CN111042821A - 一种定量判断特厚煤层沿空巷道开掘时间的双指标方法 - Google Patents
一种定量判断特厚煤层沿空巷道开掘时间的双指标方法 Download PDFInfo
- Publication number
- CN111042821A CN111042821A CN201911097866.8A CN201911097866A CN111042821A CN 111042821 A CN111042821 A CN 111042821A CN 201911097866 A CN201911097866 A CN 201911097866A CN 111042821 A CN111042821 A CN 111042821A
- Authority
- CN
- China
- Prior art keywords
- coal
- basic
- time
- gob
- roadway
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000003245 coal Substances 0.000 title claims abstract description 127
- 238000009412 basement excavation Methods 0.000 title claims abstract description 39
- 238000000034 method Methods 0.000 title claims abstract description 26
- 239000011435 rock Substances 0.000 claims abstract description 58
- 238000011161 development Methods 0.000 claims abstract description 19
- 238000011156 evaluation Methods 0.000 claims abstract description 12
- 230000005641 tunneling Effects 0.000 claims abstract description 8
- 238000005065 mining Methods 0.000 claims description 24
- 238000012544 monitoring process Methods 0.000 claims description 15
- 230000008569 process Effects 0.000 claims description 12
- 206010017076 Fracture Diseases 0.000 claims description 11
- 208000010392 Bone Fractures Diseases 0.000 claims description 10
- 238000005553 drilling Methods 0.000 claims description 8
- 238000004519 manufacturing process Methods 0.000 claims description 5
- 239000011159 matrix material Substances 0.000 claims description 4
- 238000004364 calculation method Methods 0.000 claims description 3
- 238000011835 investigation Methods 0.000 claims description 3
- 230000008961 swelling Effects 0.000 claims description 3
- 238000013459 approach Methods 0.000 claims description 2
- 230000015572 biosynthetic process Effects 0.000 claims description 2
- 238000009533 lab test Methods 0.000 claims description 2
- 238000011084 recovery Methods 0.000 claims description 2
- 230000006641 stabilisation Effects 0.000 abstract description 2
- 238000011105 stabilization Methods 0.000 abstract description 2
- 238000005516 engineering process Methods 0.000 description 6
- 238000011160 research Methods 0.000 description 5
- 230000002522 swelling effect Effects 0.000 description 4
- 238000006073 displacement reaction Methods 0.000 description 3
- 238000002474 experimental method Methods 0.000 description 3
- 238000012423 maintenance Methods 0.000 description 3
- 239000002356 single layer Substances 0.000 description 3
- 239000010410 layer Substances 0.000 description 2
- 230000008859 change Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000001687 destabilization Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000003203 everyday effect Effects 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 238000013332 literature search Methods 0.000 description 1
- 238000013508 migration Methods 0.000 description 1
- 230000005012 migration Effects 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 238000004062 sedimentation Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/003—Arrangement of measuring or indicating devices for use during driving of tunnels, e.g. for guiding machines
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F17/00—Methods or devices for use in mines or tunnels, not covered elsewhere
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Environmental & Geological Engineering (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
Description
条件 | a | b |
P>1145,σ>10 | 0.8 | 0.2 |
1075<P≤1145,5<σ≤10 | 0.7 | 0.3 |
975<P≤1145,3<σ≤5 | 0.5 | 0.5 |
895<P≤975,1<σ≤3 | 0.4 | 0.6 |
P≤875,σ≤1 | 0.3 | 0.7 |
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911097866.8A CN111042821B (zh) | 2019-11-12 | 2019-11-12 | 一种定量判断特厚煤层沿空巷道开掘时间的双指标方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911097866.8A CN111042821B (zh) | 2019-11-12 | 2019-11-12 | 一种定量判断特厚煤层沿空巷道开掘时间的双指标方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN111042821A true CN111042821A (zh) | 2020-04-21 |
