CN111105151B - Air conditioner material prediction method, system and storage medium - Google Patents

Air conditioner material prediction method, system and storage medium Download PDF

Info

Publication number
CN111105151B
CN111105151B CN201911260647.7A CN201911260647A CN111105151B CN 111105151 B CN111105151 B CN 111105151B CN 201911260647 A CN201911260647 A CN 201911260647A CN 111105151 B CN111105151 B CN 111105151B
Authority
CN
China
Prior art keywords
air conditioner
same
prediction
material quantity
score
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201911260647.7A
Other languages
Chinese (zh)
Other versions
CN111105151A (en
Inventor
黎泽斌
周轶思
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Zhuhai Lianyun Technology Co Ltd
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Zhuhai Lianyun Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai, Zhuhai Lianyun Technology Co Ltd filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201911260647.7A priority Critical patent/CN111105151B/en
Publication of CN111105151A publication Critical patent/CN111105151A/en
Application granted granted Critical
Publication of CN111105151B publication Critical patent/CN111105151B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Development Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Educational Administration (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • General Health & Medical Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

The invention provides a method, a system and a storage medium for predicting air conditioner materials, wherein the method comprises the following steps: acquiring respective predicted material quantities of multiple materials required by manufacturing an air conditioner; determining at least one historical model which is the same as the type of the air conditioner and the matching number, and acquiring the respective historical material quantity of multiple materials for manufacturing the at least one historical model; determining the same materials of the air conditioner and at least one historical machine type, and respectively acquiring a data set aiming at each same material, wherein the data set comprises the historical material quantity and the predicted material quantity aiming at the same material; estimating the reference material quantity corresponding to the same material by adopting a specified algorithm according to the data set; and according to the reference material quantity corresponding to each same material, obtaining a prediction material score related to the air conditioner, and adjusting the prediction material quantity according to the prediction material score. The method and the device have the advantages that the air conditioner material quantity is accurate, the estimation cost is saved, and the estimation efficiency is improved.

Description

Air conditioner material prediction method, system and storage medium
Technical Field
The invention relates to the technical field of air conditioner materials, in particular to an air conditioner material prediction method, an air conditioner material prediction system and a storage medium.
Background
Air conditioner manufacturing design is difficult to manage in terms of air conditioner design materials due to most of attention on design forming, and evaluation of the set of process materials is difficult. The structure of the air conditioner includes: the compressor, the condenser, the evaporimeter, the four-way valve, check valve capillary tube subassembly etc.. The material consumption conditions of all parts are different, and in most cases, the specific material consumption conditions of all parts are difficult to determine, so that a large amount of cost funds are needed to buy enough raw materials, waste of some raw materials is caused, and the cost cannot be reduced to the maximum extent.
Disclosure of Invention
The invention aims to ensure that the quantity of the preset materials of the air conditioner is accurate in the air conditioner design stage and solve the problem that the quantity of the process design materials is difficult to evaluate.
In order to solve the above problems, the present invention provides an air conditioner material prediction method, system and storage medium.
In a first aspect, the present invention provides a method for predicting air conditioner material, comprising the following steps: acquiring the respective predicted material quantity of a plurality of materials required by manufacturing the air conditioner; determining at least one historical model which is the same as the type of the air conditioner and has the same matching number, and acquiring the respective historical material quantity of multiple materials for manufacturing the at least one historical model; determining the same materials of the air conditioner and at least one historical machine type, and respectively acquiring a data set aiming at each same material, wherein the data set comprises the historical material quantity and the predicted material quantity aiming at the same material; estimating the reference material quantity corresponding to the same material by adopting a specified algorithm according to the data set; and obtaining a prediction material score related to the air conditioner according to the reference material quantity corresponding to each same material, and adjusting the prediction material quantity according to the prediction material score.
Preferably, the specifying algorithm includes: a curve fitting algorithm or a positive-Tailored distribution algorithm.
Preferably, obtaining a predictive material score associated with the air conditioner comprises: acquiring the weight of each same material, wherein the sum of the weights of the same materials is 1; acquiring the sum of the products of the reference material quantity corresponding to each same material and the corresponding weight; and adjusting the average value of the sum value to obtain the predicted material score related to the air conditioner.
Preferably, adjusting the number of the predicted materials according to the score of the predicted materials comprises: judging whether the score of the prediction material is smaller than a preset score threshold value or not; and when the predicted material score is smaller than a preset score threshold value, taking the reference material quantity corresponding to the same material as the material quantity of the air conditioner aiming at the same material.
Preferably, when a curve fitting algorithm is used, estimating the reference material quantity corresponding to the same material comprises: creating a coordinate system with the refrigerating capacity of the air conditioner as a horizontal coordinate and the material quantity as a vertical coordinate; performing curve fitting on each data in the data set in the coordinate system to form a fitted curve related to the material quantity of the same material; and in the coordinate system, obtaining a point on the fitting curve with the same refrigerating capacity as the air conditioner, and taking the ordinate of the point as the reference material quantity corresponding to the same material.
Preferably, when the positive power distribution algorithm is adopted, estimating the reference material quantity corresponding to the same material comprises: according to each data in the data set, drawing a positive-Taiwanese distribution curve related to the material quantity of the same material; and taking the material quantity corresponding to the peak value of the positive-too distribution curve as the reference material quantity corresponding to the same material.
Preferably, obtaining a predicted material score related to the air conditioner according to the reference material amount corresponding to each of the same materials includes: and obtaining a prediction material grade related to the air conditioner according to the difference value between the reference material quantity and the prediction material quantity corresponding to the same material.
Preferably, the type of the air conditioner is the same, including the same series of models as the air conditioner.
Preferably, the type of the air conditioner is the same as that of the air conditioner, and the air conditioner is a household type, a commercial type or an industrial type.
In a second aspect, the present invention provides an air conditioner material prediction system comprising a processor and a memory, the memory storing program instructions, which when executed by the processor, implement the method as described above.
In a third aspect, the present invention provides a storage medium storing program instructions which, when executed by a processor, implement a method as described above.
Compared with the prior art, the invention has the following advantages or beneficial effects:
according to the method and the device, the prediction material and the prediction material quantity of the air conditioner are integrally evaluated through the historical material and the historical material quantity of the historical machine type similar to the air conditioner, and the material quantity of the air conditioner is adjusted according to the evaluation result, so that the air conditioner material quantity is accurate and reasonable, the prediction cost is saved, and the prediction efficiency is improved. The invention can more accurately position the quantity of materials, thereby improving the process design efficiency and reducing the process design cost.
Drawings
The scope of the present disclosure may be better understood by reading the following detailed description of exemplary embodiments in conjunction with the accompanying drawings, in which:
fig. 1 is a flowchart of an air conditioner material prediction method according to a first embodiment of the present invention.
FIG. 2 is a flow chart for estimating the reference charge amount corresponding to the same charge using a curve fitting algorithm.
FIG. 3 is a flow chart for obtaining a predicted material score and adjusting the amount of predicted material.
Fig. 4 is a flow chart for estimating the reference material amount corresponding to the same material by using a positive-power distribution algorithm.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention clearer, embodiments of the present invention are described in detail below with reference to the accompanying drawings and examples, so that how to apply technical means to solve technical problems and achieve a technical effect can be fully understood and implemented.
The invention has the idea that the prediction material of the air conditioner is evaluated according to the prediction material of the air conditioner and the historical material of similar machine types, and the material of the air conditioner is adjusted according to the evaluation result value.
Example one
Fig. 1 is a flowchart of an air conditioner material prediction method according to a first embodiment of the present invention, and each step of the first embodiment of the present invention is described in detail below with reference to fig. 1.
As shown in fig. 1, the present invention provides a method for predicting air conditioner material, comprising the following steps:
s1: acquiring the respective predicted material quantity of a plurality of materials required by manufacturing the air conditioner;
the manufacture of an air conditioner requires a large number of materials, for example: screw (70), sponge (18), damping piece (4), bundle of wires (20), magnetic ring (1), controller (1), motor (1), WIFI module (1), electric heater (1), reactor (2), wiring board (1), thermal bulb (1), power cord (1), rubber sleeve patchcord (1), inter-plate line (1), built-in wiring (1), pressure sensor (1), pressure switch (1), CBB electric capacity (a plurality of, indefinite), compressor and accessory (1), condenser subassembly (1), filter (1), electronic expansion valve (1), four-way valve (1), check valve (1), stop valve (1), muffler (1), valve support (1), electrical apparatus box (1), radiator (1), soundproof cotton (16), Motor support (1), axial fan blade (1), grid (1), chassis (1), condenser sideboard (1), screen panel (1).
When the types of the air conditioners are different, the materials and the number of the materials of the air conditioners are different. In this embodiment, in the design stage of the air conditioner, various materials and the predicted material quantity required by the air conditioner may be obtained through the interactive interface.
S2: determining at least one historical model which is the same as the type of the air conditioner and has the same matching number, and acquiring the respective historical material quantity of multiple materials for manufacturing the at least one historical model;
and matching the models similar to the air conditioner according to the type and the number of the air conditioner. In the present embodiment, when the air conditioners belong to the same series, the types of the air conditioners may be considered to be the same; alternatively, the type of air conditioner may be classified into a home machine, a commercial machine, and an industrial machine. And determining historical machine types which are the same as the types and the matching numbers of the air conditioners according to the storage scale of a database, wherein the database stores the configuration of various historical machine types. The number of the models matched with the air conditioner can be various, and in practice, the number of the models is more than 100. In the air conditioner matched with the air conditioner, the matched air conditioner has the same type, and the materials of the matched air conditioner are similar to a great extent. For example, screws, sponges, damping blocks, wire ties, etc. are used, differing only in the number used. In the present embodiment, the historical material amount refers to the material amount of the material of the historical model.
S3: determining the same materials of the air conditioner and at least one historical machine type, and respectively acquiring a data set aiming at each same material, wherein the data set comprises the historical material quantity and the predicted material quantity aiming at the same material;
specifically, due to the similarity of models, the materials of the air conditioner can be similar to those of historical models to a large extent, that is, there is a little difference. In step S3, the same material of the air conditioner and the plurality of historical models is first determined. For example, four-way valves, check valves, shut valves, silencers, and the like are used. And secondly, acquiring a data set of various same materials, wherein the data set comprises the predicted material quantity of the air conditioner and the historical material quantity of the historical model. For example, a data set for the same material screw may include [ 65 (the air conditioner), 70 (historical model one), 72 (historical model two),...., 63 (historical model N). Since the air conditioner may have a plurality of same materials as the historical model, the data set may also have a plurality of data sets. For example, data sets for sponges, damping blocks or wire ties, respectively, are included.
S4: estimating the reference material quantity corresponding to the same material by adopting a specified algorithm according to the data set;
in the present embodiment, the designated algorithm is a curve fitting algorithm. FIG. 2 is a flow chart for estimating the reference charge amount corresponding to the same charge using a curve fitting algorithm. As shown in fig. 2, when the curve fitting algorithm is adopted, estimating the reference material amount corresponding to the same material includes:
s41: creating a coordinate system with the refrigerating capacity of the air conditioner as a horizontal coordinate and the material quantity as a vertical coordinate;
s42: performing curve fitting on each data in the data set in the coordinate system to form a fitted curve related to the material quantity of the same material;
for example, a data set for a screw may include [ 60, 56, 78, 98, 47, 65, 58, 63, 68, 80, 86, 46, 76, 69, 43, 77, 83, etc. ] plotting the data into a coordinate system and connecting the points, forming a fitted curve for the screw.
S43: and in the coordinate system, obtaining a point on the fitting curve with the same refrigerating capacity as the air conditioner, and taking the ordinate of the point as the reference material quantity corresponding to the same material.
And when the refrigerating capacity is the same, namely the abscissa is the same, taking the ordinate of a point on a fitting curve with the same abscissa as the reference material quantity. In this embodiment, for example, when the fitted curve is a fitted curve for a screw, the obtained reference material quantity is the reference material quantity of the air conditioner for the screw. Since the same material used by the air conditioner and the historical model may be various as described above, in step S43, reference material quantities for various same materials may be obtained. The reference material quantity can play a guiding role in the material of the air conditioner.
S5: and obtaining a prediction material score related to the air conditioner according to the reference material quantity corresponding to each same material, and adjusting the prediction material quantity according to the prediction material score.
Fig. 3 is a flowchart of obtaining the score of the predicted material and adjusting the amount of the predicted material, as shown in fig. 3, step S5 includes:
s51: acquiring the weight of each same material, wherein the sum of the weights of the same materials is 1;
the air conditioner and historical models can be made of various same materials, and different weights are given to the same materials according to actual conditions or practical requirements. For example, the same material one (weight 20%), the same material two (weight 40%), the same material three (weight 15%), the same material four (weight 25%). The sum of the weights of all the same materials is 1.
S52: acquiring the sum of the products of the reference material quantity corresponding to each same material and the corresponding weight;
in step S4, the reference material quantity of each identical material is known, and the weight of each identical material obtained in step S51 is combined. The calculation of the summation may be: (quantity of same material one, weight of same material one) + (quantity of same material two, weight of same material two) +.
S53: and adjusting the average value of the sum value to obtain the predicted material score related to the air conditioner.
In this embodiment, the adjusting process specifically includes: and introducing an intervention value in a concept parallel to the average value, respectively giving the average value and the intervention value respective weights, and adjusting the average value in a mode of (average value weight one) + (intervention value weight two) to obtain the prediction material score of the air conditioner. In this embodiment, the intervention value may be a value related to a difference between the prediction material quantity and the reference material quantity of each of the same materials; alternatively, the intervention value may be an experience value of the operator, which is given by experience accumulation. The predicted material grade represents an overall grade given whether the predicted material quantity of each material of the air conditioner is proper or not. In this embodiment, the prediction of the air conditioner material that does not meet the rating requirement may be prompted to adjust the material strategy.
S54: judging whether the score of the prediction material is smaller than a preset score threshold value or not;
s55: and when the predicted material score is smaller than a preset score threshold value, taking the reference material quantity corresponding to the same material as the material quantity of the air conditioner aiming at the same material.
In the embodiment, the prediction material and the prediction material quantity of the air conditioner are integrally evaluated through the historical material and the historical material quantity of the historical type similar to the air conditioner, and the material quantity of the air conditioner is adjusted according to the evaluation result, so that the air conditioner material quantity is accurate and reasonable, the prediction cost is saved, and the prediction efficiency is improved.
Example two
Different from the first embodiment, in the present embodiment, a positive distribution algorithm is used to estimate the reference material amount corresponding to the same material. Fig. 4 is a flow chart for estimating the reference material amount corresponding to the same material by using a positive-power distribution algorithm. As shown in fig. 4, when the positive distribution algorithm is adopted, estimating the reference material amount corresponding to the same material includes:
s41': according to each data in the data set, drawing a positive-too-distribution curve related to the material quantity of the same material;
e.g. data for screwsA set may include [ 60, 56, 78, 98, 47, 65, 58, 63, 68, 80, 86, 46, 76, 69, 43, 77, 83, etc. ]. Drawing a positive-Tai distribution curve by a positive-Tai distribution formula, wherein f (x) represents a positive-Tai distribution curve function of each material parameter in the data set, x represents each material parameter in the data set, mu represents an average value of each material parameter in the data set, sigma represents a standard deviation of each material parameter in the data set, and sigma represents a standard deviation of each material parameter in the data set2Representing the variance of each material parameter in the data set.
Figure BDA0002311508910000061
Variance σ2The calculation formula of (a) is as follows:
Figure BDA0002311508910000062
wherein x represents each material parameter in the data set, M represents an average value of each material parameter in the data set, and n represents the number of material parameters in the data set.
S42': and taking the material quantity corresponding to the peak value of the positive-too distribution curve as the reference material quantity corresponding to the same material.
In this example, the peak of the positive-tai distribution curve represents the number of materials that have the highest utilization rate in the individual model for the same material.
Next, in this embodiment, a predicted material score related to the air conditioner may also be obtained according to a difference between a reference material quantity and a predicted material quantity corresponding to the same material. The difference between the reference material quantity and the predicted material quantity can represent the deviation of the predicted material quantity from the reference material quantity, and the larger the difference is, the more inaccurate the predicted material quantity is, so that whether the predicted material quantity is accurate as a whole can be evaluated by a plurality of differences related to the same material, and in the embodiment, the differences are expressed in the form of the predicted material score.
EXAMPLE III
The invention also provides an air conditioner material prediction system which comprises a processor and a memory, wherein the memory stores program instructions, and when the program instructions are executed by the processor, the air conditioner material prediction method in the embodiment can be realized, so that the prediction material and the prediction material quantity of the air conditioner can be integrally evaluated, and the material quantity of the air conditioner can be adjusted according to the evaluation result when the evaluation scoring colleagues are given, so that the air conditioner material quantity is accurate and reasonable, the prediction cost is saved, and the prediction efficiency is improved.
The invention also provides a storage medium, which stores program instructions, and when the program instructions are executed by a processor, the method for predicting the air conditioner material can be realized.
While, for purposes of simplicity of explanation, the methodologies are shown and described as a series of acts, it is to be understood and appreciated that the methodologies are not limited by the order of acts, as some acts may, in accordance with one or more embodiments, occur in different orders and/or concurrently with other acts from that shown and described herein or not shown and described herein, as would be understood by one skilled in the art.
The above embodiments are only specific embodiments of the present invention. It is obvious that the invention is not limited to the above embodiments, but that many variations are possible. All modifications attainable by one versed in the art from the present disclosure within the scope and spirit of the present invention are to be considered as within the scope and spirit of the present invention.

Claims (8)

1. An air conditioner material prediction method is characterized by comprising the following steps:
acquiring each material required by manufacturing an air conditioner and the corresponding predicted material quantity of each material;
determining at least one historical model which is the same as the type of the air conditioner and has the same matching number, and acquiring each material for manufacturing the at least one historical model and the quantity of the historical material corresponding to each material;
determining the same materials of the air conditioner and at least one historical machine type, and respectively acquiring a data set aiming at each same material, wherein the data set comprises the historical material quantity and the predicted material quantity aiming at the same material;
estimating the reference material quantity corresponding to the same material by adopting a specified algorithm according to the data set, wherein the specified algorithm comprises a curve fitting algorithm or a positive distribution algorithm;
when a curve fitting algorithm is adopted, estimating the reference material quantity corresponding to the same material, including: creating a coordinate system with the refrigerating capacity of the air conditioner as a horizontal coordinate and the material quantity as a vertical coordinate; performing curve fitting on each data in the data set in the coordinate system to form a fitted curve related to the material quantity of the same material; in the coordinate system, obtaining a point on the fitting curve with the same refrigerating capacity as the air conditioner, and taking the ordinate of the point as the reference material quantity corresponding to the same material;
when a positive-Taiwan distribution algorithm is adopted, estimating the reference material quantity corresponding to the same material, including: according to each data in the data set, drawing a positive-Taiwanese distribution curve related to the material quantity of the same material; taking the material quantity corresponding to the peak value of the positive-Taiwan distribution curve as the reference material quantity corresponding to the same material;
and obtaining a prediction material score related to the air conditioner according to the reference material quantity corresponding to each same material, and adjusting the prediction material quantity according to the prediction material score.
2. The air conditioner material prediction method according to claim 1, characterized in that: obtaining a predictive material score associated with the air conditioner, comprising:
acquiring the weight of each same material, wherein the sum of the weights of the same materials is 1;
acquiring the sum of the products of the reference material quantity corresponding to each same material and the corresponding weight;
and adjusting the average value of the sum value to obtain the predicted material score related to the air conditioner.
3. The air conditioner material prediction method of claim 1, wherein adjusting the predicted material quantity according to the predicted material score comprises:
judging whether the score of the prediction material is smaller than a preset score threshold value or not;
and when the predicted material score is smaller than a preset score threshold value, taking the reference material quantity corresponding to the same material as the material quantity of the air conditioner aiming at the same material.
4. The air conditioner material prediction method according to claim 1, characterized in that: obtaining a predicted material score associated with the air conditioner based on the reference material quantities corresponding to each of the same materials, comprising: and obtaining a prediction material grade related to the air conditioner according to the difference value between the reference material quantity and the prediction material quantity corresponding to the same material.
5. The air conditioner material prediction method according to claim 1, characterized in that: the type of the air conditioner is the same as that of the air conditioner, and the air conditioner are of the same series of models.
6. The air conditioner material prediction method according to claim 1, characterized in that: the type of the air conditioner is the same as that of the air conditioner, and the air conditioner are both a household type, a commercial type or an industrial type.
7. An air conditioner material prediction system comprising a processor and a memory, wherein the memory stores program instructions that, when executed by the processor, implement the method of any one of claims 1-6.
8. A storage medium storing program instructions which, when executed by a processor, implement the method of any one of claims 1 to 6.
CN201911260647.7A 2019-12-10 2019-12-10 Air conditioner material prediction method, system and storage medium Active CN111105151B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911260647.7A CN111105151B (en) 2019-12-10 2019-12-10 Air conditioner material prediction method, system and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911260647.7A CN111105151B (en) 2019-12-10 2019-12-10 Air conditioner material prediction method, system and storage medium

Publications (2)

Publication Number Publication Date
CN111105151A CN111105151A (en) 2020-05-05
CN111105151B true CN111105151B (en) 2022-05-20

Family

ID=70423438

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911260647.7A Active CN111105151B (en) 2019-12-10 2019-12-10 Air conditioner material prediction method, system and storage medium

Country Status (1)

Country Link
CN (1) CN111105151B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010033536A (en) * 2007-12-20 2010-02-12 Nippon Steel Corp Method, device for predicting product material value, method, program for determining handling condition, and computer readable recording medium
CN106295995A (en) * 2016-08-10 2017-01-04 曼威网络科技(上海)有限公司 A kind of data analysing method for determining the production schedule and equipment
CN106636616A (en) * 2016-12-20 2017-05-10 中国地质大学(武汉) Sintered ore yield prediction method based on bellows waste gas temperature
CN106897803A (en) * 2017-04-27 2017-06-27 云南中烟工业有限责任公司 A kind of method based on combination grey model prediction management redried leaf tobacco raw materials requirement
CN110210000A (en) * 2019-04-18 2019-09-06 贵州大学 The identification of industrial process efficiency and diagnostic method based on Multiple Non Linear Regression

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012054987A1 (en) * 2010-10-29 2012-05-03 The University Of Sydney Method and system for tracking material

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010033536A (en) * 2007-12-20 2010-02-12 Nippon Steel Corp Method, device for predicting product material value, method, program for determining handling condition, and computer readable recording medium
CN106295995A (en) * 2016-08-10 2017-01-04 曼威网络科技(上海)有限公司 A kind of data analysing method for determining the production schedule and equipment
CN106636616A (en) * 2016-12-20 2017-05-10 中国地质大学(武汉) Sintered ore yield prediction method based on bellows waste gas temperature
CN106897803A (en) * 2017-04-27 2017-06-27 云南中烟工业有限责任公司 A kind of method based on combination grey model prediction management redried leaf tobacco raw materials requirement
CN110210000A (en) * 2019-04-18 2019-09-06 贵州大学 The identification of industrial process efficiency and diagnostic method based on Multiple Non Linear Regression

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
基于案例推理的软件工作量估算的分析与设计;蒋辉等;《科技信息》;20110125(第03期);58-60 *
工业大数据分析综述:模型与算法;王宏志 等;《大数据》;20180915;62-79 *

Also Published As

Publication number Publication date
CN111105151A (en) 2020-05-05

Similar Documents

Publication Publication Date Title
CN110736227B (en) Building management system with online configurable system identification
CN107923645B (en) Air conditioning operation analysis device and non-transitory computer-readable recording medium having program recorded thereon
CN104566821A (en) Variable-frequency air conditioner and temperature adjusting time prediction method and system thereof
EP2908066A2 (en) Evaluation supporting apparatus, method, and program for air conditioning system
CN110325805B (en) System and method for determining the efficiency of a chiller
CN111723533B (en) Energy-saving calculation method for variable-frequency water pump of ground source heat pump system
CN106123218A (en) Operation parameter determination method and device for air conditioner and air conditioner
JP2014204581A (en) Planning unit, planning system, planning method and planning program
CN114930375A (en) Energy management control system and control method for building equipment
KR101727434B1 (en) Method for estimating efficiency of refrigerator using random forest model
CN111125931B (en) Automatic optimization type searching method and device for cooling tower
CN111105151B (en) Air conditioner material prediction method, system and storage medium
Abels et al. Understanding industrial energy use through lean energy analysis
CN114329979A (en) Cooling tower operation control method and device based on white box model
CN113432268A (en) Control method of module unit and related equipment
JP2019086243A (en) Air conditioning capacity estimation device, air conditioning capacity estimation method and program
CN112781177A (en) Method and device for predicting air conditioner operation power, electronic equipment and storage medium
JP6589227B1 (en) Control device, air conditioning control system, control information calculation method and program
CN101672510B (en) Method for simulating and monitoring optimal operation of air-conditioning system
CN115077026B (en) Air conditioner control method, device, equipment, medium and air conditioner
Teo et al. Energy management controls for chiller system: A review
CN113837831A (en) Type selection method and device for air conditioner room and electronic equipment
WO2020211436A1 (en) Air-conditioning data analysis method and apparatus, and computer-readable storage medium
CN115130796A (en) Type selection method, device and equipment of air conditioning system and storage medium
JP6478805B2 (en) Power consumption estimation apparatus and program

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant