CN111119189A CN202010023854.7A CN202010023854A CN111119189A CN 111119189 A CN111119189 A CN 111119189A CN 202010023854 A CN202010023854 A CN 202010023854A CN 111119189 A CN111119189 A CN 111119189A
Authority
CN
China
Prior art keywords
reinforcement cage
frame
positioning device
steel
pile foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010023854.7A
Other languages
Chinese (zh)
Inventor
陈蛟
阮大伟
田小龙
刘鹏
谢开仲
郭晓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi University
Fifth Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Original Assignee
Guangxi University
Fifth Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi University, Fifth Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd filed Critical Guangxi University
Priority to CN202010023854.7A priority Critical patent/CN111119189A/en
Publication of CN111119189A publication Critical patent/CN111119189A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/08Sinking workpieces into water or soil inasmuch as not provided for elsewhere
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a positioning device of a pile foundation reinforcement cage and a construction method of the pile foundation reinforcement cage. Adopt this device to carry out both ends location through the upper end and the lower extreme to steel reinforcement cage respectively, effectively avoid steel reinforcement cage to put the in-process under and appear the skew slope, improve the precision that steel reinforcement cage transferred, reduce and transfer the degree of difficulty of hanging down, improve the security of construction, reduce steel reinforcement cage's damage, improve the construction quality of pile foundation, simple structure, low cost, convenient to use is favorable to practicing thrift construction period and construction cost.

Description

Pile foundation reinforcement cage positioning device and pile foundation reinforcement cage construction method
Technical Field
The invention relates to the technical field of pile foundation reinforcement cage construction, in particular to a positioning device of a pile foundation reinforcement cage and a construction method of the pile foundation reinforcement cage.
Background
The well-constructed pile hole needs to be placed with the well-made reinforcement cage in the pile foundation construction process, the position of the reinforcement cage and the designed position cannot deviate too much, otherwise, the pile foundation quality is reduced easily, the bearing capacity is insufficient, and the position of the reinforcement cage in the hole needs to be controlled accurately.
At present, in actual construction, the traditional positioning method is adopted, the positioning steps are complicated, the positioning effect is poor, the construction efficiency is not high, the safety factor is not high, and in addition, the steel reinforcement cage is placed under the steel reinforcement cage, and the scraping damage of the steel reinforcement cage and the outside stirrup is also very serious.
Disclosure of Invention
The invention aims to overcome the defects of complex positioning steps, poor positioning effect, low construction efficiency, serious damage of a reinforcement cage and the like in the prior art when the pile foundation reinforcement cage is installed, and provides a positioning device of the pile foundation reinforcement cage and a construction method of the pile foundation reinforcement cage.
In order to achieve the purpose, the invention provides the following technical scheme:
the utility model provides a positioner of pile foundation steel reinforcement cage, contains frame and support component, be equipped with at least three rolling part in the frame, all the passageway adaptation steel reinforcement cage's that the rolling part encloses external diameter, the lower part outer wall of steel reinforcement cage is connected with at least three the support component, the support component is used for the location the lower extreme of steel reinforcement cage.
By adopting the positioning device for the pile foundation reinforcement cage, at least three supporting parts are connected on the outer wall of the lower part of the reinforcement cage, after the reinforcement cage is placed in a pile hole, the supporting parts are supported on the wall of the pile hole, the lower part of the reinforcement cage can be positioned, the reinforcement cage is prevented from scraping a protective wall, the upper part of the reinforcement cage is positioned through a channel surrounded by the roller parts at the pile hole opening, when the reinforcement cage is placed, rolling friction is formed between the reinforcement cage and the roller parts, the resistance in the placing process is greatly reduced, the reinforcement cage is prevented from being scratched, by adopting the positioning device, the two ends of the upper end and the lower end of the reinforcement cage are respectively positioned, the reinforcement cage is effectively prevented from being deviated and inclined in the placing process, the placing precision of the reinforcement cage is improved, the verticality adjusting difficulty is reduced, and the construction safety is improved, the damage of the steel reinforcement cage is reduced, the construction quality of the pile foundation is improved, the structure is simple, the cost is low, the use is convenient, and the construction period and the construction cost are saved.
Preferably, the frame is square, and the frame comprises four steel section members.
More preferably, the number of the rolling members is four, and the rolling members are steel pipes.
Further preferably, the steel tube is arranged in the middle of the corresponding edge of the frame, and a rotating shaft of the steel tube is connected to the frame through a connecting part.
Preferably, the support component comprises an ear rib, and the ear rib is welded and connected with a longitudinal rib of the reinforcement cage.
Further preferably, the supporting parts are uniformly distributed along the circumferential direction of the steel reinforcement cage, and the width of each supporting part is matched with the distance between the steel reinforcement cage and the hole wall of the pile hole.
It is further preferred that the reinforcement cage comprises a plurality of sections, all of the support members being connected to the bottom of a first of the sections.
Preferably, the frame is attached to the top surface of the casing.
By adopting the arrangement mode, the top end of the reinforcement cage is ensured to be sunk into the pile casing and separated from the positioning device to the designed standard height, and the center of the top of the reinforcement cage is still coincident with the center of the pile.
A construction method of a pile foundation reinforcement cage comprises the following steps:
a. connecting at least three rolling parts in a frame, wherein a channel defined by all the rolling parts is matched with the outer diameter of a reinforcement cage, and connecting the frame to the top surface of the pile casing to ensure that the center of the channel is matched with the center of a pile hole;
b. connecting at least three support parts to the outer wall of the lower part of the first section of the reinforcement cage, wherein the width of each support part is matched with the distance between the reinforcement cage and the wall of the pile hole;
c. hoisting the reinforcement cage section by section;
d. and hoisting the last section of the steel reinforcement cage, installing at least three positioning parts on the side wall of the corresponding section, and then lowering the corresponding section to the designed elevation to complete the construction of the steel reinforcement cage.
By adopting the using method of the pile foundation reinforcement cage positioning device, the two ends of the reinforcement cage are respectively subjected to positioning control, so that the installation position of the reinforcement cage is more accurate, the reinforcement cage is conveniently positioned and corrected when being placed, the verticality adjusting difficulty is reduced, the construction safety is improved, the construction progress is accelerated, the reliability of pile foundation construction is ensured, the damage probability of the reinforcement cage is reduced, and the construction quality of a pile foundation is improved.
Preferably, the order of steps a and b can be interchanged or performed simultaneously.
In summary, compared with the prior art, the invention has the beneficial effects that:
1. by adopting the positioning device for the pile foundation reinforcement cage, disclosed by the invention, through respectively positioning the two ends of the upper end and the lower end of the reinforcement cage, the reinforcement cage is effectively prevented from deviating and inclining in the lowering process, the lowering precision of the reinforcement cage is improved, the verticality adjusting difficulty is reduced, the construction safety is improved, the damage of the reinforcement cage is reduced, the construction quality of the pile foundation is improved, the structure is simple, the cost is low, the use is convenient, and the construction period and the construction cost are favorably saved.
2. By adopting the construction method of the pile foundation reinforcement cage, the two ends of the reinforcement cage are respectively subjected to positioning control, so that the installation position of the reinforcement cage is more accurate, the reinforcement cage is conveniently positioned and corrected when being placed, the verticality adjusting difficulty is reduced, the construction safety is improved, the construction progress is accelerated, the reliability of pile foundation construction is ensured, the damage probability of the reinforcement cage is reduced, and the construction quality of a pile foundation is improved.
Drawings
Fig. 1 is a structural plan view of a positioning device for a pile foundation reinforcement cage according to the present invention;
FIG. 2 is a plan view showing the structure of the positioning device in use according to example 1;
FIG. 3 is a schematic structural view of the lower end of the reinforcement cage in the construction process of example 1;
fig. 4 is a schematic structural view of the upper end of the reinforcement cage in the construction process of embodiment 1.
The labels in the figure are: the steel bar cage comprises a frame 1, a support part 2, a rolling part 3, a steel bar cage 4, a connecting part 5, a hole wall 6, a protective cylinder 7 and a positioning part 8.
Detailed Description
The invention is described in further detail below with reference to the figures and the embodiments. It should be understood that the scope of the above-described subject matter is not limited to the following examples, and any techniques implemented based on the disclosure of the present invention are within the scope of the present invention.
Example 1
The invention relates to a positioning device of a pile foundation reinforcement cage, which comprises a frame 1 and supporting parts 2, wherein the inner hole of the frame 1 can be square, regular triangle or round, the frame 1 can also be made into a platform, so that workers can conveniently operate and place tools on the platform, at least three rolling parts 3 are arranged in the frame 1, a channel defined by all roller parts 3 is matched with the outer diameter of a reinforcement cage 4, the lowered reinforcement cage 4 is positioned by the at least three rolling parts 3, the reinforcement cage 4 can be directly in rolling contact with the rolling parts 3 when being lowered, sliding friction is replaced by rolling friction, the resistance in the lowering process is greatly reduced, the damage of the reinforcement cage 4 due to wall scraping is avoided, the outer wall of the lower part of the reinforcement cage 4 is connected with the at least three supporting parts 2, the support member 2 is used to locate the lower end of the reinforcement cage 4.
Specifically, as shown in fig. 1, the frame 1 is square, the frame 1 may be an existing square frame, or may be formed by welding four section steel members, such as i-beams and H-beams, which are simple and fast to install and remove, and have good stability, the rolling members 3 are respectively installed in the middle of four sides of the inner side of the frame 1, the rolling members 3 are steel pipes, the rotating shafts of the steel pipes are connected to the frame 1 through connecting members 5, the connecting members 5 may be steel bars, the steel bars are welded to the frame 1, and then the frame 1 is welded or fixed to the top surface of the casing 7 through ground anchors, as shown in fig. 2, the centers of the passages and the centers of the piles coincide, so as to ensure the positioning of the lowered reinforcement cage 4 in the opening.
Support component 2 welding is in 4 bottoms of steel reinforcement cage, support component 2's width adaptation interval between the pore wall 6 in steel reinforcement cage 4 and stake hole, support component 2 contains the ear muscle, as shown in fig. 3, the distance the welding has 4 at least on the 1 meter high vertical muscle in 4 bottoms of steel reinforcement cage the ear muscle, all ear muscle equipartition is on the circumference, ensures when steel reinforcement cage 4 transfers to the hole bottom, the ear muscle is at stake hole bottom butt pore wall 6 is in order to realize right through the contact location the positioning control of 4 lower extremes of steel reinforcement cage can avoid simultaneously again steel reinforcement cage 4 scratch dado, if steel reinforcement cage 4 contains a plurality of section, then all support component 2 connects in first the bottom of section.
Through right respectively the upper end and the lower extreme of steel reinforcement cage 4 carry out both ends location, effectively avoid steel reinforcement cage 4 to appear the skew slope transferring the in-process, improve the precision that steel reinforcement cage 4 was transferred, reduce and transfer the degree of difficulty of hanging down, improve the security of construction, reduce steel reinforcement cage 4's damage, improve the construction quality of pile foundation, simple structure, low cost, convenient to use is favorable to practicing thrift construction period and construction cost.
By adopting the positioning device for the pile foundation reinforcement cage in the embodiment, the construction method for the pile foundation reinforcement cage comprises the following steps:
a. at least three rolling parts 3 are connected in a frame 1, a channel defined by all the rolling parts 3 is matched with the outer diameter of a reinforcement cage 4, and the frame 1 is connected to the top surface of a pile casing 6, so that the center of the channel is matched with the center of a pile hole;
b. at least three support parts 2 are connected to the outer wall of the lower part of the first section of the reinforcement cage 4, and the width of each support part 2 is matched with the distance between the reinforcement cage 4 and the hole wall 6 of the pile hole;
c. hoisting the reinforcement cage 4 section by section;
d. and (4) hoisting the last section of the steel reinforcement cage 4, installing at least three positioning parts 8 on the side wall of the corresponding section, and then lowering the corresponding section to the designed elevation to complete the construction of the steel reinforcement cage 4.
The order of steps a and b can be interchanged or performed simultaneously.
Specifically, the steel pipes are respectively installed in the middles of four edges of the inner side of the frame 1, a channel defined by all the steel pipes is matched with the outer diameter of the reinforcement cage 4, and then the frame 1 is welded or fixed on the top surface of the pile casing 7 through a ground anchor, so that the center of the channel is overlapped with the center of the pile hole.
The muscle bottom outer wall connection of indulging of the first section of steel reinforcement cage 4 is all the ear muscle, the width adaptation of support component 2 steel reinforcement cage 4 with interval between the pore wall 6 to the ear muscle of the steel reinforcement cage 4 of guaranteeing to transfer can with the pore wall 6 carries out the contact location, as shown in fig. 3.
And then hoisting the steel reinforcement cage 4 in sections, aligning a first section with a channel surrounded by the rolling component 3, putting the first section into a pile hole, putting the pile hole to a corresponding height, penetrating at least two I-shaped steels under stirrups to hang the corresponding section of the steel reinforcement cage 4, butting a second section with the first section, wherein the main reinforcement connecting sections are arranged in a staggered manner during butting, the number of joints on the same section is not more than 50% of the number of main reinforcements, adopting sleeve connection, removing the I-shaped steels after the butting, continuously putting the steel reinforcement cage 4, slowly and uniformly putting the steel reinforcement cage 4, adjusting the verticality of the hole of the steel reinforcement cage 4 at any time according to the depth of the steel reinforcement cage, avoiding the steel reinforcement cage from inclining and swinging as much as possible, and then repeating the operation to hoist a third section and a fourth section … until the last section.
When transferring to last festival section, according to the size, the actual protective layer thickness that protect a section of thick bamboo 7 are in the top circumference equipartition welding of 4 corresponding sections of steel reinforcement cage three at least locating component 8, if adopt 4 spacer bar, as shown in fig. 4, guarantee 4 tops of steel reinforcement cage sink into break away from in the section of thick bamboo 7 positioner to the in-process of design elevation, the center at 4 tops of steel reinforcement cage still keeps the coincidence with the stake center, steel reinforcement cage 4 is transferred to design elevation after, the completion the construction of transferring of steel reinforcement cage 4.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents and improvements made within the spirit and principle of the present invention are intended to be included within the scope of the present invention.

Claims (10)

1. The utility model provides a positioner of pile foundation steel reinforcement cage, its characterized in that contains frame (1) and supporting component (2), be equipped with at least three rolling member (3) in frame (1), all the external diameter of passageway adaptation steel reinforcement cage (4) that drum part (3) enclose, the lower part outer wall of steel reinforcement cage (4) is connected with at least three supporting component (2), supporting component (2) are used for the location the lower extreme of steel reinforcement cage (4).
2. The positioning device according to claim 1, characterized in that said frame (1) is square, said frame (1) comprising four profiled steel members.
3. The positioning device according to claim 2, wherein said rolling members (3) are four in number, and said rolling members (3) are steel pipes.
4. A positioning device according to claim 3, characterized in that the steel tube is arranged in the middle of the corresponding side of the frame (1), and the rotation axis of the steel tube is connected to the frame (1) by means of a connecting part (5).
5. The positioning device according to claim 1, characterized in that the support part (2) comprises an ear rib which is welded to a longitudinal rib of the reinforcement cage (4).
6. The positioning device according to claim 5, characterized in that the support members (2) are evenly distributed circumferentially along the reinforcement cage (4), the width of the support members (2) being adapted to the spacing between the reinforcement cage (4) and the bore wall (6) of the pile bore.
7. A positioning device according to claim 6, characterized in that the reinforcement cage (4) comprises several segments, all the support members (2) being connected to the bottom of the first of said segments.
8. A positioning device according to any of claims 1-7, characterized in that the frame (1) is attached to the top surface of the casing (7).
9. A construction method of a pile foundation reinforcement cage is characterized by comprising the following steps:
a. at least three rolling parts (3) are connected in a frame (1), a channel defined by all the rolling parts (3) is matched with the outer diameter of a reinforcement cage (4), the frame (1) is connected to the top surface of a pile casing (6), and the center of the channel is matched with the center of a pile hole;
b. at least three support parts (2) are connected to the outer wall of the lower part of the first section of the reinforcement cage (4), and the width of each support part (2) is matched with the distance between the reinforcement cage (4) and the wall (6) of the pile hole;
c. hoisting the reinforcement cage (4) section by section;
d. and (4) hoisting the last section of the steel reinforcement cage (4), installing at least three positioning parts (8) on the side wall of the corresponding section, and then lowering the corresponding section to the designed elevation to complete the construction of the steel reinforcement cage (4).
10. The method for using the positioning device of the pile foundation reinforcement cage according to claim 9, wherein the sequence of the steps a and b can be interchanged or performed simultaneously.
CN202010023854.7A 2020-01-09 2020-01-09 Pile foundation reinforcement cage positioning device and pile foundation reinforcement cage construction method Pending CN111119189A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010023854.7A CN111119189A (en) 2020-01-09 2020-01-09 Pile foundation reinforcement cage positioning device and pile foundation reinforcement cage construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010023854.7A CN111119189A (en) 2020-01-09 2020-01-09 Pile foundation reinforcement cage positioning device and pile foundation reinforcement cage construction method

Publications (1)

Publication Number Publication Date
CN111119189A true CN111119189A (en) 2020-05-08

Family

ID=70487745

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010023854.7A Pending CN111119189A (en) 2020-01-09 2020-01-09 Pile foundation reinforcement cage positioning device and pile foundation reinforcement cage construction method

Country Status (1)

Country Link
CN (1) CN111119189A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112431203A (en) * 2020-11-30 2021-03-02 成都悦鉴科技有限公司 Method for lowering super-long prefabricated reinforcement cage
CN113309119A (en) * 2021-07-06 2021-08-27 中建三局集团有限公司 Construction method for constructing inclined pile by mud retaining wall

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203625890U (en) * 2013-10-31 2014-06-04 中铁港航局集团有限公司 Large-diameter cast-in-situ bored pile reinforcement cage positioning device
CN205475204U (en) * 2016-02-23 2016-08-17 宏润建设集团股份有限公司 Locator for steel reinforcement cage is transferred to drilling bored concrete pile
CN207260137U (en) * 2017-10-16 2018-04-20 中铁十二局集团第一工程有限公司 Large Bored Piles pile foundation steel bar cage mounting and positioning device
CN109610458A (en) * 2019-01-15 2019-04-12 五冶集团上海有限公司 A kind of manually digging hole filling pile steel reinforcement cage deviation preventing mean and its application method
CN211849456U (en) * 2020-01-09 2020-11-03 中铁十局集团第五工程有限公司 Pile foundation reinforcement cage positioning device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203625890U (en) * 2013-10-31 2014-06-04 中铁港航局集团有限公司 Large-diameter cast-in-situ bored pile reinforcement cage positioning device
CN205475204U (en) * 2016-02-23 2016-08-17 宏润建设集团股份有限公司 Locator for steel reinforcement cage is transferred to drilling bored concrete pile
CN207260137U (en) * 2017-10-16 2018-04-20 中铁十二局集团第一工程有限公司 Large Bored Piles pile foundation steel bar cage mounting and positioning device
CN109610458A (en) * 2019-01-15 2019-04-12 五冶集团上海有限公司 A kind of manually digging hole filling pile steel reinforcement cage deviation preventing mean and its application method
CN211849456U (en) * 2020-01-09 2020-11-03 中铁十局集团第五工程有限公司 Pile foundation reinforcement cage positioning device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112431203A (en) * 2020-11-30 2021-03-02 成都悦鉴科技有限公司 Method for lowering super-long prefabricated reinforcement cage
CN113309119A (en) * 2021-07-06 2021-08-27 中建三局集团有限公司 Construction method for constructing inclined pile by mud retaining wall

Similar Documents

Publication Publication Date Title
CN110397076B (en) Construction method of deep-water large-diameter cast-in-place pile
CN108842806B (en) Construction process of offshore wind power foundation non-rock-socketed single pile
CN207130723U (en) A kind of adjustable drilled pile reinforcing cage decentralization construction platform device
CN112900450A (en) Rotary drilling and full-rotation combined back-inserting method positioning method for steel pipe structure pile by reverse construction method
CN211849456U (en) Pile foundation reinforcement cage positioning device
CN111119189A (en) Pile foundation reinforcement cage positioning device and pile foundation reinforcement cage construction method
CN102767182A (en) Verticality adjustment system for lattice column correcting mount and construction method thereof
CN113585259B (en) Full-casing full-rotation construction method for large-diameter steel pipe structural column by reverse construction method
CN111945714B (en) Steel sleeve guiding method combined with steel upright column inserting construction method
CN108999225B (en) Inclination correcting method for rotary shifting brick-concrete structure building
CN113668512A (en) Construction method of adjacent subway full casing full slewing drilling machine pile foundation
CN106013091A (en) Steel reinforcement cage positioning device and positioning method used for building construction
CN211666301U (en) Steel constructs straightness control stop device that hangs down of post
CN113981961A (en) Barge type pile planting method for deep water bare rock
CN109385997B (en) Construction method of PHC tubular pile under narrow field condition
CN117344802A (en) Basement anti-floating anchor rod structure and construction method
CN111962506A (en) Collimating pile structure and construction method
CN113417324B (en) Core pile perpendicularity detection device of cement-soil core-inserting combined pile
CN113309083A (en) Construction method of large-diameter overlong cast-in-place pile
CN211421198U (en) Inclinometer tube structure capable of being oriented accurately
CN209907399U (en) Steel constructs straightness control stop device that hangs down of post
CN216551945U (en) Cast-in-situ bored pile steel protects a section of thick bamboo center positioning device
CN219951970U (en) Pit cover digs section steel-pipe column installation positioner
CN213806191U (en) Limiting device for placing reinforcement cage of bored pile
CN219690533U (en) Column pile structure with steel lattice column inserted with plain concrete pile as foundation pit inner support

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination