CN111155793A - Prefabricated steel bar processing shed capable of being installed quickly for building construction - Google Patents

Prefabricated steel bar processing shed capable of being installed quickly for building construction Download PDF

Info

Publication number
CN111155793A
CN111155793A CN202010007351.0A CN202010007351A CN111155793A CN 111155793 A CN111155793 A CN 111155793A CN 202010007351 A CN202010007351 A CN 202010007351A CN 111155793 A CN111155793 A CN 111155793A
Authority
CN
China
Prior art keywords
steel
supporting
plates
shaped
positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010007351.0A
Other languages
Chinese (zh)
Other versions
CN111155793B (en
Inventor
陈青青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Chengjia Construction Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202010007351.0A priority Critical patent/CN111155793B/en
Publication of CN111155793A publication Critical patent/CN111155793A/en
Application granted granted Critical
Publication of CN111155793B publication Critical patent/CN111155793B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/12Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
    • E04H1/1205Small buildings erected in the open air
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34315Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/92Protection against other undesired influences or dangers
    • E04B1/98Protection against other undesired influences or dangers against vibrations or shocks; against mechanical destruction, e.g. by air-raids
    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/18Status alarms
    • G08B21/24Reminder alarms, e.g. anti-loss alarms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Electromagnetism (AREA)
  • Environmental & Geological Engineering (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • General Physics & Mathematics (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The invention discloses a rapidly-installed prefabricated steel bar processing shed for building construction, which comprises two groups of bilaterally-symmetrical side support structures, wherein each side support structure comprises a bottom U-shaped steel and an upper bearing steel plate; according to the steel bar processing shed, the side support structure, the bearing framework and the ceiling are connected in a clamping and overlapping manner and finally are connected and reinforced through the bolts, so that the steel bar processing shed can be quickly installed, and the time and labor of workers are saved; the components of the steel bar processing shed are rarely welded, and most of the components are fixed in a detachable connection mode, so that the steel bar shed is more convenient to detach and transport in the later period, and the turnover is higher.

Description

Prefabricated steel bar processing shed capable of being installed quickly for building construction
Technical Field
The invention relates to the technical field of buildings, in particular to a prefabricated steel bar processing shed which is used for building construction and can be installed quickly.
Background
On-site centralized processing of the steel bars is generally adopted in a construction site of the building engineering, so a steel bar processing shed for centralized steel bar processing needs to be built, and a construction site is provided for steel bar straightening, steel bar material breaking, steel bar bending forming and steel bar connection; in current steel reinforcement shed construction technology, the steel reinforcement processing canopy that sets up is mainly for erectting shaped steel or steel pipe, then passes through welded connection with each component together, and this type of steel reinforcement processing canopy ubiquitous has following several problems:
1. most of the existing steel bar processing sheds are integrally welded and assembled through all components, the assembly is troublesome, the integral installation and construction speed is slow, and the time and labor force of workers are wasted;
2. the existing reinforcing steel bar processing shed adopts a welding mode due to assembly, so that the later-period disassembly is inconvenient, and the mobility and the turnover are poor;
3. the existing reinforcing steel bar processing shed is assembled by welding, so that the whole body is relatively fixed, and the high-altitude falling object does not have a damping effect when being hammered on the ceiling, so that the ceiling or the whole framework is easily deformed, and the ceiling or the whole framework is damaged seriously.
Disclosure of Invention
The invention aims to provide a prefabricated steel bar processing shed which is used for building construction and can be installed quickly, so as to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme: a prefabricated steel bar processing shed capable of being rapidly installed for building construction comprises two groups of side support structures which are bilaterally symmetrical, wherein each side support structure comprises a bottom U-shaped steel and an upper bearing steel plate, a cement seat is pre-built in a U-shaped groove of the bottom U-shaped steel, a plurality of square holes are formed in each cement seat at intervals, supporting square seats are inserted into the square holes, round holes are formed in the middle of each cement seat along the length direction, metal rod through holes are formed in the middle of each supporting square seat and coincide with the round holes, positioning metal rods are inserted into the round holes and penetrate through the corresponding metal rod through holes, L-shaped positioning plates are welded to the end parts of the two ends of the bottom U-shaped steel, transverse plates of the L-shaped positioning plates are fixedly connected with the positioning metal rods through limiting bolts, vertical rods are fixedly connected to the upper ends of the supporting square seats, the upper ends of the solid vertical rods are all sleeved with supporting sleeves, a damping mechanism is connected between each supporting sleeve and the corresponding solid vertical rod, the upper ends of a plurality of supporting sleeves are fixedly connected with upper bearing steel plates, a plurality of bearing frameworks are fixed between two upper bearing steel plates, each bearing framework comprises transverse supporting steel, both ends of the lower side of each transverse supporting steel are provided with notches, both ends of the lower side of each transverse supporting steel are respectively clamped on the two upper bearing steel plates through the notches, a plurality of U-shaped supporting plates are welded on the opposite sides of the two upper bearing steel plates, reinforcing ribs are welded on both sides of each U-shaped supporting plate, the reinforcing ribs and the upper bearing steel plates are fixedly connected through reinforcing bolts, both ends of the transverse supporting steel are respectively clamped in the corresponding U-shaped supporting plates, the transverse supporting steel and the U-shaped supporting plates are fixed through hexagonal bolts I, and arc-shaped supporting steel is arranged above the transverse supporting steel, the both ends of arc support steel are all welded there is the otic placode, and two otic placodes are equallyd divide and are do not taken the upper end both sides of establishing at the horizontal bracing steel, and all are connected fixedly through hexagon bolt II between otic placode and the horizontal bracing steel, all consolidate through a plurality of bearing diagonal steel between arc support steel and the horizontal bracing steel that corresponds and be connected, and are a plurality of bear the upper end of framework and install the ceiling, install pressure sensor between the framework that bears that the ceiling and be located the middle part, it has mounting box and alarm to weld on the framework to bear, installs central processing unit in the mounting box, pressure sensor and central processing unit signal connection, central processing unit and alarm control are connected.
Preferably, the lower surface of ceiling has the multiunit screw rod along length direction welding, and every group screw rod corresponds a bearing framework, all seted up the screw rod on bearing framework's the bearing framework diagonal bracing steel and perforated, the screw rod all passes the screw rod perforation that corresponds and passes through lock nut locking in arc support steel bottom, it is equipped with reset spring to lie in the cover between ceiling and the arc support steel on the screw rod.
Preferably, connecting sleeves are welded at the upper ends of the supporting square seats, the lower ends of the solid vertical rods are inserted into the corresponding connecting sleeves, and the solid vertical rods and the connecting sleeves are fixedly connected through connecting bolts I which penetrate through the connecting sleeves transversely.
Preferably, the lower lantern ring of welding at solid montant outside lower extreme is established including the cover to damper, the welding has the lantern ring on the outside lower extreme of support sleeve and the solid montant outside upper end all overlap, all connects fixedly through connecting bolt II between two upper lantern rings that correspond from top to bottom, all be connected with damping spring between upper lantern ring and the lower lantern ring, and damping spring all overlaps and establish the outside at solid montant.
Preferably, the upper side and the lower side of the upper bearing steel plate are symmetrically provided with a plurality of groups of positioning holes, the upper end of the support sleeve is inserted into the positioning hole below the upper bearing steel plate, the upper end of the inner wall of the support sleeve is provided with internal threads, the positioning holes above the support sleeve are screwed with positioning bolts, and the lower ends of the positioning bolts are screwed at the internal threads of the support sleeve.
Compared with the prior art, the invention has the beneficial effects that:
1. according to the steel bar processing shed, the side support structure, the bearing framework and the ceiling are connected in a clamping and overlapping manner and finally are connected and reinforced through the bolts, so that the steel bar processing shed can be quickly installed, and the time and labor of workers are saved;
2. the components of the reinforcing steel bar processing shed are rarely welded, and most of the components are fixed in a detachable connection mode, so that the reinforcing steel bar shed is more convenient to detach and carry in the later period, and the turnover is higher;
3. according to the invention, the damping mechanism is arranged on the side support structure, and the return spring is arranged below the ceiling, so that the whole body of the steel bar processing shed and the ceiling have good damping effect, and the ceiling or the whole framework is not easy to deform or damage when falling objects in the high air hit the ceiling;
4. through set up pressure sensor 33 in ceiling 4 below, when meetting high altitude junk and pounding ceiling 4, pressure sensor 33 responds to the gravity of pounding and takes place the warning through alarm 36, tells the workman not to leave the processing canopy, avoids the emergence of incident, has improved the security.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic diagram of a bearer architecture according to the present invention;
FIG. 3 is an enlarged view of the structure at A in FIG. 2 according to the present invention;
FIG. 4 is a schematic view of a side stand structure according to the present invention;
FIG. 5 is an enlarged view of the structure at B in FIG. 4 according to the present invention;
FIG. 6 is a schematic view of a square support base according to the present invention;
fig. 7 is a schematic view of the ceiling of the present invention.
In the figure: the side support structure comprises a side support structure 1, a support sleeve 2, bottom U-shaped steel 3, a ceiling 4, a bearing framework 5, transverse support steel 6, arc-shaped support steel 7, inclined support steel 8, a screw rod through hole 9, an upper bearing steel plate 10, a positioning hole 11, a positioning bolt 12, a U-shaped supporting plate 13, a reinforcing rib 14, a reinforcing bolt 15, a cement seat 16, a square hole 17, a support square seat 18, an L-shaped positioning plate 19, a positioning metal rod 20, a limiting bolt 21, a connecting sleeve 22, a connecting bolt I23, a solid vertical rod 24, a lower sleeve ring 25, an upper sleeve ring 26, a damping spring 27, a connecting bolt II28, a metal rod through hole 29, a screw rod 30, a return spring 31, a locking nut 32, a pressure sensor 33, a mounting box 34, a central processing unit 35 and.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-7, the present invention provides a technical solution: a prefabricated steel bar processing shed for rapid installation for building construction comprises two groups of side support structures 1 which are bilaterally symmetrical, wherein each side support structure 1 comprises a bottom U-shaped steel 3 and an upper bearing steel plate 10, a cement seat 16 is pre-built in a U-shaped groove of the bottom U-shaped steel 3, a plurality of square holes 17 are formed in each partition section of the cement seat 16, supporting square seats 18 are inserted in the square holes 17, and the shapes and sizes of the supporting square seats 18 are matched with the square holes 17;
round holes are formed in the middle of the cement seat 16 along the length direction, metal rod through holes 29 are formed in the middle of the supporting square seats 18, the metal rod through holes 29 are overlapped with the round holes, positioning metal rods 20 are inserted into the round holes, the positioning metal rods 20 penetrate through the corresponding metal rod through holes 29, L-shaped positioning plates 19 are welded to the end portions of the two ends of the bottom U-shaped steel 3, transverse plates of the L-shaped positioning plates 19 are fixedly connected with the positioning metal rods 20 through limiting bolts 21, the supporting square seats 18 can be fixed on the cement seat 16 through the transverse positioning metal rods 20, and therefore the cement seat is convenient to install, convenient to disassemble at the later stage and high in turnover performance;
the upper ends of the supporting square seats 18 are fixedly connected with solid vertical rods 24, the upper ends of the solid vertical rods 24 are sleeved with supporting sleeves 2, damping mechanisms are connected between the supporting sleeves 2 and the corresponding solid vertical rods 24, the upper ends of the supporting sleeves 2 are fixedly connected with upper bearing steel plates 10, a plurality of bearing frameworks 5 are fixed between the two upper bearing steel plates 10, each bearing framework 5 comprises a transverse supporting steel 6, both ends of the lower side of the transverse supporting steel 6 are provided with notches, both ends of the lower side of the transverse supporting steel 6 are respectively clamped on the two upper bearing steel plates 10 through the notches, one sides of the two upper bearing steel plates 10 opposite to each other are welded with a plurality of U-shaped supporting plates 13, both sides of each U-shaped supporting plate 13 are welded with reinforcing ribs 14, the reinforcing ribs 14 and the upper bearing steel plates 10 are fixedly connected through reinforcing bolts 15, both ends of the transverse supporting steel 6 are respectively clamped in the corresponding U-shaped supporting plates 13, and all fix through hexagon bolt I between horizontal support steel 6 and the U type layer board 13, horizontal support steel 6's top all is provided with arc support steel 7, the otic placode has all been welded at arc support steel 7's both ends, two otic placodes are equallyd divide and are do not set up the upper end both sides at horizontal support steel 6, and all connect fixedly through hexagon bolt II between otic placode and the horizontal support steel 6, all through a plurality of bearing steel 8 reinforcement connection between arc support steel 7 and the horizontal support steel 6 that corresponds, the ceiling 4 is installed to the upper end of a plurality of bearing framework 5, install pressure sensor 33 between ceiling 4 and the bearing framework 5 that is located the middle part, it has mounting box 34 and alarm 36 to weld on the bearing framework 5, install central processing unit 35 in the mounting box 34, pressure sensor 33 and central processing unit 35 signal connection, central processing unit 35 and alarm 36 control connection.
Furthermore, a plurality of groups of screw rods 30 are welded on the lower surface of the ceiling 4 along the length direction, each group of screw rods 30 corresponds to one bearing framework 5, screw rod through holes 9 are formed in the inclined support steel 8 of each bearing framework 5, the screw rods 30 penetrate through the corresponding screw rod through holes 9 and are locked at the bottoms of the arc-shaped support steels 7 through locking nuts 32, and reset springs 31 are sleeved on the screw rods 30 and located between the ceiling 4 and the arc-shaped support steels 7, so that the whole reinforcing steel bar processing shed and the ceiling 4 can have a good damping effect, and the ceiling or the whole framework is not prone to deform or damage when high-altitude falling objects hit the ceiling;
furthermore, the upper ends of the supporting square seats 18 are all welded with connecting sleeves 22, the lower ends of the solid vertical rods 24 are all inserted into the corresponding connecting sleeves 22, and the solid vertical rods 24 and the connecting sleeves 22 are all connected and fixed through connecting bolts I23 which transversely penetrate through the connecting sleeves, so that the solid vertical rods 24 and the supporting square seats 18 are very convenient to fix and detach;
furthermore, the damping mechanisms comprise lower lantern rings 25 which are sleeved and welded at the lower ends of the outer sides of the solid vertical rods 24, upper lantern rings 26 are sleeved and welded at the lower ends of the outer sides of the supporting sleeves 2 and the upper ends of the outer sides of the solid vertical rods 24, the two upper lantern rings 26 corresponding to each other up and down are connected and fixed through connecting bolts II28, damping springs 27 are connected between the upper lantern rings 26 and the lower lantern rings 25, the damping springs 27 are sleeved at the outer sides of the solid vertical rods 24, the arranged reinforcing steel bar processing shed and the ceiling 4 have good damping effects, and the ceiling or the whole framework is not prone to deformation or damage when high-altitude falling objects hit the ceiling;
furthermore, a plurality of groups of positioning holes 11 are symmetrically formed in the upper side and the lower side of the upper bearing steel plate 10, the upper end of the support sleeve 2 is inserted into the positioning hole 11 positioned below, internal threads are formed in the upper end of the inner wall of the support sleeve 2, positioning bolts 12 are screwed into the positioning holes 11 positioned above, and the lower ends of the positioning bolts 12 are screwed at the internal threads of the support sleeve 2, so that the support sleeve 2 and the upper bearing steel plate 10 are connected and fixed more conveniently, and the upper bearing steel plate 10 is convenient to install and disassemble;
according to the steel bar processing shed, the side support structure 1, the bearing framework 5 and the ceiling 4 are connected in a clamping and lapping manner and finally connected and reinforced through bolts, so that the steel bar processing shed can be quickly installed, and the time and labor of workers are saved; the components of the reinforcing steel bar processing shed are rarely welded, and most of the components are fixed in a detachable connection mode, so that the reinforcing steel bar shed is more convenient to detach and carry in the later period, and the turnover is higher; according to the invention, the damping mechanism arranged on the side support structure 1 and the return spring 31 arranged below the ceiling 4 can ensure that the whole of the steel bar processing shed and the ceiling 4 have good damping effect, and the ceiling or the whole framework is not easy to deform or damage when falling objects in the high altitude hit the ceiling; through set up pressure sensor 33 in ceiling 4 below, when meetting high altitude junk and pounding ceiling 4, pressure sensor 33 responds to the gravity of pounding and takes place the warning through alarm 36, tells the workman not to leave the processing canopy, avoids the emergence of incident, has improved the security.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a building construction is with prefabricated steel reinforcement processing canopy of quick installation, includes two sets of side support structure (1) of bilateral symmetry, its characterized in that: the side support structures (1) respectively comprise bottom U-shaped steel (3) and an upper bearing steel plate (10), cement seats (16) are pre-built in U-shaped grooves of the bottom U-shaped steel (3), a plurality of square holes (17) are formed in the cement seats (16) at intervals, supporting square seats (18) are inserted in the square holes (17), round holes are formed in the middle parts of the cement seats (16) along the length direction, metal rod through holes (29) are formed in the middle parts of the supporting square seats (18), the metal rod through holes (29) are coincided with the round holes, positioning metal rods (20) are inserted in the round holes, the positioning metal rods (20) penetrate through the corresponding metal rod through holes (29), L-shaped positioning plates (19) are welded at the end parts of the two ends of the bottom U-shaped steel (3), transverse plates of the L-shaped positioning plates (19) are fixedly connected with the positioning metal rods (20) through limiting bolts (21), the upper end of the supporting square seat (18) is fixedly connected with a solid vertical rod (24), the upper end of the solid vertical rod (24) is sleeved with a supporting sleeve (2), a damping mechanism is connected between the supporting sleeve (2) and the corresponding solid vertical rod (24), the upper ends of a plurality of supporting sleeves (2) are fixedly connected with upper bearing steel plates (10), a plurality of bearing frameworks (5) are fixed between the two upper bearing steel plates (10), each bearing framework (5) comprises transverse supporting steel (6), both ends of the lower side of each transverse supporting steel (6) are provided with notches, both ends of the lower side of each transverse supporting steel (6) are respectively clamped on the two upper bearing steel plates (10) through the notches, a plurality of U-shaped supporting plates (13) are welded on one opposite sides of the two upper bearing steel plates (10), reinforcing ribs (14) are welded on both sides of the U-shaped supporting plates (13), and the reinforcing ribs (14) and the upper bearing steel plate (10) are fixedly connected through reinforcing bolts (15), two ends of the transverse supporting steel (6) are respectively clamped in the corresponding U-shaped supporting plates (13), the transverse supporting steel (6) and the U-shaped supporting plates (13) are fixed through hexagonal bolts I, arc supporting steel (7) is arranged above the transverse supporting steel (6), lug plates are welded at two ends of the arc supporting steel (7), the two lug plates are respectively erected on two sides of the upper end of the transverse supporting steel (6), the lug plates and the transverse supporting steel (6) are fixedly connected through hexagonal bolts II, the arc supporting steel (7) and the corresponding transverse supporting steel (6) are fixedly connected through a plurality of inclined supporting steels (8), a ceiling (4) is installed at the upper ends of the bearing frameworks (5), and a pressure sensor (33) is installed between the ceiling (4) and the bearing framework (5) positioned in the middle part, bear frame (5) and go up the welding and have mounting box (34) and alarm (36), install central processing unit (35) in mounting box (34), pressure sensor (33) and central processing unit (35) signal connection, central processing unit (35) and alarm (36) control connection.
2. The prefabricated steel bar processing shed for rapid installation for building construction according to claim 1, characterized in that: the lower surface of ceiling (4) has multiunit screw rod (30) along length direction welding, and every group screw rod (30) correspond one and bear framework (5), all seted up screw rod perforation (9) on bearing framework (5) bearing diagonal bracing steel (8), screw rod (30) all pass corresponding screw rod perforation (9) and pass through lock nut (32) locking in arc support steel (7) bottom, it is equipped with reset spring (31) to lie in the cover between ceiling (4) and arc support steel (7) on screw rod (30).
3. The prefabricated steel bar processing shed for rapid installation for building construction according to claim 1, characterized in that: the upper end of the supporting square seat (18) is welded with a connecting sleeve (22), the lower end of the solid vertical rod (24) is inserted into the corresponding connecting sleeve (22), and the solid vertical rod (24) and the connecting sleeve (22) are fixedly connected through a connecting bolt I (23) which transversely penetrates through the connecting sleeve.
4. The prefabricated steel bar processing shed for rapid installation for building construction according to claim 1, characterized in that: damping device all establishes lower lantern ring (25) of welding at solid montant (24) outside lower extreme including the cover, the outside lower extreme and solid montant (24) outside upper end of support sleeve (2) all overlap and establish the welding have go up lantern ring (26), go up two of upper and lower correspondence and all connect fixedly through connecting bolt II (28) between the lantern ring (26), go up the lantern ring (26) and all be connected with damping spring (27) down between lantern ring (25), and damping spring (27) all overlap the outside of establishing solid montant (24).
5. The prefabricated steel bar processing shed for rapid installation for building construction according to claim 1, characterized in that: the upper and lower sides of the upper bearing steel plate (10) are symmetrically provided with a plurality of groups of positioning holes (11), the upper end of the supporting sleeve (2) is inserted into the positioning holes (11) below, internal threads are arranged at the upper end of the inner wall of the supporting sleeve (2), positioning bolts (12) are screwed into the positioning holes (11) above, and the lower ends of the positioning bolts (12) are screwed at the internal threads of the supporting sleeve (2).
CN202010007351.0A 2020-01-04 2020-01-04 Prefabricated steel bar processing shed capable of being installed quickly for building construction Expired - Fee Related CN111155793B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010007351.0A CN111155793B (en) 2020-01-04 2020-01-04 Prefabricated steel bar processing shed capable of being installed quickly for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010007351.0A CN111155793B (en) 2020-01-04 2020-01-04 Prefabricated steel bar processing shed capable of being installed quickly for building construction

Publications (2)

Publication Number Publication Date
CN111155793A true CN111155793A (en) 2020-05-15
CN111155793B CN111155793B (en) 2021-03-02

Family

ID=70561223

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010007351.0A Expired - Fee Related CN111155793B (en) 2020-01-04 2020-01-04 Prefabricated steel bar processing shed capable of being installed quickly for building construction

Country Status (1)

Country Link
CN (1) CN111155793B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111827556A (en) * 2020-08-03 2020-10-27 潮峰钢构集团有限公司 Combined heat-insulation type steel structure large-space ceiling and mounting method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5236836U (en) * 1975-09-09 1977-03-15
CN108316572A (en) * 2018-02-02 2018-07-24 安徽玄同工业设计有限公司 One kind is for the deicing of bus stop board ceiling, snow-removing method
CN208396353U (en) * 2018-04-17 2019-01-18 张珍 A kind of movable building engineering construction sunshade
CN109654968A (en) * 2019-01-28 2019-04-19 保利民爆哈密有限公司 A kind of mine blasting protection safety canopy
CN209891768U (en) * 2018-12-22 2020-01-03 江苏彩虹智能公共设施有限公司 Fixed effectual bus shelter

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5236836U (en) * 1975-09-09 1977-03-15
CN108316572A (en) * 2018-02-02 2018-07-24 安徽玄同工业设计有限公司 One kind is for the deicing of bus stop board ceiling, snow-removing method
CN208396353U (en) * 2018-04-17 2019-01-18 张珍 A kind of movable building engineering construction sunshade
CN209891768U (en) * 2018-12-22 2020-01-03 江苏彩虹智能公共设施有限公司 Fixed effectual bus shelter
CN109654968A (en) * 2019-01-28 2019-04-19 保利民爆哈密有限公司 A kind of mine blasting protection safety canopy

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111827556A (en) * 2020-08-03 2020-10-27 潮峰钢构集团有限公司 Combined heat-insulation type steel structure large-space ceiling and mounting method thereof

Also Published As

Publication number Publication date
CN111155793B (en) 2021-03-02

Similar Documents

Publication Publication Date Title
WO2015043313A1 (en) Steel structural composite column system and connection method therefor.
CN108532968A (en) A kind of assembled support device of steel bar truss floor support plate composite floor system
CN111155793B (en) Prefabricated steel bar processing shed capable of being installed quickly for building construction
CN111648597A (en) Silo hangs a formula steel truss bracket bearing structure
CN113137102B (en) Assembled garage roof house structure and installation method thereof
CN108915083B (en) Novel assembled cold-formed thick wall shaped steel frame-bearing structure system
CN212478675U (en) Convenient ann tears assembled steel construction reinforcing bar processing protection canopy open
CN214062433U (en) Temporary supporting structure of assembled steel structure
CN111519949B (en) Convenient assembly steel construction reinforcing bar processing protection canopy of tearing open
CN114725859A (en) Tunnel cable installing support
CN110212843B (en) Reinforcing device of photovoltaic support template and positioning method thereof
CN217734539U (en) Adjustable assembled suspended ceiling reverse supporting device
CN219508956U (en) Suspended ceiling reverse supporting structure
CN110725404B (en) Steel tube concrete column H-shaped steel beam assembly type rigid joint strong beam and strong column structure and construction method
CN212897607U (en) Tower type supporting truss
CN218562965U (en) Overhanging and floor type combined external scaffold
CN217379735U (en) Wall connecting device suitable for large-span high frame
CN219794615U (en) Wall-attached heightening piece for attached lifting scaffold
CN214034196U (en) On-spot concatenation node of combination shear wall
CN219826301U (en) Temporary supporting structure for heavier PC beam
CN213805820U (en) Assembled steel construction of public building
CN221896298U (en) Purline reinforcing structure for steel structure roof
CN217924340U (en) Novel suspended ceiling conversion layer system
CN215716238U (en) Fire hose fixing frame for prefabricated steel structure residential building
CN219100441U (en) Connection structure of filling wallboard and main structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20210205

Address after: 212000 room 110, 1ST-2ND floor, building 2, Jingxian villa, 98 Jingkou Road, Jingkou District, Zhenjiang City, Jiangsu Province

Applicant after: Jiangsu Chengjia Construction Engineering Co.,Ltd.

Address before: 310018 Zhejiang University of Finance and economics, No.18, Xueyuan street, Jianggan District, Hangzhou City, Zhejiang Province

Applicant before: Chen Qingqing

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210302