CN111326958A - Lightning rod for lightning protection engineering convenient to assemble - Google Patents
Lightning rod for lightning protection engineering convenient to assemble Download PDFInfo
- Publication number
- CN111326958A CN111326958A CN202010146408.5A CN202010146408A CN111326958A CN 111326958 A CN111326958 A CN 111326958A CN 202010146408 A CN202010146408 A CN 202010146408A CN 111326958 A CN111326958 A CN 111326958A
- Authority
- CN
- China
- Prior art keywords
- copper pipe
- galvanized copper
- galvanized
- welded
- assemble
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01T—SPARK GAPS; OVERVOLTAGE ARRESTERS USING SPARK GAPS; SPARKING PLUGS; CORONA DEVICES; GENERATING IONS TO BE INTRODUCED INTO NON-ENCLOSED GASES
- H01T19/00—Devices providing for corona discharge
- H01T19/04—Devices providing for corona discharge having pointed electrodes
Landscapes
- Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Plasma & Fusion (AREA)
- Elimination Of Static Electricity (AREA)
Abstract
The invention discloses a lightning rod for lightning protection engineering, which is convenient to assemble and comprises a second galvanized copper pipe, wherein a first connecting piece is welded at the top end of the second galvanized copper pipe; the bottom end of the third galvanized copper pipe is welded with a first connecting threaded sleeve, the first connecting piece and the first connecting threaded sleeve are mutually installed in a threaded manner, and the top end of the third galvanized copper pipe is welded with a second connecting piece; the bottom end of the fourth galvanized copper pipe is welded with a second connecting threaded sleeve, the second connecting threaded sleeve and the second connecting piece are mutually installed in a threaded manner, and the top end of the fourth galvanized copper pipe is welded with a third connecting threaded sleeve; through setting up flange and triangle bottom plate for strengthen its whole portability when using, through the connection of a plurality of structures when using, make its more convenient installation and assemble when using, thereby strengthened its result of use.
Description
Technical Field
The invention relates to the technical field of lightning protection engineering, in particular to a lightning rod for lightning protection engineering, which is convenient to assemble.
Background
Lightning rod, also known as lightning rod, is used to protect buildings, tall trees etc. from lightning strike device. The top end of the protected object is provided with a lightning receptor which is connected with a drainage ground net buried underground by a lead wire meeting the specification. The specification of the lightning rod must meet the GB standard, and the height specification of the lightning rod required by each lightning protection category is different.
It distorts the ground electric field as the thundercloud discharge approaches the ground. A space with concentrated local electric field is formed at the top end of the lightning rod to influence the development direction of lightning leading discharge, so that lightning is guided to discharge to the lightning rod, and then lightning current is introduced into the ground through the grounding down conductor and the grounding device, so that the protected object is prevented from being struck by lightning.
However, the lightning rod in the prior art has the following disadvantages when in use:
the lightning rod among the prior art single structure when using, can't realize its diversified structure when in actual use to the formula lightning rod that flows among the prior art can't stably install when using, thereby can't satisfy prior art needs.
Disclosure of Invention
The invention aims to provide a lightning rod for lightning protection engineering, which is convenient to assemble and aims to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme: a lightning rod for lightning protection engineering convenient to assemble comprises a first galvanized copper pipe, wherein a first flange is welded at the top end of the first galvanized copper pipe, and a concrete embedded part is filled in the ground at the periphery of the bottom end of the first galvanized copper pipe; the bottom end of the second galvanized copper pipe is welded with a second flange, the first flange and the second flange are fixedly installed through a fixing bolt, and the top end of the second galvanized copper pipe is welded with a first connecting piece; the bottom end of the third galvanized copper pipe is welded with a first connecting threaded sleeve, the first connecting piece and the first connecting threaded sleeve are mutually installed in a threaded manner, and the top end of the third galvanized copper pipe is welded with a second connecting piece; the bottom end of the fourth galvanized copper pipe is welded with a second connecting threaded sleeve, the second connecting threaded sleeve and the second connecting piece are mutually installed in a threaded manner, and the top end of the fourth galvanized copper pipe is welded with a third connecting threaded sleeve; and the bottom end of the solid stainless steel needle is in threaded connection with a third connecting threaded sleeve.
