CN111335975B - One-key starting method of coal-fired generator set based on starting mode of electric water feed pump - Google Patents

One-key starting method of coal-fired generator set based on starting mode of electric water feed pump Download PDF

Info

Publication number
CN111335975B
CN111335975B CN202010187718.1A CN202010187718A CN111335975B CN 111335975 B CN111335975 B CN 111335975B CN 202010187718 A CN202010187718 A CN 202010187718A CN 111335975 B CN111335975 B CN 111335975B
Authority
CN
China
Prior art keywords
started
starting
boiler
water
steam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010187718.1A
Other languages
Chinese (zh)
Other versions
CN111335975A (en
Inventor
谭祥帅
高奎
牛利涛
陈景勇
刘明海
胥成增
李长海
郭云飞
陈余土
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Thermal Power Research Institute Co Ltd
Original Assignee
Xian Thermal Power Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Thermal Power Research Institute Co Ltd filed Critical Xian Thermal Power Research Institute Co Ltd
Priority to CN202010187718.1A priority Critical patent/CN111335975B/en
Publication of CN111335975A publication Critical patent/CN111335975A/en
Application granted granted Critical
Publication of CN111335975B publication Critical patent/CN111335975B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K13/00General layout or general methods of operation of complete plants
    • F01K13/02Controlling, e.g. stopping or starting

Abstract

The invention discloses a one-key starting method of a coal-fired generator set based on a starting mode of an electric water feed pump.

Description

One-key starting method of coal-fired generator set based on starting mode of electric water feed pump
Technical Field
The invention belongs to the field of thermal power generation, and relates to a one-key starting method of a coal-fired power generating set based on a starting mode of an electric feed pump.
Background
With the promotion of deep fusion of big data, artificial intelligence and entity economy in China, the industrial technology is promoted to change and optimized and upgraded in a direction mainly attacked by intelligence, and therefore the concept of an intelligent power station is provided in the field of thermal power generation. The essence of the intelligent power station is the high development and deep integration of informatization and intelligent technologies in the field of power generation, and the intelligent power station is embodied in the systematic application of technologies such as big data, Internet of things, visualization, advanced measurement, intelligent control and the like, and is mainly characterized by ubiquitous perception, self-adaptation, intelligent integration and interaction. The technical core of the intelligent power station is information fusion and intelligent power generation technology.
The automatic starting technology of the unit serves as one of key technologies of the intelligent power station, the technology has extremely important significance in research on the technology from the perspective of quick and safe starting of the unit and from the aspect of economic benefits, meanwhile, reference is provided for application of the automatic starting technology of the intelligent power station, and the technology has important significance in promoting development of the intelligent power station.
However, the automatic starting technology in China cannot be effectively applied to the field of thermal power generation, and is limited to the construction time of capital construction in the new period of a unit and the production pressure of the unit after the unit is put into commercial operation to the greatest extent.
Disclosure of Invention
The invention aims to overcome the defects of the prior art and provides a one-key starting method of a coal-fired power generating unit based on a starting mode of a motor-driven water-feeding pump, which can realize one-key starting of the coal-fired power generating unit.
In order to achieve the purpose, the one-key starting method of the coal-fired generator set based on the starting mode of the electric feed pump, disclosed by the invention, selects the starting mode of the electric feed pump, and specifically comprises the following steps of:
at the initial stage of starting, start circulating water system and closed cooling water system in proper order, then start condensate system and lubricating oil system simultaneously again, treat that lubricating oil system starts sealed oil system after accomplishing, start low water side system that adds in proper order after treating condensate system starts to accomplish, then carry out the oxygen-eliminating device and go up the start of water washing system and the input of supplementary steam system, wait to start the static water injection of water supply pipe and oxygen-eliminating device heating system again in proper order after the oxygen-eliminating device goes up the water washing and accomplishes.
Further comprising: after a deaerator heating system is put into operation, a boiler water feeding and boiler water draining and exhausting interlock and a steam turbine water draining interlock are started at the same time, a boiler cold cleaning system is started to clean the boiler in a cold state after the boiler is fed with water, a shaft seal system and a vacuum system are started in sequence in the boiler cold cleaning process, a wind and smoke system is started after the boiler is cleaned in the cold state, a fire detection cooling fan is started and a delivery/draught fan is automatic after the wind and smoke system is started, and then ignition is prepared after the fire detection cooling fan is started.
Further comprising: after the ignition preparation of the unit is completed, water feeding and bypass automatic feeding and hearth starting purging are sequentially carried out, after the hearth purging is completed, a powder making system is started to prepare, and a secondary air door automatic feeding is carried out simultaneously, after the powder making system is prepared, a primary air fan automatic feeding and a first powder making system starting to ignite are carried out simultaneously, after the first powder making system is ignited, a boiler automatic temperature rise and pressure rise system is started, and meanwhile, a condenser temperature reduction control is put into, wherein a steam turbine EH oil system, a stator cooling water system, a high-pressure cylinder reverse heating system, a medium-pressure cylinder positive heating system and a steam heater interlayer system are started while hot washing is carried out on the boiler in the boiler automatic temperature rise and pressure rise process.
Further comprising: starting a steam turbine to perform impulse rotation after the boiler finishes hot-state impulse, putting low pressure heater and 3# high pressure heater in a steam turbine medium-speed warming process, starting the boiler to automatically boost pressure in the steam turbine high-speed warming process, starting a second set of powder preparation system after the boiler is automatically boosted, and putting superheater and reheater desuperheating water to be automatic after the second set of powder preparation system is started.
Further comprising: and starting the unit for grid connection after the second set of pulverizing system is started, performing initial load warming to start the automatic cylinder switching after the standby set is connected to the grid, starting the steam-driven water feeding pump after the automatic cylinder switching is finished, and starting the load-increasing pump after the steam-driven water feeding pump is started.
Further comprising: after the steam-driven water feeding pump is combined with the pump, the steam source of the steam feeding machine is automatically fed and the oxygen generator is automatically cut off to four times, the fuel main control is automatically fed after the steam feeding machine main control is automatically fed, the load is increased to 25% after the fuel main control is automatically fed, the standby group load is increased to 25%, the water feeding pipeline is started to be switched to the main path to operate, the denitration system is fed when the load is increased to 30% in a dry state, the third set of powder preparation system is started, the load is increased to 50% in a feeding coordination control system, and then the combustion-supporting withdrawing system is started.
The invention has the following beneficial effects:
the one-key starting method of the coal-fired generator set based on the electric water feeding pump starting mode has the advantages that during specific operation, in the starting process of the generator set, the flexibility of the starting of the generator set is improved to the maximum extent through the mutual independent and mutual correlation organic combination between the auxiliary system of the generator set and the starting system of the generator set, the technical problem that the one-key starting of the coal-fired generator set is difficult to realize is fundamentally solved, the one-key starting of the generator set is more economic than the traditional manual starting mode, and the plant power consumption of the generator set is reduced in the starting process; the water consumption and coal consumption indexes of the unit in the starting process are reduced, the misoperation of the unit caused by human reasons in the starting process is fundamentally avoided, and the unit is safer and more energy-saving in the starting process.
Drawings
FIG. 1 is a flow chart of the present invention.
Detailed Description
The invention is described in further detail below with reference to the accompanying drawings:
referring to fig. 1, the one-key starting method of the coal-fired power generating unit based on the starting mode of the electric feed pump, which is disclosed by the invention, selects the starting mode of the electric feed pump, and specifically comprises the following steps:
at the initial stage of starting, start circulating water system and closed cooling water system in proper order, then start condensate system and lubricating oil system simultaneously again, treat lubricating oil system and start sealed oil system after the completion of starting, treat that condensate system starts to start the low water side system that adds after the completion, then carry out the start of water washing system on the oxygen-eliminating device and supplementary steam system's input, treat that the oxygen-eliminating device is washed the completion back and then start the static water injection of water supply pipe and oxygen-eliminating device heating system in proper order again.
Further comprising: after a deaerator heating system is put into operation, a boiler water feeding and boiler water draining and exhausting interlock and a steam turbine water draining interlock are started at the same time, a boiler cold cleaning system is started to clean the boiler in a cold state after the boiler is fed with water, a shaft seal system and a vacuum system are started in sequence in the boiler cold cleaning process, a wind and smoke system is started after the boiler is cleaned in the cold state, a fire detection cooling fan is started and a delivery/draught fan is automatic after the wind and smoke system is started, and then ignition is prepared after the fire detection cooling fan is started.
Further comprising: after the ignition preparation of the unit is completed, water feeding and bypass automatic blowing and starting of a hearth are sequentially carried out, after the hearth blowing is completed, a coal pulverizing system is started to prepare, and a secondary air door is started automatically, after the coal pulverizing system is prepared, a primary air fan is started automatically, a first set of coal pulverizing system is started to ignite, after the first set of coal pulverizing system ignites, an automatic boiler temperature rising and pressure rising system is started, and meanwhile a condenser temperature reduction control is put into, wherein a steam turbine EH oil system, a stator cooling water system, a high-pressure cylinder reverse heating system, an intermediate pressure cylinder positive heating system and a steam heater interlayer system are started while hot washing of a boiler is carried out in the automatic boiler temperature rising and pressure rising process.
Further comprising: starting a steam turbine to perform impulse rotation after the boiler finishes hot-state impulse, putting low pressure heater and 3# high pressure heater in a steam turbine medium-speed warming process, starting the boiler to automatically boost pressure in the steam turbine high-speed warming process, starting a second set of powder preparation system after the boiler is automatically boosted, and putting superheater and reheater desuperheating water to be automatic after the second set of powder preparation system is started.
Further comprising: and starting the unit for grid connection after the second set of pulverizing system is started, performing initial load warming to start the automatic cylinder switching after the standby set is connected to the grid, starting the steam-driven water feeding pump after the automatic cylinder switching is finished, and starting the load-increasing pump after the steam-driven water feeding pump is started.
Further comprising: after the steam-driven water feeding pump is combined with the pump, the steam source of the steam feeding machine is automatically fed and the oxygen generator is automatically cut off to four times, the fuel main control is automatically fed after the steam feeding machine main control is automatically fed, the load is increased to 25% after the fuel main control is automatically fed, the standby group load is increased to 25%, the water feeding pipeline is started to be switched to the main path to operate, the denitration system is fed when the load is increased to 30% in a dry state, the third set of powder preparation system is started, the load is increased to 50% in a feeding coordination control system, and then the combustion-supporting withdrawing system is started.

