CN111395407A - Cast-in-place concrete post-cast strip forming construction method - Google Patents

Cast-in-place concrete post-cast strip forming construction method Download PDF

Info

Publication number
CN111395407A
CN111395407A CN202010240959.8A CN202010240959A CN111395407A CN 111395407 A CN111395407 A CN 111395407A CN 202010240959 A CN202010240959 A CN 202010240959A CN 111395407 A CN111395407 A CN 111395407A
Authority
CN
China
Prior art keywords
cast
post
boundary
cast strip
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010240959.8A
Other languages
Chinese (zh)
Inventor
陈曦
赵利军
王冠钦
李彦雷
卢思远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN202010240959.8A priority Critical patent/CN111395407A/en
Publication of CN111395407A publication Critical patent/CN111395407A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention provides a cast-in-place concrete post-cast strip forming construction method which comprises the following steps: 1) determining the height of the boundary plate according to the concrete post-cast strip from the foundation to a designed elevation, and determining the vertical length of the boundary plate according to the thickness of the post-cast strip; 2) the interface board is provided with reinforcing steel bar holes according to the reinforcing steel bar spacing and reinforcing steel bar number of a drawing; 3) when the post-cast strip steel bars are arranged, the water-stop steel strips are fixed at the butt joint positions of the two sides of the post-cast strip and the cast-in-situ part, the two sides of the center line of the water-stop steel strips are welded with boundary plates, the boundary plates are perpendicular to the water-stop steel strips, and the boundary plates are positioned on the boundary line of the cast-in-situ part and the post-cast part of the wall body bottom plate; 4) the side of the boundary plate post-cast strip is provided with a rivet; 5) the method has the advantages that the cast-in-place concrete structure is prevented from being damaged, the construction quality of the concrete structure is further ensured, the manual investment is less, the operation difficulty is reduced, and the construction cost is saved.

Description

Cast-in-place concrete post-cast strip forming construction method
Technical Field
The invention belongs to the field of building construction engineering, and particularly relates to a cast-in-place concrete post-cast strip forming construction method.
Background
The post-cast strip is a concrete strip reserved at the corresponding positions of the foundation slab, the wall and the beam according to the design or construction specification requirements for preventing harmful cracks from occurring in the building construction.
When the traditional cast-in-place concrete post-cast strip is constructed, a general concrete reserved surface is separated by adopting a metal net, the metal net is fixed by binding reinforcing steel bars, and the elevation of the top surface of the concrete is controlled by adopting a template.
Disclosure of Invention
The invention aims to simplify the construction of cast-in-place concrete post-cast strip, and provides a construction method which is convenient for post-cast strip molding and concrete casting elevation control.
In order to achieve the purpose, the invention provides the following technical scheme:
a cast-in-place concrete post-cast strip forming construction method comprises the following steps:
1) determining the height of the boundary plate according to the concrete post-cast strip from the foundation to a designed elevation, and determining the vertical length of the boundary plate according to the thickness of the post-cast strip;
2) the interface board is provided with reinforcing steel bar holes according to the reinforcing steel bar spacing and reinforcing steel bar number of a drawing;
3) when the post-cast strip steel bars are arranged, the water-stop steel strips are fixed at the butt joint positions of the two sides of the post-cast strip and the cast-in-situ part, the two sides of the center line of the water-stop steel strips are welded with boundary plates, the boundary plates are perpendicular to the water-stop steel strips, and the boundary plates are positioned on the boundary line of the cast-in-situ part and the post-cast part of the wall body bottom plate;
4) the side of the boundary plate post-cast strip is provided with a rivet;
5) and (4) performing post-pouring belt concrete pouring, determining the elevation of the top surface of the post-pouring belt concrete by taking the height of the top of the boundary plate as a reference during the concrete pouring, and pouring the boundary plate into the concrete.
Compared with the prior art, the invention has the beneficial effects that: the construction quality of the cast-in-place concrete structure post-cast strip is guaranteed, manual use is reduced, the operation difficulty of constructors is reduced, the construction period is shortened, the engineering cost is saved, the cast-in-place concrete structure is prevented from being damaged, and the construction quality of the concrete structure is guaranteed.
Drawings
FIG. 1: the construction structure of the post-cast strip is shown schematically;
FIG. 2: a demarcation strip chart;
FIG. 3: the overall view of the workpiece in the invention.
In the figure: the device comprises a boundary plate 1, a rivet 2, a water stop steel belt 3, a reinforcing steel bar hole 4, a post-cast belt 5, a cast-in-place belt 6 and a post-cast steel bar 7.
Detailed Description
The present invention will be described in detail below with reference to the drawings and examples. In the following description, for purposes of explanation and not limitation, specific details are set forth, such as particular shapes, sizes, etc. in order to provide a thorough understanding of the embodiments of the invention. It will be apparent, however, to one skilled in the art that the present invention may be practiced in other embodiments that depart from these specific details. In other instances, detailed descriptions of well-known technical information are omitted so as not to obscure the description of the present invention with unnecessary detail.
The invention provides a special workpiece for post-cast strip part construction, which is an integrated workpiece consisting of a boundary plate 1, a water stop steel belt 3 and rivets 2. In particular, as shown in connection with figures 1-3,
and (3) water stop steel strip: the water stop steel belt 3 is arranged at the connecting position of the cast-in-place belt 6 and the post-cast belt 5 and constructed according to the design size of a drawing.
A boundary plate 1: the interface plate 1 and the water stop steel strip 3 are welded into a whole, and the interface plate 1 comprises two parts which are respectively arranged at the inner side and the outer side of the water stop steel strip by a half. The boundary plate 1 and the water stop steel belt 3 are vertically arranged, the vertical size of the boundary plate 1 is arranged according to the thickness size of the post-cast strip 5, and the thickness of the post-cast strip 5 in the embodiment provided by the invention is 3 mm. The boundary plate 1 is arranged on the boundary line of the cast-in-place strip 6 and the post-cast strip 5. The workpiece is fixed when the post-cast strip steel bars 7 are arranged, and corresponding steel bar holes 4 are formed in the boundary plate according to the post-cast strip steel bars 7.
Riveting: the rivets 2 are fixedly connected to the surface of the boundary plate 1 and used for increasing the combination of the boundary plate 1 and post-cast concrete. The size of the rivet is as follows: the length is 10cm, and the diameter is 1.5cm-2.0 cm. The distance between every two rivets (2) is set to be 15 cm.
The cast-in-place concrete post-cast strip forming construction method provided by the invention comprises the following process steps:
1) determining the height of the boundary plate 1 according to the concrete post-cast strip foundation to a designed elevation, and determining the vertical length of the boundary plate 1 according to the thickness of the post-cast strip 5;
2) the interface plate 1 is provided with reinforcing steel bar holes 4 in advance according to the reinforcing steel bar spacing and the reinforcing steel bar number of a drawing;
3) when the post-cast steel bars 4 are arranged, the water-stop steel belts 3 are fixed at the butt joint positions of the two sides of the post-cast belt and the cast-in-place part, the two sides of the center line of the water-stop steel belts 3 are welded with boundary plates, the boundary plates 1 are perpendicular to the water-stop steel belts 3, and the boundary plates 1 are positioned on the boundary lines of the cast-in-place part and the post-cast part of the wall body bottom plate;
4) the side of the boundary plate post-cast strip is provided with a rivet 2;
5) and (4) performing post-pouring belt concrete pouring, determining the elevation of the top surface of the post-pouring belt concrete by taking the height of the top of the boundary plate as a reference during the concrete pouring, and pouring the boundary plate into the concrete.
According to the method, the concrete pouring finish surface is controlled through the steel plate, the boundary plate is poured into the concrete, follow-up dismantling is not needed, the concrete surface quality is protected, the construction is not damaged, and the cast-in-place concrete post-cast strip and the concrete structure engineering quality are guaranteed.
The construction method ensures the construction quality of the post-cast strip of the cast-in-place concrete structure, reduces the manual use, reduces the operation difficulty of constructors, shortens the construction period, saves the engineering cost, avoids the cast-in-place concrete structure from being damaged, and further ensures the construction quality of the concrete structure.

Claims (1)

1. A cast-in-place concrete post-cast strip forming construction method comprises the following steps:
1) determining the height of the boundary plate according to the concrete post-cast strip from the foundation to a designed elevation, and determining the vertical length of the boundary plate according to the thickness of the post-cast strip;
2) forming reinforcing steel bar holes on the boundary plate according to the reinforcing steel bar spacing and reinforcing steel bar number of a drawing;
3) when the post-cast strip steel bars are arranged, the water-stop steel strips are fixed at the butt joint positions of the two sides of the post-cast strip and the cast-in-situ part, the two sides of the center line of the water-stop steel strips are welded with boundary plates, the boundary plates are perpendicular to the water-stop steel strips, and the boundary plates are positioned on the boundary line of the cast-in-situ part and the post-cast part of the wall body bottom plate;
4) the side of the boundary plate post-cast strip is provided with a rivet;
5) and (4) performing post-pouring belt concrete pouring, determining the elevation of the top surface of the post-pouring belt concrete by taking the height of the top of the boundary plate as a reference during the concrete pouring, and pouring the boundary plate into the concrete.
CN202010240959.8A 2020-03-31 2020-03-31 Cast-in-place concrete post-cast strip forming construction method Pending CN111395407A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010240959.8A CN111395407A (en) 2020-03-31 2020-03-31 Cast-in-place concrete post-cast strip forming construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010240959.8A CN111395407A (en) 2020-03-31 2020-03-31 Cast-in-place concrete post-cast strip forming construction method

Publications (1)

Publication Number Publication Date
CN111395407A true CN111395407A (en) 2020-07-10

Family

ID=71433794

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010240959.8A Pending CN111395407A (en) 2020-03-31 2020-03-31 Cast-in-place concrete post-cast strip forming construction method

Country Status (1)

Country Link
CN (1) CN111395407A (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102635128A (en) * 2012-04-27 2012-08-15 天津二十冶建设有限公司 Foundation slab post-cast strip waterproof steel plate combined structure and bracing method thereof
CN204059419U (en) * 2014-08-20 2014-12-31 山东莱钢建设有限公司 A kind of ater-casting
CN105649113A (en) * 2015-02-05 2016-06-08 中国建筑第四工程局有限公司 Structure and construction method of basement post-cast strip
CN106193340A (en) * 2016-08-26 2016-12-07 杭州江润科技有限公司 Cast-in-place prestressing without bondn ultralong floor combination type reinforcing strip anti-cracking structure and construction method
CN106284427A (en) * 2016-08-31 2017-01-04 中国冶集团有限公司 A kind of basement post-pouring zone temporary leaking water gear soil construction method
CN206070600U (en) * 2016-08-31 2017-04-05 中国一冶集团有限公司 A kind of basement bottom plate rear pouring tape plate device
CN108166531A (en) * 2017-12-26 2018-06-15 中国建筑第七工程局有限公司 Basic alter-pouring strips mould plate and the construction method for pouring post-cast strip
CN207512697U (en) * 2017-11-24 2018-06-19 中铁七局集团第五工程有限公司 Post-cast strip antipriming
JP2018159220A (en) * 2017-03-22 2018-10-11 大成建設株式会社 Method of constructing underground structure, form and underground structure
CN109577377A (en) * 2018-11-29 2019-04-05 成都建工第二建筑工程有限公司 Basement post-pouring zone structure and its construction method

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102635128A (en) * 2012-04-27 2012-08-15 天津二十冶建设有限公司 Foundation slab post-cast strip waterproof steel plate combined structure and bracing method thereof
CN204059419U (en) * 2014-08-20 2014-12-31 山东莱钢建设有限公司 A kind of ater-casting
CN105649113A (en) * 2015-02-05 2016-06-08 中国建筑第四工程局有限公司 Structure and construction method of basement post-cast strip
CN106193340A (en) * 2016-08-26 2016-12-07 杭州江润科技有限公司 Cast-in-place prestressing without bondn ultralong floor combination type reinforcing strip anti-cracking structure and construction method
CN106284427A (en) * 2016-08-31 2017-01-04 中国冶集团有限公司 A kind of basement post-pouring zone temporary leaking water gear soil construction method
CN206070600U (en) * 2016-08-31 2017-04-05 中国一冶集团有限公司 A kind of basement bottom plate rear pouring tape plate device
JP2018159220A (en) * 2017-03-22 2018-10-11 大成建設株式会社 Method of constructing underground structure, form and underground structure
CN207512697U (en) * 2017-11-24 2018-06-19 中铁七局集团第五工程有限公司 Post-cast strip antipriming
CN108166531A (en) * 2017-12-26 2018-06-15 中国建筑第七工程局有限公司 Basic alter-pouring strips mould plate and the construction method for pouring post-cast strip
CN109577377A (en) * 2018-11-29 2019-04-05 成都建工第二建筑工程有限公司 Basement post-pouring zone structure and its construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
范秋雨: "《建筑工地实用技术问答》", 30 April 2003, 中国建筑工业出版社 *

Similar Documents

Publication Publication Date Title
CN103291001A (en) Method for controlling thickness of protection layer on surface of floor slab reinforcing mesh and mould used in method
CN203546583U (en) Box-inside horizontal reinforcing device of concrete box-cross-section multi-beam bridge
CN215395892U (en) Prefabricated case roof beam centre form come-up prevention and cure structure
CN111395407A (en) Cast-in-place concrete post-cast strip forming construction method
CN107060173B (en) Early demoulding construction method in clear-water concrete wafer board structure hole
CN209190965U (en) A kind of adjustable prefabricated board die
CN110761562A (en) Auxiliary tool for pouring concrete and using method
CN209277403U (en) A kind of beam reinforcement cages holding clamp
CN210738077U (en) Waterproof reverse-edge aluminum alloy hanging die
CN211948026U (en) Cast-in-place splayed wall template system of apron culvert
CN210507768U (en) Novel prefabricated balcony
CN108590042B (en) Multifunctional stirrup for controlling thickness of steel bar protection layer and floor slab
CN211850361U (en) One-step pouring structure for balcony constructional column and main body structure
CN208202548U (en) Support system structure of transvers plate is exempted from a kind of beam slab post-cast strip
CN208168349U (en) A kind of profile steel concrete column template reinforcing device
CN202644483U (en) Pier large steel template
CN220058371U (en) Basement outer wall stagnant water steel sheet strutting arrangement
CN216781526U (en) Tunnel lining steel bar protection layer thickness positioning steel bar head beveling tool
CN210713227U (en) Steel plate wall stress release node structure of steel structure core barrel
CN210798297U (en) Floor board connection structure is worn to crane span structure
CN217326469U (en) Adjustable shaping template for wall type friction damper
CN209942234U (en) Anti-bank of falling board district concrete hangs mould positioning tool
CN220100654U (en) Shaping device is reserved to flue construction entrance to a cave
CN217759989U (en) A regularization template for deformation joint department shear force wall construction
CN213330031U (en) Inner and outer wall positioning and thickness control device of cast-in-place concrete shear wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20200710