CN111352352B - 用于确定工业系统的系统设定的方法和系统 - Google Patents
用于确定工业系统的系统设定的方法和系统 Download PDFInfo
- Publication number
- CN111352352B CN111352352B CN201911328470.XA CN201911328470A CN111352352B CN 111352352 B CN111352352 B CN 111352352B CN 201911328470 A CN201911328470 A CN 201911328470A CN 111352352 B CN111352352 B CN 111352352B
- Authority
- CN
- China
- Prior art keywords
- settings
- simulation
- industrial
- power system
- candidate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 74
- 238000004088 simulation Methods 0.000 claims abstract description 82
- 238000005457 optimization Methods 0.000 claims abstract description 78
- 238000004891 communication Methods 0.000 claims description 15
- 230000000694 effects Effects 0.000 claims description 13
- 230000004044 response Effects 0.000 claims description 11
- 239000004065 semiconductor Substances 0.000 claims description 3
- 238000004590 computer program Methods 0.000 claims 1
- 230000008859 change Effects 0.000 description 30
- 230000006870 function Effects 0.000 description 14
- 230000006399 behavior Effects 0.000 description 8
- 230000005540 biological transmission Effects 0.000 description 8
- 238000004519 manufacturing process Methods 0.000 description 6
- 238000009826 distribution Methods 0.000 description 4
- 238000005265 energy consumption Methods 0.000 description 4
- 238000012544 monitoring process Methods 0.000 description 4
- 230000001960 triggered effect Effects 0.000 description 4
- 238000013461 design Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 230000001360 synchronised effect Effects 0.000 description 3
- 238000013459 approach Methods 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 239000011521 glass Substances 0.000 description 2
- 230000002452 interceptive effect Effects 0.000 description 2
- 230000003278 mimic effect Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 238000012795 verification Methods 0.000 description 2
- 230000006978 adaptation Effects 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 230000005684 electric field Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 230000036962 time dependent Effects 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
- G05B23/0259—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the response to fault detection
- G05B23/0286—Modifications to the monitored process, e.g. stopping operation or adapting control
- G05B23/0294—Optimizing process, e.g. process efficiency, product quality
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B13/00—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
- G05B13/02—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
- G05B13/04—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B17/00—Systems involving the use of models or simulators of said systems
- G05B17/02—Systems involving the use of models or simulators of said systems electric
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01W—METEOROLOGY
- G01W1/00—Meteorology
- G01W1/10—Devices for predicting weather conditions
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/02—Marketing; Price estimation or determination; Fundraising
- G06Q30/0201—Market modelling; Market analysis; Collecting market data
- G06Q30/0206—Price or cost determination based on market factors
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B2219/00—Program-control systems
- G05B2219/30—Nc systems
- G05B2219/32—Operator till task planning
- G05B2219/32021—Energy management, balance and limit power to tools
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P70/00—Climate change mitigation technologies in the production process for final industrial or consumer products
- Y02P70/10—Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Abstract
Description
Claims (19)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP18214990.6A EP3671374A1 (en) | 2018-12-21 | 2018-12-21 | Method and system for determining system settings for an industrial system |
EP18214990.6 | 2018-12-21 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111352352A CN111352352A (zh) | 2020-06-30 |
CN111352352B true CN111352352B (zh) | 2024-04-26 |
Family
ID=64901351
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911328470.XA Active CN111352352B (zh) | 2018-12-21 | 2019-12-20 | 用于确定工业系统的系统设定的方法和系统 |
Country Status (3)
Country | Link |
---|---|
US (1) | US11669085B2 (zh) |
EP (1) | EP3671374A1 (zh) |
CN (1) | CN111352352B (zh) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112602025A (zh) * | 2018-08-23 | 2021-04-02 | 西门子股份公司 | 工业控制器的数字孪生的自动设置 |
US11881713B1 (en) * | 2020-03-06 | 2024-01-23 | National Technology & Engineering Solutions Of Sandia, Llc | Digital twin advanced distribution management systems (ADMS) and methods |
CN112464418B (zh) * | 2020-11-17 | 2023-07-28 | 海南省电力学校(海南省电力技工学校) | 一种分布式能源资源的通用数字孪生体构建方法 |
EP4002033A1 (en) * | 2020-11-20 | 2022-05-25 | Siemens Industry Software NV | Generating a digital twin, method, system, computer program product |
CN112330492B (zh) * | 2020-11-24 | 2022-09-30 | 国网河南省电力公司经济技术研究院 | 一种基于通信可靠性约束的主动配电网能源共享方法 |
EP4016359A1 (de) * | 2020-12-21 | 2022-06-22 | Siemens Aktiengesellschaft | Verfahren, computer-programm-produkt und modellierungswerkzeug zum referenzmodellbasierten, anforderungsbezogenen entwickeln eines technischen systems |
CN113193589B (zh) * | 2021-03-31 | 2022-08-16 | 哈尔滨工业大学 | 基于数字孪生模拟的dfig风电场次同步振荡抑制方法 |
US11868122B2 (en) * | 2021-09-10 | 2024-01-09 | Rockwell Automation Technologies, Inc. | Digital twin outcome-driven orchestration |
CN115700504A (zh) * | 2022-10-18 | 2023-02-07 | 国网青海省电力公司海北供电公司 | 一种基于数字孪生智慧电网推演系统 |
CN116227248B (zh) * | 2023-05-10 | 2023-07-07 | 长江三峡集团实业发展(北京)有限公司 | 重力储能系统的数字孪生体构建方法、装置及电子设备 |
CN116703321B (zh) * | 2023-06-09 | 2023-11-21 | 北京市永康药业有限公司 | 一种基于绿色生产的药厂管理方法及系统 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9811074B1 (en) * | 2016-06-21 | 2017-11-07 | TruPhysics GmbH | Optimization of robot control programs in physics-based simulated environment |
WO2018111368A1 (en) * | 2016-12-15 | 2018-06-21 | Siemens Aktiengesellschaft | Configuration and parameterization of energy control system |
CN108427390A (zh) * | 2018-04-16 | 2018-08-21 | 长安大学 | 一种基于数字孪生的车间级智能制造系统及其配置方法 |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20110082597A1 (en) * | 2009-10-01 | 2011-04-07 | Edsa Micro Corporation | Microgrid model based automated real time simulation for market based electric power system optimization |
US10762475B2 (en) * | 2015-02-25 | 2020-09-01 | Siemens Schweiz Ag | Digital twins for energy efficient asset maintenance |
WO2016186694A1 (en) | 2015-05-15 | 2016-11-24 | General Electric Company | Condition-based validation of performance updates |
CN105205231B (zh) * | 2015-09-06 | 2018-11-09 | 中国电力科学研究院 | 一种基于dcom的配电网数字仿真系统 |
US20170091791A1 (en) * | 2015-09-25 | 2017-03-30 | General Electric Company | Digital power plant system and method |
US10417614B2 (en) * | 2016-05-06 | 2019-09-17 | General Electric Company | Controlling aircraft operations and aircraft engine components assignment |
US20170323240A1 (en) * | 2016-05-06 | 2017-11-09 | General Electric Company | Computing system to control the use of physical state attainment with inspection |
US20180356811A1 (en) * | 2017-06-12 | 2018-12-13 | Honeywell International Inc. | Apparatus and method for automated identification and diagnosis of constraint violations |
-
2018
- 2018-12-21 EP EP18214990.6A patent/EP3671374A1/en active Pending
-
2019
- 2019-12-20 CN CN201911328470.XA patent/CN111352352B/zh active Active
- 2019-12-23 US US16/724,891 patent/US11669085B2/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9811074B1 (en) * | 2016-06-21 | 2017-11-07 | TruPhysics GmbH | Optimization of robot control programs in physics-based simulated environment |
WO2018111368A1 (en) * | 2016-12-15 | 2018-06-21 | Siemens Aktiengesellschaft | Configuration and parameterization of energy control system |
CN108427390A (zh) * | 2018-04-16 | 2018-08-21 | 长安大学 | 一种基于数字孪生的车间级智能制造系统及其配置方法 |
Also Published As
Publication number | Publication date |
---|---|
EP3671374A1 (en) | 2020-06-24 |
US20200201314A1 (en) | 2020-06-25 |
US11669085B2 (en) | 2023-06-06 |
CN111352352A (zh) | 2020-06-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111352352B (zh) | 用于确定工业系统的系统设定的方法和系统 | |
James et al. | Delay aware power system synchrophasor recovery and prediction framework | |
CN107516895B (zh) | 配电网快速仿真方法、装置、存储介质及其计算机设备 | |
US8447707B2 (en) | Automated control of a power network using metadata and automated creation of predictive process models | |
CN104657194B (zh) | 用于计算网络中动作的影响的方法和系统 | |
US11568499B2 (en) | Sensor-based predictive outage system | |
CN112287504B (zh) | 一种配电网离线/在线一体化仿真系统和方法 | |
CN113010393A (zh) | 基于混沌工程的故障演练方法及装置 | |
CN109447276B (zh) | 一种机器学习系统、设备及应用方法 | |
CN115174416B (zh) | 一种网络规划系统、方法、装置及电子设备 | |
JP2023533670A (ja) | 技術システムに対するリスクの影響推定 | |
CN103761281B (zh) | 一种数据处理方法和系统 | |
CN112286088A (zh) | 一种动力设备故障预测模型在线应用的方法及应用系统 | |
Bai et al. | Automatic modeling and optimization for the digital twin of a regional multi-energy system | |
WO2023016069A1 (zh) | 一种高效的电路仿真方法、装置、设备及存储介质 | |
Lin et al. | Hpt-rl: Calibrating power system models based on hierarchical parameter tuning and reinforcement learning | |
JP2019008794A (ja) | 電気全体回路のシミュレーションのためのコンピュータ実装方法 | |
KR101759893B1 (ko) | 분산자원 모의운전을 위한 시나리오 기반 가상장비 관리 장치 | |
EP3940530A1 (en) | Method for updating a description of an automation system | |
US20240070352A1 (en) | Simulating electrical grid transmission and distribution using multiple simulators | |
CN116544931B (zh) | 基于集成片段变换和时间卷积网络的电力负荷分布预测方法 | |
CN113159773B (zh) | 一种量化交易回测数据生成方法及装置 | |
Laouid et al. | Optimal Placement of Phasor Measurement Units Considering the Topology Transformation Method | |
US20240135062A1 (en) | System, server, and method for predicting and controlling emissions in an industrial environment | |
Horton et al. | A Software Based Smart Grid Framework for Automated Decision on Resource Allocation, Topological Control using OMNET++ |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: Swiss Baden Applicant after: ABB Switzerland Co.,Ltd. Applicant after: Hitachi energy Switzerland AG Address before: Swiss Baden Applicant before: ABB Switzerland Co.,Ltd. Applicant before: ABB grid Switzerland AG |
|
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20220507 Address after: Swiss Baden Applicant after: ABB Switzerland Co.,Ltd. Applicant after: ABB grid Switzerland AG Address before: Swiss Baden Applicant before: ABB Switzerland Co.,Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20240425 Address after: Swiss Baden Applicant after: ABB Switzerland Co.,Ltd. Country or region after: Switzerland Applicant after: Hitachi Energy Co.,Ltd. Address before: Swiss Baden Applicant before: ABB Switzerland Co.,Ltd. Country or region before: Switzerland Applicant before: Hitachi energy Switzerland AG |