CN111325525A - Local production financial investment management system - Google Patents

Local production financial investment management system Download PDF

Info

Publication number
CN111325525A
CN111325525A CN202010148852.0A CN202010148852A CN111325525A CN 111325525 A CN111325525 A CN 111325525A CN 202010148852 A CN202010148852 A CN 202010148852A CN 111325525 A CN111325525 A CN 111325525A
Authority
CN
China
Prior art keywords
investment
module
project
management
die body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202010148852.0A
Other languages
Chinese (zh)
Inventor
刘哲生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202010148852.0A priority Critical patent/CN111325525A/en
Publication of CN111325525A publication Critical patent/CN111325525A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16MFRAMES, CASINGS OR BEDS OF ENGINES, MACHINES OR APPARATUS, NOT SPECIFIC TO ENGINES, MACHINES OR APPARATUS PROVIDED FOR ELSEWHERE; STANDS; SUPPORTS
    • F16M13/00Other supports for positioning apparatus or articles; Means for steadying hand-held apparatus or articles
    • F16M13/005Other supports for positioning apparatus or articles; Means for steadying hand-held apparatus or articles integral with the apparatus or articles to be supported
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/06Asset management; Financial planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/16Real estate

Abstract

The invention discloses a geological production financial investment management system, which comprises an investment module, a management module, a project investment module, a business module, an infrastructure module, a park environment module and a survey module, wherein the investment module is used for carrying out financial management on a plurality of regions; the die body can be effectively protected by the corner pad and the soft pad, the die body is prevented from being deformed due to collision or extrusion to influence the use of the box body, and objects in the die body are conveniently locked in the process of using the box body by the first lock catch and the second lock catch to prevent the objects from falling; and the project is regularly evaluated by using a value engineering means, the evaluation opinions and the improvement scheme are reported, the project implementation process is changed and perfected, a management mechanism of real estate financial investment is established, and the management mechanism is responsible for information collection, market investigation, feasibility research, investment suggestion opinions, participation in investment decision, implementation of the investment decision and management work on investment, and is matched with the application of a high-precision simple information box to finish the operation of the whole real estate financial investment management system.

Description

Local production financial investment management system
Technical Field
The invention relates to the technical field of investment management, in particular to a system for managing the investment of a regional production financial system.
Background
Real estate finance is a general term for a series of financial activities for financing, financing and related financial services through currency circulation and credit channels during the development, circulation and consumption of real estate. The basic task of the method is to utilize various financial modes and financial tools to collect and integrate funds, support real estate development, circulation and consumption, promote the virtuous circle of the funds in the real estate reproduction process and ensure the smooth operation of the real estate reproduction process; however, in the process of real estate financial investment management in the market at present, a clear management scheme is not available, the whole investment development direction is fuzzy and unclear, the situations of management confusion and inconvenient monitoring and management are caused, in the file confidentiality and collection process of each link, a conventionally used file handbag does not take protection measures, and in the using process, the bag body is easily damaged and damped due to external collision or extrusion, so that the file handbag cannot be used continuously, and important electronic files are damaged.
Disclosure of Invention
The invention aims to solve the technical problems of overcoming the defects of the prior art and providing a system for managing the financing investment of the underground production, which gradually implements the selection of the surrounding background condition, the surrounding projects and the reference area of the project, the development profile of the surrounding projects, the analysis of the favorable and unfavorable factors of the project plot, the conclusion and the countermeasure by analyzing the analysis, the development concept, the development rhythm and the technical economic index of the target client, and develops the management project and the new enterprise by using the existing brand, fund and talent resources in the forms of full resources, joint resources and cooperation in the country and abroad and cooperates with the positioning of the investment management project to realize the gradual development of the project; the investment environment analysis, market investigation, investment opportunity research, investment project feasibility analysis and investment project economic evaluation items and decision-making work of investment projects are completed in the early stage of gradual development, information is collected through a high-precision simple information box, and a management module of real estate financial investment collects the investment information through various channels and methods; the surface of the die body is provided with a fixed corner pad, one side of the corner pad is provided with a soft pad, the other side of the corner pad is provided with a connecting block, the inside of the die body is provided with a main frame, one end of the main frame is provided with a positioning block, the surface of the positioning block is provided with a positioning hole, one side of the main frame is provided with a first lock catch, one side of the first lock catch is provided with a second lock catch, the top of the die body is provided with a pull ring, the box body can be moved at any time by using the pull ring, the surface of the main frame is provided with decorative patterns, the decorative patterns can also decorate the inside of the die body, the die body is flatly placed on a horizontal ground, an object is placed in the die body, the object is locked by using the first lock catch and the second lock catch, the main frame supports the die body, so that the die body cannot deform, the connecting block is used for connecting with other die bodies, and the corner pad and the soft pad protect the die bodies from collision or extrusion, so that the safe storage work of information collection is completed, important information is recorded and stored at any time in the whole real estate financial management work, and the management work in each link is improved conveniently; the die body can be effectively protected by arranging the corner pad and the soft pad, the die body is prevented from being deformed due to collision or extrusion and affecting the use of the box body, and objects in the die body can be conveniently locked in the process of using the box body by arranging the first lock catch and the second lock catch, so that the die body is prevented from falling; the method comprises the steps of making a survey plan, carrying out periodic tracking inspection on investment projects, dynamically managing the investment projects, grasping the quality, progress and cost control conditions of the investment projects in time, evaluating the projects periodically by using a value engineering means, reporting evaluation opinions and an improvement scheme, modifying and perfecting project implementation processes, establishing a management mechanism of real estate financial investment, taking charge of information collection of the investment projects, market investigation, feasibility research, investment suggestion opinions, participation in investment decisions, implementation of investment decisions and management work on investment, and completing operation of the whole real estate financial investment management system by matching with application of a high-precision simple information box.
In order to solve the above technical problem, the present invention provides a first technical solution as follows:
the invention discloses a local production financial investment management system which is characterized by comprising an investment module, a management module, a project investment module, a business module, an infrastructure module, a garden environment module and a survey module;
the investment module utilizes the existing brand, capital and talent resources to develop operation projects and launch new enterprises in the forms of full-investment, joint-investment and cooperation inside and outside the country, thereby directly obtaining rights, benefits and bearing corresponding risks, and expanding the investment principles according with the development strategy by safety, profitability and commonness;
the management module is used for establishing a management module of real estate financial investment and is responsible for information collection of investment projects, market investigation, feasibility research, investment suggestion opinions, participation in investment decisions, implementation of the investment decisions and management of the investment;
the system comprises a project investment module, a management module of real estate financial investment, a data acquisition module, a data processing module and a data processing module, wherein the management module of real estate financial investment is responsible for organizing the work of investment environment analysis, market investigation, investment opportunity research, investment project feasibility analysis and investment project economic evaluation and decision making of investment projects, and collecting information through a high-precision simple information box; investment information of nature, infrastructure, economy, industrial structure and project;
the high-precision simple information box comprises a die body, a corner pad, a cushion and a main frame, wherein the corner pad is arranged on the surface of the die body, the cushion is arranged on one side of the corner pad, a connecting block is arranged on the other side of the corner pad, the main frame is arranged in the die body, a positioning block is arranged at one end of the main frame, a positioning hole is formed in the surface of the positioning block, a first lock catch is arranged on one side of the main frame, a second lock catch is arranged on one side of the first lock catch, a pull ring is arranged at the top of the die body, and decorative grains are arranged on the surface of the main;
the real estate services comprise planning design, landscape design, construction, installation, building materials, decoration and property management;
the system comprises an infrastructure module, a water supply system, a drainage system, a reclaimed water system, a power supply system, a public lighting system, a heat supply system, natural gas, a communication system, an air conditioning system, a cable television and satellite receiving system, a fire fighting system, a security system, a background sound system, a computer network system and a vertical transportation system, wherein the infrastructure module comprises a building internal pipeline configuration, a water supply system, a drainage system, a reclaimed water system, a power supply system, a public lighting;
the garden environment module comprises garden roads, garden waterscape, garden identification and detailed processing; managing property; the method comprises the following steps of managing a property management mode, managing requirements, investing content once by a developer, service items, a management charge collecting principle and an expenditure range; marketing planning; the method comprises marketing plan work key points, building of a building selling place and building of a new VIP customer room;
the investigation module is used for making an investigation plan, including time, personnel, investigation modes, collection and project and data connected with special subjects, analyzing and sorting the data, and writing an investigation report on the basis, wherein the investigation report comprises the following contents:
a. the purpose, method, object, time, location condition of the survey;
b. the investigation conclusion is obtained by the investigation data analysis;
c. analyzing and demonstrating the survey theory;
d. a scientific management system is established for the opinions and the suggested resource projects of the survey projects or the special subjects, the method comprises the steps of carrying out periodic tracking inspection on the investment projects, carrying out dynamic management on the investment projects, mastering the quality, progress and cost control conditions of the investment projects in time, carrying out periodic evaluation on the projects by using a value engineering means, and reporting the evaluation opinions and the improvement schemes.
As a preferred technical scheme of the invention, the investment module also comprises education, sports, culture, tourism and leisure and hotel dominance industries.
As a preferred technical scheme of the invention, the management module also carries out accurate prediction, carries out examination and verification on various budgets of the project construction, and controls the cost of the project construction.
As a preferred technical solution of the present invention, the connecting block is connected with the second lock catch through a mold body, and the first lock catch is connected with the second lock catch through the mold body.
As a preferred technical solution of the present invention, the project investment management module further includes and sorts the collected information, and purposefully, programmatically and pertinently investigates market conditions, wherein the investigation content includes local economic conditions, resource conditions, relevant policies, market demands, peer conditions, human environments, customs habits and industry development situations.
In order to solve the above technical problem, the present invention provides a second technical solution as follows:
a kind of financial investment management system of the local production, the implementation step of the financial investment management of the local production is as follows:
the method comprises the following steps: firstly, project positioning is carried out, analysis, development conception, development rhythm and technical and economic index positioning analysis of target customers are carried out, then the selection of the surrounding background condition of the project, the surrounding project and the reference area and the development general profile of the project, the analysis of favorable and unfavorable factors of the project plot, conclusion and countermeasures are carried out step by step, the existing brands, funds and talent resources are utilized, the management project is developed and new enterprises are launched in the forms of full resources, joint resources and cooperation in and out, and the positioning implementation project is carried out step by matching with the investment management project; the investment environment analysis, market investigation, investment opportunity research, investment project feasibility analysis and investment project economic evaluation items and decision-making work of investment projects are completed in the early stage of gradual development, information is collected through a high-precision simple information box, and a management module of real estate financial investment collects the investment information through various channels and methods;
step two: the method comprises the following steps that a fixed corner pad is arranged on the surface of a die body, a soft pad is arranged on one side of the corner pad, a connecting block is arranged on the other side of the corner pad, a main frame is arranged in the die body, a positioning block is arranged at one end of the main frame, a positioning hole is arranged on the surface of the positioning block, a first lock catch is arranged on one side of the main frame, a second lock catch is arranged on one side of the first lock catch, a pull ring is arranged at the top of the die body, a box body can be moved at any time by using the pull ring, decorative patterns are arranged on the surface of the main frame, the interior of the die body can be decorated by the decorative patterns, an investigation plan is formulated, and the investigation plan comprises time, personnel, investigation modes, collection and project and special subject connection; the method comprises the steps of carrying out periodic tracking inspection on investment projects, carrying out dynamic management on the investment projects, mastering the quality, progress and cost control conditions of the investment projects in time, carrying out periodic evaluation on the projects by using a value engineering means, reporting evaluation opinions and an improvement scheme, and then changing and perfecting a project implementation process;
step three: the die body is flatly placed on a horizontal ground, an object is placed in the die body, the object is locked by using the first lock catch and the second lock catch, the main frame supports the die body, so that the die body is not deformed due to overlarge internal bearing in the use process of the die body, the object can be quickly placed in the die body by using the positioning hole in the positioning block, when other die bodies need to be connected, the die body is connected with other die bodies by using the connecting block, and the angle pad and the cushion protect the die body from being collided or extruded, so that the safe storage work of information collection is finished; the management mechanism for establishing the financial investment of the real estate is responsible for information collection of investment projects, market investigation, feasibility research, suggestion opinions of investment, participation in investment decisions, implementation of the investment decisions and management work on the investment, and completes operation of the whole financial investment management system of the real estate in cooperation with application of a high-precision simple information box.
Compared with the prior art, the invention has the following beneficial effects:
1: the invention develops the management project and launches new enterprises in full-resource, joint-resource and cooperation modes by utilizing the existing brands, funds and talent resources, and matching with investment management project positioning and implementation projects to be developed step by step through the analysis, development conception, development rhythm and positioning analysis of technical and economic indexes of target customers, the selection and development general situation of the peripheral background situation, the peripheral project and the reference area of the project, the favorable and unfavorable factor analysis and conclusion and countermeasure of the project plot; the investment environment analysis, market investigation, investment opportunity research, investment project feasibility analysis and investment project economic evaluation items and decision-making work of investment projects are completed in the early stage of gradual development, information is collected through a high-precision simple information box, and a management module of real estate financial investment collects the investment information through various channels and methods; the surface of the die body is provided with a fixed corner pad, one side of the corner pad is provided with a soft pad, the other side of the corner pad is provided with a connecting block, the inside of the die body is provided with a main frame, one end of the main frame is provided with a positioning block, the surface of the positioning block is provided with a positioning hole, one side of the main frame is provided with a first lock catch, one side of the first lock catch is provided with a second lock catch, the top of the die body is provided with a pull ring, the box body can be moved at any time by using the pull ring, the surface of the main frame is provided with decorative patterns, the decorative patterns can also decorate the inside of the die body, the die body is flatly placed on a horizontal ground, an object is placed in the die body, the object is locked by using the first lock catch and the second lock catch, the main frame supports the die body, so that the die body cannot deform, the connecting block is used for being connected with other die bodies, and the corner pads and the soft pads protect the die bodies from being collided or extruded, so that the safe storage work of information collection is completed, important information is recorded and stored at any time in the whole real estate financial management work, and the management work in each link is convenient to improve.
2: the die body can be effectively protected by arranging the corner pad and the soft pad, the die body is prevented from being deformed due to collision or extrusion to influence the use of the box body, and objects in the die body are conveniently locked in the process of using the box body by arranging the first lock catch and the second lock catch, so that the die body is prevented from falling; the method comprises the steps of making a survey plan, carrying out periodic tracking inspection on investment projects, dynamically managing the investment projects, grasping the quality, progress and cost control conditions of the investment projects in time, evaluating the projects periodically by using a value engineering means, reporting evaluation opinions and an improvement scheme, modifying and perfecting project implementation processes, establishing a management mechanism of real estate financial investment, taking charge of information collection of the investment projects, market investigation, feasibility research, investment suggestion opinions, participation in investment decisions, implementation of investment decisions and management work on investment, and completing operation of the whole real estate financial investment management system by matching with application of a high-precision simple information box.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the principles of the invention and not to limit the invention. In the drawings:
FIG. 1 is one of the overall structural schematic diagrams of the information box of the present invention;
FIG. 2 is a second schematic diagram of the overall structure of the information box of the present invention;
FIG. 3 is a schematic view of the assembly structure of the corner pad and the secondary locking device of the present invention;
FIG. 4 is a schematic view of an assembly structure of the positioning block and the positioning hole of the present invention;
FIG. 5 is a diagram of a system relationship module of the present invention.
In the figure: 1. a mold body; 2. a corner pad; 3. a soft cushion; 4. connecting blocks; 5. a main frame; 6. positioning blocks; 7. positioning holes; 8. a first lock catch; 9. a second lock catch; 10. a pull ring; 11. and (6) decorating grains.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are described herein for the purpose of illustration and explanation and not limitation.
Example 1
As shown in fig. 1 to 5, the present invention provides a geo-production financial investment management system, which includes an investment module, a management module, a project investment module, a business module, an infrastructure module, a campus environment module, and a survey module;
the investment module utilizes the existing brand, capital and talent resources to develop operation projects and launch new enterprises in the forms of full-investment, joint-investment and cooperation inside and outside the country, thereby directly obtaining rights, benefits and bearing corresponding risks, and expanding the investment principles according with the development strategy by safety, profitability and commonness;
the management module is used for establishing a management module of real estate financial investment and is responsible for information collection of investment projects, market investigation, feasibility research, investment suggestion opinions, participation in investment decisions, implementation of the investment decisions and management of the investment;
the system comprises a project investment module, a management module of real estate financial investment, a data acquisition module, a data processing module and a data processing module, wherein the management module of real estate financial investment is responsible for organizing the work of investment environment analysis, market investigation, investment opportunity research, investment project feasibility analysis and investment project economic evaluation and decision making of investment projects, and collecting information through a high-precision simple information box; investment information of nature, infrastructure, economy, industrial structure and project;
the high-precision simple information box comprises a die body 1, a corner pad 2, a cushion 3 and a main frame 5, wherein the corner pad 2 is arranged on the surface of the die body 1, the cushion 3 is arranged on one side of the corner pad 2, a connecting block 4 is arranged on the other side of the corner pad 3, the main frame 5 is arranged in the die body 1, a positioning block 6 is arranged at one end of the main frame 5, a positioning hole 7 is arranged on the surface of the positioning block 6, a first lock catch 8 is arranged on one side of the main frame 5, a second lock catch 9 is arranged on one side of the first lock catch 8, a pull ring 10 is arranged at the top of the die body 1, and decorative patterns;
the real estate services comprise planning design, landscape design, construction, installation, building materials, decoration and property management;
the system comprises an infrastructure module, a water supply system, a drainage system, a reclaimed water system, a power supply system, a public lighting system, a heat supply system, natural gas, a communication system, an air conditioning system, a cable television and satellite receiving system, a fire fighting system, a security system, a background sound system, a computer network system and a vertical transportation system, wherein the infrastructure module comprises a building internal pipeline configuration, a water supply system, a drainage system, a reclaimed water system, a power supply system, a public lighting;
the garden environment module comprises garden roads, garden waterscape, garden identification and detailed processing; managing property; the method comprises the following steps of managing a property management mode, managing requirements, investing content once by a developer, service items, a management charge collecting principle and an expenditure range; marketing planning; the method comprises marketing plan work key points, building of a building selling place and building of a new VIP customer room;
the investigation module is used for making an investigation plan, including time, personnel, investigation modes, collection and project and data connected with special subjects, analyzing and sorting the data, and writing an investigation report on the basis, wherein the investigation report comprises the following contents:
a. the purpose, method, object, time, location condition of the survey;
b. the investigation conclusion is obtained by the investigation data analysis;
c. analyzing and demonstrating the survey theory;
d. a scientific management system is established for the opinions and the suggested resource projects of the survey projects or the special subjects, the method comprises the steps of carrying out periodic tracking inspection on the investment projects, carrying out dynamic management on the investment projects, mastering the quality, progress and cost control conditions of the investment projects in time, carrying out periodic evaluation on the projects by using a value engineering means, and reporting the evaluation opinions and the improvement schemes.
The investment module also contains education, sports, culture, travel leisure and hotel advantage industries.
The management module also carries out accurate prediction, carries out examination and verification on all budgets of the project construction, and controls the cost of the project construction.
The connecting block 4 is connected with the second lock catch 9 through the die body 1, and the first lock catch 8 is connected with the second lock catch 9 through the die body 1.
The project investment management module also comprises a function of sorting and screening the collected information, and purposefully, programmatically and pertinently investigating market conditions, wherein investigation contents comprise local economic conditions, resource conditions, relevant policies, market demands, peer conditions, human environments, customs habits and industry development situations.
A kind of financial investment management system of the local production, the implementation step of the financial investment management of the local production is as follows:
the method comprises the following steps: firstly, project positioning is carried out, analysis, development conception, development rhythm and technical and economic index positioning analysis of target customers are carried out, then the selection of the surrounding background condition of the project, the surrounding project and the reference area and the development general profile of the project, the analysis of favorable and unfavorable factors of the project plot, conclusion and countermeasures are carried out step by step, the existing brands, funds and talent resources are utilized, the management project is developed and new enterprises are launched in the forms of full resources, joint resources and cooperation in and out, and the positioning implementation project is carried out step by matching with the investment management project; the investment environment analysis, market investigation, investment opportunity research, investment project feasibility analysis and investment project economic evaluation items and decision-making work of investment projects are completed in the early stage of gradual development, information is collected through a high-precision simple information box, and a management module of real estate financial investment collects the investment information through various channels and methods;
step two: the method comprises the following steps that a fixed corner pad 2 is arranged on the surface of a die body 1, a soft pad 3 is arranged on one side of the corner pad 2, a connecting block 4 is arranged on the other side of the corner pad 3, a main frame 5 is arranged inside the die body 1, a positioning block 6 is arranged at one end of the main frame 5, a positioning hole 7 is arranged on the surface of the positioning block 6, a first lock catch 8 is arranged on one side of the main frame 5, a second lock catch 9 is arranged on one side of the first lock catch 8, a pull ring 10 is arranged at the top of the die body 1, the box body can be moved at any time by using the pull ring 10, decorative patterns 11 are arranged on the surface of the main frame 5, the decorative patterns 11 can be arranged inside the die body, an investigation plan is formulated, the investigation plan comprises time, personnel, investigation modes, collection and; the method comprises the steps of carrying out periodic tracking inspection on investment projects, carrying out dynamic management on the investment projects, mastering the quality, progress and cost control conditions of the investment projects in time, carrying out periodic evaluation on the projects by using a value engineering means, reporting evaluation opinions and an improvement scheme, and then changing and perfecting a project implementation process;
step three: the die body 1 is flatly placed on a horizontal ground, an object is placed into the die body 1, the object is locked by using the first lock catch 8 and the second lock catch 9, the main frame 5 supports the die body 1, so that the die body 1 cannot deform due to overlarge internal bearing in the use process of the die body 1, the object can be rapidly placed into the die body 1 by using the positioning hole 7 on the positioning block 6, when other die bodies 1 need to be connected, the die body 1 is connected with other die bodies 1 by using the connecting block 4, and the die body 1 is protected from being collided or extruded by the corner pad 2 and the cushion 3, so that the safe storage work of information collection is completed; the management mechanism for establishing the financial investment of the real estate is responsible for information collection of investment projects, market investigation, feasibility research, suggestion opinions of investment, participation in investment decisions, implementation of the investment decisions and management work on the investment, and completes operation of the whole financial investment management system of the real estate in cooperation with application of a high-precision simple information box.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art will understand that various changes, modifications and substitutions can be made without departing from the spirit and scope of the invention as defined by the appended claims. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The system for managing the investment of the geo-production financial is characterized by comprising an investment module, a management module, a project investment module, a business module, an infrastructure module, a park environment module and a survey module;
the investment module utilizes the existing brand, capital and talent resources to develop operation projects and launch new enterprises in the forms of full-investment, joint-investment and cooperation inside and outside the country, thereby directly obtaining rights, benefits and bearing corresponding risks, and expanding the investment principles according with the development strategy by safety, profitability and commonness;
the management module is used for establishing a management module of real estate financial investment and is responsible for information collection of investment projects, market investigation, feasibility research, investment suggestion opinions, participation in investment decisions, implementation of the investment decisions and management of the investment;
the system comprises a project investment module, a management module of real estate financial investment, a data acquisition module, a data processing module and a data processing module, wherein the management module of real estate financial investment is responsible for organizing the work of investment environment analysis, market investigation, investment opportunity research, investment project feasibility analysis and investment project economic evaluation and decision making of investment projects, and collecting information through a high-precision simple information box; investment information of nature, infrastructure, economy, industrial structure and project;
the high-precision simple information box comprises a die body (1), a corner pad (2), a cushion (3) and a main frame (5), wherein the corner pad (2) is arranged on the surface of the die body (1), the cushion (3) is arranged on one side of the corner pad (2), a connecting block (4) is arranged on the other side of the corner pad (3), the main frame (5) is arranged inside the die body (1), a positioning block (6) is arranged at one end of the main frame (5), a positioning hole (7) is arranged on the surface of the positioning block (6), a first lock catch (8) is arranged on one side of the main frame (5), a second lock catch (9) is arranged on one side of the first lock catch (8), a pull ring (10) is arranged at the top of the die body (1), and decorative grains (11) are arranged on the surface of the main frame (;
the real estate services comprise planning design, landscape design, construction, installation, building materials, decoration and property management;
the system comprises an infrastructure module, a water supply system, a drainage system, a reclaimed water system, a power supply system, a public lighting system, a heat supply system, natural gas, a communication system, an air conditioning system, a cable television and satellite receiving system, a fire fighting system, a security system, a background sound system, a computer network system and a vertical transportation system, wherein the infrastructure module comprises a building internal pipeline configuration, a water supply system, a drainage system, a reclaimed water system, a power supply system, a public lighting;
the garden environment module comprises garden roads, garden waterscape, garden identification and detailed processing; managing property; the method comprises the following steps of managing a property management mode, managing requirements, investing content once by a developer, service items, a management charge collecting principle and an expenditure range; marketing planning; the method comprises marketing plan work key points, building of a building selling place and building of a new VIP customer room;
the investigation module is used for making an investigation plan, including time, personnel, investigation modes, collection and project and data connected with special subjects, analyzing and sorting the data, and writing an investigation report on the basis, wherein the investigation report comprises the following contents:
a. the purpose, method, object, time, location condition of the survey;
b. the investigation conclusion is obtained by the investigation data analysis;
c. analyzing and demonstrating the survey theory;
d. a scientific management system is established for the opinions and the suggested resource projects of the survey projects or the special subjects, the method comprises the steps of carrying out periodic tracking inspection on the investment projects, carrying out dynamic management on the investment projects, mastering the quality, progress and cost control conditions of the investment projects in time, carrying out periodic evaluation on the projects by using a value engineering means, and reporting the evaluation opinions and the improvement schemes.
2. The system of claim 1, wherein the investment module further comprises an educational, sports, cultural, tourist leisure and hospitality advantage industry.
3. The system of claim 1, wherein the management module is further configured to perform accurate forecasting, review and audit various budgets of the project construction, and control the cost of the project construction.
4. A geo-financial investment management system according to claim 1, wherein the connector block (4) is connected to the secondary locking buckle (9) by a die body (1), and the primary locking buckle (8) is connected to the secondary locking buckle (9) by a die body (1).
5. The system of claim 1, wherein the project investment management module further comprises and processes the collected information into a sort, a screen, a purposeful, a planned, and a local survey of market conditions, wherein the survey comprises local economic conditions, resource conditions, relevant policies, market demands, peer conditions, human environments, customs habits, and industry development situations.
6. A system for managing financial investments in property according to any one of claims 1 to 5, wherein the management of financial investments in property is carried out by:
the method comprises the following steps: firstly, project positioning is carried out, analysis, development conception, development rhythm and technical and economic index positioning analysis of target customers are carried out, then the selection of the surrounding background condition of the project, the surrounding project and the reference area and the development general profile of the project, the analysis of favorable and unfavorable factors of the project plot, conclusion and countermeasures are carried out step by step, the existing brands, funds and talent resources are utilized, the management project is developed and new enterprises are launched in the forms of full resources, joint resources and cooperation in and out, and the positioning implementation project is carried out step by matching with the investment management project; the investment environment analysis, market investigation, investment opportunity research, investment project feasibility analysis and investment project economic evaluation items and decision-making work of investment projects are completed in the early stage of gradual development, information is collected through a high-precision simple information box, and a management module of real estate financial investment collects the investment information through various channels and methods;
step two: the surface of a die body (1) is provided with a fixed corner pad (2), one side of the corner pad (2) is provided with a soft pad (3), the other side of the corner pad (3) is provided with a connecting block (4), a main frame (5) is arranged in the die body (1), one end of the main frame (5) is provided with a positioning block (6), the surface of the positioning block (6) is provided with a positioning hole (7), one side of the main frame (5) is provided with a first lock catch (8), one side of the first lock catch (8) is provided with a second lock catch (9), the top of the die body (1) is provided with a pull ring (10), a box body can be moved at any time by using the pull ring (10), the surface of the main frame (5) is provided with decorative grains (11), the decorative grains (11) can be decorated in the die body, and survey plans including time, personnel, survey modes, collection and items are formulated, and the data connected with the special subject, and analyzing and sorting the data, and writing a survey report on the basis; the method comprises the steps of carrying out periodic tracking inspection on investment projects, carrying out dynamic management on the investment projects, mastering the quality, progress and cost control conditions of the investment projects in time, carrying out periodic evaluation on the projects by using a value engineering means, reporting evaluation opinions and an improvement scheme, and then changing and perfecting a project implementation process;
step three: the die body (1) is flatly placed on a horizontal ground, an object is placed into the die body (1), the object is locked by using a first lock catch (8) and a second lock catch (9), the main frame (5) supports the die body (1) so that the die body (1) cannot deform due to overlarge internal bearing in the using process, the object can be rapidly placed into the die body (1) by using a positioning hole (7) in a positioning block (6), when other die bodies (1) need to be connected, the die body (1) is connected with other die bodies (1) by using a connecting block (4), and the corner pad (2) and the soft pad (3) protect the die body (1) from collision or extrusion, so that the safe storage work of information collection is completed; the management mechanism for establishing the financial investment of the real estate is responsible for information collection of investment projects, market investigation, feasibility research, suggestion opinions of investment, participation in investment decisions, implementation of the investment decisions and management work on the investment, and completes operation of the whole financial investment management system of the real estate in cooperation with application of a high-precision simple information box.
CN202010148852.0A 2020-03-05 2020-03-05 Local production financial investment management system Withdrawn CN111325525A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010148852.0A CN111325525A (en) 2020-03-05 2020-03-05 Local production financial investment management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010148852.0A CN111325525A (en) 2020-03-05 2020-03-05 Local production financial investment management system

Publications (1)

Publication Number Publication Date
CN111325525A true CN111325525A (en) 2020-06-23

Family

ID=71163711

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010148852.0A Withdrawn CN111325525A (en) 2020-03-05 2020-03-05 Local production financial investment management system

Country Status (1)

Country Link
CN (1) CN111325525A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112950391A (en) * 2021-04-06 2021-06-11 郑州科技学院 Investment planning system based on big data

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112950391A (en) * 2021-04-06 2021-06-11 郑州科技学院 Investment planning system based on big data

Similar Documents

Publication Publication Date Title
US20020072960A1 (en) Methods and devices utilizing a tracking system
Cerreta et al. Urbanization suitability maps: A dynamic spatial decision support system for sustainable land use
Fraile et al. Decision model for siting transport and logistic facilities in urban environments: A methodological approach
CN113379227A (en) Industrial park data processing method and device, computer equipment and storage medium
Bacău et al. Integrating strategic planning intentions into land-change simulations: Designing and assessing scenarios for Bucharest
Kumar et al. Polycentric urban growth and identification of urban hot spots in Faridabad, the million-plus metropolitan city of Haryana, India: a zonal assessment using spatial metrics and GIS
CN111325525A (en) Local production financial investment management system
Sisman et al. Using GIS-based multi-criteria decision analysis techniques in the smart cities
Feng et al. Research on the construction of intelligent management platform of garden landscape environment system based on remote sensing images
CN113408882A (en) Intelligent construction management system for hydroelectric engineering
KR20170010930A (en) Smart safety helper service method by cctv
CN115358540A (en) Full-period carbon evaluation method and system for urban update project
CN115345419A (en) Cultivated land intelligent protection supervision method and system based on space code
Bouramdane Enhancing disaster management in smart cities through MCDM-AHP analysis amid 21st century challenges
González Begega et al. Workforces and local communities against corporate restructuring: a comparative case study of resistance to plant closures in Northern Spain
Qasim et al. Leveraging drone technology in the accounting profession: Current trends, future opportunities, and anticipated challenges
Cheng et al. Risk identification of public infrastructure projects based on VFPE
Liu Urban groundwater quality monitoring and state-owned assets management optimization based on spatial information processing
CN116611616A (en) Chemical safety intelligent management and control platform
Xu The Big Data for Comprehensive Evaluation of GIS Engineering Based on Data Envelopment Analysis
Juchelka et al. Evaluation of Impacts of Logistics Clusters in the Corridor Rotterdam–Genoa
Ourng et al. A proposed methodology for understanding urban growth pattern: A case study in Siem Reap, Cambodia
Lampič et al. Tools for sustainable and smart land use: Slovenian approach for land regeneration support
Hurd et al. Temporal characterization of Connecticut’s Landscape: Methods, results, and applications
Tchouma et al. Environmental impact of operations carried out in the context of distributed maintenance: a literature review

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20200623

WW01 Invention patent application withdrawn after publication