technology with various output devices to convert the electronic signals into phenomena which can be felt by people, and the phenomena can be true and real objects in reality and can also be substances which can not be seen by the naked eyes and are expressed by a three-dimensional model. Because these phenomena are not directly visible, but are simulated by computer technology, they are called virtual reality;
the Chinese patent with the current publication number of CN109583085A discloses a building construction quality control method based on BIM and VR technology, which comprises the steps of creating a deepened graph of sample plate nodes of each professional virtual process; creating a visual process template based on the BIM technology; identifying detailed components, materials, quality acceptance standard diagrams and construction process flow diagrams in a virtual process sample plate based on a BIM technology, and rendering and creating a 4K-level process node diagram; creating a virtual process template three-dimensional panorama by using VR technology; compiling a detail node introduction description audio file in the virtual process template; uploading the BIM + VR virtual process template drawing and the audio file to a VR-level cloud management platform; and adding a virtual process template construction process introduction audio file in the VR-level cloud management platform.
Although the building construction quality control method based on the BIM and VR technology realizes the application of the BIM technology and the VR technology in a virtual process sample plate, realizes the management concept of green construction with land saving, material saving and energy saving, and has high economic benefit and social benefit, the information of a client and a construction party is asymmetric due to the inexperience of the client to the building industry, and the construction process performed in the virtual sample plate has certain packing property and exemplarity, and the construction quality of a house can not be actually checked.
Disclosure of Invention
The invention aims to provide a building construction quality control system and method based on BIM and VR technologies, so as to solve the problems in the prior art.
In order to achieve the purpose, the invention provides the following technical scheme:
a building construction quality control system based on BIM and VR technology comprises an initial VR image projection module, a construction material suggestion pre-selection module, a real-time construction monitoring module, a BIM difference comparison module and a main structure detail presentation module, wherein the initial VR image projection module, the construction material suggestion pre-selection module and the real-time construction monitoring module are sequentially connected through an intranet;
the initial VR image projection module is used for performing VR imaging on a selected design drawing, the construction material suggestion pre-selection module is used for providing suggestions of construction materials and selecting decoration materials according to the requirements of customers, the real-time construction monitoring module is used for performing real-time measurement, acceptance and monitoring on a construction site, the BIM difference comparison module is used for comparing the selected design drawing with actual site decoration, and the main structure detail presentation module is used for performing quality evaluation on a main structure after finishing decoration.
According to the technical scheme: the initial VR projection module comprises a design concept diagram selection submodule and a VR template house construction design detail module, the design concept diagram selection submodule is used for selecting design diagrams of different house types according to own preferences so as to carry out AR imaging, the VR template house construction design detail module is used for explaining the design details of a template house type selected by a customer, the design details comprise room proportion and design function, and the design concept diagram selection submodule is connected with the construction material suggestion pre-selection module through an intranet.
According to the technical scheme: the VR template house construction design detail module comprises a virtual scene construction unit, the virtual scene construction unit is used for virtually imaging a decoration design drawing selected by a customer, a data glove is arranged inside the virtual scene construction unit and used for enabling a user to perform multi-mode operation in a virtual scene constructed by VR, the multi-mode operation comprises adjustment of furniture inside the virtual scene, change of wall color, change of setting in the virtual scene according to instructions of the user, and calculation of feasibility of changing of setting of the virtual scene according to data information of different areas, when the calculation feasibility is larger than 80%, the setting modified by the customer is used by default, and when the calculation feasibility is smaller than 80%, a designer needs to confirm a scheme with the customer again.
According to the technical scheme: the construction material suggestion pre-selection module comprises a material suggestion submodule and a user self-selection submodule, wherein the material suggestion submodule is used for suggesting materials according to a sample house type selected by a user, the interior of each suggested material contains the material, color, price, advantages and disadvantages and brand of the material, and the user self-selection submodule is used for enabling the user to purchase the decoration material according to the suggestion.
According to the technical scheme: the real-time construction monitoring module comprises a plurality of cameras and a partition image comparison sub-module, the cameras are used for collecting actual decoration conditions inside a house, decoration images are collected through the cameras, the collected decoration images are cut according to similar heights, the cut images are sent to the partition image comparison sub-module, the partition image comparison sub-module compares the collected images with sample plates according to four corners of different rooms in similarity, coordinates of measuring points of each wall of the room are set to be (w, x, y and z), coordinates of each image from the measuring points of the four corners to the center are set to be (wi, xi, yi and zi), i is 1, 2, … and n, and images of each image of the wall of the room, corresponding to the sample plates, are sent to the BIM difference comparison module to compare the similarity.
According to the technical scheme: the BIM difference comparison module comprises a problem real-time feedback sub-module and an artificial response channel, and the BIM difference comparison module is set to detect the similarity of each image of one wall to a corresponding decoration area of the sample plate respectivelya1, a2, a3, an-1 and an, and setting the mean value of the similarity of each wall as
Figure DEST_PATH_IMAGE002
= (a 1+ a2+ a3+. + an-1+ an)/n, when
Figure DEST_PATH_IMAGE002A
Greater than 80% of the set threshold value, and reaching the acceptance level by default when the threshold value is greater than the set threshold value
Figure DEST_PATH_IMAGE002AA
And when the similarity of the wall surface is lower than 80%, the problem real-time feedback submodule feeds back the data, and the artificial response channel timely responds to the problem by a client.
According to the technical scheme: the main structure detail presentation module comprises a quality evaluation module and a decoration total budget estimation module, wherein the quality evaluation module is used for carrying out all-around detection and evaluation on decoration interior, material impermeability, material hardness, ageing resistance, wear resistance and main wall thickness, the decoration total budget estimation module estimates the total decoration amount of the house type interior and sends the estimated value to a user, and the decoration total budget estimation module carries out total estimation on design cost, material cost, labor cost and time cost.
By adopting the technical scheme: the quality evaluation module carries out all-around evaluation on the internal structure and details of the decoration, the quality score of each point is obtained according to values of different quality indexes of the interior, the material seepage resistance, the material hardness, the aging resistance, the wear resistance and the main wall thickness of the decoration, the quality score is 1-10, the quality scores are set to be B1, B2, B3, B4, B5 and B6 respectively, whether the B1, B2, B3, B4, B5 and B6 belong to {6, 10} or not is judged, the quality index of which the quality score does not belong to {6, 10} is rejected, the quality index directly verified to be not up to the acceptance standard, and when the quality index meets the {6, 10} or the quality index mean value = is calculated according to a formula
Figure DEST_PATH_IMAGE004
(B1 + B2+ B3+ B4+ B5+ B6), when the average value of the quality index is more than 7,the acceptance criteria are met and the customer is notified to accept.
A building construction quality control method based on BIM and VR technology comprises the following steps:
s1: performing VR imaging on the selected design drawing by using an initial VR projection module, selecting design drawings of different house types by a design concept drawing selection submodule according to own preferences so as to perform AR imaging, and explaining design details of a sample house type selected by a customer by using a VR sample house construction design detail module, wherein the design details comprise room proportion and design function;
s2: the construction material suggestion preselection module is used for providing suggestions of construction materials, but the decoration materials are selected according to the requirements of customers, the material suggestion submodule is used for suggesting materials according to a sample house type selected by a user, the interior of each suggestion material contains the material, color, price, advantages and disadvantages and brands of the material, and the user self-selection submodule enables the user to purchase the decoration materials according to the suggestions;
s3: the method comprises the steps that a real-time construction monitoring module is used for carrying out real-time measurement, acceptance and monitoring on a construction site, a plurality of cameras are used for collecting actual decoration conditions inside a house, decoration images are collected through the cameras, the collected decoration images are cut according to similar heights, the cut images are sent to a partitioned image comparison sub-module, the partitioned image comparison sub-module is used for carrying out similarity comparison on the collected images and sample plate decoration according to four corners of different rooms, coordinates of measuring points of each wall of the room are set to be (w, x, y, z), coordinates of each image from the four corner measuring points to the center are set to be (wi, xi, yi, zi), i is 1, 2, … and n, and images of areas corresponding to the sample plates of each image of the wall surfaces of the room are sent to a BIM difference comparison module for carrying out similarity comparison;
s4: comparing the selected design drawing with actual field decoration by using a BIM difference comparison module, setting the similarity of each image of one wall detected by the BIM difference comparison module to the corresponding region of the sample plate for decoration as a1, a2, a3, a
Figure DEST_PATH_IMAGE002AAA
= (a 1, a2, a 3.,. an-1, an)/n, when
Figure DEST_PATH_IMAGE002AAAA
Greater than 80% of the set threshold value, and reaching the acceptance level by default when the threshold value is greater than the set threshold value
Figure DEST_PATH_IMAGE002AAAAA
When the similarity of the wall surface is lower than 80%, the data are sent to a problem real-time feedback submodule, the problem real-time feedback submodule feeds back the similarity of the wall surface lower than 80%, and a manual response channel timely responds to the problem by a client;
s5: the main structure after finishing decoration is subjected to quality evaluation by using the main structure detail presentation module, the quality evaluation module carries out all-dimensional detection and evaluation on the interior of the decoration, the impermeability of materials, the hardness of the materials, the ageing resistance, the wear resistance and the thickness of the main wall, and the decoration total budget estimation module estimates the total sum of the house interior decoration and sends the estimated value to a user.
According to the technical scheme: in step S5, the main structure detail presentation module is used to perform quality assessment on the main structure after finishing decoration, the quality assessment module performs all-round detection and assessment on the interior of the decoration, the impermeability of materials, the hardness of materials, the aging resistance, the wear resistance and the thickness of the main wall, the decoration total budget estimation module estimates the total decoration amount of the house interior and sends the estimated value to the user, and the method further comprises the following steps:
the total budget estimation module of fitment carries out total estimation to design cost, material cost, labour cost and time cost, and the cost of setting for the design cost is A, and the cost of labour cost is B every day, and the cost of time cost is B, and the cost of each area material cost is C, sets for indoor length to be x, and the width is y, and the room height is h, and the door and window area is Z, sets for the wall area to be S1, and the top surface area is S2, and total area is S total, and the total budget of fitment is R total, according to the formula:
S1=(x+y)*2*h
S2=x*y
s total = [ (x + y) × 2 × h ] + (x × y) -Z
Total of R = a + Bb + [ (x + y) 2+ h + (x + y) -Z ]. C
And the decoration total budget estimation module sends the calculated R total to a client for checking, so that acceptance can be better completed.
Compared with the prior art, the invention has the beneficial effects that: the invention can actually check the construction quality of the house, and avoid the difference between the actual house and the template house;
the construction material difference comparison module is used for comparing the selected design drawing with actual field decoration, and the main structure detail presentation module is used for carrying out quality evaluation on a main structure after finishing decoration.
Drawings
In order that the present invention may be more readily and clearly understood, a more particular description of the invention briefly described above will be rendered by reference to specific embodiments that are illustrated in the appended drawings.
FIG. 1 is a schematic block diagram of a building construction quality control system based on BIM and VR techniques according to the present invention;
FIG. 2 is a schematic diagram of concrete steps of a building construction quality control method based on BIM and VR technologies according to the present invention;
FIG. 3 is a schematic diagram of an implementation method of the building construction quality control system and method based on BIM and VR technologies.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1 to 3, in the embodiment of the invention, a building construction quality control system and method based on BIM and VR technologies includes an initial VR projection module, a construction material suggestion pre-selection module, a real-time construction monitoring module, a BIM difference comparison module, and a main structure detail presentation module, wherein the initial VR projection module, the construction material suggestion pre-selection module, and the real-time construction monitoring module are sequentially connected through an intranet, the BIM difference comparison module is respectively connected with the initial VR projection module and the real-time construction monitoring module through the intranet, and the main structure detail presentation module is respectively connected with the real-time construction monitoring module through the intranet;
the initial VR image projection module is used for performing VR imaging on a selected design drawing, the construction material suggestion pre-selection module is used for providing suggestions of construction materials and selecting decoration materials according to the requirements of customers, the real-time construction monitoring module is used for performing real-time measurement, acceptance and monitoring on a construction site, the BIM difference comparison module is used for comparing the selected design drawing with actual site decoration, and the main structure detail presentation module is used for performing quality evaluation on a main structure after finishing decoration.
According to the technical scheme: the initial VR projection module comprises a design concept diagram selection submodule and a VR template house construction design detail module, the design concept diagram selection submodule is used for selecting design diagrams of different house types according to own preferences so as to carry out AR imaging, the VR template house construction design detail module is used for explaining the design details of a template house type selected by a customer, the design details comprise room proportion and design function, and the design concept diagram selection submodule is connected with the construction material suggestion pre-selection module through an intranet.
According to the technical scheme: the VR template house construction design detail module comprises a virtual scene construction unit, the virtual scene construction unit is used for virtually imaging a decoration design drawing selected by a customer, a data glove is arranged inside the virtual scene construction unit and used for enabling a user to perform multi-mode operation in a virtual scene constructed by VR, the multi-mode operation comprises adjustment of furniture inside the virtual scene, change of wall color, change of setting in the virtual scene according to instructions of the user, and calculation of feasibility of changing of setting of the virtual scene according to data information of different areas, when the calculation feasibility is larger than 80%, the setting modified by the customer is used by default, and when the calculation feasibility is smaller than 80%, a designer needs to confirm a scheme with the customer again.
According to the technical scheme: the construction material suggestion pre-selection module comprises a material suggestion submodule and a user self-selection submodule, wherein the material suggestion submodule is used for suggesting materials according to a sample house type selected by a user, the interior of each suggested material contains the material, color, price, advantages and disadvantages and brand of the material, and the user self-selection submodule is used for enabling the user to purchase the decoration material according to the suggestion.
According to the technical scheme: the real-time construction monitoring module comprises a plurality of cameras and a partition image comparison sub-module, the cameras are used for collecting actual decoration conditions inside a house, decoration images are collected through the cameras, the collected decoration images are cut according to similar heights, the cut images are sent to the partition image comparison sub-module, the partition image comparison sub-module compares the collected images with sample plates according to four corners of different rooms in similarity, coordinates of measuring points of each wall of the room are set to be (w, x, y and z), coordinates of each image from the measuring points of the four corners to the center are set to be (wi, xi, yi and zi), i is 1, 2, … and n, and images of each image of the wall of the room, corresponding to the sample plates, are sent to the BIM difference comparison module to compare the similarity.
According to the technical scheme: the BIM difference comparison module comprises a problem real-time feedback sub-module and a manual response channel, the BIM difference comparison module is used for detecting that the similarity of each image of one wall to a corresponding region of a template decoration is respectively a1, a2, a3, a-1 and an, and the mean value of the similarity of each wall is set as
Figure DEST_PATH_IMAGE002AAAAAA
= (a 1+ a2+ a3+. + an-1+ an)/n, when
Figure DEST_PATH_IMAGE002AAAAAAA
Greater than 80% of the set threshold value, and reaching the acceptance level by default when the threshold value is greater than the set threshold value
Figure DEST_PATH_IMAGE002AAAAAAAA
And when the similarity of the wall surface is lower than 80%, the problem real-time feedback submodule feeds back the data, and the artificial response channel timely responds to the problem by a client.
According to the technical scheme: the main structure detail presentation module comprises a quality evaluation module and a decoration total budget estimation module, wherein the quality evaluation module is used for carrying out all-around detection and evaluation on decoration interior, material impermeability, material hardness, ageing resistance, wear resistance and main wall thickness, the decoration total budget estimation module estimates the total decoration amount of the house type interior and sends the estimated value to a user, and the decoration total budget estimation module carries out total estimation on design cost, material cost, labor cost and time cost.
By adopting the technical scheme: the quality evaluation module carries out all-around evaluation on the internal structure and details of the decoration, the quality score of each point is obtained according to values of different quality indexes of the interior, the material seepage resistance, the material hardness, the aging resistance, the wear resistance and the main wall thickness of the decoration, the quality score is 1-10, the quality scores are set to be B1, B2, B3, B4, B5 and B6 respectively, whether the B1, B2, B3, B4, B5 and B6 belong to {6, 10} or not is judged, the quality index of which the quality score does not belong to {6, 10} is rejected, the quality index directly verified to be not up to the acceptance standard, and when the quality index meets the {6, 10} or the quality index mean value = is calculated according to a formula
Figure DEST_PATH_IMAGE004A
(B1 + B2+ B3+ B4+ B5+ B6), when the average value of the quality index is more than 7, the acceptance criterion is reached, and the client is informed to accept.
A building construction quality control method based on BIM and VR technology comprises the following steps:
s1: performing VR imaging on the selected design drawing by using an initial VR projection module, selecting design drawings of different house types by a design concept drawing selection submodule according to own preferences so as to perform AR imaging, and explaining design details of a sample house type selected by a customer by using a VR sample house construction design detail module, wherein the design details comprise room proportion and design function;
s2: the construction material suggestion preselection module is used for providing suggestions of construction materials, but the decoration materials are selected according to the requirements of customers, the material suggestion submodule is used for suggesting materials according to a sample house type selected by a user, the interior of each suggestion material contains the material, color, price, advantages and disadvantages and brands of the material, and the user self-selection submodule enables the user to purchase the decoration materials according to the suggestions;
s3: the method comprises the steps that a real-time construction monitoring module is used for carrying out real-time measurement, acceptance and monitoring on a construction site, a plurality of cameras are used for collecting actual decoration conditions inside a house, decoration images are collected through the cameras, the collected decoration images are cut according to similar heights, the cut images are sent to a partitioned image comparison sub-module, the partitioned image comparison sub-module is used for carrying out similarity comparison on the collected images and sample plate decoration according to four corners of different rooms, coordinates of measuring points of each wall of the room are set to be (w, x, y, z), coordinates of each image from the four corner measuring points to the center are set to be (wi, xi, yi, zi), i is 1, 2, … and n, and images of areas corresponding to the sample plates of each image of the wall surfaces of the room are sent to a BIM difference comparison module for carrying out similarity comparison;
s4: comparing the selected design drawing with actual field decoration by using a BIM difference comparison module, setting the similarity of each image of one wall detected by the BIM difference comparison module to the corresponding region of the sample plate for decoration as a1, a2, a3, a
Figure DEST_PATH_IMAGE002AAAAAAAAA
= (a 1, a2, a 3.,. an-1, an)/n, when
Figure DEST_PATH_IMAGE002AAAAAAAAAA
Greater than 80% of the set threshold value, and reaching the acceptance level by default when the threshold value is greater than the set threshold value
Figure DEST_PATH_IMAGE002AAAAAAAAAAA
When the similarity of the wall surface is lower than 80%, the data are sent to a problem real-time feedback submodule, the problem real-time feedback submodule feeds back the similarity of the wall surface lower than 80%, and a manual response channel timely responds to the problem by a client;
s5: the main structure after finishing decoration is subjected to quality evaluation by using the main structure detail presentation module, the quality evaluation module carries out all-dimensional detection and evaluation on the interior of the decoration, the impermeability of materials, the hardness of the materials, the ageing resistance, the wear resistance and the thickness of the main wall, and the decoration total budget estimation module estimates the total sum of the house interior decoration and sends the estimated value to a user.
According to the technical scheme: in step S5, the main structure detail presentation module is used to perform quality assessment on the main structure after finishing decoration, the quality assessment module performs all-round detection and assessment on the interior of the decoration, the impermeability of materials, the hardness of materials, the aging resistance, the wear resistance and the thickness of the main wall, the decoration total budget estimation module estimates the total decoration amount of the house interior and sends the estimated value to the user, and the method further comprises the following steps:
the total budget estimation module of fitment carries out total estimation to design cost, material cost, labour cost and time cost, and the cost of setting for the design cost is A, and the cost of labour cost is B every day, and the cost of time cost is B, and the cost of each area material cost is C, sets for indoor length to be x, and the width is y, and the room height is h, and the door and window area is Z, sets for the wall area to be S1, and the top surface area is S2, and total area is S total, and the total budget of fitment is R total, according to the formula:
S1=(x+y)*2*h
S2=x*y
s total = [ (x + y) × 2 × h ] + (x × y) -Z
Total of R = a + Bb + [ (x + y) 2+ h + (x + y) -Z ]. C
And the decoration total budget estimation module sends the calculated R total to a client for checking, so that acceptance can be better completed.
Example 1: limiting conditions, setting design costsThe cost is 5000, the cost of labor cost per day is 1000 yuan, the cost of time cost is 30 days, the cost of material cost per area is 500 yuan, the length of the indoor is 10m, the width is 8m, the height of the indoor is 4m, the area of a door and a window is 16m2Setting the wall surface area to be S1, the top surface area to be S2, the total area to be S total, and the total decoration budget to be R total according to the formula:
S1=(x+y)*2*h
S2=x*y
s total = [ (x + y) × 2 × h ] + (x × y) -Z
Total of R = a + Bb + [ (x + y) 2+ h + (x + y) -Z ]. C
Calculating to obtain: s1= (10 + 8) × 2 × 4=144m2;S2=10*8=80m2(ii) a S total = [ (10 + 8) × 2 × 4]+(10*8)-16]=208m2(ii) a R total =5000+1000 +30 +208 + 500=139000 members; the decoration total budget estimation module sends the calculated 139000 yuan to the client for checking, so that the acceptance can be better completed.
Example 2: the conditions are limited, the cost of design fee is set to 6500, the cost of labor fee per day is 800 yuan, the cost of time fee is 50 days, the cost of material fee per area is 750 yuan, the length of the indoor is set to 18m, the width is set to 9m, the height of the indoor is set to 4m, the area of the door and the window is set to 35m2Setting the wall surface area to be S1, the top surface area to be S2, the total area to be S total, and the total decoration budget to be R total according to the formula:
S1=(x+y)*2*h
S2=x*y
s total = [ (x + y) × 2 × h ] + (x × y) -Z
Total of R = a + Bb + [ (x + y) 2+ h + (x + y) -Z ]. C
Calculating to obtain: s1= (18 + 9) × 2 × 4=216m2;S2=18*9=162m2(ii) a Stotal = [ (18 + 9) × 2 × 4]+(18*9)-35]=343m2(ii) a Total =6500+800 × 50+343 × 750=303750 elements; the decoration total budget estimation module sends the calculated 303750 yuan to the client for checking, so that the acceptance can be better completed.
Example 3: the design cost is 3000, the labor cost is 300 yuan per day, the time cost is 60 days, the material cost per area is 400 yuan, and the indoor length is set as8m, 6m in width, 3.5m in height and 14m in area2Setting the wall surface area to be S1, the top surface area to be S2, the total area to be S total, and the total decoration budget to be R total according to the formula:
S1=(x+y)*2*h
S2=x*y
s total = [ (x + y) × 2 × h ] + (x × y) -Z
Total of R = a + Bb + [ (x + y) 2+ h + (x + y) -Z ]. C
Calculating to obtain: s1= (8 + 6) × 2 × 3.5=98m2;S2=8*6=48m2(ii) a Stotal = [ (8 + 6) × 2 × 3.5]+(8*6)-14]=132m2(ii) a R total =3000+300 × 60+132 × 400=73800 elements; the decoration total budget estimation module sends the calculated 73800 yuan to the client for checking, so that the acceptance can be better completed.
Example 4: the design cost is set to 4500, the labor cost per day is 280 yuan, the time cost is 45 days, the material cost per area is 350 yuan, the indoor length is 10m, the width is 6m, the indoor height is 3.5m, and the area of the door and the window is 20m2Setting the wall surface area to be S1, the top surface area to be S2, the total area to be S total, and the total decoration budget to be R total according to the formula:
S1=(x+y)*2*h
S2=x*y
s total = [ (x + y) × 2 × h ] + (x × y) -Z
Total of R = a + Bb + [ (x + y) 2+ h + (x + y) -Z ]. C
Calculating to obtain: s1= (10 + 6) × 2 × 3.5=112m2;S2=8*6=48m2(ii) a Stotal = [ (8 + 6) × 2 × 3.5]+(8*6)-14]=140m2(ii) a R total =4500+280 + 45+140 + 350=66100 elements; the decoration total budget estimation module sends the calculated 66100 yuan to the client for checking, so that the acceptance can be better completed.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein.

Claims (3)

1. The utility model provides a building construction quality control system based on BIM and VR technique which characterized in that: the system comprises an initial VR (virtual reality) image shooting module, a construction material suggestion pre-selection module, a real-time construction monitoring module, a BIM difference comparison module and a main structure detail presenting module, wherein the initial VR image shooting module, the construction material suggestion pre-selection module and the real-time construction monitoring module are sequentially connected through an intranet;
the initial VR image projection module is used for performing VR imaging on a selected design drawing, the construction material suggestion pre-selection module is used for providing suggestions of construction materials but selecting decoration materials according to the requirements of customers, the real-time construction monitoring module is used for performing real-time measurement, acceptance and monitoring on a construction site, the BIM difference comparison module is used for comparing the selected design drawing with actual site decoration, and the main structure detail presentation module is used for performing quality evaluation on a main structure after finishing decoration;
the initial VR projection module comprises a design concept diagram selection submodule and a VR template house construction design detail module, the design concept diagram selection submodule is used for selecting design diagrams of different house types according to own preferences so as to carry out VR imaging, the VR template house construction design detail module is used for explaining the design details of a template house type selected by a customer, wherein the design details comprise room proportion and design function, and the design concept diagram selection submodule is connected with the construction material suggestion pre-selection module through an intranet;
the VR template house construction design detail module comprises a virtual scene construction unit, the virtual scene construction unit is used for virtually imaging a decoration design drawing selected by a client, a data glove is arranged inside the virtual scene construction unit and is used for enabling a user to perform multi-mode operation in a virtual scene constructed by VR, the multi-mode operation comprises adjustment of furniture inside the virtual scene and change of wall color, setting in the virtual scene is changed according to instructions of the user, feasibility of changing the setting of the virtual scene is calculated according to data information of different areas, when the calculated feasibility is larger than 80%, the setting modified by the client is used in a default mode, and when the calculated feasibility is smaller than 80%, a designer needs to re-confirm a scheme with the client;
s1: performing VR imaging on the selected design drawing by using an initial VR projection module, selecting design drawings of different house types by a design concept drawing selection submodule according to own preferences so as to perform VR imaging, and explaining design details of a sample house type selected by a customer by using a VR sample house construction design detail module, wherein the design details comprise room proportion and design action;
s2: the construction material suggestion preselection module is used for providing suggestions of construction materials, but the decoration materials are selected according to the requirements of customers, the material suggestion submodule is used for suggesting materials according to a sample house type selected by a user, the interior of each suggestion material contains the material, color, price, advantages and disadvantages and brands of the material, and the user self-selection submodule enables the user to purchase the decoration materials according to the suggestions;
s3: the method comprises the steps that a real-time construction monitoring module is used for carrying out real-time measurement, acceptance and monitoring on a construction site, a plurality of cameras are used for collecting actual decoration conditions inside a house, decoration images are collected through the cameras, the collected decoration images are cut according to similar heights, the cut images are sent to a partitioned image comparison sub-module, the partitioned image comparison sub-module is used for carrying out similarity comparison on the collected images and sample plate decoration according to four corners of different rooms, coordinates of measuring points of each wall of the room are set to be (w, x, y, z), coordinates of each image from the four corner measuring points to the center are set to be (wi, xi, yi, zi), i is 1, 2, … and n, and images of areas corresponding to the sample plates of each image of the wall surfaces of the room are sent to a BIM difference comparison module for carrying out similarity comparison;
s4: using BIM diversity contrast module to assign design to selected designThe drawing is compared with actual field decoration, the BIM difference comparison module is set to detect that the similarity of each image of one wall to the corresponding area of the template decoration is a1, a2, a3, a
Figure FDA0003021650250000031
an)/n when
Figure FDA0003021650250000032
Greater than 80% of the set threshold value, and reaching the acceptance level by default when the threshold value is greater than the set threshold value
Figure FDA0003021650250000033
When the similarity of the wall surface is lower than 80%, the data are sent to a problem real-time feedback submodule, the problem real-time feedback submodule feeds back the similarity of the wall surface lower than 80%, and a manual response channel timely responds to the problem by a client;
s5: the main structure detail presentation module is used for carrying out quality evaluation on the main structure after finishing decoration, the quality evaluation module carries out omnibearing detection and evaluation on the interior of the decoration, the impermeability of materials, the hardness of the materials, the ageing resistance, the wear resistance and the thickness of a main wall, the decoration total budget estimation module estimates the total decoration amount of the house type interior and sends the estimated value to a user;
in step S5, the main structure detail presentation module is used to perform quality evaluation on the main structure after finishing decoration, the quality evaluation module performs all-round detection and evaluation on the interior of the decoration, the impermeability of the material, the hardness of the material, the aging resistance, the wear resistance and the thickness of the main wall, the decoration total budget estimation module estimates the total decoration amount of the house interior, and sends the estimated value to the user, and the method further includes the following steps:
the total budget estimation module of fitment carries out total estimation to design cost, material cost, labour cost and time cost, and the cost of setting for the design cost is A, and the cost of labour cost is B every day, and the cost of time cost is B, and the cost of each area material cost is C, sets for indoor length to be x, and the width is y, and the room height is h, and the door and window area is Z, sets for the wall area to be S1, and the top surface area is S2, and total area is S total, and the total budget of fitment is R total, according to the formula:
S1=(x+y)*2*h
S2=x*y
(x + y) 2 h + Z
R total ═ a + Bb + [ (x + y) × 2 × h + (x × y) -Z ] × C
The decoration total budget estimation module sends the calculated R total to a client for checking, so that acceptance can be better completed;
the construction material suggestion pre-selection module comprises a material suggestion submodule and a user self-selection submodule, wherein the material suggestion submodule is used for suggesting materials according to a sample room type selected by a user, the interior of each suggested material contains the material, color, price, advantages and disadvantages and brand of the material, and the user self-selection submodule is used for enabling the user to purchase the decoration material according to the suggestion;
the real-time construction monitoring module comprises a plurality of cameras and a partitioned image comparison sub-module, the cameras are used for collecting actual decoration conditions inside a house, decoration images are collected through the cameras, the collected decoration images are cut according to similar heights, the cut images are sent to the partitioned image comparison sub-module, the partitioned image comparison sub-module compares the collected images with sample plates according to four corners of different rooms in similarity, coordinates of measuring points of each wall of the room are set to be (w, x, y and z), coordinates of each image from the measuring points of the four corners to the center are set to be (wi, xi, yi and zi), i is 1, 2, … and n, and images of areas corresponding to the sample plates of each image on the wall of the room are sent to the BIM difference comparison module for comparison of the similarity;
the BIM difference comparison module comprises a problem real-time feedback sub-module and a manual response channel, the BIM difference comparison module is used for detecting that the similarity of each image of one wall to a corresponding region of a template decoration is respectively a1, a2, a3, a-1 and an, and the mean value of the similarity of each wall is set as
Figure FDA0003021650250000051
When in use
Figure FDA0003021650250000052
Greater than 80% of the set threshold value, and reaching the acceptance level by default when the threshold value is greater than the set threshold value
Figure FDA0003021650250000053
And when the similarity of the wall surface is lower than 80%, the problem real-time feedback submodule feeds back the data, and the artificial response channel timely responds to the problem by a client.
2. The BIM and VR based building construction quality control system of claim 1, wherein the main structure detail presenting module comprises a quality evaluation module and a decoration total budget estimation module, the quality evaluation module is used for carrying out all-round detection and evaluation on decoration interior, material impermeability, material hardness, aging resistance, wear resistance and main wall thickness, the decoration total budget estimation module estimates the total amount of decoration of the house interior and transmits the estimated value to a user, and the decoration total budget estimation module comprises total estimation on design cost, material cost, labor cost and time cost.
3. The building construction quality control system based on BIM and VR technique of claim 2, wherein the quality evaluation module carries out all-dimensional evaluation on the decoration internal structure and details, and obtains the quality score of each quality index according to the values of different quality indexes of decoration internal, material impermeability, material hardness, aging resistance, wear resistance and main wall thickness, and the value range of the quality score is [1,10 ]]The quality scores are set to be B1, B2, B3, B4, B5 and B6, respectively, and whether or not B1, B2, B3, B4, B5 and B6 belong to the section [6, 10]Reject quality score not within interval [6, 10]The quality index of (2) is directly verified not to meet the acceptance standard, and when the quality index meets the interval of [6, 10 ]]Then calculate according to the formula
Figure FDA0003021650250000061
Figure FDA0003021650250000062
And when the average value of the quality indexes is more than 7, the quality indexes reach the acceptance standard, and the client is informed to accept.
CN202010174228.8A 2020-03-13 2020-03-13 Building construction quality control system and method based on BIM and VR technology Active CN111400800B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010174228.8A CN111400800B (en) 2020-03-13 2020-03-13 Building construction quality control system and method based on BIM and VR technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010174228.8A CN111400800B (en) 2020-03-13 2020-03-13 Building construction quality control system and method based on BIM and VR technology

Publications (2)

Publication Number Publication Date
CN111400800A CN111400800A (en) 2020-07-10
CN111400800B true CN111400800B (en) 2021-07-02

Family

ID=71436157

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010174228.8A Active CN111400800B (en) 2020-03-13 2020-03-13 Building construction quality control system and method based on BIM and VR technology

Country Status (1)

Country Link
CN (1) CN111400800B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111986191B (en) * 2020-08-31 2022-05-27 江苏工程职业技术学院 Building construction acceptance method and system
CN112364423A (en) * 2020-11-13 2021-02-12 重庆建工住宅建设有限公司 Assembly type decoration construction method combining AR technology and BIM technology
CN112348478B (en) * 2020-11-16 2023-05-30 尹继强 Visual building decoration monitoring system and method based on Internet of things
CN112733239A (en) * 2021-01-15 2021-04-30 广州市新誉工程咨询有限公司 Building engineering quality monitoring method and system based on BIM model
CN113255033B (en) * 2021-05-11 2022-04-05 上海慧之建建设顾问有限公司 Building engineering supervision intelligent integrated cloud platform based on BIM technology and supervision method
CN116843507B (en) * 2023-07-11 2024-02-27 圣风多媒体科技(上海)有限公司 Intelligent management system for digital display content

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107944124A (en) * 2017-11-20 2018-04-20 上海得见计算机科技有限公司 Indoor design method and system based on user interest preference
CN108920750A (en) * 2018-05-24 2018-11-30 武汉八维时空信息技术股份有限公司 The fusion of engineering-built Dynamic and Multi dimensional information and cooperation interaction system
CN108959672A (en) * 2017-05-27 2018-12-07 中国二十冶集团有限公司 A kind of finishing management method based on virtual technology
CN109325886A (en) * 2018-09-25 2019-02-12 温州云计划科技有限公司 A method of automatically generating decoration budget and goods matching
CN109408932A (en) * 2018-10-15 2019-03-01 鼎宸建设管理有限公司 A kind of architectural design management system based on BIM and VR

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140095262A1 (en) * 2011-07-06 2014-04-03 Real Time Software, Inc. Sales system and business method including computer apparatus and product for and method of determining price
US20130335413A1 (en) * 2012-06-13 2013-12-19 National Chiao Tung University System and method for estimating construction duration

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108959672A (en) * 2017-05-27 2018-12-07 中国二十冶集团有限公司 A kind of finishing management method based on virtual technology
CN107944124A (en) * 2017-11-20 2018-04-20 上海得见计算机科技有限公司 Indoor design method and system based on user interest preference
CN108920750A (en) * 2018-05-24 2018-11-30 武汉八维时空信息技术股份有限公司 The fusion of engineering-built Dynamic and Multi dimensional information and cooperation interaction system
CN109325886A (en) * 2018-09-25 2019-02-12 温州云计划科技有限公司 A method of automatically generating decoration budget and goods matching
CN109408932A (en) * 2018-10-15 2019-03-01 鼎宸建设管理有限公司 A kind of architectural design management system based on BIM and VR

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
BIM与VR技术在装饰工程设计阶段的应用分析;杨菲等;《河北工业科技》;20200304;第37卷(第1期);第48-53页 *

Also Published As

Publication number Publication date
CN111400800A (en) 2020-07-10

Similar Documents

Publication Publication Date Title
CN111400800B (en) Building construction quality control system and method based on BIM and VR technology
Rebolj et al. Point cloud quality requirements for Scan-vs-BIM based automated construction progress monitoring
CN107004297B (en) Three-dimensional automatic stereo modeling method and program based on two-dimensional plane diagram
CN109408907B (en) Method and device for manufacturing three-dimensional building physical model
Roh et al. An object-based 3D walk-through model for interior construction progress monitoring
Kensek Building information modeling
Attia et al. Simulation-based decision support tool for early stages of zero-energy building design
CN107679310A (en) The real-time progress 3 D stereo methods of exhibiting of engineering based on BIM and image congruencing technology
CN108959672A (en) A kind of finishing management method based on virtual technology
US20200258285A1 (en) Distributed computing systems, graphical user interfaces, and control logic for digital image processing, visualization and measurement derivation
CN110909600A (en) Method and system for automatically generating decoration quotation from design drawing
CN109544687B (en) Directional layered household graph expansion method
CN113449355A (en) Building house type graph automatic generation method based on artificial intelligence
Kim et al. QuVue implementation for decisions related to high-rise residential building layouts
CN106952346B (en) System and method for generating suspended ceiling 3D model based on drawing plane polygon
Mota et al. A comparison of spatiotemporal visualizations for 3D urban analytics
CN116310188B (en) Virtual city generation method and storage medium based on instance segmentation and building reconstruction
CN116485633A (en) Point cloud display diagram generation method and device, electronic equipment and storage medium
CN113989680B (en) Automatic building three-dimensional scene construction method and system
US20130321414A1 (en) Converting a 3d model into multiple matrices
CN115393501A (en) Information processing method and device
He et al. A visual landscape assessment approach for high-density urban development: A GIS-based index
CN113297652A (en) Construction drawing generation method, device and equipment
Isaacs et al. A unique approach to visualising sustainability in the built environment
Tarkhan et al. Capturing façade diversity in urban settings using an automated window to wall ratio extraction and detection workflow

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20210617

Address after: 302, automobile building, 45 Zhenhua Road, Huaqiangbei street, Futian District, Shenzhen, Guangdong 518000

Applicant after: Shenzhen Shenbai Digital Image Design Co.,Ltd.

Address before: No. 371, Jiangdong Middle Road, Jianye District, Nanjing City, Jiangsu Province, 210000

Applicant before: Chen Hongwei

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant