CN111105150A - Project risk analysis system - Google Patents

Project risk analysis system Download PDF

Info

Publication number
CN111105150A
CN111105150A CN201911259760.3A CN201911259760A CN111105150A CN 111105150 A CN111105150 A CN 111105150A CN 201911259760 A CN201911259760 A CN 201911259760A CN 111105150 A CN111105150 A CN 111105150A
Authority
CN
China
Prior art keywords
project
risk
information
risk analysis
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911259760.3A
Other languages
Chinese (zh)
Inventor
杜庆荣
何宾
黄聪
梁少勇
王乙伊
曾德利
李光哲
邱智强
詹万强
余爱英
郑志杰
罗志强
陆俊
钟源建
林焕波
杜锦烽
陈超华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Power Engineering Supervision Co ltd
Original Assignee
Guangzhou Power Engineering Supervision Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Power Engineering Supervision Co ltd filed Critical Guangzhou Power Engineering Supervision Co ltd
Priority to CN201911259760.3A priority Critical patent/CN111105150A/en
Publication of CN111105150A publication Critical patent/CN111105150A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • General Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a project risk analysis system, which comprises: the system comprises a project management module, a risk standard library module, a project analysis module and a user interface; the project management module is used for acquiring project information uploaded by a user side and classifying the project information according to a preset processing logic to generate project information data; the risk standard library module is used for receiving and storing risk standard rules corresponding to different project types; the project analysis module is used for identifying the project information data to acquire the risk standard rule corresponding to the project type, and analyzing and processing the project information data according to the acquired risk standard rule to acquire a risk analysis result; the user interface is used for displaying the risk analysis result.

Description

Project risk analysis system
Technical Field
The invention relates to the field of risk analysis, in particular to a project risk analysis system.
Background
In the current power supervision industry, risk analysis and management of power engineering projects become one of the important issues considered by production and operation decision makers. How to accurately and flexibly analyze the project risks has become one of the important contents of project management work.
In the prior art, project engineering risks are analyzed by using a check table; the check table is a risk identification check table compiled based on the previous analogy project information and other related information; the check list is generally arranged according to the source of the risk. The method has the defects that the method is limited by project comparability, all project analysis utilizes the same template, but due to the fact that the project types are different, the analysis result obtained when the same template is used for analysis has larger error compared with the real result, and the accuracy of project engineering risk analysis is low.
Disclosure of Invention
The invention provides a project risk analysis system, which classifies project information data to be analyzed by presetting different types of risk standard rules, selects corresponding risk standard rules for analysis processing, and solves the technical problem that the analysis result error is larger because the same template is used in the existing project risk analysis scheme, so that the project type is accurately judged, and the corresponding risk standard rules are selected for analysis, thereby improving the project engineering risk analysis accuracy.
In order to solve the above technical problem, an embodiment of the present invention provides a project risk analysis system, including: the system comprises a project management module, a risk standard library module, a project analysis module and a user interface;
the project management module is used for acquiring project information uploaded by a user side and classifying the project information according to a preset processing logic to generate project information data;
the risk standard library module is used for receiving and storing risk standard rules corresponding to different project types;
the project analysis module is used for identifying the project information data to acquire the risk standard rule corresponding to the project type, and analyzing and processing the project information data according to the acquired risk standard rule to acquire a risk analysis result;
the user interface is used for displaying the risk analysis result.
Preferably, the item risk analysis system further includes: and the monitoring center module is used for sending out an alarm instruction according to the risk grade of the risk analysis result.
Preferably, the item risk analysis system further includes: and the storage module is used for storing the project information data and the risk analysis result.
Preferably, the item risk analysis system further includes: and the safety daily report module is used for receiving the project work plan uploaded by the user side, judging whether a project subjected to risk analysis exists in the project work plan according to the risk analysis result, and generating safety daily report information according to the judgment result.
Preferably, the security daily module includes:
the request data unit is used for receiving a security daily report establishing request and respectively sending the stored project information data to the user side according to types so that the user side can select the required project information data;
the first judgment unit is used for receiving the project information data selected and uploaded by the user side as a project work plan, judging whether a project subjected to risk analysis exists in the current project work plan, if so, returning the project risk analysis data, and if not, returning risk standard information related to the project type;
the second judgment unit is used for judging whether risks exist in the project risk analysis result or not according to the returned project risk data and the construction site condition, confirming if the risks exist, and removing and submitting related data information from the project risk analysis result if the risks do not exist;
and the submission storage unit is used for generating and storing the safety daily report data according to the submission information.
Preferably, the item risk analysis system further includes: and the sign-in module is used for acquiring the positioning information and the project operation information uploaded by the user side and storing the positioning information and the project operation information.
Preferably, the check-in module includes:
the request acquisition unit is used for acquiring a sign-in request initiated by a user terminal and calling positioning navigation equipment to acquire the current position information of the user terminal;
the information acquisition unit is used for acquiring current construction project information and field construction pictures uploaded by a user side as project operation information of a current user;
and the information storage unit is used for storing the position information and the project operation information.
Preferably, the positioning navigation device performs positioning through a GPS module.
Preferably, the user interface is further configured to: and receiving a query instruction, performing corresponding data identification query according to the query instruction, and acquiring and displaying corresponding item risk information.
Preferably, the user interface is further configured to: and receiving a management operation instruction, and executing a corresponding interface operation action according to the management operation instruction.
Compared with the prior art, the embodiment of the invention has the following beneficial effects:
according to the method, different types of risk standard rules are preset, project information data needing to be analyzed are classified, and the corresponding risk standard rules are selected for analysis processing, so that the technical problem that the analysis result error is large due to the fact that the same template is used in the existing project risk analysis scheme is solved, and therefore the project engineering risk analysis accuracy is improved by accurately judging the project types and selecting the corresponding risk standard rules for analysis.
Drawings
FIG. 1: the invention provides a schematic structural diagram of a project risk analysis system in an embodiment.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The method divides the electric power engineering according to types, and adopts different project risk analysis processes aiming at different types of electric power engineering projects. An initial risk standard library is built in, and managers acquire risk standards according to the types, construction environments and construction characteristics of electric power engineering projects to be analyzed to assist project risk analysis. And on the basis of the project risk analysis work, the site supervisor further performs risk analysis evaluation confirmation and feedback on the construction site.
Referring to fig. 1, a preferred embodiment of the present invention provides a project risk analysis system, including: the system comprises a project management module, a risk standard library module, a project analysis module and a user interface;
the project management module is used for acquiring project information uploaded by a user side and classifying the project information according to a preset processing logic to generate project information data; second, the project management module includes the functionality to create, delete, edit, and find projects. The process flow of creating the project comprises the following steps: the first step is as follows: the user fills in project information; the second step is that: the user judges the type of the belonged item according to the item information and submits the item; the third step: the system acquires information submitted by a user, classifies the information according to preset processing logic, and generates and stores project information data.
The risk standard library module is used for receiving and storing risk standard rules corresponding to different project types; the risk standard library module also has the functions of creating, deleting, editing and searching risk standards.
The project analysis module is used for identifying the project information data to acquire the risk standard rule corresponding to the project type, and analyzing and processing the project information data according to the acquired risk standard rule to acquire a risk analysis result; the project analysis module includes the functions of creating, deleting, editing and searching project risk analysis information. The process flow for creating the project risk analysis comprises the following steps: the first step is as follows: a user selects a project to be subjected to risk analysis, and obtains and submits project information; the second step is that: the system searches a risk standard library according to the submitted project information to obtain a corresponding type of risk standard and returns data to the user; the third step: the user conducts risk estimation based on experience and risk standards according to project information, selects risks possibly occurring in the project construction process and submits data to the system; the fourth step: and the system generates a risk analysis record according to the submitted risk estimation data and stores the risk analysis record.
The user interface is used for displaying the risk analysis result. In this embodiment, the user interface is further configured to: and receiving a query instruction, performing corresponding data identification query according to the query instruction, and acquiring and displaying corresponding item risk information. In this embodiment, the user interface is further configured to: and receiving a management operation instruction, and executing a corresponding interface operation action according to the management operation instruction. The user interface may enable a user to interact with the system through the user interface. Specifically, the method comprises the following steps: 1. the user can perform project creation, deletion, editing and searching operations on the user interface. 2. The user can perform the operations of creating, deleting, editing and searching the risk standard on the user interface. 3. The user can perform the operations of creating, deleting, editing and searching the item risk analysis information on the user interface. 4. The user can browse the project risk information on the user interface, obtain the risk warning and check the risk level.
In this embodiment, the project risk analysis system further includes: and the monitoring center module is used for sending out an alarm instruction according to the risk grade of the risk analysis result. The monitoring center module has the functions of browsing project construction addresses, project risk levels and risk level alarm on the GIS map.
In this embodiment, the project risk analysis system further includes: and the storage module is used for storing the project information data and the risk analysis result.
In this embodiment, the project risk analysis system further includes: and the safety daily report module is used for receiving the project work plan uploaded by the user side, judging whether a project subjected to risk analysis exists in the project work plan according to the risk analysis result, and generating safety daily report information according to the judgment result. In this embodiment, the security daily module includes: the request data unit is used for receiving a security daily report establishing request and respectively sending the stored project information data to the user side according to types so that the user side can select the required project information data; the first judgment unit is used for receiving the project information data selected and uploaded by the user side as a project work plan, judging whether a project subjected to risk analysis exists in the current project work plan, if so, returning the project risk analysis data, and if not, returning risk standard information related to the project type; the second judgment unit is used for judging whether risks exist in the project risk analysis result or not according to the returned project risk data and the construction site condition, confirming if the risks exist, and removing and submitting related data information from the project risk analysis result if the risks do not exist; and the submission storage unit is used for generating and storing the safety daily report data according to the submission information. The project risk analysis system may also be specifically configured to: and (4) submitting a project work plan by the user, inquiring whether the work plan contains the project subjected to risk analysis or not by the system according to the information submitted by the user, and generating a daily report according to the information. The processing flow of the safety daily report is as follows: the first step is as follows: a user initiates a request for creating a safety daily report; the second step is that: the system reads the storage layer, acquires the project information data and returns the project information data to the user according to type division; the third step: selecting and submitting a piece of project information data in the project information data result set by a user; the fourth step: the system reads the storage layer according to the project information data selected by the user, inquires whether project risk analysis data related to the project information exists, if yes, returns the project risk analysis data, and if not, returns risk standard information related to the project type; the fifth step: the user further performs risk analysis according to the returned project risk data and the construction site conditions, evaluates whether the construction site has risks in the project risk analysis data, confirms if the risks exist, removes related risk evaluation information from the project risk analysis data if the risks do not exist, and evaluates and submits risk grades according to risk standards after the evaluation is completed; and a sixth step: and the system generates and stores safety daily report data and risk assessment data according to the submitted information.
In this embodiment, the project risk analysis system further includes: and the sign-in module is used for acquiring the positioning information and the project operation information uploaded by the user side and storing the positioning information and the project operation information. In this embodiment, the check-in module includes: the request acquisition unit is used for acquiring a sign-in request initiated by a user terminal and calling positioning navigation equipment to acquire the current position information of the user terminal; the information acquisition unit is used for acquiring current construction project information and field construction pictures uploaded by a user side as project operation information of a current user; and the information storage unit is used for storing the position information and the project operation information. In this embodiment, the positioning navigation device performs positioning through a GPS module. The check-in module can be used to the user and check in at the job site, and the automatic acquisition GPS location selects the construction project, shoots relevant construction picture, submits the data to the system, and the system receives the storage information of checking in, and the flow of checking in is: the first step is as follows: a user initiates a sign-in request; the second step is that: the system calls a GPS function, acquires the current position information of the user, returns the position information to the user and sets the position information to be unchangeable; the third step: a user initiates a project information request, acquires project information, selects a current construction project and submits the current construction project; the fourth step: the system inquires whether the safety daily report of the construction project exists or not according to the submitted information, if yes, risk evaluation information in the daily report is extracted and returned, if not, the check-in request is marked as a common check-in, and the system returns the risk evaluation information and check-in type information to the user; the fifth step: the user receives the system return information, shoots the site construction picture and uploads, if the risk assessment information exists, the site risk is confirmed according to the risk assessment information, shoots the risk confirmation picture and finally submits the picture; and a sixth step: the system receives check-in information and pictures submitted by a user and stores the check-in information and the pictures in the storage layer.
The invention refines the risk analysis process according to the type of the project, improves the accuracy of the risk analysis and reduces the range of the risk source by establishing a risk standard library, performing non-construction site risk evaluation by using the risk standard library, performing on-site risk analysis and evaluation on a construction site, confirming the risk on the construction site and acquiring data. According to the invention, the information exchange in the processes of risk analysis and risk management and control is accelerated by using the Internet, the safety condition of the construction project is monitored in real time, so that a manager can more efficiently adjust the expected risk analysis, and the risk analysis is more flexible. Through data acquisition and analysis statistics of the risk analysis process, the project construction process is visually displayed, more data bases are provided for risk analysis of managers, and the risk analysis is more accurate.
The above-mentioned embodiments are provided to further explain the objects, technical solutions and advantages of the present invention in detail, and it should be understood that the above-mentioned embodiments are only examples of the present invention and are not intended to limit the scope of the present invention. It should be understood that any modifications, equivalents, improvements and the like, which come within the spirit and principle of the invention, may occur to those skilled in the art and are intended to be included within the scope of the invention.

Claims (10)

1. A project risk analysis system, comprising: the system comprises a project management module, a risk standard library module, a project analysis module and a user interface;
the project management module is used for acquiring project information uploaded by a user side and classifying the project information according to a preset processing logic to generate project information data;
the risk standard library module is used for receiving and storing risk standard rules corresponding to different project types;
the project analysis module is used for identifying the project information data to acquire the risk standard rule corresponding to the project type, and analyzing and processing the project information data according to the acquired risk standard rule to acquire a risk analysis result;
the user interface is used for displaying the risk analysis result.
2. The project risk analysis system of claim 1, further comprising: and the monitoring center module is used for sending out an alarm instruction according to the risk grade of the risk analysis result.
3. The project risk analysis system of claim 1, further comprising: and the storage module is used for storing the project information data and the risk analysis result.
4. The project risk analysis system of claim 3, further comprising: and the safety daily report module is used for receiving the project work plan uploaded by the user side, judging whether a project subjected to risk analysis exists in the project work plan according to the risk analysis result, and generating safety daily report information according to the judgment result.
5. The project risk analysis system of claim 4, wherein the security daily module comprises:
the request data unit is used for receiving a security daily report establishing request and respectively sending the stored project information data to the user side according to types so that the user side can select the required project information data;
the first judgment unit is used for receiving the project information data selected and uploaded by the user side as a project work plan, judging whether a project subjected to risk analysis exists in the current project work plan, if so, returning the project risk analysis data, and if not, returning risk standard information related to the project type;
the second judgment unit is used for judging whether risks exist in the project risk analysis result or not according to the returned project risk data and the construction site condition, confirming if the risks exist, and removing and submitting related data information from the project risk analysis result if the risks do not exist;
and the submission storage unit is used for generating and storing the safety daily report data according to the submission information.
6. The project risk analysis system of claim 1, further comprising: and the sign-in module is used for acquiring the positioning information and the project operation information uploaded by the user side and storing the positioning information and the project operation information.
7. The project risk analysis system of claim 6, wherein the check-in module comprises:
the request acquisition unit is used for acquiring a sign-in request initiated by a user terminal and calling positioning navigation equipment to acquire the current position information of the user terminal;
the information acquisition unit is used for acquiring current construction project information and field construction pictures uploaded by a user side as project operation information of a current user;
and the information storage unit is used for storing the position information and the project operation information.
8. The project risk analysis system of claim 7, wherein the positioning navigation device is positioned by a GPS module.
9. The project risk analysis system of claim 1, wherein the user interface is further to: and receiving a query instruction, performing corresponding data identification query according to the query instruction, and acquiring and displaying corresponding item risk information.
10. The project risk analysis system of claim 1, wherein the user interface is further to: and receiving a management operation instruction, and executing a corresponding interface operation action according to the management operation instruction.
CN201911259760.3A 2019-12-10 2019-12-10 Project risk analysis system Pending CN111105150A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911259760.3A CN111105150A (en) 2019-12-10 2019-12-10 Project risk analysis system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911259760.3A CN111105150A (en) 2019-12-10 2019-12-10 Project risk analysis system

Publications (1)

Publication Number Publication Date
CN111105150A true CN111105150A (en) 2020-05-05

Family

ID=70423460

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911259760.3A Pending CN111105150A (en) 2019-12-10 2019-12-10 Project risk analysis system

Country Status (1)

Country Link
CN (1) CN111105150A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112258061A (en) * 2020-10-28 2021-01-22 福建正孚软件有限公司 Intelligent risk analysis early warning system and early warning method for whole process of project
CN113094270A (en) * 2021-04-13 2021-07-09 中国工商银行股份有限公司 Project automation verification method and device
CN113469546A (en) * 2021-07-13 2021-10-01 宝能(广州)汽车研究院有限公司 Project management and control method based on standard and regulation, electronic equipment and storage medium
CN113837664A (en) * 2021-11-03 2021-12-24 天津电力工程监理有限公司 Project risk analysis system
CN114091899A (en) * 2021-11-22 2022-02-25 支付宝(杭州)信息技术有限公司 Risk feature identification method and device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102521710A (en) * 2011-12-22 2012-06-27 上海建科工程咨询有限公司 Building construction quality safety online risk assessment system
CN107450426A (en) * 2017-08-01 2017-12-08 中国建筑第八工程局有限公司 Foundation pit construction deformable statistical analysis method and system
CN110163532A (en) * 2019-05-30 2019-08-23 深圳前海微众银行股份有限公司 Methods of risk assessment, risk management method, device, equipment and storage medium
CN110490442A (en) * 2019-08-07 2019-11-22 嘉兴市华信工程咨询有限公司 A kind of Engineering Cost Consulting project risk management system and method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102521710A (en) * 2011-12-22 2012-06-27 上海建科工程咨询有限公司 Building construction quality safety online risk assessment system
CN107450426A (en) * 2017-08-01 2017-12-08 中国建筑第八工程局有限公司 Foundation pit construction deformable statistical analysis method and system
CN110163532A (en) * 2019-05-30 2019-08-23 深圳前海微众银行股份有限公司 Methods of risk assessment, risk management method, device, equipment and storage medium
CN110490442A (en) * 2019-08-07 2019-11-22 嘉兴市华信工程咨询有限公司 A kind of Engineering Cost Consulting project risk management system and method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李小伟;: "工程项目招投标风险与防范研究", 价值工程, no. 25, pages 36 - 37 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112258061A (en) * 2020-10-28 2021-01-22 福建正孚软件有限公司 Intelligent risk analysis early warning system and early warning method for whole process of project
CN113094270A (en) * 2021-04-13 2021-07-09 中国工商银行股份有限公司 Project automation verification method and device
CN113094270B (en) * 2021-04-13 2024-03-26 中国工商银行股份有限公司 Project automatic verification method and device
CN113469546A (en) * 2021-07-13 2021-10-01 宝能(广州)汽车研究院有限公司 Project management and control method based on standard and regulation, electronic equipment and storage medium
CN113837664A (en) * 2021-11-03 2021-12-24 天津电力工程监理有限公司 Project risk analysis system
CN114091899A (en) * 2021-11-22 2022-02-25 支付宝(杭州)信息技术有限公司 Risk feature identification method and device

Similar Documents

Publication Publication Date Title
CN111105150A (en) Project risk analysis system
CN109934356B (en) Machine room inspection method based on big data and related equipment
CN109088773B (en) Fault self-healing method and device, server and storage medium
CN111882087A (en) Equipment maintenance processing method, device, computer system and readable storage medium
CN113722370A (en) Data management method, device, equipment and medium based on index analysis
CN114386627A (en) Photovoltaic module fault maintenance method and device
CN111046382B (en) Database auditing method, equipment, storage medium and device
CN112905857A (en) Data leakage behavior tracing method and device based on data characteristics
CN113837408A (en) Traffic facility operation and maintenance management system based on equipment full-life-cycle supervision
CN109412861B (en) Method for establishing security association display of terminal network
CN113609698A (en) Process reliability analysis method and system based on process fault database
CN112379656A (en) Processing method, device, equipment and medium for detecting abnormal data of industrial system
CN111985513A (en) Rapid identification network asset attribution system and identification analysis method thereof
CN115810137B (en) Construction method of interactive artificial intelligence technical evaluation scheme
CN113691423B (en) Drawing method and device of data flow path, storage medium and electronic equipment
CN116307385B (en) Method for analyzing archival data based on extreme environment exploration operation
CN109582534B (en) Method and device for determining operation entry of system and server
CN115798101A (en) Management method and device for emergency repair task tool
CN108256730B (en) Power field monitoring method and device, storage medium and computer equipment
CN115422009A (en) Data monitoring method and system for robot
CN117609055A (en) Data management method, device, electronic equipment and storage medium
CN115185735A (en) Software fault identification self-healing method and related equipment
CN116957310A (en) Intelligent manufacturing data management system and method based on cloud computing technology
CN115934706A (en) Database statement processing method and device, storage medium and electronic equipment
CN115794609A (en) Script sharing method and device, electronic equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20200505

RJ01 Rejection of invention patent application after publication