CN111191911A - 一种基于规划运行的线路重载及n-1辅助判断系统 - Google Patents
一种基于规划运行的线路重载及n-1辅助判断系统 Download PDFInfo
- Publication number
- CN111191911A CN111191911A CN201911369629.2A CN201911369629A CN111191911A CN 111191911 A CN111191911 A CN 111191911A CN 201911369629 A CN201911369629 A CN 201911369629A CN 111191911 A CN111191911 A CN 111191911A
- Authority
- CN
- China
- Prior art keywords
- module
- line
- data
- analysis
- feeder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010586 diagram Methods 0.000 claims abstract description 29
- 238000012423 maintenance Methods 0.000 claims abstract description 27
- 238000012544 monitoring process Methods 0.000 claims abstract description 22
- 230000000007 visual effect Effects 0.000 claims abstract description 22
- 238000012545 processing Methods 0.000 claims abstract description 7
- 238000004364 calculation method Methods 0.000 claims description 19
- 238000006243 chemical reaction Methods 0.000 claims description 11
- 238000009434 installation Methods 0.000 claims description 9
- 230000003203 everyday effect Effects 0.000 claims description 8
- 230000005540 biological transmission Effects 0.000 claims description 6
- 238000004806 packaging method and process Methods 0.000 claims description 3
- 238000007619 statistical method Methods 0.000 claims description 3
- 238000011161 development Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000002354 daily effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0637—Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/067—Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Theoretical Computer Science (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Educational Administration (AREA)
- General Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Health & Medical Sciences (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Water Supply & Treatment (AREA)
- Public Health (AREA)
- Primary Health Care (AREA)
- General Health & Medical Sciences (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911369629.2A CN111191911A (zh) | 2019-12-26 | 2019-12-26 | 一种基于规划运行的线路重载及n-1辅助判断系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911369629.2A CN111191911A (zh) | 2019-12-26 | 2019-12-26 | 一种基于规划运行的线路重载及n-1辅助判断系统 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111191911A true CN111191911A (zh) | 2020-05-22 |
Family
ID=70710593
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911369629.2A Pending CN111191911A (zh) | 2019-12-26 | 2019-12-26 | 一种基于规划运行的线路重载及n-1辅助判断系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111191911A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111600305A (zh) * | 2020-07-03 | 2020-08-28 | 广东电网有限责任公司 | 一种配网馈线批量转供方案重组优选分析的方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102497021A (zh) * | 2011-12-14 | 2012-06-13 | 广东电网公司佛山供电局 | 配电线路实时监控分析系统 |
CN103529708A (zh) * | 2013-09-25 | 2014-01-22 | 江苏省电力公司 | 配电网的预操作仿真系统及仿真分析方法 |
US20170300753A1 (en) * | 2016-04-19 | 2017-10-19 | Rockwell Automation Technologies, Inc. | Analyzing video streams in an industrial environment to identify potential problems and select recipients for a display of video streams related to the potential problems |
CN110362894A (zh) * | 2019-06-28 | 2019-10-22 | 贵州电网有限责任公司 | 配电线路、变压器综合降损及节能计算分析方法及系统 |
-
2019
- 2019-12-26 CN CN201911369629.2A patent/CN111191911A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102497021A (zh) * | 2011-12-14 | 2012-06-13 | 广东电网公司佛山供电局 | 配电线路实时监控分析系统 |
CN103529708A (zh) * | 2013-09-25 | 2014-01-22 | 江苏省电力公司 | 配电网的预操作仿真系统及仿真分析方法 |
US20170300753A1 (en) * | 2016-04-19 | 2017-10-19 | Rockwell Automation Technologies, Inc. | Analyzing video streams in an industrial environment to identify potential problems and select recipients for a display of video streams related to the potential problems |
CN110362894A (zh) * | 2019-06-28 | 2019-10-22 | 贵州电网有限责任公司 | 配电线路、变压器综合降损及节能计算分析方法及系统 |
Non-Patent Citations (2)
Title |
---|
文伯瑜: "《二十一世纪输配电技术的创新与发展 第六届输配电技术国际会议论文集》", 31 October 2007, 中国电力出版社 * |
陈雪 等: "基于多源数据的配电网规划辅助决策系统研究", 《广东电力》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111600305A (zh) * | 2020-07-03 | 2020-08-28 | 广东电网有限责任公司 | 一种配网馈线批量转供方案重组优选分析的方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3913555A1 (en) | Power distribution network operation aided decision-making analysis system and method | |
CN104462473B (zh) | 一种基于cim‑e电网模型自动生成cim‑g格式厂站内接线图的方法 | |
CN107991525B (zh) | 一种绿色产业园区供用电能效监测与故障责任识别方法及系统 | |
CN113283704A (zh) | 基于知识图谱的电网故障智能处置系统及方法 | |
CN109034666B (zh) | 一种基于负荷突变的低压电网拓扑大数据辨识系统及方法 | |
CN110046391B (zh) | 基于监控信息表的变电站一次接线图自动生成方法 | |
CN103926891B (zh) | 移动通信机房基站动力环境设备监测系统及方法 | |
CN103544652A (zh) | 电网行业分类负荷自动统计方法及系统 | |
CN108448721A (zh) | 电力系统主站监控信号与标准信号自动匹配的方法 | |
CN107942872A (zh) | 一种电力调度运行管理系统 | |
CN116094174A (zh) | 基于知识图谱的电网运维监控方法、系统、设备及介质 | |
CN109063963A (zh) | 一种基于单元制配电网模型的重要用户电源风险评估方法 | |
CN106229978A (zh) | 台区低电压问题的预判方法及系统 | |
CN113109656A (zh) | 一种低压台区线损精细化分析系统及分析方法 | |
CN111191911A (zh) | 一种基于规划运行的线路重载及n-1辅助判断系统 | |
CN103412862A (zh) | 一种动态母线功率不平衡率获取方法 | |
CN113344364B (zh) | 停电计划的风险分析方法、装置、电子设备及存储介质 | |
CN103077485A (zh) | 基于电网历史信息统计分析的多维度电压偏离度指标方法 | |
CN111273075B (zh) | 一种配网自动化电流整定告警方法 | |
CN104901328A (zh) | 基于复杂控制网络下的多端柔直控制模式自动识别方法 | |
CN112649696A (zh) | 电网异常状态识别方法 | |
CN116799953A (zh) | 一种基于电网调度监控的设备异常识别方法、装置及设备 | |
CN113256178B (zh) | 一种配网运行方式合理性评估方法和系统 | |
CN116108203A (zh) | 电网全景调度知识图谱构建和电网设备管理的方法、系统、存储介质及设备 | |
CN110544985A (zh) | 一种网源协调数据通信系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 518000 electric power dispatching and communication building, 4020 Shennan East Road, Luohu District, Shenzhen, Guangdong Applicant after: Shenzhen Power Supply Co.,Ltd. Applicant after: China Southern Power Grid Shenzhen Digital Power Grid Research Institute Co.,Ltd. Address before: 518000 electric power dispatching and communication building, 4020 Shennan East Road, Luohu District, Shenzhen, Guangdong Applicant before: Shenzhen Power Supply Co.,Ltd. Applicant before: SHENZHEN COMTOP INFORMATION TECHNOLOGY Co.,Ltd. |
|
CB02 | Change of applicant information | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200522 |
|
RJ01 | Rejection of invention patent application after publication |