Preferably, a reinforcing rib is welded at the joint of the second galvanized copper pipe and the third flange, and a grounding bolt is embedded on one side of the lower surface of the third flange.
Preferably, the lengths of the second galvanized copper pipe, the third galvanized copper pipe and the fourth galvanized copper pipe are the same, and the length of the solid stainless steel needle is two thirds of the length of the second galvanized copper pipe, the third galvanized copper pipe and the fourth galvanized copper pipe.
Preferably, the diameter of the first galvanized copper pipe is seventy-five millimeters, the diameter of the second galvanized copper pipe is fifty millimeters, the diameter of the third galvanized copper pipe is forty millimeters, the diameter of the fourth galvanized copper pipe is thirty-two millimeters, and the diameter of the solid stainless steel needle is twenty millimeters.
Preferably, the method further comprises the following steps: the triangular bottom plate, tertiary bottom plate top and second galvanized steel pipe mutual welding, triangular bottom plate top and second galvanized steel pipe junction welding have the strengthening rib.
Preferably, the corners of the triangular bottom plate are welded with channel steel, and the position of the channel steel close to one end is sleeved with a positioning pin.
Preferably, the first galvanized copper pipe is buried under the ground.
Preferably, the middle part of the fourth galvanized steel pipe is sleeved with a galvanized hanging ring.
Preferably, the length of the triangular bottom plate is eight decimeters, and the diameters of the first flange and the second flange are three decimeters.
Compared with the prior art, the invention has the beneficial effects that:
through setting up flange and triangle bottom plate for strengthen its whole portability when using, through the connection of a plurality of structures when using, make its more convenient installation and assemble when using, thereby strengthened its result of use.
Drawings
FIG. 1 is a schematic structural diagram of an embodiment of the present invention;
FIG. 2 is a schematic view of an installation configuration of one embodiment of the present invention;
FIG. 3 is an enlarged view of the area of FIG. 1A according to the present invention;
FIG. 4 is an enlarged structural view of the area shown in FIG. 1B according to the present invention;
FIG. 5 is an enlarged view of the area of FIG. 1C according to the present invention;
FIG. 6 is an enlarged view of the area of FIG. 1D according to the present invention;
FIG. 7 is an enlarged view of the area of FIG. 1E according to the present invention;
FIG. 8 is a schematic structural diagram of another embodiment of the present invention;
FIG. 9 is a schematic bottom view of another embodiment of the present invention;
fig. 10 is a schematic perspective view of another embodiment of the present invention.
In the figure: 1-a first galvanized steel pipe; 11-concrete embedded parts; 2-a first flange; 3-a second flange; 31-reinforcing ribs; 32-a ground bolt; 4-a second galvanized steel pipe; 41-a first connector; 5-a third galvanized steel pipe; 51-a first connecting thread bush; 52-a second connector; 6-fourth galvanized steel pipe; 61-a second connecting thread bush; 62-galvanized hanging rings; 63-a third connecting thread bush; 7-solid stainless steel needles; 8-triangular bottom plate; 81-channel steel; 82-positioning pin.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example 1:
referring to fig. 1-7, the present invention provides a technical solution: a lightning rod for lightning protection engineering convenient to assemble comprises a first galvanized copper pipe 1, wherein a first flange 2 is welded at the top end of the first galvanized copper pipe 1, and a concrete embedded part 11 is filled in the ground at the periphery of the bottom end of the first galvanized copper pipe 1; the second galvanized copper pipe 4 is welded with a second flange 3 at the bottom end of the second galvanized copper pipe 4, the first flange 2 and the second flange 3 are fixedly installed through a fixing bolt, and a first connecting piece 41 is welded at the top end of the second galvanized copper pipe 4; the bottom end of the third galvanized copper pipe 5 is welded with a first connecting threaded sleeve 51, the first connecting piece 41 and the first connecting threaded sleeve 51 are mutually installed in a threaded manner, and the top end of the third galvanized copper pipe 5 is welded with a second connecting piece 52; a fourth galvanized copper pipe 6, wherein a second connecting threaded sleeve 61 is welded at the bottom end of the fourth galvanized copper pipe 6, the second connecting threaded sleeve 61 and the second connecting piece 52 are mutually installed in a threaded manner, and a third connecting threaded sleeve 63 is welded at the top end of the fourth galvanized copper pipe 6; and the bottom end of the solid stainless steel needle 7 is in threaded connection with a third connecting threaded sleeve 63.
A reinforcing rib 31 is welded at the joint of the second galvanized copper pipe 4 and the third flange 3, and a grounding bolt 32 is embedded on one side of the lower surface of the third flange 3; the lengths of the second galvanized copper pipe 4, the third galvanized copper pipe 5 and the fourth galvanized copper pipe 6 are the same, and the length of the solid stainless steel needle 7 is two thirds of the length of the second galvanized copper pipe 4, the third galvanized copper pipe 5 and the fourth galvanized copper pipe 6.
The diameter of the first galvanized copper pipe 1 is seventy-five millimeters, the diameter of the second galvanized copper pipe 4 is fifty millimeters, the diameter of the third galvanized copper pipe 5 is forty millimeters, the diameter of the fourth galvanized copper pipe 6 is thirty-two millimeters, and the diameter of the solid stainless steel needle 7 is twenty millimeters; the first galvanized copper pipe 1 is buried under the ground; the middle part of the fourth galvanized steel 6 pipe is sleeved with a galvanized lifting ring 62; the diameters of the first flange 2 and the second flange 3 are three decimeters.
Example 2:
referring to fig. 3-10, the present invention provides a technical solution: a lightning rod for lightning protection engineering convenient to assemble comprises a second galvanized copper pipe 4, wherein a first connecting piece 41 is welded at the top end of the second galvanized copper pipe 4; the bottom end of the third galvanized copper pipe 5 is welded with a first connecting threaded sleeve 51, the first connecting piece 41 and the first connecting threaded sleeve 51 are mutually installed in a threaded manner, and the top end of the third galvanized copper pipe 5 is welded with a second connecting piece 52; a fourth galvanized copper pipe 6, wherein a second connecting threaded sleeve 61 is welded at the bottom end of the fourth galvanized copper pipe 6, the second connecting threaded sleeve 61 and the second connecting piece 52 are mutually installed in a threaded manner, and a third connecting threaded sleeve 63 is welded at the top end of the fourth galvanized copper pipe 6; and the bottom end of the solid stainless steel needle 7 is in threaded connection with a third connecting threaded sleeve 63.
The lengths of the second galvanized copper pipe 4, the third galvanized copper pipe 5 and the fourth galvanized copper pipe 6 are the same, and the length of the solid stainless steel needle 7 is two thirds of the length of the second galvanized copper pipe 4, the third galvanized copper pipe 5 and the fourth galvanized copper pipe 6.
The diameter of the second galvanized copper pipe 4 is fifty millimeters, the diameter of the third galvanized copper pipe 5 is forty millimeters, the diameter of the fourth galvanized copper pipe 6 is thirty-two millimeters, and the diameter of the solid stainless steel needle 7 is twenty millimeters; the middle part of the fourth galvanized steel 6 pipe is sleeved with a galvanized hanging ring 62.
The method comprises the following steps: the top end of the three-stage bottom plate 8 is welded with the second galvanized steel pipe 4, and a reinforcing rib 31 is welded at the joint of the top end of the three-stage bottom plate 8 and the second galvanized steel pipe 4; channel steel 81 is welded at the corner of the triangular bottom plate 8, and a positioning pin 82 is sleeved at one end of the channel steel 81 close to one end; the length of the triangular bottom plate 8 is eight decimeters.
The lightning rod combined with the above embodiments has two forms in practical use, the form of the first embodiment is adopted in the fixed building range, the form of the second embodiment is selected in the flow action, and the lightning rod passes through the corresponding first connecting piece 41, the second connecting piece 52 and the corresponding first connecting threaded sleeve 51, the second connecting threaded sleeve 61 and the third connecting threaded sleeve 63 during installation, so that the lightning rod facilitates the effective stabilizing effect during use and the using effect during use.
In the several embodiments provided in the present invention, it should be understood that the disclosed apparatus may be implemented in other ways. For example, the above-described embodiments of the apparatus are merely illustrative, and for example, the melting of the inner container and the type of solution therein are merely one way in which fire may be extinguished and may be actually realized with additional materials. In addition, the welding, screwing or winding connection between the components shown or discussed may be accomplished by means of equipment such as welding torch, screwing with wrench, etc., and the components of the device may be made of various materials, such as aluminum alloy, steel, copper, etc., and may be formed by casting or by mechanical punching.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
The above description is only an embodiment of the present invention, and not intended to limit the scope of the present invention, and all modifications of equivalent structures and equivalent processes performed by the present specification and drawings, or directly or indirectly applied to other related technical fields, are included in the scope of the present invention.
Claims (9)
1. The utility model provides a lightning rod for lightning protection engineering convenient to assemble which characterized in that includes:
the concrete embedded part comprises a first galvanized copper pipe (1), wherein a first flange (2) is welded at the top end of the first galvanized copper pipe (1), and a concrete embedded part (11) is filled in the ground at the periphery of the bottom end of the first galvanized copper pipe (1);
the bottom end of the second galvanized copper pipe (4) is welded with a second flange (3), the first flange (2) and the second flange (3) are fixedly installed through a fixing bolt, and the top end of the second galvanized copper pipe (4) is welded with a first connecting piece (41);
the bottom end of the third galvanized copper pipe (5) is welded with a first connecting threaded sleeve (51), the first connecting piece (41) and the first connecting threaded sleeve (51) are mutually installed in a threaded manner, and the top end of the third galvanized copper pipe (5) is welded with a second connecting piece (52);
the bottom end of the fourth galvanized copper pipe (6) is welded with a second connecting threaded sleeve (61), the second connecting threaded sleeve (61) and the second connecting piece (52) are mutually installed in a threaded mode, and the top end of the fourth galvanized copper pipe (6) is welded with a third connecting threaded sleeve (63);
the solid stainless steel needle (7), solid stainless steel needle (7) bottom and third connection thread cover (63) threaded connection.
2. The lightning rod convenient to assemble for lightning protection engineering of claim 1, characterized in that: the joint of the second galvanized copper pipe (4) and the third flange (3) is welded with a reinforcing rib (31), and one side of the lower surface of the third flange (3) is inlaid with a grounding bolt (32).
3. The lightning rod convenient to assemble for lightning protection engineering of claim 1, characterized in that: the lengths of the second galvanized copper pipe (4), the third galvanized copper pipe (5) and the fourth galvanized copper pipe (6) are the same, and the length of the solid stainless steel needle (7) is two thirds of the lengths of the second galvanized copper pipe (4), the third galvanized copper pipe (5) and the fourth galvanized copper pipe (6).
4. The lightning rod convenient to assemble for lightning protection engineering of claim 1, characterized in that: the diameter of the first galvanized copper pipe (1) is seventy-five millimeters, the diameter of the second galvanized copper pipe (4) is fifty millimeters, the diameter of the third galvanized copper pipe (5) is forty millimeters, the diameter of the fourth galvanized copper pipe (6) is thirty-two millimeters, and the diameter of the solid stainless steel needle (7) is twenty millimeters.
5. The lightning rod convenient to assemble for lightning protection engineering of claim 1, further comprising:
triangle bottom plate (8), tertiary bottom plate (8) top and second galvanized steel pipe (4) weld each other, triangle bottom plate (8) top and second galvanized steel pipe (4) junction weld have strengthening rib (31).
6. The lightning rod convenient to assemble for lightning protection engineering of claim 5, characterized in that: triangular bottom plate (8) corner all weld channel-section steel (81), channel-section steel (81) be close to one end department and all cup jointed locating pin (82).
7. The lightning rod convenient to assemble for lightning protection engineering of claim 1, characterized in that: the first galvanized copper pipe (1) is buried under the ground.
8. The lightning rod convenient to assemble for lightning protection engineering of claim 1, characterized in that: the middle part of the fourth galvanized steel (6) pipe is sleeved with a galvanized hanging ring (62).
9. The lightning rod convenient to assemble for lightning protection engineering of claim 5, characterized in that: the triangular bottom plate (8) is lengthened to eight decimeters, and the diameters of the first flange (2) and the second flange (3) are three decimeters.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010146408.5A CN111326958A (en) | 2020-03-05 | 2020-03-05 | Lightning rod for lightning protection engineering convenient to assemble |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010146408.5A CN111326958A (en) | 2020-03-05 | 2020-03-05 | Lightning rod for lightning protection engineering convenient to assemble |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111326958A true CN111326958A (en) | 2020-06-23 |
Family
ID=71171483
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010146408.5A Pending CN111326958A (en) | 2020-03-05 | 2020-03-05 | Lightning rod for lightning protection engineering convenient to assemble |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111326958A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1102016A (en) * | 1994-11-01 | 1995-04-26 | 王德言 | Optimized lightning rod |
CN201478692U (en) * | 2009-08-14 | 2010-05-19 | 北京欧地安科技股份有限公司 | Fast-assembly lightning rod |
CN205212183U (en) * | 2015-12-25 | 2016-05-04 | 天津奥麦思电气有限公司 | Lightning rod convenient to installation |
CN110061426A (en) * | 2019-04-26 | 2019-07-26 | 山东理工职业学院 | A kind of interim lightning arrester |
CN209313195U (en) * | 2018-10-18 | 2019-08-27 | 无锡市华鹰移动照明有限公司 | Multi-joint telescoping self-conductive lightning rod |
-
2020
- 2020-03-05 CN CN202010146408.5A patent/CN111326958A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1102016A (en) * | 1994-11-01 | 1995-04-26 | 王德言 | Optimized lightning rod |
CN201478692U (en) * | 2009-08-14 | 2010-05-19 | 北京欧地安科技股份有限公司 | Fast-assembly lightning rod |
CN205212183U (en) * | 2015-12-25 | 2016-05-04 | 天津奥麦思电气有限公司 | Lightning rod convenient to installation |
CN209313195U (en) * | 2018-10-18 | 2019-08-27 | 无锡市华鹰移动照明有限公司 | Multi-joint telescoping self-conductive lightning rod |
CN110061426A (en) * | 2019-04-26 | 2019-07-26 | 山东理工职业学院 | A kind of interim lightning arrester |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN211182560U (en) | Novel tower lightning grounding device | |
CN205116866U (en) | Device is down drawn to transmission line cable termination solid | |
CN111326958A (en) | Lightning rod for lightning protection engineering convenient to assemble | |
CN206558253U (en) | A kind of high intensity modified chlorinated polyvinyl chloride cable sheath tube | |
CN105429034B (en) | Grounding device of transformer substation containing inlet and outlet cables and mounting method thereof | |
CN208815732U (en) | A kind of bright frame glass curtain wall lightning protection node structure | |
KR102097513B1 (en) | Lightning Rod With Thunderbolt Prevention | |
CN217334423U (en) | Grounding grid device | |
CN207009693U (en) | A kind of high soil resistivity substation grounding structure | |
CN204597402U (en) | Electrical interconnecting component | |
CN109066112A (en) | Reduce the earthing or grounding means and method of ground resistance and anti-artificial destruction high voltage iron tower | |
CN1411101A (en) | Quick installing grounding pole | |
CN208908260U (en) | The independent compound earthed system of antistatic | |
CN212389045U (en) | Steel construction protector of choosing outward | |
CN209603611U (en) | A kind of band rushes the fence upright of hook | |
CN203589374U (en) | A TN-S system which is used for a steel structure workshop cable and which can be without a protective ground wire | |
CN207597991U (en) | It is a kind of that there is the telescopic temporary line erecting rod of acousto-optic warning | |
CN209056625U (en) | Earthing or grounding means for tower bar equipment | |
CN215926989U (en) | Be used for building engineering assembled guardrail of maintaining | |
CN209419173U (en) | Component is defendd in windage yaw | |
CN205296204U (en) | Foundation structure of light pole basic station | |
CN2520573Y (en) | Insulation protection grounding downlead | |
CN204782201U (en) | Steel pipe pole is with steel pipe cross arm of eight arris variable cross sections | |
CN204857984U (en) | Outdoor light of TD -LTE network hands over equipment lightning protection ground system's earth mat | |
CN212543253U (en) | Insulating support welded by using waste reinforcing steel bars |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200623 |