CN111042821B CN111042821B (zh) | 2021-03-30 |
Family
ID=70232401
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911097866.8A Active CN111042821B (zh) | 2019-11-12 | 2019-11-12 | 一种定量判断特厚煤层沿空巷道开掘时间的双指标方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111042821B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113153418A (zh) * | 2021-04-08 | 2021-07-23 | 中国矿业大学 | 一种基于综合指数法的三维空间充填效果评价方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011103620A1 (en) * | 2010-02-26 | 2011-09-01 | Subsidence Control International Pty Ltd | A method of reducing subsidence or windblast impacts from longwall mining |
CN103470261A (zh) * | 2013-09-30 | 2013-12-25 | 山东科技大学 | 综采放顶煤采空区原巷道顶板下沿空掘巷的方法 |
CN106884655A (zh) * | 2017-01-10 | 2017-06-23 | 山东建筑大学 | 一种沿空掘巷煤柱双向加固方法 |
-
2019
- 2019-11-12 CN CN201911097866.8A patent/CN111042821B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011103620A1 (en) * | 2010-02-26 | 2011-09-01 | Subsidence Control International Pty Ltd | A method of reducing subsidence or windblast impacts from longwall mining |
CN103470261A (zh) * | 2013-09-30 | 2013-12-25 | 山东科技大学 | 综采放顶煤采空区原巷道顶板下沿空掘巷的方法 |
CN106884655A (zh) * | 2017-01-10 | 2017-06-23 | 山东建筑大学 | 一种沿空掘巷煤柱双向加固方法 |
Non-Patent Citations (1)
Title |
---|
任侃: "深井综放工作面沿空掘巷时空关系分析", 《山西焦煤科技》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113153418A (zh) * | 2021-04-08 | 2021-07-23 | 中国矿业大学 | 一种基于综合指数法的三维空间充填效果评价方法 |
Also Published As
Publication number | Publication date |
---|---|
CN111042821B (zh) | 2021-03-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109611143B (zh) | 顶板水压致裂多参量综合监测系统及致裂效果判别方法 | |
CN209761499U (zh) | 顶板水压致裂多参量综合监测系统 | |
CN113404535B (zh) | 一种煤矿井上下水力压裂防治冲击地压的方法 | |
CN112446143B (zh) | 一种厚松散层薄基岩下条带充填开采参数设计方法 | |
CN113622913B (zh) | 一种全垮落法开采下井上下一体化隧道围岩变形控制方法 | |
CN109681180B (zh) | 煤矿地面压裂坚硬顶板控制采场强矿压效果预评价方法 | |
CN112483068B (zh) | 一种采煤工作面超前顶板预裂爆破钻孔的倾角确定方法 | |
CN112901169B (zh) | 一种不对称孤岛工作面的冲击失稳判别与防冲开采方法 | |
CN113738363A (zh) | 一种针对连续多层坚硬顶板煤层的高低位断顶卸压方法 | |
Wang et al. | Field application of non-blasting mechanized mining using high-frequency impact hammer in deep hard rock mine | |
CN111042821B (zh) | 一种定量判断特厚煤层沿空巷道开掘时间的双指标方法 | |
CN117823044A (zh) | 一种千米水平钻压裂提高本工作面瓦斯抽采效果与邻近巷道围岩稳定性的方法 | |
CN110863828B (zh) | 一种特厚煤层沿空掘巷紧张接替的定量解决方法 | |
CN111008758B (zh) | 基于双指标权重法的特厚煤层沿空煤巷开掘时间设计方法 | |
CN113047838A (zh) | 分段或阶段空场法开采滞留存窿矿的精细化安全回采方法 | |
CN112861068A (zh) | 一种采动覆岩破坏高度的确定方法 | |
CN111946343A (zh) | 一种地面垂直孔复合喷射压裂解决坚硬顶板难垮落的方法 | |
CN113153418B (zh) | 一种基于综合指数法的三维空间充填效果评价方法 | |
CN110630316A (zh) | 一种废弃工作面导气裂隙带发育特征判别方法 | |
CN114329922B (zh) | 基于结构性覆岩的导水裂隙带高度确定方法 | |
Zhang et al. | A case study of cutting performance by a transverse cutting head based on three-dimensional particle flow model | |
Wang et al. | Deformations and failures of goaf-side entries driving adjacent to longwall top coal caving panel | |
Zhang et al. | Deformation mechanism of gob‐side entry at top coal caving mining face: A numerical study | |
Zhang et al. | Study on the optimal design of deep roadway support based on three-dimensional in-situ stress measurement | |
Li et al. | Rock strata failure and subsidence characteristics under the mining of short distance thick coal seams: a case in west China |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhang Guangchao Inventor after: Tao Guangzhe Inventor after: Wen Zhijie Inventor after: Jiang Bangyou Inventor after: Li You Inventor after: Zhao Deshuai Inventor after: Sun Jiang Inventor after: Zhang Fuqiang Inventor before: Zhang Guangchao Inventor before: Wen Zhijie Inventor before: Jiang Bangyou Inventor before: Tao Guangzhe Inventor before: Li You Inventor before: Zhao Deshuai Inventor before: Sun Jiang Inventor before: Zhang Fuqiang |