CN111064187A CN201911259206.5A CN201911259206A CN111064187A CN 111064187 A CN111064187 A CN 111064187A CN 201911259206 A CN201911259206 A CN 201911259206A CN 111064187 A CN111064187 A CN 111064187A
Authority
CN
China
Prior art keywords
power
unit
load
electric
representing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201911259206.5A
Other languages
English (en)
Other versions
CN111064187B (zh
Inventor
吴旭
王正风
丁一
桑茂盛
周迪雅
周晓鸣
包铭磊
吴天曈
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University ZJU
State Grid Anhui Electric Power Co Ltd
Original Assignee
Zhejiang University ZJU
State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University ZJU, State Grid Anhui Electric Power Co Ltd filed Critical Zhejiang University ZJU
Priority to CN201911259206.5A priority Critical patent/CN111064187B/zh
Publication of CN111064187A publication Critical patent/CN111064187A/zh
Application granted granted Critical
Publication of CN111064187B publication Critical patent/CN111064187B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明公开了一种发用电的电量极限分配方法。根据历史负荷数据,预测未来的全年负荷曲线;根据各时刻节点负荷数据,将全年负荷曲线分解到电网中每个负荷节点;在电网中具有大规模独立负荷用电情况下,以用电代价最小为目标,考虑发用电平衡和机组容量约束,建立大规模独立负荷用电优化模型,求解模型得到电网各机组的出清电量;以机组开机方式最小及电校核量最小为目标,建立机组总电量分配优化模型,求解得到机组的最小开机方式、各机组的总电量和电校核量;判断电校核量是否满足要求并按照各机组的出清电量进行分配。本发明能在满足电网安全运行的前提下,能分配机组的出清电量,并获得发用电电量极限。

Description

一种发用电的电量极限分配方法
技术领域
本发明属于电网、电力市场技术领域的一种用电处理优化方法,涉及一种发用电的电量极限分配方法。
背景技术
电力体制改革,涉及电力工业发展、国家政策制定等各个方面,是一项涉及面广、影响主体多、工作量浩大的系统工程,任务非常复杂,对电网安全稳定运行具有重要影响。其中,大规模独立负荷用电是电力体制改革的切入点与突破口,但也会带来一系列问题,可能导致电网调节资源减少、资源协调更加复杂,增加保障电网安全稳定运行的复杂性和难度。由于60万千瓦及以上机组相对于30万千瓦及以下机组更具有竞争优势,大规模独立负荷用电必将向大机组集中,导致30万千瓦及以下机组的年利用小时数逐渐下降,这可能对电网的安全稳定运行、迎峰度夏、度冬及供热安全带来不利影响。大规模独立负荷用电带来的具体影响如下:
1)减小了电网可调度空间,显著增加调度电量优化和协调的复杂度;
2)可能产生极端潮流运行方式,逼近电网安全极限,安全裕度下降;
3)机组可调度出力范围缩小,参与调峰机组减少,电网调峰资源紧张;
4)可调度备用容量不足;
5)机组可检修时间窗口受限,机组检修申请冲突等。
发明内容
为了解决背景技术中存在的问题,本发明的目的是提供一种考虑大规模独立负荷用电的电量极限分配方法。本发明能在满足电网安全运行的同时,确定电网发用电计划放开规模极限。
为此,本发明采用的具体技术方案是包括以下步骤:
步骤1、根据历史负荷数据,预测未来的全年负荷曲线;
步骤2、根据各时刻节点负荷数据,将全年负荷曲线分解到电网中每个负荷节点;
步骤3、在电网中具有大规模独立负荷用电情况下,以用电代价最小为目标,考虑发用电平衡和机组容量约束,建立大规模独立负荷用电优化模型,求解模型得到电网各机组的出清电量;
步骤4、以机组开机方式最小及电校核量最小为目标,建立计及发用电平衡、机组容量限制、电网线路安全、机组供热需求、机组检修计划等物理运行约束的机组总电量分配优化模型,求解得到机组的最小开机方式、各机组的总电量和电校核量;
步骤5、判断步骤4获得的电校核量是否满足要求,若否,返回步骤3,并调整大规模独立负荷用电量占电网总用电量的比例η;若是,按照各机组的出清电量对各机组进行分配。
具体实施中还将各机组的出清电量Ei mark进行累加得到大规模独立负荷用电存在情况下的发用电电量极限。
本发明的所述电网是由多个节点组成,发电机组和用电设备均连接在节点上,节点之间是由输电线路连接进而构成电网。
所述的步骤1具体如下:
步骤1.1、基于历史负荷曲线,通过平移和拉伸得到预测年度负荷曲线,计算如下:
Figure BDA0002311141550000021
式中,Lm(t)示第m月第t时段的预测负荷;
Figure BDA0002311141550000022
表示第m月预测的最小负荷;
Figure BDA0002311141550000023
表示第m月预测的最大负荷;
Figure BDA0002311141550000024
表示第m月历史负荷曲线;
Figure BDA0002311141550000025
表示第m月历史最小负荷;
Figure BDA0002311141550000026
表示第m月历史最大负荷;m为预测年份中各月的序数;
步骤1.2、根据各月负荷预测数据,得到预测年份总负荷电量Q:
Figure BDA0002311141550000027
本发明所述的负荷为用电量。
所述的步骤2采用以下公式将电网年负荷曲线分解到电网中每个负荷节点:
Figure BDA0002311141550000028
式中,
Figure BDA0002311141550000029
表示第m月第n节点第t时段的预测负荷;
Figure BDA00023111415500000210
表示第n节点的负荷值;N表示电网节点总数;n为电网中节点的序数。
所述的步骤3具体如下:
步骤3.1、在电网中具有大规模独立负荷用电情况下,以用电代价最小为目标函数,建立大规模独立负荷用电优化模型:
Figure BDA00023111415500000211
式中,
Figure BDA00023111415500000212
表示第i台机组在第t个时段内的电出力,出力即为输出功率;Ci(·)表示第i台机组的用电代价函数;Ng表示电网中的机组数量;T表示用电周期;γ表示电量惩罚因子;Cpun表示电量惩罚因子对应的惩罚系数;i为电网中机组的序数;t为用电周期中各时段的序数;
步骤3.2、建立以下大规模独立负荷用电优化模型的等量约束:
Figure BDA0002311141550000031
Figure BDA0002311141550000032
Figure BDA0002311141550000033
式中,η表示大规模独立负荷用电量占电网总用电量的比例;
Figure BDA0002311141550000034
表示第m月总负荷电量;
Figure BDA0002311141550000035
表示第m月中总电量;Pi,max表示第i台机组的最大技术出力;
大规模独立负荷用电量是指一年的用电量大于所在地区电网一年用电量20%的负荷设备集合。
步骤3.3、建立以下大规模独立负荷用电优化模型的不等量约束:
γ≥0
Figure BDA0002311141550000036
Figure BDA0002311141550000037
式中,r表示机组的电量上限系数;
步骤3.4、采用线性规划方法求解上述大规模独立负荷用电优化模型,得到各机组各时段电出力
Figure BDA0002311141550000038
再采用以下公式累加得到第i台机组在用电周期内的出清电量
Figure BDA0002311141550000039
计算如下:
Figure BDA00023111415500000310
所述的步骤4具体如下:
步骤4.1、以机组开机方式最小及电校核量最小为目标函数,建立计及发电负荷平衡、机组容量限制、电网线路安全、机组供热需求、机组检修计划等实际运行约束的机组总电量分配优化模型:
Figure BDA00023111415500000311
式中,Pi,t表示第i台机组在第t时段内的总出力;vi表示第i台机组的开机权重系数,权重越小则开机优先性越高;λi表示第i台机组的电校核量;
Figure BDA00023111415500000312
表示第i台机组的电校核量惩罚系数;
步骤4.2、建立以下计及实际运行约束的机组总电量分配优化模型的等量约束:
Figure BDA0002311141550000041
Figure BDA0002311141550000042
ui,t=0 t∈Trepair,i
式中,Lj,t表示第j个负荷节点在第t个时段内的负荷量;Pl,t表示第l条线路在第t时段内流过的功率;Gl-i表示线路-机组传输分配系数,具体为第i台机组增加单位功率导致第l条线路流过功率的增量;Gl-j表示线路-负荷功率分配系数,具体为第j个节点增加单位负荷功率导致第l条线路流过功率的增量;Trepair,i表示第i台机组的检修时间周期;l为电网中线路的序数;ui,t表示第i台机组在第t时段内的开机状态,开机为1,关机为0;NL表示电网中负荷节点的数量;j为电网中负荷节点的序数;
步骤4.2、建立以下计及实际运行约束的机组总电量分配优化模型的不等量约束:
ui,tPi,min≤Pi,t≤ui,tPi,max
Pl,min≤Pl,t≤Pl,max l=1,2,,NL
Figure BDA0002311141550000043
-Rd,i≤Pi,t-Pi,t-1≤Ru,i
Ti on≥Ti U
Ti off≥Ti D
Figure BDA0002311141550000044
Figure BDA0002311141550000045
Figure BDA0002311141550000046
λi≥0
式中,ui,t表示第i台机组在第t个时段的开机状态,为0-1变量(开机为1,关机为0);NL表示电网线路总数;ρ表示电网的备用系数;Rd,i、Ru,i表示第i台机组的上、下爬坡速率极限;Ti on、Ti off表示第i台机组的实际连续开机、关机时间;Ti U、Ti D表示第i台机组的最小持续开机、关机时间;
Figure BDA0002311141550000047
表示第i台机组在第t个时段内的供热需求;Nheat表示供热机组集合,供热机组是指在冬天供暖期间用于供热发电的发电机组,供热机组是发电机组中的一部分。发电机组中除了供热机组还有非供热机组,非供热机组或者叫常规机组;Theat表示供热时间周期;Ωj表示第j个电厂所拥有的机组集合,电厂中包含一个或多个节点;Z表示电网中电厂总数;j为电网中电厂的序数;
Figure BDA0002311141550000051
表示机组的第i个用电周期的月度出清电量;Pi,min、Pi,max分别表示第i台机组的最大、最小技术出力,Pl,min、Pl,max分别表示第l条线路最大、最小传输能力;
步骤4.3、采用混合整数线性规划方法求解上述机组总电量分配优化模型,得到机组最小开机方式、各机组各时段的总出力Pi,t和电校核量λi,进一步采用以下公式处理得到各机组的在用电周期内的总发电量
Figure BDA0002311141550000052
和电校核量
Figure BDA0002311141550000053
Figure BDA0002311141550000054
Figure BDA0002311141550000055
所述步骤5具体为:
判断电校核量是否满足以下公式:
Figure BDA0002311141550000056
式中,Erequire表示电校核量的最大允许值;
若不满足,则将大规模独立负荷用电量占电网总用电量的比例降低5%,并返回步骤3再次处理得到新的各机组的出清电量,并执行步骤4进行电量校验,直至满足要求;
若满足,则按照步骤3处理获得各机组的出清电量
Figure BDA0002311141550000057
对各机组进行分配。
将每台机组最终求解到的出清电量
Figure BDA0002311141550000058
进行累加,可得到大规模独立负荷用电存在情况下的发用电电量极限。
本发明具有的有益效果如下:
本发明方法为一种在考虑大规模独立负荷用电存在电网中的背景下,充分考虑电网安全运行约束的发用电的电量极限分配方法;
本发明方法能够合理分配各机组的出清电量,确定电网发用电规模极限,保证电网运行在安全的运行方式,预留足够的安全裕度,同时能够考虑机组的检修时间和供热需求等实际工业运行要求,避免大规模独立负荷用电量过大对电网安全运行带来不利影响,为电网适应考虑大规模独立负荷用电情况提供可靠的方案,弥补当前研究领域的空白。
附图说明
图1是本发明方法流程图。
图2是电网中各类发电机组装机容量占比分布图。
图3是预测年份的负荷曲线。
图4是η取70%时各电厂在用电周期内的出清电量分布图。
图5是η取70%时各电厂在用电周期内的总电量和出清电量对比图。
图6是η分别取0~70%时各机组的电校核量
Figure BDA0002311141550000061
具体实施方式
下面结合附图和实施例对本发明作进一步说明。
如图1所示,本发明的实施例及其实施过程如下:
以某省实际电网为例,结合技术方案和附图详细叙述本发明的具体实施。
该电网共包含112台机组,36家电厂,部分机组属于同一的电厂。如图2所示,将电网中所包含的发电机组根据装机容量大小分为4类:1000MW、600~1000MW、300~600MW、300MW以下。其中,600MW及以上发电机组的装机容量占电网总装机容量近70%,300MW以下发电机组的装机容量占比最小,不足4%。
如图2所示,具体步骤如下:
步骤1、根据历史负荷数据,预测未来的全年负荷曲线;
步骤1.1、基于历史负荷曲线,通过平移和拉伸得到预测年度负荷曲线,计算如下:
Figure BDA0002311141550000062
步骤1.2、根据各月负荷预测数据,得到预测年份总负荷电量Q:
Figure BDA0002311141550000063
在上述步骤1中,求解得到预测年份所有时段的负荷大小,将每个时段的负荷连接起来构成负荷曲线,如图3所示。
步骤2、根据各时刻节点负荷数据,将全年负荷曲线分解到电网中每个负荷节点;
步骤2.1、采用以下公式将电网年负荷曲线分解到电网中每个负荷节点:
Figure BDA0002311141550000064
步骤3、在电网中具有大规模独立负荷用电情况下,以用电代价最小为目标,考虑发用电平衡和机组容量约束,建立大规模独立负荷用电优化模型,求解模型得到电网各机组的出清电量;
步骤3.1、在电网中具有大规模独立负荷用电情况下,以用电代价最小为目标函数,建立大规模独立负荷用电优化模型:
Figure BDA0002311141550000071
步骤3.2、建立以下大规模独立负荷用电优化模型的等量约束:
Figure BDA0002311141550000072
Figure BDA0002311141550000073
大规模独立负荷用电量是指一年的用电量大于所在地区电网一年用电量20%的负荷设备集合。
步骤3.3、建立以下大规模独立负荷用电优化模型的不等量约束:
γ≥0
Figure BDA0002311141550000074
Figure BDA0002311141550000075
步骤3.4、采用线性规划方法求解上述大规模独立负荷用电优化模型,得到各机组各时段电出力
Figure BDA0002311141550000076
再采用以下公式累加得到第i台机组在用电周期内的出清电量
Figure BDA0002311141550000077
计算如下:
Figure BDA0002311141550000078
在上述步骤3中,η取70%,求解得到各机组在用电周期内的出清电量Ei mark。为了便于比较,将属于同一电厂的机组进行合并,得到每个电厂在用电周期内的出清电量。图4展示了各电厂的出清电量分布情况,其中,横坐标为电厂按照总装机容量从大到小进行排序得到的序号。可以看出,前三个电厂的出清电量最多,这是因为这些电厂内机组的装机容量都是1000MW,所以竞争力最强;4到18电厂的出清电量相差不多,但比前三个电厂小得多,这是因为这些电厂内的机组的装机容量均为600~100MW,竞争力均差不多,但比1000MW机组弱;从第19个电厂开始,后面的电厂均没有得到出清电量,这是因为这些电厂内的机组的装机容量均为6000MW以下,竞争力最小,无法获得出清电量。
步骤4、以机组开机方式最小及电校核量最小为目标,建立计及发用电平衡、机组容量限制、电网线路安全、机组供热需求、机组检修计划等物理运行约束的机组总电量分配优化模型,求解得到机组的最小开机方式、各机组的总电量和电校核量;
步骤4.1、以机组开机方式最小及电校核量最小为目标函数,建立计及发电负荷平衡、机组容量限制、电网线路安全、机组供热需求、机组检修计划等实际运行约束的机组总电量分配优化模型:
Figure BDA0002311141550000081
步骤4.2、建立以下计及实际运行约束的机组总电量分配优化模型的等量约束:
Figure BDA0002311141550000082
Figure BDA0002311141550000083
ui,t=0 t∈Trepair,i
步骤4.2、建立以下计及实际运行约束的机组总电量分配优化模型的不等量约束:
ui,tPi,min≤Pi,t≤ui,tPi,max
Pl,min≤Pl,t≤Pl,max l=1,2,...,NL
Figure BDA0002311141550000084
-Rd,i≤Pi,t-Pi,t-1≤Ru,i
Ti on≥Ti U
Ti off≥Ti D
Figure BDA0002311141550000085
Figure BDA0002311141550000086
Figure BDA0002311141550000087
λi≥0
步骤4.3、采用混合整数线性规划方法求解上述机组总电量分配优化模型,得到机组最小开机方式、各机组各时段的总出力Pi,t和电校核量λi,进一步采用以下公式处理得到各机组的在用电周期内的总发电量
Figure BDA0002311141550000088
和电校核量
Figure BDA0002311141550000089
Figure BDA00023111415500000810
Figure BDA0002311141550000091
在上述步骤4中,η取70%,求解得到各机组的在用电周期内的总发电量
Figure BDA0002311141550000092
和步骤3中得到的出清电量进行对比,结果见图5所示。可以看出,前18个电厂虽然拿到了出清电量,但是这些电厂的总发电量均小于出清电量。这初步表明此时大规模独立负荷用电量占电网总用电量的比例η过高,大量机组由于受到电网安全运行的约束,无法全部完成自身的出清电量,应该进一步降低η。为了量化出清电量超出总发电量的严重程度,还需要通过电量校核量
Figure BDA0002311141550000093
进行验证,通过计算得到电校核量
Figure BDA0002311141550000094
为272亿千瓦时。
步骤5、判断步骤4获得的电校核量是否满足要求,若否,返回步骤3,并调整大规模独立负荷用电量占电网总用电量的比例η;若是,按照各机组的出清电量对各机组进行分配。
最后将各机组的出清电量
Figure BDA0002311141550000095
进行累加得到大规模独立负荷用电存在情况下的发用电电量极限。
在上述步骤中,假定电校核量的最大容许值为100亿千瓦时,则根据步骤4可知η取70%时,电校核量
Figure BDA0002311141550000096
为272亿千瓦时,不满足要求,需要进一步降低η。图6展示了η从70%按5%步长逐渐降到0时,电校核量
Figure BDA0002311141550000097
的变化情况。可以看出,当η降到60%时,电校核量
Figure BDA0002311141550000098
刚好为100亿千瓦时,满足要求;进一步降低η,电校核量持续降低,小于30%时,电校核量为0。由此可知,该电网的大规模独立负荷用电量占电网总用电量的比例η极限为60%,计算此时发用电电量极限,可得为1250亿千瓦时。
因此,根据本发明提出的考虑大规模独立负荷用电存在电网中的电量极限分配方法,可以合理分配各机组的出清电量,确定电网发用电规模极限,保证电网运行在安全的运行方式,预留足够的安全裕度,避免大规模独立负荷用电量过大对电网安全运行带来不利影响。

Claims (6)

1.一种发用电的电量极限分配方法,其特征在于:包括以下步骤:
步骤1、根据历史负荷数据,预测未来的全年负荷曲线;
步骤2、根据各时刻节点负荷数据,将全年负荷曲线分解到电网中每个负荷节点;
步骤3、在电网中具有大规模独立负荷用电情况下,以用电代价最小为目标,考虑发用电平衡和机组容量约束,建立大规模独立负荷用电优化模型,求解模型得到电网各机组的出清电量;
步骤4、以机组开机方式最小及电校核量最小为目标,建立机组总电量分配优化模型,求解得到机组的最小开机方式、各机组的总电量和电校核量;
步骤5、判断步骤4获得的电校核量是否满足要求,若否,返回步骤3,并调整大规模独立负荷用电量占电网总用电量的比例η;若是,按照各机组的出清电量进行分配。
2.根据权利要求1所述的发用电的电量极限分配方法,其特征在于:
所述的步骤1具体如下:
步骤1.1、基于历史负荷曲线,通过平移和拉伸得到预测年度负荷曲线,计算如下:
Figure FDA0002311141540000011
式中,Lm(t)示第m月第t时段的预测负荷;
Figure FDA0002311141540000012
表示第m月预测的最小负荷;
Figure FDA0002311141540000013
表示第m月预测的最大负荷;
Figure FDA0002311141540000014
表示第m月历史负荷曲线;
Figure FDA0002311141540000015
表示第m月历史最小负荷;
Figure FDA0002311141540000016
表示第m月历史最大负荷;m为预测年份中各月的序数;
步骤1.2、根据各月负荷预测数据,得到预测年份总负荷电量Q:
Figure FDA0002311141540000017
3.根据权利要求1所述的发用电的电量极限分配方法,其特征在于:
所述的步骤2采用以下公式将电网年负荷曲线分解到电网中每个负荷节点:
Figure FDA0002311141540000018
式中,
Figure FDA0002311141540000019
表示第m月第n节点第t时段的预测负荷;
Figure FDA00023111415400000110
表示第n节点的负荷值;N表示电网节点总数;n为电网中节点的序数。
4.根据权利要求1所述的发用电的电量极限分配方法,其特征在于:
所述的步骤3具体如下:
步骤3.1、在电网中具有大规模独立负荷用电情况下,以用电代价最小为目标函数,建立大规模独立负荷用电优化模型:
Figure FDA0002311141540000021
式中,
Figure FDA0002311141540000022
表示第i台机组在第t个时段内的电出力;Ci(·)表示第i台机组的用电代价函数;Ng表示电网中的机组数量;T表示用电周期;γ表示电量惩罚因子;Cpun表示电量惩罚因子对应的惩罚系数;i为电网中机组的序数;t为用电周期中各时段的序数;
步骤3.2、建立以下大规模独立负荷用电优化模型的等量约束:
Figure FDA0002311141540000023
Figure FDA0002311141540000024
Figure FDA0002311141540000025
式中,η表示大规模独立负荷用电量占电网总用电量的比例;
Figure FDA0002311141540000026
表示第m月总负荷电量;
Figure FDA0002311141540000027
表示第m月中总电量;Pi,max表示第i台机组的最大技术出力;
步骤3.3、建立以下大规模独立负荷用电优化模型的不等量约束:
γ≥0
Figure FDA0002311141540000028
Figure FDA0002311141540000029
式中,r表示机组的电量上限系数;
步骤3.4、求解上述大规模独立负荷用电优化模型,得到各机组各时段电出力
Figure FDA00023111415400000210
再采用以下公式累加得到第i台机组在用电周期内的出清电量
Figure FDA00023111415400000211
计算如下:
Figure FDA00023111415400000212
5.根据权利要求1所述的发用电的电量极限分配方法,其特征在于:
所述的步骤4具体如下:
步骤4.1、以机组开机方式最小及电校核量最小为目标函数,建立机组总电量分配优化模型:
Figure FDA00023111415400000213
式中,Pi,t表示第i台机组在第t时段内的总出力;vi表示第i台机组的开机权重系数;λi表示第i台机组的电校核量;
Figure FDA00023111415400000214
表示第i台机组的电校核量惩罚系数;
步骤4.2、建立以下机组总电量分配优化模型的等量约束:
Figure FDA0002311141540000031
Figure FDA0002311141540000032
ui,t=0t∈Trepair,i
式中,Lj,t表示第j个负荷节点在第t个时段内的负荷量;Pl,t表示第l条线路在第t时段内流过的功率;Gl-i表示线路-机组传输分配系数;Gl-j表示线路-负荷功率分配系数;Trepair,i表示第i台机组的检修时间周期;l为电网中线路的序数;ui,t表示第i台机组在第t时段内的开机状态,开机为1,关机为0;NL表示电网中负荷节点的数量;j为电网中负荷节点的序数;
步骤4.2、建立以下机组总电量分配优化模型的不等量约束:
ui,tPi,min≤Pi,t≤ui,tPi,max
Pl,min≤Pl,t≤Pl,maxl=1,2,…,NL
Figure FDA0002311141540000033
-Rd,i≤Pi,t-Pi,t-1≤Ru,i
Ti on≥Ti U
Ti off≥Ti D
Figure FDA0002311141540000034
Figure FDA0002311141540000035
Figure FDA0002311141540000036
λi≥0
式中,ui,t表示第i台机组在第t个时段的开机状态;NL表示电网线路总数;ρ表示电网的备用系数;Rd,i、Ru,i表示第i台机组的上、下爬坡速率极限;Ti on、Ti off表示第i台机组的实际连续开机、关机时间;Ti U、Ti D表示第i台机组的最小持续开机、关机时间;
Figure FDA0002311141540000037
表示第i台机组在第t个时段内的供热需求;Nheat表示供热机组集合;Theat表示供热时间周期;Ωj表示第j个电厂所拥有的机组集合;Z表示电网中电厂总数;j为电网中电厂的序数;
Figure FDA0002311141540000038
表示机组的第i个用电周期的月度出清电量;Pi,min、Pi,max分别表示第i台机组的最大、最小技术出力,Pl,min、Pl,max分别表示第l条线路最大、最小传输能力;
步骤4.3、求解上述机组总电量分配优化模型,得到机组最小开机方式、各机组各时段的总出力Pi,t和电校核量λi,进一步采用以下公式处理得到各机组的在用电周期内的总发电量
Figure FDA0002311141540000041
和电校核量
Figure FDA0002311141540000042
Figure FDA0002311141540000043
Figure FDA0002311141540000044
6.根据权利要求1所述的发用电的电量极限分配方法,其特征在于:
所述步骤5具体为:
判断电校核量是否满足以下公式:
Figure FDA0002311141540000045
式中,Erequire表示电校核量的最大允许值;
若不满足,则将大规模独立负荷用电量占电网总用电量的比例降低5%,并返回步骤3再次处理得到新的各机组的出清电量,并执行步骤4进行电量校验,直至满足要求;
若满足,则按照步骤3处理获得各机组的出清电量
Figure FDA0002311141540000046
进行分配。
CN201911259206.5A 2019-12-10 2019-12-10 一种发用电的电量极限分配方法 Active CN111064187B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911259206.5A CN111064187B (zh) 2019-12-10 2019-12-10 一种发用电的电量极限分配方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911259206.5A CN111064187B (zh) 2019-12-10 2019-12-10 一种发用电的电量极限分配方法

Publications (2)

Publication Number Publication Date
CN111064187A true CN111064187A (zh) 2020-04-24
CN111064187B CN111064187B (zh) 2023-03-14

Family

ID=70300517

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911259206.5A Active CN111064187B (zh) 2019-12-10 2019-12-10 一种发用电的电量极限分配方法

Country Status (1)

Country Link
CN (1) CN111064187B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115882456A (zh) * 2023-03-03 2023-03-31 浙江浙能能源服务有限公司 一种基于大规模电网潮流的电力控制方法及系统

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20160169202A1 (en) * 2013-05-03 2016-06-16 State Grid Corporation Of China Short-term operation optimization method of electric power system including large-scale wind power
CN107276065A (zh) * 2016-04-07 2017-10-20 中国电力科学研究院 基于负荷特征时段的月度发电计划优化与安全校核方法
CN110310173A (zh) * 2019-06-11 2019-10-08 上海电力学院 一种可再生能源参与中长期电力交易的电量分配方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20160169202A1 (en) * 2013-05-03 2016-06-16 State Grid Corporation Of China Short-term operation optimization method of electric power system including large-scale wind power
CN107276065A (zh) * 2016-04-07 2017-10-20 中国电力科学研究院 基于负荷特征时段的月度发电计划优化与安全校核方法
CN110310173A (zh) * 2019-06-11 2019-10-08 上海电力学院 一种可再生能源参与中长期电力交易的电量分配方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
周明 等: "兼顾中长期交易和风电参与的日前市场出清模型", 《中国科学:信息科学》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115882456A (zh) * 2023-03-03 2023-03-31 浙江浙能能源服务有限公司 一种基于大规模电网潮流的电力控制方法及系统

Also Published As

Publication number Publication date
CN111064187B (zh) 2023-03-14

Similar Documents

Publication Publication Date Title
CN109962499B (zh) 一种电网多时间尺度调度方法
Alharbi et al. Probabilistic coordination of microgrid energy resources operation considering uncertainties
Bakirtzis et al. Short term generation scheduling in a small autonomous system with unconventional energy sources
CN112821462B (zh) 一种电网多种调节资源的协调优化方法
Wu et al. A multi-agent-based energy-coordination control system for grid-connected large-scale wind–photovoltaic energy storage power-generation units
CN110188950A (zh) 基于多代理技术的虚拟电厂供电侧和需求侧优化调度建模方法
CN111934360B (zh) 基于模型预测控制的虚拟电厂-储能系统能量协同优化调控方法
CN114336702B (zh) 基于双层随机规划的风光储场站群功率分配协同优化方法
CN112583017B (zh) 考虑储能运行约束的混合微电网能量分配方法及系统
CN111697578B (zh) 多目标含储能区域电网运行控制方法
CN109586284B (zh) 考虑弃能约束的送端电力系统随机生产模拟方法及应用
CN114744687A (zh) 一种虚拟电厂的能源调控方法及系统
CN111555281A (zh) 一种电力系统灵活性资源配置仿真方法及装置
CN113346555B (zh) 一种考虑电量协调的日内滚动调度方法
Awasthi et al. Operation of datacenter as virtual power plant
CN117578537A (zh) 基于碳交易和需求响应的微电网优化调度方法
CN105186584A (zh) 一种考虑调峰和爬坡需求的两阶段源-荷调度方法及装置
Li et al. Development and application of dispatching and energy management system for 50MW/100MWh battery energy storage station
CN111064187B (zh) 一种发用电的电量极限分配方法
CN116505512A (zh) 考虑负荷需求响应的微网优化运行方法
CN104659818A (zh) 一种正负旋转备用容量在含风电系统中的最优分配方法
Shenghui et al. Retracted: Multi-Objective Optimization Method for Source-Source Coordination of Power System Considering Wind Power Consumption
Zhang et al. Equilibrium models of electricity market considering wind power producer and electric vehicle aggregator
CN113762632B (zh) 一种电气综合能源系统的协同优化运行方法及系统
CN115293595B (zh) 考虑光伏出力不确定性的虚拟电厂聚合能力评估方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant