CN111396681A - But height-adjusting's antidetonation gallows - Google Patents
But height-adjusting's antidetonation gallows Download PDFInfo
- Publication number
- CN111396681A CN111396681A CN202010378205.9A CN202010378205A CN111396681A CN 111396681 A CN111396681 A CN 111396681A CN 202010378205 A CN202010378205 A CN 202010378205A CN 111396681 A CN111396681 A CN 111396681A
- Authority
- CN
- China
- Prior art keywords
- channel steel
- support
- support screw
- seismic
- screw
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L55/00—Devices or appurtenances for use in, or in connection with, pipes or pipe systems
- F16L55/02—Energy absorbers; Noise absorbers
- F16L55/033—Noise absorbers
- F16L55/035—Noise absorbers in the form of specially adapted hangers or supports
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/08—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
Description
技术领域technical field
本发明涉及减震技术领域,具体涉及一种可调节高度的抗震支吊架。The invention relates to the technical field of shock absorption, in particular to an anti-seismic support and hanger with adjustable height.
背景技术Background technique
近年来世界各地的台风、海啸、地震等自然灾害频繁发生,给社会和人民造成了非常严重的创伤。在涉及到型钢类部件与墙体连接时,通常的方法是将型钢用螺栓直接连接或用支架连接到墙面上。用上述连接方式后,当型钢与墙体之间发生有震动的时候,连接的型钢或螺栓会受到来自震动的冲击力,由于型钢形状固定,进而不能进行有效缓冲,发生较大振动时易产生过大变形,导致机电管线及设备发生破坏,严重影响建筑结构使用功能,造成损失。In recent years, natural disasters such as typhoons, tsunamis and earthquakes have occurred frequently around the world, causing serious trauma to society and people. When it comes to the connection of profiled steel components to the wall, the usual method is to directly connect the profiled steel with bolts or connect it to the wall with brackets. After using the above connection method, when there is vibration between the profiled steel and the wall, the connected profiled steel or bolts will be subjected to the impact force from the vibration. Because the shape of the profiled steel is fixed, it cannot be effectively buffered, and it is easy to generate large vibrations. Excessive deformation will lead to damage to the mechanical and electrical pipelines and equipment, which will seriously affect the use and function of the building structure and cause losses.
现有的抗震支吊架,如中国专利201821776348.X,该专利公开了“一种设置有速度锁定器的抗震支吊架,包括依次连接呈直线形的第一连接座子件、第一连接块、第一C型钢、速度锁定器、第二C型钢、第二连接座子件、第二连接块,以及连接二连接块的第三C型钢,第三C型钢上端部内设置有抗震连接座子件,抗震连接座子件位于第三C型钢外侧并通过销轴连接抗震连接座子件,丝杆连接在第三C型钢的下端,第四C型钢连接在丝杆的底端,钢板一端连接第三C型钢下端一端连接第四C型钢上端;本装置通过速度锁定器的设置,能够使得在正常状态下,实现移动连接并具备一定的大变形控制限位能力,在受到较大振动状态下,能够实现刚性连接。”但是上述支吊架具有一定的缺陷,其本身的结构固定,而由于建筑物都有一定的设计误差,是的该装置在安装的时候经常会出现尺寸的问题,导致安装困难。Existing anti-seismic supports and hangers, such as Chinese Patent 201821776348.X, the patent discloses "a kind of anti-seismic supports and hangers provided with speed lockers, including a first connecting seat component that is connected in a straight line, a first connecting block, the first C-shaped steel, the speed lock, the second C-shaped steel, the second connecting seat component, the second connecting block, and the third C-shaped steel connecting the two connecting blocks, the upper end of the third C-shaped steel is provided with an anti-vibration connecting seat The sub-piece, the anti-vibration connecting seat sub-piece is located on the outside of the third C-shaped steel and is connected to the anti-vibration connecting seat sub-piece through the pin, the screw is connected to the lower end of the third C-shaped steel, the fourth C-shaped steel is connected to the bottom end of the screw, and one end of the steel plate One end connected to the lower end of the third C-shaped steel is connected to the upper end of the fourth C-shaped steel; through the setting of the speed lock, the device can realize the mobile connection and have a certain large deformation control limit ability under normal conditions. However, the above-mentioned support and hanger has certain defects, and its own structure is fixed, and because the building has certain design errors, yes, the device often has size problems during installation. Makes installation difficult.
发明内容SUMMARY OF THE INVENTION
为解决上述技术问题,本发明的目的是提供一种可调节高度的抗震支吊架。In order to solve the above technical problems, the purpose of the present invention is to provide a height-adjustable anti-seismic support and hanger.
本发明的技术方案如下:The technical scheme of the present invention is as follows:
一种可调节高度的抗震支吊架,安装于上部墙体(100)上,其特征在于,包括:A height-adjustable anti-seismic support and hanger, mounted on an upper wall (100), is characterized in that, comprising:
相互平行设置并固定连接到上部墙体(100)中的第一支撑螺杆(3),所述第一制成螺杆(3)套入到第一槽钢(1)内并通过加劲装置(2)压紧连接;The first support screws (3) arranged in parallel to each other and fixedly connected to the upper wall (100), the first made screws (3) are sleeved into the first channel steel (1) and passed through the stiffening device (2) ) press the connection;
所述第一支撑螺杆(3)的下部连接到水平设置的第三槽钢(7)内,所述第三槽钢(7)左右两端的下方均垂直连接有第二支撑螺杆(9),所述第二支撑螺杆(9)连接到花篮螺母(10)的上部,所示花篮螺母(10)的下部连接有第三支撑螺杆(15)的上端,所述第三支撑螺杆(15)的下端均连接到水平设置的第四槽钢(14)内;The lower part of the first support screw (3) is connected to the third channel steel (7) arranged horizontally, and the bottom of the left and right ends of the third channel steel (7) is vertically connected with a second support screw (9), The second support screw (9) is connected to the upper part of the flower basket nut (10), and the lower part of the shown flower basket nut (10) is connected with the upper end of the third support screw (15), the third support screw (15) The lower ends are connected to the fourth channel steel (14) arranged horizontally;
所述第三槽钢(7)上设置有两个连接块(12),所述第四槽钢(14)上设置有两个连接块(12),四个连接块(12)用于连接通风管道(13)。The third channel steel (7) is provided with two connection blocks (12), the fourth channel steel (14) is provided with two connection blocks (12), and the four connection blocks (12) are used for connection Ventilation duct (13).
进一步的,所述第一支撑螺杆(3)的上端连接有转换头(4),所述转换头(4)连接到所述上部墙体(100)中。Further, a conversion head (4) is connected to the upper end of the first support screw (3), and the conversion head (4) is connected to the upper wall (100).
进一步的,还包括限位螺栓(11),所述限位螺栓(11)贯穿连接所述花篮螺母(10)和第二支撑螺杆(9)/第三支撑螺杆(15)。Further, a limit bolt (11) is also included, and the limit bolt (11) penetrates and connects the turnbuckle nut (10) and the second support screw (9)/third support screw (15).
进一步的,包括了一个侧拉支撑,所述侧拉支撑包括了第二槽钢(5)和连接到其两端的抗震铰链(6),其中一个抗震铰链(6)连接到上部墙体(100)上,其中另一个抗震铰链(6)连接到第三槽钢(7)上使得第一槽钢(1)、第二槽钢(5)、上部墙体(100)呈三角形。Further, a side pull support is included, the side pull support includes a second channel steel (5) and an anti-vibration hinge (6) connected to both ends thereof, wherein one anti-vibration hinge (6) is connected to the upper wall (100). ), wherein another seismic hinge (6) is connected to the third channel steel (7) so that the first channel steel (1), the second channel steel (5) and the upper wall (100) are triangular.
进一步的,所述第三槽钢(7)/第四槽钢(14)上均设置有“U”形压块(8);所述第一支撑螺杆(3)贯穿位于所述第三槽钢(7)上“U”形压块(8)的上部;所述第二支撑螺杆(9)贯穿位于所述第三槽钢(7)上“U”形压块(8)的下部;所述第三支撑螺杆(15)贯穿位于所述第四槽钢(14)上的“U”形压块(8)。Further, the third channel steel (7)/fourth channel steel (14) are provided with "U"-shaped pressing blocks (8); the first support screw (3) penetrates through the third channel The upper part of the "U"-shaped pressing block (8) on the steel (7); the second support screw (9) penetrates through the lower part of the "U"-shaped pressing block (8) on the third channel steel (7); The third support screw (15) penetrates the "U"-shaped pressing block (8) located on the fourth channel steel (14).
借由上述方案,本发明至少具有以下优点:By means of the above scheme, the present invention has at least the following advantages:
本装置采用花篮螺母连接了第二支撑螺杆和第三支撑螺杆,能够调节具体螺杆的安装位置,从而实现对第三槽钢和第四槽钢之间距离的改变。The device uses a flower basket nut to connect the second support screw and the third support screw, and can adjust the installation position of the specific screw, so as to realize the change of the distance between the third channel steel and the fourth channel steel.
上述说明仅是本发明技术方案的概述,为了能够更清楚了解本发明的技术手段,并可依照说明书的内容予以实施,以下以本发明的较佳实施例并配合附图详细说明如后。The above description is only an overview of the technical solution of the present invention. In order to understand the technical means of the present invention more clearly, and implement it according to the content of the description, the preferred embodiments of the present invention are described in detail below with the accompanying drawings.
附图说明Description of drawings
为了更清楚地说明本发明实施例的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,应当理解,以下附图仅示出了本发明的某个实施例,因此不应被看作是对范围的限定,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他相关的附图。In order to illustrate the technical solutions of the embodiments of the present invention more clearly, the following briefly introduces the accompanying drawings that need to be used in the embodiments. It should be regarded as a limitation of the scope, and for those of ordinary skill in the art, other related drawings can also be obtained according to these drawings without any creative effort.
图1是本发明的结构示意图;Fig. 1 is the structural representation of the present invention;
图2是本发明花篮螺母连接示意图;Fig. 2 is the connection schematic diagram of the flower basket nut of the present invention;
图3是本发明抗震铰链的结构示意图;Fig. 3 is the structural representation of the anti-seismic hinge of the present invention;
图中:In the picture:
100-上部墙体;100-upper wall;
1-第一槽钢;2-加劲装置;3-第一支撑螺杆;4-转换头;5-第二槽钢;6-抗震铰链;61-第一铰链;62-第二铰链;63-转轴;7-第三槽钢;8-压块;9-第二支撑螺杆;10-花篮螺母;11-限位螺栓;12-连接块;13-通风管道;14-第四槽钢;15-第三支撑螺杆。1- first channel steel; 2- stiffening device; 3- first support screw; 4- conversion head; 5- second channel steel; 6- anti-vibration hinge; 61- first hinge; 62- second hinge; 63- Rotating shaft; 7-Third channel steel; 8-Press block; 9-Second support screw; 10-Tube nut; 11-Limiting bolt; 12-Connecting block; 13-Ventilation duct; 14-Fourth channel steel; 15 - Third support screw.
具体实施方式Detailed ways
下面结合附图和实施例,对本发明的具体实施方式作进一步详细描述。以下实施例用于说明本发明,但不用来限制本发明的范围。The specific embodiments of the present invention will be described in further detail below with reference to the accompanying drawings and embodiments. The following examples are intended to illustrate the present invention, but not to limit the scope of the present invention.
实施例1:Example 1:
一种可调节高度的抗震支吊架,安装到上部墙体100中,包括了第一槽钢1、加劲装置2、第一制成螺杆3、转换头4、第二槽钢5、抗震铰链6、第三槽钢7、压块8、第二支撑螺杆9、花篮螺母10、限位螺栓11、连接块12、通风管道13、第四槽钢14、第三支撑螺杆15。A height-adjustable anti-seismic support and hanger, installed in the
第一槽钢1的数量为两个,在第一槽钢1中均设置了一个第一支撑螺杆3,在第一槽钢1的侧面开设置了多个螺纹孔,在螺纹孔中螺纹连接了加紧装置2,加紧装置2类似于螺丝,加紧装置2的端部挤压第一支撑螺杆3,将第一支撑螺杆3和第一槽钢1压紧连接,在第一支撑螺杆3的端部螺纹连接了一个转换头4,该转换头4的结构为六角螺丝(形状较长),在上部墙体100中一般是设置化学锚栓的,该转换头4连接到上部墙体100的化学锚栓中。The number of the first channel steel 1 is two, a
两个第一槽钢1相互平行设置,第一槽钢1的上部均通过转换头4连接到上部墙体100中。The two first channel steels 1 are arranged parallel to each other, and the upper parts of the first channel steels 1 are connected to the
在第一槽钢1的下部连接了第三槽钢7,第三槽钢7和第一槽钢1垂直连接。再具体连接的时候,在第三槽钢7的左右两端各套设了一个“U”形压块8,第一支撑螺杆3的下端深入到第三槽钢7的内部,并通过位于第三槽钢7上边上下两侧的两个螺母固定到第一支撑螺杆3上进行固定。A
在其中一个“U”形压块8和连接的螺母之间还连接了抗震铰链6的一端,该抗震铰链6连接到第二槽钢5的一端,第二槽钢5的另一端连接了另一个抗震铰链6,另一个抗震铰链6连接到了上部墙体100中。上部墙体100,第一槽钢1,第二槽钢5形成了一个三角形,更加有利于固定连接。One end of the anti-vibration hinge 6 is also connected between one of the "U"-shaped
抗震铰链6包括了两个部分,第一铰链61、第二铰链62以及转轴63,第一铰链61和第二铰链62通过转轴63进行连接。在第二槽钢5上端是通过螺丝连接了抗震铰链6的第一铰链61,第二铰链62是连接到上部墙体100上。在第二槽钢5下端连接了抗震铰链6第二铰链62的一端,第一铰链61是连接到了“U”形压块8和螺母之间。The anti-vibration hinge 6 includes two parts, a
在第三槽钢7的“U”形压块8的下部还连接了第二支撑螺杆9,第二支撑螺杆9的上端深入到第三槽钢7的内部,并通过位于第三槽钢7上边上下两侧的两个螺母固定到第二支撑螺杆9上进行固定。A
第二支撑螺杆9的下端连接到花篮螺母10的上部,花篮螺母10的下部连接有第三支撑螺杆15的一端,为了对第二支撑螺杆9和第三支撑螺杆15进行限位,还各设置了一个限位螺旋11,具体的做法是在花篮螺母10的侧面开孔,在第二支撑螺杆9和第三支撑螺杆15位于花篮螺母10内的部分进行开孔,让限位螺栓11贯穿连接花篮螺母10和第二支撑螺杆9/第三支撑螺杆15,实现限位连接。The lower end of the
第三支撑螺杆15的下端连接到第四槽钢14内,具体在连接的时候,在第四槽钢14外套设“U”形压块8,第三支撑螺杆15贯穿“U”形压块8和第三支撑螺杆15,在第三支撑螺杆15上位于“U”形压块8上下两端通过螺母进行固定连接。The lower end of the
第三槽钢7和第四槽钢14之间形成了一个安装空间,在第三槽钢7上安装了两个直角连接块12,在第四槽钢14上安装了两个直角连接块12,四个直角连接块12形成了一个矩形的安装部,该安装部内用于安装通风管道13,通风管道13是方形固定在直角连接块12的另一个连街边上。An installation space is formed between the
实施例2:Example 2:
实施例2和实施例1唯一的不同在于,在实施例1中第一支撑螺杆3和第二支撑螺杆9是两根螺杆,在实施例2中第一支撑螺杆3和第二支撑螺杆9是一根螺杆。The only difference between Example 2 and Example 1 is that in Example 1, the
本发明的工作原理如下:The working principle of the present invention is as follows:
本装置主要是起到抗震的作用,整个装置最主要的特点是在于第三槽钢7和第四槽钢14之间的距离可以调控,这解决了现实中如果采用固定的螺杆连接第三槽钢7和第四槽钢14,造成两者之间形成的安装空间大小一定,而在实际安装中,很难达到通风管道13的尺寸和第三槽钢7和第四槽钢14之间的距离一致的问题。This device mainly plays an anti-seismic role. The main feature of the whole device is that the distance between the
本装置的优点如下:The advantages of this device are as follows:
本装置采用花篮螺母连接了第二支撑螺杆和第三支撑螺杆,能够调节具体螺杆的安装位置,从而实现对第三槽钢和第四槽钢之间距离的改变。The device uses a flower basket nut to connect the second support screw and the third support screw, and can adjust the installation position of the specific screw, so as to realize the change of the distance between the third channel steel and the fourth channel steel.
本装置通过限位螺栓固定了第二支撑螺杆/第三支撑螺杆和花篮螺母,更加紧固可靠。The device fixes the second support screw/third support screw and the flower basket nut through the limit bolt, which is more reliable and fast.
以上所述仅是本发明的优选实施方式,并不用于限制本发明,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明技术原理的前提下,还可以做出若干改进和变型,这些改进和变型也应视为本发明的保护范围。The above are only the preferred embodiments of the present invention and are not intended to limit the present invention. It should be pointed out that for those skilled in the art, some improvements can be made without departing from the technical principles of the present invention. These improvements and modifications should also be regarded as the protection scope of the present invention.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010378205.9A CN111396681A (en) | 2020-05-07 | 2020-05-07 | But height-adjusting's antidetonation gallows |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010378205.9A CN111396681A (en) | 2020-05-07 | 2020-05-07 | But height-adjusting's antidetonation gallows |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN111396681A true CN111396681A (en) | 2020-07-10 |
Family
ID=71435652
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202010378205.9A Pending CN111396681A (en) | 2020-05-07 | 2020-05-07 | But height-adjusting's antidetonation gallows |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN111396681A (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112065835A (en) * | 2020-10-19 | 2020-12-11 | 泰州盛平精密机械配件有限公司 | Mounting structure of turnbuckle for hanger |
| CN112856044A (en) * | 2021-02-24 | 2021-05-28 | 中建二局安装工程有限公司 | Device of takeing root of electric pipeline gallows in steel construction truss |
| CN116591534A (en) * | 2023-03-01 | 2023-08-15 | 中建三局集团有限公司 | A suspension formwork structure and construction method for the lower layer slab of a double-layer roof of a one-story warehouse |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2008267602A (en) * | 2007-03-29 | 2008-11-06 | Plant Earthquake Disaster Prevention Associates Inc | Energy absorption support device |
| CN203395399U (en) * | 2013-07-25 | 2014-01-15 | 常州市武进武南管道设备有限公司 | Horizontal adjustable guide pipeline hanging bracket |
| US20150327705A1 (en) * | 2014-05-19 | 2015-11-19 | Qmotion Incorporated | Crossover bracket for drapery |
| CN205190454U (en) * | 2015-11-23 | 2016-04-27 | 深圳市置华机电设备有限公司 | An antidetonation gallows and supporting component thereof |
| CN206904368U (en) * | 2017-05-26 | 2018-01-19 | 江苏壹鼎崮机电科技有限公司 | A kind of rectangular air duct bilaterally earthquake-resisting support device |
| CN208331454U (en) * | 2018-06-28 | 2019-01-04 | 安徽亿德顺科技有限公司 | A kind of rectangular air duct antidetonation suspension and support |
| CN209370782U (en) * | 2018-10-31 | 2019-09-10 | 江苏容大减震科技股份有限公司 | A kind of antidetonation suspension and support being provided with speed lockup's device |
| CN209671754U (en) * | 2019-01-10 | 2019-11-22 | 安徽亿德顺科技有限公司 | A kind of adjustable type pipeline elevator |
| CN212251678U (en) * | 2020-05-07 | 2020-12-29 | 江苏容大减震科技股份有限公司 | But height-adjusting's antidetonation gallows |
-
2020
- 2020-05-07 CN CN202010378205.9A patent/CN111396681A/en active Pending
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2008267602A (en) * | 2007-03-29 | 2008-11-06 | Plant Earthquake Disaster Prevention Associates Inc | Energy absorption support device |
| CN203395399U (en) * | 2013-07-25 | 2014-01-15 | 常州市武进武南管道设备有限公司 | Horizontal adjustable guide pipeline hanging bracket |
| US20150327705A1 (en) * | 2014-05-19 | 2015-11-19 | Qmotion Incorporated | Crossover bracket for drapery |
| CN205190454U (en) * | 2015-11-23 | 2016-04-27 | 深圳市置华机电设备有限公司 | An antidetonation gallows and supporting component thereof |
| CN206904368U (en) * | 2017-05-26 | 2018-01-19 | 江苏壹鼎崮机电科技有限公司 | A kind of rectangular air duct bilaterally earthquake-resisting support device |
| CN208331454U (en) * | 2018-06-28 | 2019-01-04 | 安徽亿德顺科技有限公司 | A kind of rectangular air duct antidetonation suspension and support |
| CN209370782U (en) * | 2018-10-31 | 2019-09-10 | 江苏容大减震科技股份有限公司 | A kind of antidetonation suspension and support being provided with speed lockup's device |
| CN209671754U (en) * | 2019-01-10 | 2019-11-22 | 安徽亿德顺科技有限公司 | A kind of adjustable type pipeline elevator |
| CN212251678U (en) * | 2020-05-07 | 2020-12-29 | 江苏容大减震科技股份有限公司 | But height-adjusting's antidetonation gallows |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112065835A (en) * | 2020-10-19 | 2020-12-11 | 泰州盛平精密机械配件有限公司 | Mounting structure of turnbuckle for hanger |
| CN112856044A (en) * | 2021-02-24 | 2021-05-28 | 中建二局安装工程有限公司 | Device of takeing root of electric pipeline gallows in steel construction truss |
| CN116591534A (en) * | 2023-03-01 | 2023-08-15 | 中建三局集团有限公司 | A suspension formwork structure and construction method for the lower layer slab of a double-layer roof of a one-story warehouse |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN111396681A (en) | But height-adjusting's antidetonation gallows | |
| CN102287578A (en) | Spring-rubber vibration isolating hanging frame for damping vibration and reducing noise for warm ventilation pipe | |
| CN108533834B (en) | Vibration reduction type anti-seismic support and hanger with adjustable supporting rigidity | |
| CN206708696U (en) | Shear the antidetonation finished product suspension and support of structure | |
| CN209196287U (en) | A kind of roof trusses layer ventilation shaft | |
| CN217580189U (en) | A kind of building foundation pit construction safety support structure | |
| CN212251678U (en) | But height-adjusting's antidetonation gallows | |
| CN216305533U (en) | Structure is built to antidetonation room | |
| CN215334826U (en) | An earthquake-resistant building pipeline lateral support hanger | |
| CN221629041U (en) | A pipeline seismic support structure | |
| CN204164607U (en) | A kind of para-seismic support of building interior electromechanical equipment | |
| CN211289180U (en) | An underground garage pipeline comprehensive support | |
| CN212107205U (en) | A water conservancy pipeline support connection structure | |
| CN221665444U (en) | Anti-seismic bracket for air pipe installation | |
| CN210050397U (en) | Mounting and supporting device for air pipe | |
| CN211976130U (en) | A lateral water pipe anti-seismic support hanger | |
| CN211421901U (en) | Planking supports convenient to dismouting | |
| CN209587608U (en) | A kind of large size LCD screen hanging bracket | |
| CN222732403U (en) | Pipeline anti-seismic bracket | |
| CN219732265U (en) | A kind of prefabricated house building steel structure frame | |
| CN221723700U (en) | A seismic support for engineering construction | |
| CN211951700U (en) | A rectangular air duct lateral seismic support | |
| CN219823510U (en) | A sensor-monitoring anti-seismic bracket | |
| CN213712097U (en) | Effectual antidetonation of antidetonation hangs support | |
| CN221742127U (en) | Civil engineering frame beam reinforcing apparatus |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200710 |