Claims (1)

1. A one-key starting method of a coal-fired generator set based on a starting mode of an electric feed pump is characterized in that the generator set selects the starting mode of the electric feed pump, and the method specifically comprises the following steps:
in the initial starting stage, a circulating water system and a closed cooling water system are started in sequence, then a condensate system and a lubricating oil system are started simultaneously, a sealing oil system is started after the lubricating oil system is started, a low water adding side system is started after the condensate system is started, then starting of a water feeding and flushing system of a deaerator and input of an auxiliary steam system are carried out, and a water feeding pipeline static water injection and deaerator heating system is started in sequence after the deaerator is flushed;
further comprising:
after the deaerator heating system is put into operation, a boiler drainage exhaust interlock and a steam turbine drainage interlock are put into operation while boiler water feeding is started, a boiler cold cleaning system is started to carry out boiler cold cleaning after the boiler water feeding is finished, wherein a shaft seal system and a vacuum system are sequentially started in the boiler cold cleaning process, a smoke system is started after the boiler cold cleaning is finished, a fire detection cooling fan is started and a delivery/draught fan is automatic simultaneously after the smoke system is started, and then ignition is prepared after the fire detection cooling fan is started;
further comprising:
after the ignition preparation of the unit is completed, water feeding and bypass automatic feeding and hearth starting purging are sequentially carried out, after the hearth purging is completed, a powder making system is started to prepare and a secondary air door automatic feeding are simultaneously carried out, after the powder making system is prepared, a primary fan automatic feeding and a first powder making system starting to ignite are simultaneously carried out, after the first powder making system finishes igniting, a boiler automatic temperature rising and boosting system is started, and meanwhile a condenser is fed for temperature reduction control, wherein a steam turbine EH oil system, a stator cooling water system, a high-pressure cylinder reverse heating system, a medium-pressure cylinder positive heating system and a steam heater interlayer system are started while hot washing is carried out on the boiler in the boiler automatic temperature rising and boosting process;
further comprising:
starting a steam turbine to perform impulse rotation after the boiler is subjected to thermal state impulse, putting low pressure heating in the medium-speed warming process of the steam turbine and putting 3# high pressure heating in the medium-speed warming process of the steam turbine in a steam turbine medium-pressure cylinder starting mode, starting the boiler to automatically boost pressure in the high-speed warming process of the steam turbine, starting a second set of powder making system after the boiler is automatically boosted, and putting superheater and reheater desuperheating water to be automatic after the second set of powder making system is started;
further comprising:
starting the unit to be connected to the power after the second set of pulverizing system is started, starting an automatic cylinder switching by initial load warming after the standby set is connected to the power, starting the steam feed pump after the automatic cylinder switching is finished, and starting a load-raising pump after the steam feed pump is started;
further comprising:
after the steam feed pump is started and started, the steam supply of the oxygen supply device is automatically switched off, the main control of the oxygen supply device is automatically switched off to four pumps, after the main control of the steam supply device is automatically switched on, the main control of the fuel is automatically switched on, after the main control of the fuel is automatically switched on, the load is increased to 25%, the load of the standby group is increased to 25%, the water supply pipeline is started to be switched to the main path for operation, then the denitration system is started when the load is increased to 30% in a dry state for operation, the third set of powder preparation system is started, the load is increased to 50% in a coordinated control system, and then the combustion-withdrawing system is started.
CN202010187718.1A 2020-03-17 2020-03-17 One-key starting method of coal-fired generator set based on starting mode of electric water feed pump Active CN111335975B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010187718.1A CN111335975B (en) 2020-03-17 2020-03-17 One-key starting method of coal-fired generator set based on starting mode of electric water feed pump

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010187718.1A CN111335975B (en) 2020-03-17 2020-03-17 One-key starting method of coal-fired generator set based on starting mode of electric water feed pump

Publications (2)

Publication Number Publication Date
CN111335975A CN111335975A (en) 2020-06-26
CN111335975B true CN111335975B (en) 2022-06-10

Family

ID=71178304

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010187718.1A Active CN111335975B (en) 2020-03-17 2020-03-17 One-key starting method of coal-fired generator set based on starting mode of electric water feed pump

Country Status (1)

Country Link
CN (1) CN111335975B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113467395A (en) * 2021-07-05 2021-10-01 南方电网调峰调频发电有限公司 Thermal power generating unit starting method and device, computer equipment and storage medium

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3915629B2 (en) * 2002-08-23 2007-05-16 日新電機株式会社 Automatic control device
CN103616854B (en) * 2013-10-24 2016-04-27 上海迪吉特控制系统有限公司 Thermal power plant's monoblock is from the optimization implementation method of on off control logic
CN107060919B (en) * 2017-05-31 2019-05-03 邯钢集团邯宝钢铁有限公司 A kind of gas fired-boiler steam turbine power generation Quick starting energy-saving device and method

Also Published As

Publication number Publication date
CN111335975A (en) 2020-06-26

Similar Documents

Publication Publication Date Title
CN111335976B (en) One-key starting method of coal-fired generator set based on steam feed pump starting mode
CN104963735B (en) Utilize the method and device of condenser cooling water backwater waste heat gaseous fuel
CN113007692B (en) Coal-fired unit whole-process automatic starting control method based on steam-driven water-feeding pump
CN111335975B (en) One-key starting method of coal-fired generator set based on starting mode of electric water feed pump
CN108843418A (en) A kind of double pressure high efficiency burnt gas supercritical carbon dioxide association circulating power generation systems
CN201715490U (en) Waste heat comprehensive recovery system of fuel gas boiler
CN111780081A (en) 700 ℃ boiler heating surface arrangement device for preventing reheated steam temperature from failing to reach standard
CN112879890B (en) Automatic starting control method for whole process of coal-fired unit based on electric water feeding pump
CN211975088U (en) Reverse-heating cold-state starting system of condensing turbine generator set
CN209893366U (en) Steam-water circulating system for waste incineration power generation
CN208380648U (en) A kind of association circulating power generation system of the double pressure supercritical carbon dioxide waste heat boilers of band
CN208042106U (en) A kind of coal gas high-temperature high-voltage power generation system
CN110953763A (en) Gas cogeneration system and control method thereof
CN201420574Y (en) Device for low temperature waste heat power generation by applying screw expander
CN109539216A (en) A kind of combined generating system of integrated garbage burning boiler and coal-burning boiler
CN212719661U (en) Novel heating surface arrangement structure of single-reheating 700 ℃ ultra-supercritical boiler
CN109296413A (en) A kind of the bypass double reheat power generator and method cooling using deep sea water
CN212673163U (en) Steam heating starting system of once-through boiler
CN209369886U (en) A kind of bypass double reheat power generator cooling using deep sea water
CN219412681U (en) Shaft seal heating pipe system of gas combined cycle unit
RU2317426C2 (en) Method of operation of thermal power station
CN217737175U (en) Novel superheater for improving power generation efficiency of garbage power plant
CN220395781U (en) Cold starting pre-heating mechanism of double-shaft unit in gas-steam combined cycle heat supply
CN220793101U (en) Steam reheating equipment for coal-fired generator set
CN215490405U (en) Solar energy-gas combined cycle power generation system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant