CN111045107A - Method for confining sandstone-type uranium ore body output part of oxidation zone between basin floors - Google Patents

Method for confining sandstone-type uranium ore body output part of oxidation zone between basin floors Download PDF

Info

Publication number
CN111045107A
CN111045107A CN201911401334.9A CN201911401334A CN111045107A CN 111045107 A CN111045107 A CN 111045107A CN 201911401334 A CN201911401334 A CN 201911401334A CN 111045107 A CN111045107 A CN 111045107A
Authority
CN
China
Prior art keywords
sandstone
oxidation
drilling
ore body
uranium ore
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201911401334.9A
Other languages
Chinese (zh)
Inventor
黄少华
秦明宽
刘章月
何中波
郭强
贾立诚
东艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Research Institute of Uranium Geology
Original Assignee
Beijing Research Institute of Uranium Geology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Research Institute of Uranium Geology filed Critical Beijing Research Institute of Uranium Geology
Priority to CN201911401334.9A priority Critical patent/CN111045107A/en
Publication of CN111045107A publication Critical patent/CN111045107A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V9/00Prospecting or detecting by methods not provided for in groups G01V1/00 - G01V8/00
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/24Earth materials

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Food Science & Technology (AREA)
  • Remote Sensing (AREA)
  • Medicinal Chemistry (AREA)
  • Geology (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Geophysics (AREA)
  • Geophysics And Detection Of Objects (AREA)

Abstract

The invention belongs to the technical field of sandstone-type uranium ores in basins, and particularly discloses a method for delineating the output part of an interbedded oxidized zone sandstone-type uranium ore body in a basin, which comprises the following steps of ① working area and target layer selection, ② drilling hole selection and interval calculation, ③ oxidized sandstone core sample collection, ④ ferric iron ore separation and (U-Th)/He dating, ⑤ average oxidation rate calculation, and ⑥ uranium ore body output part delineation.

Description

Method for confining sandstone-type uranium ore body output part of oxidation zone between basin floors
Technical Field
The invention belongs to the technical field of sandstone-type uranium ores in basins, and particularly relates to a method for delineating output parts of sandstone-type uranium ore bodies in oxidation zone between basins.
Background
The formation of the interlayer oxidation zone type uranium ore is closely related to the after-oxidation action, shallow uranium-bearing oxygen-bearing underground water penetrates along the exposed part of a basin edge target layer and seeps downwards along a sandstone water-bearing layer sandwiched between mudstone water barriers to the deep part, when oxygen ions in the shallow uranium-bearing oxygen-bearing underground water are continuously and gradually consumed by reducing media such as plant stems, carbon scraps or pyrite and the like contained in target layer gray sandstone, the pyrite can be gradually oxidized and corroded to become limonite (goethite ) and hematite, the color of the gray sandstone also gradually changes to red (yellow) sandstone, the geochemical environment of the water-bearing layer gradually changes from oxidation to reduction environment, and further hexavalent uranium is adsorbed, reduced, precipitated and enriched; along with the continuous penetration of the oxidized water source, the uranium ore body is continuously advanced by oxidation reduction again, and then a classic interlayer oxidation zone type roll-shaped uranium ore body is formed. Correspondingly, the ore-bearing target layer sand bodies can be divided into a red (yellow) oxidation zone, a light grey (green) oxidation-reduction transition zone and a grey (green) primary reduction zone from the basin edge to the basin in sequence; uranium ore is usually positioned in an oxidation-reduction transition zone and is controlled by an after-generated oxidation front line extremely obviously.
At present, the exploration thought of the uranium mine is as follows: drilling is gradually carried out from the basin edge to the basin, and when the drill hole reveals a yellow oxidation zone of a target layer, the drill hole can be determined as an oxidation hole; drilling towards the inner direction of the basin continuously, and determining the drilling hole as a reduction hole when the target layer gray proto-sandstone is exposed by the drilling hole; and then, drilling holes are continuously and repeatedly arranged in the oxidation-reduction transition zone between the oxidation holes and the reduction holes to trace the front edge of the oxidation zone, and the ore searching target area is further continuously reduced until the output position of the uranium ore body is positioned. However, the cost of drilling is about 800 yuan/m, and a 500m drill hole requires about 40 ten thousand costs; considering that the anabolic oxidation causes the pyrite in sandstone to be continuously oxidized and corroded into limonite and hematite and simultaneously accompanies the formation of uranium ore, the two are associated products formed by the same geological action event. Therefore, before further drilling deployment, the trivalent iron minerals in the sandstone samples in the drilled oxidation zone can be subjected to (U-Th)/He dating so as to obtain the time for forming the after-generation oxidation zone and the average rate of forward advancement of the front line, and finally, in the uranium mineralization combining area, the front line of the oxidation zone and the production range of uranium ore bodies can be accurately determined.
Disclosure of Invention
The invention aims to provide a method for estimating the basin interlaminar oxidation zone propulsion rate and the uranium ore body output position, which can reduce an ore finding target area to the maximum extent, directly provide quantitative technical support for next drilling deployment and save the economic cost of exploration.
The technical scheme adopted by the invention is as follows:
a method for delineating a sedimentary basin interbedded oxide zone sandstone-type uranium ore body development part specifically comprises the following steps:
step 1, determining an ore finding position and a main attack position of sandstone-type uranium ore to obtain a main uranium ore-forming era (t) in a region0);
Step 2, selecting a plurality of oxidation drill holes at the ore searching part in the step 1 according to the exploration lines, and acquiring the distance L between each drill hole and the first drill hole at the edge of the basinn-1
Step 3, collecting a sample of the generated oxidized sandstone of the drill hole selected in the step 2;
step 4, carrying out (U-Th)/He dating t on the sample collected in the step 3 for sorting the ferric iron mineralsn
Step 5 is the drilling interval L according to step 2 aboven-1And the oxidation age t obtained in the above step 4nCalculating the average speed V of the after-oxidation forward propulsion;
step 6 is a regional primary uranium mineralization epoch t in combination according to step 1 above0The drilling interval L of the step 2n-1The age t of formation of the secondary oxidation zone obtained in the above step 4nAnd the average velocity V obtained in the step 5 is comprehensively used before the definition of the oxidation zoneThe sharp line and the possible developing parts of uranium ore body.
In the step 1, a basin sandstone type uranium mine exploration part and an ore exploration target layer of a main attack are determined, a plurality of drill holes are required to be drilled in the area according to a drilling exploration line, and the sandstone of the target layer in the drill holes has an after-oxidation effect; and combining the regional structure evolution history and the uranium mineralization dating result of predecessors to acquire the main uranium mineralization time t of the region0
In the step 2, implemented oxidation drilling is selected for the uranium ore prospecting position in the step 1 according to the drilling exploration line direction (from the basin edge to the basin), and numbering is carried out in sequence: drilling 1, drilling 2, … … and drilling n, wherein n is more than or equal to 2; and respectively calculating and obtaining the plane spacing L between each other drilling hole and the drilling hole 1 according to the drilling coordinatesn-1
In the step 3, the drill holes selected in the step 2 are respectively collected with red (yellow) color post-oxidation sandstone samples of the same target layer of the prospecting, the number of the samples is respectively 1, the weight of the samples is more than or equal to 3kg, and the samples are sequentially numbered as sample 1, sample 2, … … and sample n, wherein n is more than or equal to 2.
In the step 4, the oxidized sandstone sample collected in the step 3 is subjected to mineral separation to separate ferric iron minerals (hematite, goethite or hydrogoethite), the total weight of the minerals is more than or equal to 10mg, and the ferric iron minerals are sent to a laboratory to be subjected to (U-Th)/He dating to obtain the epigenetic ages of post-oxidation of each sample, wherein t is the epigenetic age of the sample, and t is the epigenetic age of the sample1、t2、……、tnWherein n is more than or equal to 2.
The drilling plane spacing L in the step 5) to be combined with the step 2)n-1And said postoxidation time t in step 4nCalculating and obtaining an average rate V of the propulsion of the after-generated oxidation to the interior of the basin, wherein V is L1/(t1-t2)+L2/(t1-t3)+……+Ln-1/(t1-tn)](n-1), n is more than or equal to 2; generally, the earlier the sandstone closer to the basin rim is oxidized, the greater the age, and thus, t1>t2>……>tn
In the step 6, the knot is formedSynthesizing the regional main uranium mineralization time t in the step 10The distance L between the drilling planes in the step 2n-1And said postoxidation time t in step 4nAnd the average oxidation advance rate V calculated in the step 5 is calculated to obtain the plane spacing L of the ore body possibly from each drilling holen’,Ln’=V(tn-t0) In general, uranium mineralization is relatively delayed by the time of the after-oxidation, tn>t0(ii) a Then calculating the relative distance delta L between the ore body and the drill hole nn,ΔLn=Ln’-(L-Ln-1) Wherein L is the plane distance between the head and the tail of the drill hole; when Δ Ln<When the value is 0, the data is meaningless, the data is removed, otherwise, the data is reserved, and the reserved numerical values are sorted from small to large; finally, the possible positions of the oxidation zone front line and the uranium ore body development thereof are obtained, namely the minimum and maximum plane distances from the drill hole n are respectively Min (delta L)n) And Max (Δ L)n) Azimuth is in the direction of borehole 1 to borehole n.
The invention has the beneficial effects that:
according to the method for defining the sandstone-type uranium ore body production part between basin beds, in the early stage of further uranium ore exploration drilling hole arrangement, the possible uranium ore body development position can be estimated by using the implemented sample of the epigenetic oxidized sandstone core of the ore finding drilling hole and acquiring the average speed of the advancing of the front line before epigenetic oxidation, the ore finding target area can be predicted more accurately and quantitatively, the later stage drilling hole arrangement range is reduced to the maximum extent, the blindness of drilling hole arrangement can be reduced to a greater extent, the success rate of drilling and revealing ore bodies is improved, and the economic cost of ore deposit exploration is greatly saved.
Drawings
FIG. 1 is a flow chart of a method for defining an output part of an oxide zone sandstone-type uranium ore body between basin layers, which is provided by the invention;
FIG. 2 is a cross-sectional view of a typical drilled uranium exploration line for an interbed oxidation zone type uranium mine;
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and examples.
As shown in fig. 1, the method for determining the front edge of the oxidation zone between sedimentary basin layers and the output position of uranium ore bodies provided by the invention specifically comprises the following steps:
step 1, selecting a uranium ore exploration area and a target layer, and determining the main ore forming time of the area as t0(ii) a The method comprises the following specific steps:
step 1.1, selecting an ore-searching part as a research object in a certain sedimentation basin, and requiring the part to be drilled with a plurality of holes in the direction of an exploration line from the basin edge to the basin;
step 1.2, determining a main ore finding target layer, and requiring the sandstone of the target layer in the drilled hole to generate an oxidation phenomenon after the development;
step 1.3, according to the basin region structure evolution history and the uranium mineralization dating result of predecessors, determining the main uranium mineralization time of the region as t0
For example, the depressed west part of Kluyvern in the Heilall basin is selected as a research object, the following Chalk system major grinding crutch river group is used as a main ore-finding target layer, a plurality of drilling exploration lines are arranged and implemented by predecessors, and the red and yellow after-growth oxidation of sandstone at the layer is obviously developed is found in a drill hole; in addition, the U-Pb dating result of the ore sample of the uranium earth surface deposit in the ancient epoch of the region as a tectonic lift-denudation period is 67Ma, so that the main mineralization time t is determined0Is 67 Ma.
Step 2, drilling and selecting the ore exploration part in the step 1 according to the direction of a drilling exploration line in the basin from the basin edge, and numbering the selected drill holes in sequence: drilling 1, drilling 2, … … and drilling n, wherein n is more than or equal to 2; calculating the plane distance L from the drill hole 1 to other drill holes according to the geodetic coordinates of the drill holes by taking the drill hole 1 as a starting pointn-1As shown in fig. 2.
For example, the 3-hole drill hole of the exploration line 0 of the west of the kruse valley is taken as an example, the 3-hole drill hole is respectively numbered as a drill hole 1, a drill hole 2 and a drill hole 3, the orientation from the drill hole 1 to the drill hole 3 is SE130 degrees, and the plane distance from the drill hole 2 to the drill hole 1 is calculated to be L1At 10km, the borehole 3 is at a planar distance L from the borehole 12=12km。
And 3, respectively collecting the drilling holes selected in the step 2 by using a secondary oxidized sandstone sample, and numbering the sample 1, the sample 2, the sample … … and the sample n.
For example, red and yellow anabolic sandstone stones from the large grinding corner river group in the borehole 1, the borehole 2 and the borehole 3 are respectively sampled, the weight of each sandstone is greater than or equal to 3kg, and the samples 1, 2 and 3 are respectively numbered.
Step 4, respectively carrying out mineral separation on the sandstone samples collected in the step 3, at least separating trivalent iron minerals (hematite, goethite or hydrogoethite) with the weight of more than or equal to 10mg, and sending the trivalent iron minerals (hematite, goethite or hydrogoethite) to a laboratory for (U-Th)/He dating year to obtain the time t formed by the subsequent oxidation of each samplenT is greater since the earlier the formation of the subsequent oxidation occurs closer to the basin rim, the greater the age1>t2>……>tn
For example, the anagen oxidation times of the sandstone in the large grinding corner river group in the drill holes 1, 2 and 3 are respectively 80Ma, 72Ma and 69Ma measured in years.
Step 5, the plane spacing L for the step 2n-1And the postoxidation time t in the above step 4nAnd calculating to obtain an average speed V of the anagen oxidation advancing to the interior of the basin, wherein generally, the further towards the deep part in the basin, the speed of the anagen oxidation zone can be gradually slowed down under the influence of the densification of the sandstone for the compression action and the reduction of the gravity driving action, and the method specifically comprises the following steps:
step 5.1, obtaining the after-oxidation rate of each drill hole n relative to the drill hole 1: vn-1=Ln-1/(t1-tn);
Step 5.2, calculating the average rate of the forward propulsion of the after-oxidation in the region: v ═ L1/(t1-t2)+L2/(t1-t3)+……+Ln-1/(t1-tn)]/(n-1)。
For example, it is calculated that the rate of the after-oxidation of the borehole 2 relative to the borehole 1 is V110/(80-72) 1.25km/Ma, the rate of ex-situ oxidation of the borehole 3 relative to the borehole 1 is V212/(80-69) ═ 1.09 km/Ma; intoAnd the average rate of the advancement of the after-oxidation to the basin was calculated to be V ═ 1.25+1.09)/2 ═ 1.17 km/Ma.
Step 6, combining the time t of ore formation of the regional main uranium in the step 10The drilling plane spacing L in the step 2n-1The postoxidation time t in the above step 4nAnd calculating the average oxidation advance rate V calculated in the step 5 to obtain the plane spacing L of the ore body possibly from each drill holen’,Ln’=V(tn-t0) T is therefore due to the relative lag of uranium mineralization to the time of the subsequent oxidation0<tn(ii) a Then calculating the oxidation zone front line relatively far from the drill hole n and the possible position delta L of uranium ore body developmentn,ΔLn=Ln’-(L-Ln-1) Wherein L is the planar distance between the borehole n furthest from the rim and the borehole 1 closest to the rim; retention of Δ Ln>0, and sorting from small to large; i.e. the minimum and maximum plan distances from the borehole n are Min (al) respectivelyn) And Max (Δ L)n) The orientation is in the direction of bore 1 to bore n, as shown in figure 2.
For example, it is calculated that the ore body of the kruse west 0 exploration line may be separated from the borehole 1, 2 and 3 by the distance L1’=1.17*(80-67)=15.21km、L2’=1.17*(72-67)=5.85km、L3' -1.17 ═ (69-67) ═ 2.34 km; further, it is found that the relative distances of the ore body from the drill hole 3 are respectively Delta L1=15.21-(12-0)=3.21km,ΔL2=5.85-(12-10)=3.85km,ΔL32.34- (12-12) ═ 2.34 km; finally, it is statistically possible that the uranium ore body may be produced in a range of 2.34km to 3.85km from the bore hole 3 in the direction of the basin, as shown in fig. 2, at an azimuth SE130 °.
The method can be widely used for ore searching of sandstone-type uranium ores at various parts in domestic basins such as Yili, Ordos, Bi-Lian and Songliao, can approach possible developing parts of uranium ores to the maximum extent, reduces an ore searching target area, provides quantitative reference data for arrangement of ore searching drill holes, directly serves actual ore searching production requirements, greatly saves exploration economic cost, and has important practical application value; the method also has important reference significance for the arrangement of prospecting and drilling holes of other similar types (sedimentary iron, copper and lead-zinc ores) in the basin. It will be apparent to those skilled in the art that certain changes may be made without departing from the spirit and scope of the invention. The present invention may be practiced using any conventional and well-established technique, which is not described in detail herein.

Claims (7)

1. A method for determining the output part of an oxide zone sandstone-type uranium ore body between basin floors is characterized by comprising the following steps: the method comprises the following steps:
step (1) uranium ore exploration area and target layer selection are carried out, and main uranium ore forming time t on the area is determined0
Step (2) selecting drill holes in the uranium ore exploration working area according to exploration lines in the step (1);
step (3) collecting a target layer post-oxidation sandstone sample in the drilling hole in the step (2);
step (4) carrying out trivalent iron mineral separation and (U-Th)/He dating on the oxidized sandstone sample collected in the step (3) to obtain the generated oxidation time tn
Step (5) is based on the drilling distance in the step (2) and the after oxidation time t in the step (4)nCalculating the average rate V of the generated oxidation;
step (6) is the main ore formation time t according to the step (1)0The drilling interval in the step (2) and the after oxidation time t in the step (4)nAnd (5) calculating the minimum plane distance Min (delta L) of the uranium ore body from the drill hole according to the average rate V of the metagenetic oxidation in the step (5)n) And maximum planar distance Max (Δ L)n) And further to circle the scope of the development of the ore body.
2. The method of delineating a zonal oxide sandstone-type uranium ore body production site of claim 1, wherein: in the step (1), a plurality of holes are drilled in the working area according to the direction of the exploration line, and a main attack ore exploration target layer is exposed; ore bearing construction over defined areaThe mineralization age is t0
3. The method of delineating a zonal oxide sandstone-type uranium ore body production site of claim 2, wherein: and (3) drilling in the step (2) is located in the uranium ore exploration area in the step (1), the drilling holes 1, the drilling holes 2, … … and the drilling hole n are numbered from the edge of the basin to the basin in sequence, and the plane spacing L between other drilling holes and the drilling hole 1 is calculatedn-1(ii) a Drilling requirements: and the target layer in the drilled hole has an after-oxidation phenomenon after being spread along a certain direction.
4. The method of delineating a zonal oxide sandstone-type uranium ore body production site of claim 3, wherein: in the step (3), collecting a target layer generated oxidized sandstone sample in the step (1) in the drilling hole in the step (2); sample requirements: the weight is more than or equal to 3kg, and one sample is collected from each drill hole and is numbered in sequence: sample 1, sample 2, … …, sample n.
5. The method of delineating a zonal oxide sandstone-type uranium ore body production site of claim 4, wherein: in the step (4), the oxidized sandstone sample collected in the step (3) is subjected to mineral separation, a ferric iron mineral is separated and sent to a laboratory for (U-Th)/He dating, and the time t of the subsequent oxidation of each sample is obtainedn
6. The method of delineating a zonal oxide sandstone-type uranium ore body production site of claim 5, wherein: the step (5) is combined with the drilling distance L in the step (2)n-1And the after-oxidation time t in the step (4)nThe average rate of the after-oxidation V, V ═ L was obtained by calculation1/(t1-t2)+L2/(t1-t3)+……+Ln-1/(t1-tn)]/(n-1),n≥2。
7. According to the claims6, the method for determining the output part of the sandstone-type uranium ore body between the enclosed basin floors is characterized by comprising the following steps: in the step (6), according to the regional main uranium mineralization time t in the step (1)0The after-oxidation time t in the step (4)nAnd (5) calculating the average rate V of the after-oxidation to obtain the plane distance L of the ore body from each drill holen’,Ln’=V(tn-t0) (ii) a Combining the drilling plane spacing L in the step (2)n-1The maximum and minimum plan distances DeltaL of the ore body from the borehole n can be obtained from the orientationn,ΔLn=Ln’-(L-Ln-1) And L is the plane distance between the head drill hole and the tail drill hole, so that the uranium ore body development range is quantitatively enclosed.
CN201911401334.9A 2019-12-30 2019-12-30 Method for confining sandstone-type uranium ore body output part of oxidation zone between basin floors Withdrawn CN111045107A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201911401334.9A CN111045107A (en) 2019-12-30 2019-12-30 Method for confining sandstone-type uranium ore body output part of oxidation zone between basin floors

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201911401334.9A CN111045107A (en) 2019-12-30 2019-12-30 Method for confining sandstone-type uranium ore body output part of oxidation zone between basin floors

Publications (1)

Publication Number Publication Date
CN111045107A true CN111045107A (en) 2020-04-21

Family

ID=70242145

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911401334.9A Withdrawn CN111045107A (en) 2019-12-30 2019-12-30 Method for confining sandstone-type uranium ore body output part of oxidation zone between basin floors

Country Status (1)

Country Link
CN (1) CN111045107A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113534284A (en) * 2021-06-16 2021-10-22 核工业北京地质研究院 Method for estimating development characteristics of sand oxidation zone by using water quality parameters
CN114063191A (en) * 2021-08-30 2022-02-18 核工业北京地质研究院 Ore searching method for basin compact sandstone uranium deposit

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113534284A (en) * 2021-06-16 2021-10-22 核工业北京地质研究院 Method for estimating development characteristics of sand oxidation zone by using water quality parameters
CN113534284B (en) * 2021-06-16 2024-03-19 核工业北京地质研究院 Method for estimating development characteristics of sand oxidation zone by using water quality parameters
CN114063191A (en) * 2021-08-30 2022-02-18 核工业北京地质研究院 Ore searching method for basin compact sandstone uranium deposit
CN114063191B (en) * 2021-08-30 2023-10-20 核工业北京地质研究院 Basin compact sandstone uranium deposit prospecting method

Similar Documents

Publication Publication Date Title
CN111045106B (en) Method for delineating sandstone-type uranium ore body output part of interbedded oxidation zone of basin
Groves et al. The conjunction of factors that lead to formation of giant gold provinces and deposits in non-arc settings
CN104612675B (en) A kind of carbonate formation Lithology while drilling method for quickly identifying
CN106257310B (en) Sedimentary basin oil gas strong reducing action area Prospecting Sandstone-type Uranium Deposits method for establishing model
Gemmell et al. Stringer system and alteration zones underlying the Hellyer volcanogenic massive sulfide deposit, Tasmania, Australia
CN106501871A (en) A kind of paleo-channel type uranium ore detection method
CN105510989A (en) Research method suitable for characteristics of interlayer oxidation zone of sandstone-type uranium deposit
CN111045107A (en) Method for confining sandstone-type uranium ore body output part of oxidation zone between basin floors
Ohle et al. Geologic problems in the southeast Missouri lead district
Sweeney et al. Stable isotope and geochemical studies in the role of early diagenesis in ore formation, Konkola Basin, Zambian copper belt
CN116520452B (en) Missippi lead-zinc deposit prospecting prediction method
CN107895216B (en) Method for rapidly delineating position of oxidation front line between ancient layers of oil gas covering area
CN110727034A (en) Sandstone-type uranium ore mapping method
CN106526698B (en) A kind of method for finding Volcanic-type sulfide deposit Beneficial Ore-forming region
Cooper et al. The Crummock Water aureole: a zone of metasomatism and source of ore metals in the English Lake District
CN113534284A (en) Method for estimating development characteristics of sand oxidation zone by using water quality parameters
CN104358564A (en) Method for predicting mudstone crack by structure causes
Oliver et al. Fluid flow and metasomatism in the genesis of the amphibolites-facies, pelite-hosted Kanmantoo copper deposit, South Australia
CN116165708A (en) Accurate positioning method for uranium-bearing ore-forming sand body with beneficial coverage area
CN109580498B (en) Geological identification method for ore-bearing interlayer oxidation zone of sandstone-type uranium ore
CN111323846A (en) Multi-element ore control factor combined quantitative ore formation prediction method
Kozlov Metamorphism, PTt Conditions of Formation, and Prospects for the Practical Use of Al2SiO5 Polymorphs, Chloritoid, and Staurolite (Yenisei Ridge)
CN111063028A (en) Geological recognition and positioning method suitable for uranium ore deep favorable ore-forming space
CN111045105B (en) Method for predicting geochemical connate zonation model for deep exploration of volcanic rock type uranium ores
CN115204563A (en) Evaluation method suitable for ore exploration target layer of sandstone-type uranium ore

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20200421