CN111125812A - Automatic house building scheme generation method and device, computer equipment and storage medium - Google Patents

Automatic house building scheme generation method and device, computer equipment and storage medium Download PDF

Info

Publication number
CN111125812A
CN111125812A CN201911190825.3A CN201911190825A CN111125812A CN 111125812 A CN111125812 A CN 111125812A CN 201911190825 A CN201911190825 A CN 201911190825A CN 111125812 A CN111125812 A CN 111125812A
Authority
CN
China
Prior art keywords
building
options
house
user
scheme
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201911190825.3A
Other languages
Chinese (zh)
Other versions
CN111125812B (en
Inventor
朱涛
朱凯薇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Baiyun University
Original Assignee
Guangdong Baiyun University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Baiyun University filed Critical Guangdong Baiyun University
Priority to CN201911190825.3A priority Critical patent/CN111125812B/en
Publication of CN111125812A publication Critical patent/CN111125812A/en
Application granted granted Critical
Publication of CN111125812B publication Critical patent/CN111125812B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects
    • G06T17/10Constructive solid geometry [CSG] using solid primitives, e.g. cylinders, cubes
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T2210/00Indexing scheme for image generation or computer graphics
    • G06T2210/04Architectural design, interior design

Abstract

The application relates to a house building scheme automatic generation method and device, computer equipment and a storage medium. The house building scheme automatic generation method comprises the following steps: acquiring user budget and land area; displaying each suite of rooms to be selected according to the user budget and the land area, wherein the suite of rooms to be selected is a suite of which the room building cost is less than the user budget and the room building area is less than the land area; displaying building options corresponding to the target building package according to the target building package selected by the user through the input equipment, wherein each type of building options corresponds to a plurality of contents; acquiring target content determined by a user from the content corresponding to various house building options through input equipment; and generating a building scheme according to the target content corresponding to the various building options. The standardized set meal is provided for users to select, so that the mass production and the manufacturing of building materials and the rapid building of houses in factories are facilitated, resources can be saved to the maximum extent, the cost is reduced, and the benefits are increased.

Description

Automatic house building scheme generation method and device, computer equipment and storage medium
Technical Field
The invention relates to the field of buildings, in particular to a method and a device for automatically generating a building scheme, computer equipment and a storage medium.
Background
The statements herein merely provide background information related to the present application and may not necessarily constitute prior art.
At present, the construction work in all aspects, especially the house system reform work concerning the livelihood is being promoted in the society. The house reformation of a new rural area is taken as one of key contents of house system reformation, a scheme which meets the construction requirement and the customer requirement is correspondingly provided by adopting a demand inquiry mode at present, the efficiency is low, the construction period is long, and the relocation speed is slow.
Disclosure of Invention
Based on this, it is necessary to provide a building scheme automatic generation method and apparatus, a computer device, and a storage medium for solving the problems of low house improvement efficiency and long house construction period, so as to improve the house design standardization and further improve the house construction efficiency.
In one aspect, an embodiment of the present application provides an automatic generation method for a building scheme, including:
acquiring user budget and land area;
displaying each suite of rooms to be selected according to the user budget and the land area, wherein the suite of rooms to be selected is a suite of which the room building cost is less than the user budget and the room building area is less than the land area;
displaying building options corresponding to the target building package according to the target building package selected by the user through the input equipment, wherein each type of building options corresponds to a plurality of contents;
acquiring target content determined by a user from the content corresponding to various house building options through input equipment;
and generating a building scheme according to the target content corresponding to the various building options.
In one embodiment, the method for automatically generating a building scheme further includes:
if a content change instruction is received, skipping to execute the step of displaying the house building option;
and updating the building scheme according to the acquired new target content.
In one embodiment, if a content change instruction is received, the step of skipping to execute and display the house building option includes:
and if the content change instruction is received, displaying the house building options in sequence from high to low according to the priority of the various house building options.
In one embodiment, the building options include a necessary option and an additional option, the necessary option having a higher priority than the additional option.
In one embodiment, the priority of each building option display is proportional to the cost of the target content of each building option in the building scheme before updating.
In one embodiment, before the step of generating the building scheme according to the target content corresponding to each type of building option, the method further includes:
and if the acquired target content lacks the content of the necessary options, executing a prompt action.
In one embodiment, the method for automatically generating a building scheme further includes:
and constructing and displaying a three-dimensional model of the house according to the house building scheme.
An automatic generation device for a building scheme, comprising:
the information acquisition unit is used for acquiring user budget and land area;
the house building package display unit is used for displaying each house building package to be selected according to the user budget and the land area, and the house building package to be selected is an option with the house building cost smaller than the user budget and the house building area smaller than the land area;
the building option display unit is used for displaying building options corresponding to the target building package according to the target building package selected by the user through the input equipment, wherein each type of building options corresponds to a plurality of contents;
the target content acquisition unit is used for acquiring target content determined by a user from contents corresponding to various house building options through input equipment;
and the building scheme generating unit is used for generating building schemes according to the target contents corresponding to the various building options.
A computer device comprises a memory, a processor and a computer program which is stored on the memory and can run on the processor, and the steps of the house building scheme automatic generation method are realized when the processor executes the program.
A computer-readable storage medium, on which a computer program is stored which, when being executed by a processor, carries out the steps of the above-mentioned method for automatically generating a room-building solution.
One or more embodiments provided by the invention have at least the following beneficial effects: according to the automatic generation method of the building scheme, the computer technology and the database technology are utilized, the standardized building packages meeting the requirements of budget and land area are displayed in a popup window or designated area display mode according to the budget, the land area and the like of a user and are selected by the user, various packages are standardized packages, a menu type display mode provides building options for the user, and then the building scheme meeting the requirements of the user is generated according to the content selected by the user from the various building options. Through the computer equipment capable of executing the steps of the house building scheme automatic generation method, a user can select house specifications to be built according to land area, house structure requirements and price, different customer requirements can be met, house manufacturing standardization can be realized, batch production and manufacturing of building materials and rapid building of houses can be conveniently carried out in factories, resources can be saved to the maximum extent, cost is reduced, and benefits are increased.
Drawings
FIG. 1 is a diagram of an application environment for a method for automatically generating a housing construction plan according to an embodiment;
FIG. 2 is a schematic flow chart illustrating a method for automatically generating a housing construction plan according to an embodiment;
FIG. 3 is a schematic diagram of a prefabricated building manufacturing package display interface in one embodiment;
FIG. 4 is a schematic diagram of a set of infrastructure-based services selection interface in accordance with an embodiment;
FIG. 5 is a diagram illustrating an overall single-story building scheme generated after modeling according to the building scheme in one embodiment;
FIG. 6 is a diagram illustrating an overall double-story building scheme generated after modeling according to the building scheme in one embodiment;
FIG. 7 is a schematic overall diagram of a three-story building scheme generated after modeling according to the building scheme in one embodiment;
FIG. 8 is a schematic diagram of a foundation structure generated after modeling according to a housing construction scheme in one embodiment;
FIG. 9 is a schematic diagram illustrating a partial structure of a garage and an entrance door generated after modeling according to a building scheme in one embodiment;
FIG. 10 is a partial schematic view of a window generated after modeling according to a building scheme in one embodiment;
FIG. 11 is a block diagram showing the construction of an automatic house-building scheme generating apparatus according to an embodiment;
FIG. 12 is a diagram illustrating an internal structure of a computer device according to an embodiment.
Detailed Description
To facilitate an understanding of the invention, the invention will now be described more fully with reference to the accompanying drawings. Preferred embodiments of the present invention are shown in the drawings. This invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete.
It will be understood that when an element is referred to as being "connected" to another element, it can be directly connected to the other element and be integral therewith, or intervening elements may also be present. The terms "mounted," "one end," "the other end," and the like are used herein for illustrative purposes only.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used in the description of the invention herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.
The house building scheme automatic generation method provided by the application can be applied to the application environment shown in fig. 1. Wherein the terminal 102 communicates with the server 104 via a network. The user carries out the house building package and the selection of the house building package through the house building package to be selected displayed on the terminal 102, the terminal 102 generates a house building scheme according to the input of the user, the house building scheme can also be sent to the server 104 of the corresponding factory through the network, and after the factory server 104 receives the house building scheme, a building material order is generated for building material processing to prepare for house building. The terminal 102 may also send the generated building plan to the server 104 of the construction company, which organizes the foundation part construction to provide a matching foundation for the building construction on the ground. The terminal 102 may be, but not limited to, various personal computers, notebook computers, smart phones, tablet computers, and portable wearable devices, and the server 104 may be implemented by an independent server or a server cluster formed by a plurality of servers.
The embodiment of the application provides an automatic generation method of a building scheme, as shown in fig. 1, including:
s10: acquiring user budget and land area;
s20: displaying each suite of rooms to be selected according to the user budget and the land area, wherein the suite of rooms to be selected is a suite of which the room building cost is less than the user budget and the room building area is less than the land area;
s30: displaying building options corresponding to the target building package according to the target building package selected by the user through the input equipment, wherein each type of building options corresponds to a plurality of contents;
s40: acquiring target content determined by a user from the content corresponding to various house building options through input equipment;
s50: and generating a building scheme according to the target content corresponding to the various building options.
The land area refers to the area of the ground cover corresponding to the soil right owned by the user, such as the area of a home base, the area of a factory building land and the like. The user budget and the land area can be obtained from input signals of input devices such as a keyboard and a mouse. The house building package is a package specified according to the relevant national environmental protection standard and the house building standard and is a pre-established standard package. As shown in fig. 3 and 4, the PACKAGE of rooms to be selected includes a PACKAGE of foundation construction type (pack age2) and a PACKAGE of prefabricated house manufacturing type (pack age 1). Among them, the PACKAGE of foundation construction class (pack age2) refers to a PACKAGE including contents of a foundation layout, a water supply pipeline, a sewer pipeline, a gas reserve position, and the like, which are related to the land area and the budget. The target building package is a package selected by the user through the input device. The building options refer to options of foundation and above-ground part building schemes related to building, and each building option corresponds to a plurality of contents, for example, for a foundation option in the building options, a foundation frame, a reserved position of a sewer pipe, a reserved position of a gas pipeline and the like can be corresponded. For another example, the above-ground part construction plan options in the building options may correspond to the height of a floor, the frame structure of each floor, the arrangement and materials (aluminum alloy, wooden frame, etc.) of doors and windows, the shape of a roof, roof box beams, roof insulation materials, and the like. That is, the content corresponding to the building option may include two categories, i.e., building material type and assembly method. Wherein the set of foundation construction type PACKAGEs (PACKAGE2) and the set of prefabricated house manufacturing type PACKAGEs (PACKAGE1) have an association relationship in that the building construction of the above-ground portion is matched with the foundation, each of the set of foundation construction type PACKAGEs (PACKAGE2) is associated with the matched set of prefabricated house manufacturing type PACKAGEs (PACKAGE1), and when a certain set of foundation construction type PACKAGEs (PACKAGE2) is selected, the user can select the design contents of the above-ground portion building only from the set of prefabricated house manufacturing type PACKAGEs (PACKAGE1) associated with the set of foundation construction type PACKAGEs (PACKAGE 2). Similarly, when a PACKAGE of prefabricated building types (PACKAGE1) is selected, the PACKAGE of construction types (PACKAGE2) associated with the selected PACKAGE of prefabricated building types (PACKAGE1) is automatically associated.
Specifically, the method for automatically generating a housing construction scheme provided in the embodiment of the present application utilizes a computer technology and a database technology, and displays a housing construction package that does not exceed a budget and an area in a menu form by obtaining the budget of a user and the area of a land that can be used for building construction for the user to select, the user can select one of the housing construction packages through an input device such as a mouse, a keyboard, or a touch screen, and obtain the selected housing construction package as a target housing construction package through the input device, and the housing construction involves a large amount of content, so in order to provide a housing construction scheme that is satisfactory for the user, a housing construction option corresponding to the target housing construction package is also displayed, the user can select and screen a plurality of contents corresponding to the housing construction option through the input device, and can obtain the content selected by the user as a target content through the input device, and generate the housing construction scheme according to the target content selected by the user, the house building scheme automatic generation method provided by the embodiment of the application is provided for a user to select through providing a standardized package, is favorable for unified planning of subsequent house building operation, is favorable for batch production of assembly material processing plants, improves house building efficiency, and shortens the relocation period. On the other hand, the automatic house building scheme generation method can not only meet the budget requirements of users, but also perform personalized customization of details such as doors and windows according to personal preferences. As shown in fig. 3 and 4, the method for automatically generating a building scheme provided in the embodiment of the present application may further display a to-be-selected building package in a menu form and display building options and contents in the menu form, so as to facilitate selection by a user. Optionally, in order to further accelerate building efficiency, in the building scheme automatic generation method provided in the embodiment of the present application, the building material selection contents related to the building architecture in the building package in the building scheme automatic generation method are limited, for example, not more than 5, which is beneficial to production and assembly of the building architecture assembly parts of the overground part, and can further improve the efficiency of building the whole building, shorten the period, and facilitate street planning and sewer and gas pipeline planning.
In addition, considering different areas, the weather difference is large, the requirements for building rooms are different, for example, in the three eastern provinces, due to the fact that the weather is cold in winter, the requirements for heat preservation and freezing resistance of the wall body are high, the suite of rooms to be selected can also be related to the area where the rooms are built, the user budget and the land area are obtained, meanwhile, the information of the area where the rooms are built can also be obtained, and the suite of rooms to be selected is displayed according to the area information, the user budget and the land area. Specifically, all the suite of building rooms corresponding to the region information may be obtained from the database according to the region information, and then the suite of building rooms with the cost smaller than the user budget and the foundation area smaller than the land area is further selected from the obtained suite of building rooms as the suite of building rooms to be selected.
According to the automatic house building scheme generation method provided by the embodiment of the application, by utilizing a computer technology and a database technology, house building packages meeting the requirements of budget and land area are displayed in a popup window or designated area (DISPLAY AREA) display mode according to the budget, the land area and the like of a user and are selected by the user, various packages are standard packages, a menu type display mode provides house building options for the user, and then the house building scheme meeting the requirements of the user is generated according to the content selected by the user from various house building options. Through the computer equipment capable of executing the steps of the house building scheme automatic generation method, a user can select house specifications of a project to be built according to land area, house structure requirements and price, requirements of different customers can be met, house manufacturing standardization can be realized, batch production and manufacturing of building materials and rapid building of houses can be conveniently carried out in factories, resources can be saved to the maximum extent, cost is reduced, and benefits are increased. The house building scheme automatic generation method can be copied and has wide popularization prospect, and multi-provincial, multi-regional or transnational house building work can be realized according to the standard.
In one embodiment, building options corresponding to a target building package are displayed according to the target building package selected by a user through an input device, and the step of each type of building options corresponding to a plurality of contents comprises:
when a first-stage trigger signal is received, skipping to display a building option corresponding to the target building package according to the first-stage trigger signal; the first-stage trigger signal is generated when a user selects one of the building packages through the input device;
the step of displaying building options corresponding to the target building package according to the target building package selected by the user through the input device comprises the following steps:
when a second-level trigger signal is received, skipping to display the content corresponding to the selected house building option according to the second-level trigger signal; the second-stage trigger signal is generated when a user selects one of the house building options through the input device;
the step of acquiring the target content determined by the user from the content corresponding to the various house building options through the input device comprises the following steps:
and when a third-level trigger signal is received, acquiring target content according to the third-level trigger signal, wherein the third-level trigger signal is generated when a user selects one content from the contents corresponding to the house building option as the target content through an input device.
In one embodiment, the method for automatically generating a building scheme further includes:
if a content change instruction is received, skipping to execute the step of displaying the house building option;
and updating the building scheme according to the acquired new target content.
The content changing instruction is a step capable of driving the display interface to jump to a building option, so that a user can reselect the content of the building option through the input device, after the user selects new content as the content of the building option through the input device, a new building scheme is generated according to the updated target content, it should be noted that there are a plurality of building options, if only the content in one of the building options is changed, the changed content in the building option and the selected content in the other building options are included according to the acquired new target content, and the finally determined target content in each building option is synthesized to generate the building scheme. After the building scheme is generated, the three-dimensional house model can be generated according to a modeling method, so that a user can visually know the selected building scheme, and a direction is provided for the user to further modify the building scheme.
In one embodiment, if a content change instruction is received, the step of skipping to execute and display the house building option includes:
and if the content change instruction is received, displaying the house building options in sequence from high to low according to the priority of the various house building options.
In order to help the user to quickly select the standardized housing construction scheme suitable for the user, after the content change instruction is received, the housing construction options can be displayed in sequence from high to low according to the priority levels of the housing construction options, for example, the housing construction options are displayed in sequence from top to bottom in the display area (DISPLAYAREA). The setting of the priority may be a setting related to the user's attention to the building options, for example, if the user pays attention to lighting and ventilation, the window setting options related to lighting and ventilation may be set to a higher priority. The building priority can be set according to the importance degree of building options for building construction, for example, the floor height and the building layout are basic options of building construction, a higher priority can be set, and the material of the window is an optional option, and a lower priority can be correspondingly set. The specific priority setting rules are not limited to the two exemplified herein.
In one embodiment, the building options include a necessary option and an additional option, the necessary option having a higher priority than the additional option.
The necessary options refer to parts essential for building construction, such as foundations (foundation routing shapes, drainage pipe reserved positions and the like) and building frames (external walls, floor heights, house beams, support walls, roofs and the like). Additional options are options that do not affect the housing's dwelling function, e.g., roof solar panel settings, etc.
In one embodiment, the priority of each building option display is proportional to the cost of the target content of each building option in the building scheme before updating.
For the house building options with higher cost, the user usually pays more attention and care, and based on this, the priority of the house building options can be proportional to the cost of the target content of each house building option in the house building scheme before updating, and the higher the cost of the target cost, the higher the priority.
In the method for automatically generating the building scheme provided by the embodiment of the application, the building options comprise other power supply mode options, and the other power supply mode options comprise a solar energy setting mode, a solar panel model and other contents. A user can select a solar energy setting mode through the input device to serve as an auxiliary power supply mode and supply power in parallel with a power supply network.
In one embodiment, before the step of generating the building scheme according to the target content corresponding to each type of building option, the method further includes:
and if the acquired target content lacks the content of the necessary options, executing a prompt action.
As described in the above embodiment, the necessary options are necessary parts for implementing the house living function, and when detecting that the content of the necessary options is absent in the currently selected target content, the pre-warning prompting action is performed to prompt the user to select the content of the absent necessary house building options. The executing of the early warning prompt action may be displaying a building option interface, and performing early warning prompt by blinking or red displaying icons of necessary building options that are not selected.
In one embodiment, the method for automatically generating a building scheme further includes:
and constructing and displaying a three-dimensional model of the house according to the house building scheme.
The Building three-dimensional model can be generated based on a Building Information Model (BIM) according to the Building scheme and the concrete implementation of the Building three-dimensional model is displayed. The three-dimensional model comprises a three-dimensional drawing of the whole house structure and also can comprise a three-dimensional drawing of a foundation part, and shows the frame structure of the foundation and the arrangement positions of an Aseismic column (Aseismic column) and a Load-bearing wall (Load-bearing wall); a partial schematic of the house construction may also be included. Specifically, as shown in fig. 5 to 10, the schematic diagrams of the house solutions with different floor heights can be displayed as a whole, the installation positions of a solar panel (solarpanels), a Garage (Garage), an entrance Door (Door), a Window (Window) and the like can be displayed, and the schematic diagrams of the Garage (Garage), the entrance Door (Door), the Window (Window) and the like can be displayed locally.
In one embodiment, the method for automatically generating a building scheme further includes:
and sending the building scheme to a target manufacturer, wherein the target manufacturer refers to the manufacturer associated with the target content. For example, the building scheme selects a type a wall column, the wall column is processed and produced by a first manufacturer, and the first manufacturer is a target manufacturer. And after receiving the building scheme, the target manufacturer generates an order according to the building scheme, and performs batch machining on the required wall columns, box girders, wall surface heat insulation materials, roof heat insulation materials and roof tiles according to the specific size of the building structure. The target manufacturer can also reserve fixed positions on the wall column, the box girder, the wall surface heat insulation material, the roof heat insulation material and the roof tiles according to the assembly modes of all parts represented in the building scheme, for example, the wall column is connected with the heat insulation wall surface through standard screws, the screws and the screws are locked and locked by spring gaskets and screw caps, the roof box girder and the roof heat insulation material, the roof tiles are connected by waterproof sealing gaskets, the screws and are locked and locked by the spring gaskets and the screw caps, and the like.
In one embodiment, before sending the building plan to the target manufacturer, the method further includes:
sending a house building scheme to the bid winning object;
the step of sending the building scheme to the target manufacturer comprises the following steps:
and after receiving confirmation information fed back by the bid winning object, sending a house building scheme to a target manufacturer.
It should be understood that, although the steps in the flowchart of fig. 2 are shown in order as indicated by the arrows, the steps are not necessarily performed in order as indicated by the arrows. The steps are not performed in the exact order shown and described, and may be performed in other orders, unless explicitly stated otherwise. Moreover, at least a portion of the steps in fig. 2 may include multiple sub-steps or multiple stages that are not necessarily performed at the same time, but may be performed at different times, and the order of performance of the sub-steps or stages is not necessarily sequential, but may be performed in turn or alternately with other steps or at least a portion of the sub-steps or stages of other steps.
On the other hand, an embodiment of the present application further provides an automatic generation apparatus for a building scheme, as shown in fig. 11, including:
the information acquisition unit 1 is used for acquiring user budget and land area;
the house building package display unit 2 is used for displaying each house building package to be selected according to the user budget and the land area, wherein the house building package to be selected is an option with the house building cost smaller than the user budget and the house building area smaller than the land area;
the building option display unit 3 is used for displaying building options corresponding to the target building package according to the target building package selected by the user through the input device, wherein each type of building option corresponds to a plurality of contents;
the target content acquisition unit 4 is used for acquiring target content determined by a user from the content corresponding to various house building options through input equipment;
and the building scheme generating unit 5 is used for generating building schemes according to the target contents corresponding to the various building options.
For specific limitations of the building plan automatic generation device, reference may be made to the above limitations of the building plan automatic generation method, which is not described herein again. Specifically, the user budget and the land area are acquired through the information acquisition unit 1, each house building package to be selected is displayed through the house building package display unit 2 by using the user budget and the land area, then a target house building package selected by a user through input equipment is acquired through the house building option display unit 3, house building options corresponding to the target house building package are displayed, target contents determined by the user from contents corresponding to various house building options through the input equipment are acquired through the target content acquisition unit 4, and finally a house building scheme is generated by using the target contents corresponding to the various house building options through the house building scheme generation unit 5. The automatic generation device of the building scheme provided by the embodiment of the application supplies users to select through providing various standardized packages, and is favorable for improving building efficiency. It should be noted that, all or part of the modules in the automatic building scheme generation apparatus may be implemented by software, hardware, or a combination thereof. The automatic generation device of the building scheme also comprises other modules to realize other steps of the automatic generation method of the building scheme. The modules can be embedded in a hardware form or independent from a processor in the computer device, and can also be stored in a memory in the computer device in a software form, so that the processor can call and execute operations corresponding to the modules.
In one embodiment, a computer device is provided, which may be a terminal, and its internal structure diagram may be as shown in fig. 12. The computer device includes a processor, a memory, a network interface, a display screen, and an input device connected by a system bus. Wherein the processor of the computer device is configured to provide computing and control capabilities. The memory of the computer device comprises a nonvolatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of an operating system and computer programs in the non-volatile storage medium. The network interface of the computer device is used for communicating with an external terminal through a network connection. The computer program is executed by a processor to implement a method for automatically generating a housing solution. The display screen of the computer equipment can be a liquid crystal display screen or an electronic ink display screen, and the input device of the computer equipment can be a touch layer covered on the display screen, a key, a track ball or a touch pad arranged on the shell of the computer equipment, an external keyboard, a touch pad or a mouse and the like.
Those skilled in the art will appreciate that the architecture shown in fig. 12 is merely a block diagram of some of the structures associated with the disclosed aspects and is not intended to limit the computing devices to which the disclosed aspects apply, as particular computing devices may include more or less components than those shown, or may combine certain components, or have a different arrangement of components.
A computer device comprising a memory and a processor, the memory storing a computer program, the processor implementing the following steps when executing the computer program:
s10: acquiring user budget and land area;
s20: displaying each suite of rooms to be selected according to the user budget and the land area, wherein the suite of rooms to be selected is a suite of which the room building cost is less than the user budget and the room building area is less than the land area;
s30: displaying building options corresponding to the target building package according to the target building package selected by the user through the input equipment, wherein each type of building options corresponds to a plurality of contents;
s40: acquiring target content determined by a user from the content corresponding to various house building options through input equipment;
s50: and generating a building scheme according to the target content corresponding to the various building options.
The explanations of land area and the like are the same as those in the above embodiment of the method, and are not described herein. When the computer device provided by the embodiment of the application works, any step in the method embodiment can be executed, so that the beneficial effects of the method can be achieved.
A computer-readable storage medium, on which a computer program is stored which, when executed by a processor, carries out the steps of:
s10: acquiring user budget and land area;
s20: displaying each suite of rooms to be selected according to the user budget and the land area, wherein the suite of rooms to be selected is a suite of which the room building cost is less than the user budget and the room building area is less than the land area;
s30: displaying building options corresponding to the target building package according to the target building package selected by the user through the input equipment, wherein each type of building options corresponds to a plurality of contents;
s40: acquiring target content determined by a user from the content corresponding to various house building options through input equipment;
s50: and generating a building scheme according to the target content corresponding to the various building options.
It will be understood by those skilled in the art that all or part of the processes of the methods of the embodiments described above can be implemented by hardware instructions of a computer program, which can be stored in a non-volatile computer-readable storage medium, and when executed, can include the processes of the embodiments of the methods described above. Any reference to memory, storage, database, or other medium used in the embodiments provided herein may include non-volatile and/or volatile memory, among others. Non-volatile memory can include read-only memory (ROM), Programmable ROM (PROM), Electrically Programmable ROM (EPROM), Electrically Erasable Programmable ROM (EEPROM), or flash memory. Volatile memory can include Random Access Memory (RAM) or external cache memory. By way of illustration and not limitation, RAM is available in a variety of forms such as Static RAM (SRAM), Dynamic RAM (DRAM), Synchronous DRAM (SDRAM), Double Data Rate SDRAM (DDRSDRAM), Enhanced SDRAM (ESDRAM), Synchronous Link DRAM (SLDRAM), Rambus Direct RAM (RDRAM), direct bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).
The technical features of the embodiments described above may be arbitrarily combined, and for the sake of brevity, all possible combinations of the technical features in the embodiments described above are not described, but should be considered as being within the scope of the present specification as long as there is no contradiction between the combinations of the technical features.
The above-mentioned embodiments only express several embodiments of the present invention, and the description thereof is more specific and detailed, but not construed as limiting the scope of the present invention. It should be noted that, for a person skilled in the art, several variations and modifications can be made without departing from the inventive concept, which falls within the scope of the present invention. Therefore, the protection scope of the present patent shall be subject to the appended claims.

Claims (10)

1. A building scheme automatic generation method is characterized by comprising the following steps:
acquiring user budget and land area;
displaying each suite of rooms to be selected according to the user budget and the land area, wherein the suite of rooms to be selected is a suite of which the room building cost is less than the user budget and the room building area is less than the land area;
displaying building options corresponding to a target building package according to the target building package selected by a user through input equipment, wherein each type of building options corresponds to a plurality of contents;
acquiring target content determined by a user from the content corresponding to the house building options through input equipment;
and generating a building scheme according to the target content corresponding to the building options.
2. The method of claim 1, further comprising:
if a content change instruction is received, skipping to execute the step of displaying the house building option;
and updating the building scheme according to the acquired new target content.
3. The method of claim 2, wherein the step of skipping to execute the house building option if a content change instruction is received comprises:
and if the content change instruction is received, displaying the house building options in sequence from high to low according to the priority of the various house building options.
4. The automatic house-building scheme generation method of claim 3, wherein the house-building options comprise a necessary option and an additional option, and the priority of the necessary option is higher than that of the additional option.
5. The method of claim 3, wherein the priority of each room establishment option display is proportional to the cost of the target content of each room establishment option in the room establishment scheme before updating.
6. The method according to claim 4, wherein before the step of generating the building plan according to the target content corresponding to each type of building option, the method further comprises:
and if the acquired target content lacks the content of the necessary options, executing a prompt action.
7. The method of claim 1, further comprising:
and constructing and displaying a three-dimensional house model according to the house construction scheme.
8. An automatic generation device for a building scheme, comprising:
the information acquisition unit is used for acquiring user budget and land area;
the building package display unit is used for displaying various building packages to be selected according to the user budget and the land area, wherein the building packages to be selected are options of which the building cost is less than the user budget and the building area is less than the land area;
the building option display unit is used for displaying building options corresponding to a target building package selected by a user through input equipment, wherein each type of building options corresponds to a plurality of contents;
the target content acquisition unit is used for acquiring target content determined by a user from the content corresponding to the house building options through input equipment;
and the building scheme generating unit is used for generating building schemes according to the target contents corresponding to the building options.
9. A computer device comprising a memory, a processor and a computer program stored on the memory and executable on the processor, characterized in that the processor implements the steps of the method of automatically generating a housing solution according to any one of claims 1-7 when executing the program.
10. A computer-readable storage medium, on which a computer program is stored, which program, when being executed by a processor, carries out the steps of the method for automatically generating a housing construction scheme according to any one of claims 1 to 7.
CN201911190825.3A 2019-11-28 2019-11-28 Automatic generation method and device for building plan, computer equipment and storage medium Active CN111125812B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911190825.3A CN111125812B (en) 2019-11-28 2019-11-28 Automatic generation method and device for building plan, computer equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911190825.3A CN111125812B (en) 2019-11-28 2019-11-28 Automatic generation method and device for building plan, computer equipment and storage medium

Publications (2)

Publication Number Publication Date
CN111125812A true CN111125812A (en) 2020-05-08
CN111125812B CN111125812B (en) 2023-09-26

Family

ID=70496962

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911190825.3A Active CN111125812B (en) 2019-11-28 2019-11-28 Automatic generation method and device for building plan, computer equipment and storage medium

Country Status (1)

Country Link
CN (1) CN111125812B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6345258B1 (en) * 1997-12-30 2002-02-05 William E. Pickens Information system for new home builders
CA2442225A1 (en) * 2003-09-24 2005-03-24 Paolo Tiramani Method of selling pre-fabricated houses
US20050283371A1 (en) * 2002-08-30 2005-12-22 Paolo Tiramani Method of selling pre-fabricated houses
JP2007102400A (en) * 2005-10-03 2007-04-19 Mitsui Home Co Ltd Computer estimation system for house and estimation method for house
CN102782689A (en) * 2009-12-23 2012-11-14 Aea集成公司 System and method for automated building services design
CN105513126A (en) * 2015-11-26 2016-04-20 南京国图信息产业股份有限公司 Three-dimensional building modeling method
CN107358460A (en) * 2017-06-20 2017-11-17 百度在线网络技术(北京)有限公司 Acquisition methods, device and the computer equipment of decoration budget quotation
CN109636535A (en) * 2018-12-19 2019-04-16 杭州庭好数字科技有限公司 Fit up set meal customization of individual character system and method
CN110245160A (en) * 2019-06-03 2019-09-17 贝壳技术有限公司 A kind of method and system of determining house decoration scheme

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6345258B1 (en) * 1997-12-30 2002-02-05 William E. Pickens Information system for new home builders
US20050283371A1 (en) * 2002-08-30 2005-12-22 Paolo Tiramani Method of selling pre-fabricated houses
CA2442225A1 (en) * 2003-09-24 2005-03-24 Paolo Tiramani Method of selling pre-fabricated houses
JP2007102400A (en) * 2005-10-03 2007-04-19 Mitsui Home Co Ltd Computer estimation system for house and estimation method for house
CN102782689A (en) * 2009-12-23 2012-11-14 Aea集成公司 System and method for automated building services design
CN105513126A (en) * 2015-11-26 2016-04-20 南京国图信息产业股份有限公司 Three-dimensional building modeling method
CN107358460A (en) * 2017-06-20 2017-11-17 百度在线网络技术(北京)有限公司 Acquisition methods, device and the computer equipment of decoration budget quotation
CN109636535A (en) * 2018-12-19 2019-04-16 杭州庭好数字科技有限公司 Fit up set meal customization of individual character system and method
CN110245160A (en) * 2019-06-03 2019-09-17 贝壳技术有限公司 A kind of method and system of determining house decoration scheme

Also Published As

Publication number Publication date
CN111125812B (en) 2023-09-26

Similar Documents

Publication Publication Date Title
Calvi et al. Energy efficiency and seismic resilience: A common approach
US10430526B2 (en) Systems and methods for displaying impact analysis data while designing an architectural structure
Macias et al. Embodied and operational energy assessment of different construction methods employed on social interest dwellings in Ecuador
KR20090126574A (en) Design system for wooden structure with post and beam by assembling basic construction unit and design method thereof
CA2775837A1 (en) Methods and systems for modular buildings
Lee et al. Comparative analysis of energy related performance and construction cost of the external walls in high-rise residential buildings
Maučec et al. Use of sensitivity analysis for a determination of dominant design parameters affecting energy efficiency of timber buildings in different climates
JP4139592B2 (en) Insulation method selection support system
Kristiansen et al. The viability of solar photovoltaic powered off-grid Zero Energy Buildings based on a container home
AU2011284789B2 (en) Systems and methods for providing product information
KR101993421B1 (en) System and Method for Predicting Performance of New and Renewable Energy System Based on Measured Data
KR101356462B1 (en) Ifc based three dimensional building control method and three dimensional building control system using the same
KR101356463B1 (en) Ifc based three dimensional rendering method and three dimensional visualization device using the same
Amani et al. Review on energy efficiency using the ecotect simulation software for residential building sector
Kaitouni et al. A holistic digital workflow methodology to shifting towards net zero energy urban residential buildings in a semi-arid climate
Strazzeri et al. Qualitative and quantitative study to assess the use of rammed earth construction technology in Perth and the south-west of Western Australia
CN111125812B (en) Automatic generation method and device for building plan, computer equipment and storage medium
KR102028861B1 (en) Apparatus and method for building energy performance prediction simulation
US20070265927A1 (en) Software design system
Prasad et al. Delivering on the climate emergency: Towards a net zero carbon built environment
Griffin Multi-performance retrofits to commercial buildings in seismic zones
Byrne et al. Transitioning to net zero energy homes—learnings from the CRC’s high-performance housing living laboratories
Elkaftangui et al. Optimizing prefabricated construction techniques in UAE as a solution to shortage of middle-income housing
Hashemi et al. Prefabrication
Leboeuf Standard Assumptions and Methods for Solar Heating and Cooling Systems Analyses

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant