CN111103501A - 一种中性点不接地配电网对地绝缘参数测量方法及系统 - Google Patents
一种中性点不接地配电网对地绝缘参数测量方法及系统 Download PDFInfo
- Publication number
- CN111103501A CN111103501A CN201811173175.7A CN201811173175A CN111103501A CN 111103501 A CN111103501 A CN 111103501A CN 201811173175 A CN201811173175 A CN 201811173175A CN 111103501 A CN111103501 A CN 111103501A
- Authority
- CN
- China
- Prior art keywords
- distribution network
- neutral point
- ground
- ungrounded
- current signal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000007935 neutral effect Effects 0.000 title claims abstract description 72
- 238000000034 method Methods 0.000 title claims abstract description 42
- 238000009413 insulation Methods 0.000 title claims abstract description 32
- 238000005259 measurement Methods 0.000 claims abstract description 30
- 238000002347 injection Methods 0.000 claims description 14
- 239000007924 injection Substances 0.000 claims description 14
- 230000008030 elimination Effects 0.000 abstract description 16
- 238000003379 elimination reaction Methods 0.000 abstract description 16
- 230000005284 excitation Effects 0.000 description 7
- 230000009466 transformation Effects 0.000 description 5
- 230000001629 suppression Effects 0.000 description 4
- 239000003990 capacitor Substances 0.000 description 3
- 238000013016 damping Methods 0.000 description 2
- 238000010891 electric arc Methods 0.000 description 2
- 230000005350 ferromagnetic resonance Effects 0.000 description 2
- 238000000691 measurement method Methods 0.000 description 2
- 238000001514 detection method Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000016507 interphase Effects 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 229920006395 saturated elastomer Polymers 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/08—Locating faults in cables, transmission lines, or networks
- G01R31/081—Locating faults in cables, transmission lines, or networks according to type of conductors
- G01R31/086—Locating faults in cables, transmission lines, or networks according to type of conductors in power transmission or distribution networks, i.e. with interconnected conductors
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/12—Testing dielectric strength or breakdown voltage ; Testing or monitoring effectiveness or level of insulation, e.g. of a cable or of an apparatus, for example using partial discharge measurements; Electrostatic testing
- G01R31/14—Circuits therefor, e.g. for generating test voltages, sensing circuits
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
- Y04S10/52—Outage or fault management, e.g. fault detection or location
Abstract
本发明公开了一种中性点不接地配电网对地绝缘参数测量方法及系统,包括以下步骤:通过中性点不接地配电网一个零序电压互感器A开口三角侧注入一特定频率电流信号;在另一个零序电压互感器B开口三角侧空载零序电压互感器测量返回的该频率电压信号;由该电压信号和电流信号计算出中性点不接地配电网的对地绝缘参数,即对地电容和对地泄漏电导。本发明可实现对地绝缘参数的在线测量,测量时不需改变配电网一次侧接线,不影响配电网正常运行,且可消除电压互感器内阻抗及配电网消谐电阻的影响,具有测量安全、简便、经济和精度高的特点。
Description
技术领域
本发明属于配电网测量领域,特别涉及一种中性点不接地配电网对地绝缘参数测量方法及系统。
背景技术
中性点不接地配电网对地绝缘参数分为对地电容电流和对地泄漏电流。中性点不接地配电网发生单相接地故障时,配电网对地电容电流不大的情况下接地电弧能够自行熄灭,而随着电缆线路在电力系统中所占比例不断增加,配电网对地电容电流逐渐增大,中性点不接地配电网出现接地故障时电弧难以自行熄灭,且易发展成相间故障,危及人身及设备安全,需装设消弧线圈以补偿对地电容电流及对地泄漏电流。因此,实时测量中性点不接地配电网对地绝缘参数是配电网是否装设消弧线圈的重要依据。
目前,中性点不接地配电网对地绝缘参数测量方法主要分为直接法和间接法。直接法主要包括单相金属接地法,该方法操作复杂,,需要直接操作一次设备,存在安全隐患,一般不采用较少实际应用。间接法主要包括人工中性点法、偏置电容法和注入信号法。其中,人工中性点法需在配电网接入一组模拟中性点的电容器,需要改变一次侧接线;偏置电容法同样需要在一次侧线路上接入一偏置电容,存在安全隐患;注入信号法主要有两种:
一种是从电压互感器注入三个频率不同的电流信号,测量开口三角侧电压幅值,联立方程求解配电网对地绝缘参数。该方法计算复杂,且受电压互感器内阻抗及消谐电阻的影响较大。
另一种是向配电网电压互感器开口三角侧注入两个不同频率的恒流信号,测量返回电压信号,列写方程组计算出配电网对地绝缘参数。该方法注入信号频率选取困难,测量误差较大。
中性点不接地配电网在发生主变空载投运、线路接地、非全相运行等故障时,10kV母线电压互感器磁饱和后将发生铁磁谐振,造成互感器过激磁,使运行和计量检测造成困难。工程实际中采取在互感器开口三角处并联消谐电阻的方式来消除互感器铁磁谐振。然而,消谐电阻的接入导致对地参数测量等效电路拓扑发生改变,现有测量方法均未考虑消谐电阻对绝缘参数测量的影响,应用时测量误差较大。现采用的单频率测量法,利用互感器一次侧和开口三角侧漏电感参数近似相等,进而忽略互感器内阻抗的影响。该方法仅能计算配电网电容电流,无法计算泄漏电流,同时测量精度受互感器参数限制,难以满足目前的配电网运行要求。
总之,现有技术无法精准测量中性点不接地配电网对地绝缘参数。
发明内容
本发明针对现有技术中测量中性点不接地配电网对地绝缘参数操作复杂或者测量不准确的问题,提供了一种中性点不接地配电网对地绝缘参数测量方法及系统,本方案能够同时测量总对地电容和总对地泄漏电导,测量精度高,且测量过程安全可靠。
一种中性点不接地配电网对地绝缘参数测量方法,包括以下步骤:
步骤3):利用电压信号和电流信号计算中性点不接地配电网的对地绝缘参数,即总对地电容ΣC和总对地泄漏电导Σg;
通过改变原有的三相五柱式变压器进行测量的形式,采用两个零序电压互感器进行测量,利用零序电压互感器的励磁阻抗远大于内阻抗的特性,同时,将注入信号与测量返回信号分开,从电路原理中消除内阻抗的影响,从而忽略注入电流源的串联内阻以及电压源的空载内阻,同时利用特征频率信号流通回路的阻抗分布特性,从原理上消除了消谐电阻造成的参数测量误差,从而完全消除了电压互感器内阻抗及消谐电阻对中性点不接地配电网对地绝缘参数的影响。
一种中性点不接地配电网对地绝缘参数测量系统,包括电流信号注入单元、电压信号返回测量单元以及参数计算单元;
所述参数计算单元采用上述的方法对中性点不接地配电网的总对地电容ΣC和总对地泄漏电导Σg进行计算。
有益效果
本发明提供了一种中性点不接地配电网对地绝缘参数测量方法及系统,包括以下步骤:通过中性点不接地配电网一个零序电压互感器A开口三角侧注入一特定频率电流信号;在另一个零序电压互感器B开口三角侧空载零序电压互感器测量返回的该频率电压信号;由该电压信号和电流信号计算出中性点不接地配电网的对地绝缘参数,即对地电容和对地泄漏电导。
相较于现有技术而言,具有以下优点:
(1)实现中性点不接地配电网对地电容、泄漏电导及阻尼率的准确测量;
(2)通过中性点不接地配电网一个零序电压互感器A开口三角侧采用电流源注入一特定频率电流信号可忽略电流源的串联内阻;在另一个开口三角侧空载的零序电压互感器B测量返回的该频率电压信号可忽略电压源的空载内阻,同时利用特征频率信号流通回路的阻抗分布特性,从原理上消除了消谐电阻造成的参数测量误差,从而完全消除了电压互感器内阻抗及消谐电阻对中性点不接地配电网对地绝缘参数的影响;
(3)不需改变配电网一次接线,不影响配电网正常运行,保障测量过程安全可靠;
(4)该方法注入信号频率选取只要是非工频即可,无需选择和调节复杂的特定频率,容易实现。
附图说明
图1为本发明所述中性点不接地配电网电容电流测量的结构原理图;
图2为中性点不接地配电网电容电流测量等效电路;
图3为中性点不接地配电网电容电流测量简化等效电路;
图4为中性点不接地配电网电容电流测量过程流程图。
具体实施方式
下面结合附图和实施例对本发明作进一步的说明。
如图1所示,一种中性点不接地配电网对地绝缘参数测量方法,包括以下步骤:
步骤3):利用电压信号和电流信号计算中性点不接地配电网的对地绝缘参数,即总对地电容ΣC和总对地泄漏电导Σg;
中性点不接地配电网电容电流测量等效电路如图2所示:为电压互感器A开口三角侧注入特定频率电流信号归算到一次侧的值,为配电网一次侧感应出的零序电流;为另一开口三角侧空载的电压互感器B处测量返回电压归算到一次侧的值;RA'、LA'为电压互感器A开口三角侧的漏电阻和漏电感归算到一次侧的值;RB'、LB'为电压互感器B开口三角侧的漏电阻和漏电感归算到一次侧的值;RA1、LA1为电压互感器A高压侧漏电阻和漏电感;RB1、LB1为电压互感器B高压侧漏电阻和漏电感;ZMA为电压互感器A的励磁阻抗;ZMB为电压互感器B的励磁阻抗;ΣC为中性点不接地配电网总对地电容,ΣC=CA+CB+CC;∑g为中性点不接地配电网总对地泄漏电导,∑g=1/RA+1/RB+1/RC。由于流过消谐电阻Z0的电流为因此在中性点不接地配电网电容电流测量等效电路中消谐电阻变为3Z0。
由于电压互感器的励磁阻抗远大于互感器短路阻抗和配电网线路对地阻抗,励磁电流几乎为零,在参数测量过程中可忽略互感器励磁支路的影响,中性点不接地配电网电容电流测量简化等效电路如图3所示。通过电压互感器A开口三角侧注入一特征频率电流信号至配电网时,一次侧感应出零序电流由于其不能在配电网电源与负载之间流通,只能通过配电网对地电容及对地泄漏电阻形成回路。设零序电压互感器A、B的变比为n1、n2,则归算到一次侧的值为:
将式(1)、式(2)作商,得到:
中性点不接地配电网对地绝缘参数测量过程流程如图4所示。首先从变比为n1的电压互感器注入特征频率电流信号至配电网,然后在另一变比为n2的电压互感器测量特征频率返回电压利用公式(4)-(7)来测算中性点不接地配电网对地绝缘参数。
此时电压互感器内阻抗及消谐电阻对中性点不接地配电网电容电流测量没有影响,可实现对地参数精准测量,且测量时不需改变配电网一次接线,不影响配电网正常运行,保障测量过程安全可靠。
通过改变原有的三相五柱式变压器进行测量的形式,采用两个零序电压互感器进行测量,利用零序电压互感器的励磁阻抗远大于内阻抗的特性,同时,将注入信号与测量返回信号分开,从电路原理中消除内阻抗的影响,从而达到忽略注入电流源的串联内阻以及电压源的空载内阻,同时利用特征频率信号流通回路的阻抗分布特性,从原理上消除了消谐电阻造成的参数测量误差,从而完全消除了电压互感器内阻抗及消谐电阻对中性点不接地配电网对地绝缘参数的影响。
一种中性点不接地配电网对地绝缘参数测量系统,包括电流信号注入单元、电压信号返回测量单元以及参数计算单元;
所述参数计算单元采用上述的方法对中性点不接地配电网的总对地电容ΣC和总对地泄漏电导Σg进行计算。
以上详细介绍了本发明应用于中性点不接地配电网的技术原理,随调式消弧线圈在配电网正常运行时不投入运行,相当于不接地电网,因此,本发明同样适用于经随调式消弧线圈接地配电网。以下进一步介绍本发明应用于中性点不接地配电网的具体情况:
如图1所示,在10kV中性点不接地配电网中,配电网单相对地泄漏电阻RA=RB=RC=2000Ω,配电网单相对地电容CA=CB=CC=47.7μF,消谐电阻Z0=30Ω。通过中性点不接地配电网一个变比n1为100的零序电压互感器A开口三角侧注入一幅值为10A的电流信号,初相角为0°。从另一个变比n2为100的零序电压互感器B的开口三角侧测得返回的该特征频率电压。根据公式(4)计算得中性点不接地配电网总对地电容ΣC,根据公式(6)计算得中性点不接地配电网总对地泄漏电导∑g。改变注入信号频率的对地绝缘参数测量试验结果如表1所示。
表1
从上述数据可以看出,该测量方法完全消除了零序电压互感器内阻抗及消谐电阻的影响,提高注入信号频率至80Hz时,单相对地泄漏电阻测量值相对误差为0.06%,单相对地电容测量值相对误差为0.105%,测量精度高,且安全、简便和经济,完全满足中性点不接地配电网运行要求。
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811173175.7A CN111103501B (zh) | 2018-10-09 | 2018-10-09 | 一种中性点不接地配电网对地绝缘参数测量方法及系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811173175.7A CN111103501B (zh) | 2018-10-09 | 2018-10-09 | 一种中性点不接地配电网对地绝缘参数测量方法及系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111103501A true CN111103501A (zh) | 2020-05-05 |
CN111103501B CN111103501B (zh) | 2022-05-20 |
Family
ID=70417937
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811173175.7A Active CN111103501B (zh) | 2018-10-09 | 2018-10-09 | 一种中性点不接地配电网对地绝缘参数测量方法及系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111103501B (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111781536A (zh) * | 2020-08-04 | 2020-10-16 | 蚌埠依爱消防电子有限责任公司 | 一种监测单相交流系统对地绝缘电阻及泄漏电容的方法 |
CN112269049A (zh) * | 2020-10-14 | 2021-01-26 | 广西电网有限责任公司电力科学研究院 | 一种配电网对地电容电流测量方法及系统 |
CN112269064A (zh) * | 2020-10-16 | 2021-01-26 | 南方电网科学研究院有限责任公司 | 配电网对地泄漏电阻测量系统和方法 |
CN112769116A (zh) * | 2020-12-28 | 2021-05-07 | 长沙理工大学 | 一种发电厂厂用电系统接地故障有源消弧方法及其装置 |
CN115951262A (zh) * | 2023-03-13 | 2023-04-11 | 青岛鼎信通讯股份有限公司 | 一种应用于电力台区的自然故障漏电流检测方法 |
Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2073876C1 (ru) * | 1992-05-06 | 1997-02-20 | Чувашский государственный университет им.И.Н.Ульянова | Способ определения зоны и места замыкания линии электропередачи |
CN101021554A (zh) * | 2007-03-16 | 2007-08-22 | 长沙理工大学 | 中性点不接地配电网对地电容电流测量方法 |
CN101021556A (zh) * | 2007-03-16 | 2007-08-22 | 长沙理工大学 | 配电网对地绝缘参数测量和控制方法 |
CN101021552A (zh) * | 2007-03-15 | 2007-08-22 | 长沙理工大学 | 配电网接地故障电流测量方法 |
CN102798795A (zh) * | 2012-08-14 | 2012-11-28 | 大连电力勘察设计院有限公司 | 一种小电流接选线及故障定位的方法 |
CN103135031A (zh) * | 2012-12-31 | 2013-06-05 | 中国矿业大学 | 煤矿高压电网绝缘状态监测方法 |
CN103163433A (zh) * | 2013-03-05 | 2013-06-19 | 贵阳新光电气有限公司 | 发电机定子、配电网绝缘在线监测及其接地选线方法 |
CN104111403A (zh) * | 2014-04-24 | 2014-10-22 | 杨庆申 | 一种小电流接地电力系统微机综保选线方法 |
CN104280664A (zh) * | 2013-07-04 | 2015-01-14 | 刘宝稳 | 一种谐振接地系统在线绝缘监视与选线方法 |
CN104914322A (zh) * | 2014-03-16 | 2015-09-16 | 田京涛 | 一种区域线路对地参数检测方法及在接地故障区域定位方面的应用 |
CN105021871A (zh) * | 2014-04-17 | 2015-11-04 | 国家电网公司 | 一种不完全信息下电缆线路泄露电流确定方法 |
CN207198234U (zh) * | 2017-10-11 | 2018-04-06 | 国网山东省电力公司济宁供电公司 | 一种中性点不接地配电网电容电流测量装置 |
CN107894543A (zh) * | 2017-11-14 | 2018-04-10 | 云南电网有限责任公司电力科学研究院 | 一种配电网对地参数测量装置、方法及系统 |
CN108054764A (zh) * | 2018-01-10 | 2018-05-18 | 重庆聚陆新能源有限公司 | 一种多功能配电网柔性接地装置及控制方法 |
CN108445336A (zh) * | 2017-10-23 | 2018-08-24 | 国网山东省电力公司济宁供电公司 | 一种配电网有功泄漏电流在线测量方法 |
CN108493916A (zh) * | 2018-05-04 | 2018-09-04 | 国网湖南省电力有限公司 | 一种配电网零序过电压的抑制方法及其抑制电路 |
-
2018
- 2018-10-09 CN CN201811173175.7A patent/CN111103501B/zh active Active
Patent Citations (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2073876C1 (ru) * | 1992-05-06 | 1997-02-20 | Чувашский государственный университет им.И.Н.Ульянова | Способ определения зоны и места замыкания линии электропередачи |
CN101021552A (zh) * | 2007-03-15 | 2007-08-22 | 长沙理工大学 | 配电网接地故障电流测量方法 |
CN101021554A (zh) * | 2007-03-16 | 2007-08-22 | 长沙理工大学 | 中性点不接地配电网对地电容电流测量方法 |
CN101021556A (zh) * | 2007-03-16 | 2007-08-22 | 长沙理工大学 | 配电网对地绝缘参数测量和控制方法 |
CN102798795A (zh) * | 2012-08-14 | 2012-11-28 | 大连电力勘察设计院有限公司 | 一种小电流接选线及故障定位的方法 |
CN103135031A (zh) * | 2012-12-31 | 2013-06-05 | 中国矿业大学 | 煤矿高压电网绝缘状态监测方法 |
CN103163433A (zh) * | 2013-03-05 | 2013-06-19 | 贵阳新光电气有限公司 | 发电机定子、配电网绝缘在线监测及其接地选线方法 |
CN104280664A (zh) * | 2013-07-04 | 2015-01-14 | 刘宝稳 | 一种谐振接地系统在线绝缘监视与选线方法 |
CN104914322A (zh) * | 2014-03-16 | 2015-09-16 | 田京涛 | 一种区域线路对地参数检测方法及在接地故障区域定位方面的应用 |
CN105021871A (zh) * | 2014-04-17 | 2015-11-04 | 国家电网公司 | 一种不完全信息下电缆线路泄露电流确定方法 |
CN104111403A (zh) * | 2014-04-24 | 2014-10-22 | 杨庆申 | 一种小电流接地电力系统微机综保选线方法 |
CN207198234U (zh) * | 2017-10-11 | 2018-04-06 | 国网山东省电力公司济宁供电公司 | 一种中性点不接地配电网电容电流测量装置 |
CN108445336A (zh) * | 2017-10-23 | 2018-08-24 | 国网山东省电力公司济宁供电公司 | 一种配电网有功泄漏电流在线测量方法 |
CN107894543A (zh) * | 2017-11-14 | 2018-04-10 | 云南电网有限责任公司电力科学研究院 | 一种配电网对地参数测量装置、方法及系统 |
CN108054764A (zh) * | 2018-01-10 | 2018-05-18 | 重庆聚陆新能源有限公司 | 一种多功能配电网柔性接地装置及控制方法 |
CN108493916A (zh) * | 2018-05-04 | 2018-09-04 | 国网湖南省电力有限公司 | 一种配电网零序过电压的抑制方法及其抑制电路 |
Non-Patent Citations (2)
Title |
---|
卓超等: "基于双电压互感器的中性点不接地配电网", 《电网技术》 * |
曾祥君等: "中性点不接地配电网电容电流实时测量新方法", 《电力系统自动化》 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111781536A (zh) * | 2020-08-04 | 2020-10-16 | 蚌埠依爱消防电子有限责任公司 | 一种监测单相交流系统对地绝缘电阻及泄漏电容的方法 |
CN112269049A (zh) * | 2020-10-14 | 2021-01-26 | 广西电网有限责任公司电力科学研究院 | 一种配电网对地电容电流测量方法及系统 |
CN112269049B (zh) * | 2020-10-14 | 2023-08-22 | 广西电网有限责任公司电力科学研究院 | 一种配电网对地电容电流测量方法及系统 |
CN112269064A (zh) * | 2020-10-16 | 2021-01-26 | 南方电网科学研究院有限责任公司 | 配电网对地泄漏电阻测量系统和方法 |
CN112769116A (zh) * | 2020-12-28 | 2021-05-07 | 长沙理工大学 | 一种发电厂厂用电系统接地故障有源消弧方法及其装置 |
CN112769116B (zh) * | 2020-12-28 | 2024-03-19 | 长沙理工大学 | 一种发电厂厂用电系统接地故障有源消弧方法及其装置 |
CN115951262A (zh) * | 2023-03-13 | 2023-04-11 | 青岛鼎信通讯股份有限公司 | 一种应用于电力台区的自然故障漏电流检测方法 |
Also Published As
Publication number | Publication date |
---|---|
CN111103501B (zh) | 2022-05-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111103501B (zh) | 一种中性点不接地配电网对地绝缘参数测量方法及系统 | |
CN110927517B (zh) | 采用星型电容器的中性点不接地配电网对地绝缘参数测量方法及系统 | |
CN107796989B (zh) | 一种配电网电容电流在线测量方法 | |
Jia et al. | A new single-ended fault-location scheme for utilization in an integrated power system | |
CN111551821B (zh) | 一种配电网接地故障辨识方法、装置及设备 | |
CN111103500B (zh) | 一种计及阻尼电阻的谐振接地配电网对地参数测量方法 | |
Hao | Single-phase grounding fault line selection method based on zero-sequence current increment | |
Yu et al. | A novel insulation parameter online measuring technique based on two voltage transformers for distribution networks | |
CN108445336A (zh) | 一种配电网有功泄漏电流在线测量方法 | |
Rhode et al. | Line impedance measurement: a nondisruptive wideband technique | |
CN111289802A (zh) | 一种适用于谐振接地系统对地电容电流的测量方法 | |
CN110244192B (zh) | 一种电力架空线接地故障测距方法 | |
CN107831378A (zh) | 一种检验消弧线圈补偿效果的装置及方法 | |
CN115622015A (zh) | 基于故障后配电网对地参数测量的有源消弧方法 | |
CN111141945A (zh) | 一种三相不平衡系统电容电流测量方法 | |
CN103487724A (zh) | 一种配电网单相接地故障定位方法 | |
CN107390032B (zh) | 线路对地电容参数测量系统及测量方法 | |
CN111103499A (zh) | 一种经消弧线圈串联电阻接地配电网对地参数测量方法 | |
CN114252736A (zh) | 一种基于背景谐波的有源配电网单相故障线路选线方法 | |
Yu et al. | Insulation parameter online measurement technology based on extended zero-sequence circuits for resonant grounding distribution networks | |
CN110208655B (zh) | 一种消弧线圈接地方式下的配电网单相接地故障模型分析方法 | |
CN103454561A (zh) | 一种配电网单相接地故障定位方法 | |
CN109030958B (zh) | 一种发电机定子绕组对地电容实时测量方法 | |
Nan et al. | A new method of measuring capacitance current in non-effective grounding power system | |
Zhai et al. | A Novel Earth Capacitance Measuring Method for Distribution Network Based on Direct Signal-Injection at Neutral Point |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20210712 Address after: Room 201, jinhongyuan, 229 tongzipo West Road, high tech Development Zone, Changsha City, Hunan Province, 410205 Applicant after: Changsha Jingke Electric Technology Co.,Ltd. Address before: 410114 No. two, 960 Wan Li Li South Road, Yuhua District, Changsha, Hunan Applicant before: Changsha University of Science & Technology |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |